HomeMy WebLinkAboutCAG-20-065 -Duvall - Weekly Statement of Working Days T 0�
CITY OF RENTON
2023 HOLIDAY SCHEDULE
The following days will be observed as holidays in 2023 for eligible City employees:
New Year's Day (observed) Monday, January 2
Martin Luther King, Jr. Day Monday, January 16
Memorial Day Monday, May 29
Juneteenth Monday, June 19
Independence Day Tuesday, July 4
Labor Day Monday, September 4
Veterans Day (observed) Friday, November 10
Thanksgiving Day Thursday, November 23
Day after Thanksgiving Friday, November 24
Christmas Day Monday, December 25
Day after Christmas Day Tuesday, December 26
2 Personal (floating) Holidays* Employee's Choice
*Available after six months of service and as specified in labor contract
111
CITY OF RENTON
2022 HOLIDAY SCHEDULE
The following days will be observed as holidays in 2022 for eligible City employees:
New Year's Day (observed) Friday, December 31, 2021
Martin Luther King, Jr. Day Monday, January 17
Memorial Day Monday, May 30
Juneteenth (observed) Monday, June 20
Independence Day Monday, July 4
Labor Day Monday, September 5
Veterans Day Friday, November 11
Thanksgiving Day Thursday, November 24
Day after Thanksgiving Friday, November 25
Christmas Day (observed) Monday, December 26
Day after Christmas Day Tuesday, December 27
2 Personal (floating) Holidays* Employee's Choice
*Available after six months of service and as specified in labor contract
WEEKLY WORKING DAYS REPORT
1/1210 CITY OF RENTON
DUVALL AVENUE NE
Lay 8z Osborne, Ixac. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 06/24/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 20.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 280.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 277.0 I/' WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 1.0 4/ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 278.0 'r. WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 2.0 ,/ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: CO No 33 adds 3 working days
Order to Resume Work 6-21-23 and Temporary Suspension effective 6-22-23. Order to Resume Work
on 6/23/23.Substantial completion was requested by Contractor for 6/23/23. Worked two half days this week.
COPIES TO: GRAY&OSBORNE,INC.
CITY OF RENTON RE TEN ER(Signatur
REED TRUCKING&EXCAVATING, INC. DATE: 6/ /2023
REPORT NO.: 68
Jv�
Page 1 of 1
WEEKLY WORKING DAYS REPORT
get:0 CITY OF RENTON
DUVALL AVENUE NE
Iiy 8z Osborne, Inc. G&O#20593
GONSUL71NG ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 05/20/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 17.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 277.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 275.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 1.5 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 277.0 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 0.0 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
Temporary Suspension effective 5/16/23 mid-da>
COPIES TO: GRAY&OSBORNE, INC.
CITY OF RENTON ENT 1NEER(Si re)
REED TRUCKING&EXCAVATING,INC. DAT . /23/2023
REPORT NO.: 67
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4elb CITY OF RENTON
DUVALL AVENUE NE
Grr. y&Oaborae, G&O#20593
CONSULTNG ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 05/13/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 17.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 277.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 272.5 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 3.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 275.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 1.5 . WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
Order to Resume Work effective Monday 5/8/23,Temporary Suspension effective 5/10/23
Order to Resume Work effective Friday 5/12/23
COPIES TO: GRAY&OSBORNE,INC. !�� ",
CITY OF RENTON NT GINEER( gnature)
REED TRUCKING&EXCAVATING,INC. DAT : 12/2023
REPORT •.: 66
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4k*0 CITY OF RENTON
DUVALL AVENUE NE
Gray t3z Osborn i, G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 05/06/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 17.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 277.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 268.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 272.5 `/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 4.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
Temp Suspension effective Friday 5/5/23
COPIES TO: GRAY&OSBORNE,INC.
CITY OF RENTON RES ENT GINEER(Sign e)
REED TRUCKING&EXCAVATING,INC. DA : 5 /2023
REPORT NO.:
Page 1 of 1
WEEKLY WORKING DAYS REPORT
46ab CITY OF RENTON
DUVALL AVENUE NE
Gray&:Oaborric,, Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 04/29/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 17.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 277.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 267.5 tr' WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 1.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 268.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 8.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
Resume to Work order Friday 4/28/23
COPIES TO: GRAY&OSBORNE,INC. G"
CITY OF RENTON ENT INEER(Signature)
REED TRUCKING&EXCAVATING,INC. DA :
REPORT NO.: 64
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4510 CITY OF RENTON
DUVALL AVENUE NE
Grp 8z Osborne, In G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 04/22/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 17.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 277.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 264.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 3.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 267.5 ✓ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 9.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
Work M-W,Temp Suspension resumes 4/20/23
COPIES TO: GRAY&OSBORNE,INC.
CITY OF RENTON ID ENGINEER(Sign e)
REED TRUCKING&EXCAVATING,INC. ATE 4 1—Z.
REP RT NO.:
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4eirb CITY OF RENTON
DUVALL AVENUE NE
GrveLy&Osborne, Imo. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 04/15/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 17.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 277.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 260.5 1/' WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 264.5 t/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 12.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
Resume work effective 4/11/23
COPIES TO: GRAY&OSBORNE,INC.
CITY OF RENTON DEN EN EER(Signature)
REED TRUCKING&EXCAVATING,INC. DA E: 1 Z
REPORT .: 2
Page 1 of 1
WEEKLY WORKING DAYS REPORT
1 CITY OF RENTON
DUVALL AVENUE NE
Grna &C)sborrte+In- G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 04/08/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 17.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 277.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 260.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 0.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 260.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 16.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
Temp shutdown effective 3/29/23
COPIES TO: GRAY&OSBORNE,INC.
CITY OF RENTON DEN GINEER ture)
REED TRUCKING&EXCAVATING, INC. DA E:
REPORT NO.: 61
Page 1 of 1
WEEKLY WORKING DAYS REPORT
CITY OF RENTON
DUVALL AVENUE NE
Grimly 8z Oaborrie, Iu G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 04/01/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 17.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 277.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 259.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 1.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 260.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 16.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
Resume Work 3/28/23 and Temp shutdown resumes on 3/29/23
COPIES TO: GRAY&OSBORNE,INC.
CITY OF RENTON RE DENT
F 1.11rm!IIIIEs.
REED TRUCKING&EXCAVATING,INC. DA E: 4/60/Z 3
REPORT NO.: 60
Page 1 of 1
WEEKLY WORKING DAYS REPORT
41Eib CITY OF RENTON
DUVALL AVENUE NE
Gnay 8r Oaborrie, I» G&O#20593
CONSUL11NG ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 02/18/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 257.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 2.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 259.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 2.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: Tues 2/14/23 unworkable day due to snow
Temporary Suspension resumes 2/16/23
COPIES TO: GRAY&OSBORNE,INC.
CITY OF RENTON ' I► T : t I EER(Signature
REED TRUCKING&EXCAVATING,INC. DAT": /17/202
REPORT NO.: 59
Page 1 of 1
�v LEKLY WORKING DAYS REYui2T
451:0 CITY OF RENTON
DUVALL AVENUE NE
Gray&Osborne' Laic. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 02/11/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 253.5 ✓ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 .1/ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 257.5 i� WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 4.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: No work on 2/10/23
project suspended for concrete wall curing
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA rCITY OF RENTON RESIDENT INSPEC OR ' atur
REED TRUCKING&EXCAVATING,INC. DATE: 2/11/2023
REPORT NO.: 58
Page 1 of 1
WEEKLY WORKING DAYS REPORT
Ca) CITY OF RENTON
DUVALL AVENUE NE
Gray&OsLorintie,I G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 02/04/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 248.5 L/ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 253.5 t/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 8.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA dr/' /Ai
CITY OF RENTON RESIDENT INSPECTOR Is.ture)
REED TRUCKING&EXCAVATING,INC. DATE: 2/4/2023
REPORT NO.: 57
1/
Page 1 of 1
%ir:KLY WORKING DAYS REPORT
4R2710 CITY OF RENTON
DUVALL AVENUE NE
Gn-s &Osbor t",I G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING, INC. WEEK ENDING: 01/28/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 243.5 ✓ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING /
(WEEK COVERED BY THIS REPORT): 5.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START /
(SUM OF ITEMS 6 AND 7): 248.5 V WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 13.5 l/ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGg
CITY OF RENTON RESIDENT INSPECTOR( ature)
REED TRUCKING&EXCAVATING,INC. DATE: 1/28/2023
REPORT NO.: 56
V 15?
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4i2) CITY OF RENTON
DUVALL AVENUE NE
GY-ay 8&Osb wrie, I G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 01/21/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 239.5 '✓ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 243.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 18.5 V WORKING DAYS
(1TlM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: No work Monday 1-16-23 Holiday G.•••
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA I ft yTh
CITY OF RENTON RESIDENT INSPECTOR nature)
REED TRUCKING&EXCAVATING,INC. DATE: 1/21/2023
REPORT NO.: 55
V 179
Page 1 of 1
WEEKLY WORKING DAYS REPORT
16a> CITY OF RENTON
DUVALL AVENUE NE
Gray 8E Osbo rite, Int; G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 01/14/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 234.5 ,7 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 239.5 V WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 22.5 ,/ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA'I -...�
CITY OF RENTON RESIDENT INSPECTOR(S L .ture)
REED TRUCKING&EXCAVATING,INC. DATE: 1/14/2023 `
REPORT NO.: 54
Page 1 of 1
`.._EKLY WORKING DAYS REI k,RT
454A, CITY OF RENTON
DUVALL AVENUE NE
Gri;ay&4061130o1Crie7 G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 01/07/23
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 230.5 ✓ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 ✓ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 234.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 27.5 WORKING DAYS
(ITEM 5 -ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: Holiday no work on Monday 1/2/23
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EAR /f1�
CITY OF RENTON RESIDENT INSPECTO ignature)
REED TRUCKING&EXCAVATING, INC. DATE: 1/7/2023
REPORT NO.: 53
\/15
Page 1 of 1
Wk4LKLY WORKING DAYS REPOn4RAO i
CITY OF RENTON
DUVALL AVENUE NE
Gray 4Sir Osbor e,, Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING& EXCAVATING, INC. WEEK ENDING: 12/31/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 230.5 ,1 , WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 0.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 230.5 —' WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 31.5 WORKING DAYS
(1'I'EM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: Holiday break no work this week
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA E
CITY OF RENTON RESIDENT INSPE (Si attire)
REED TRUCKING&EXCAVATING,INC. DATE: 12/31/2022
REPORT NO.: 2
✓" L.,.. >
Page 1 of 1
WEEKLY WORKING DAYS REPORT
Ca) CITY OF RENTON
DUVALL AVENUE NE
Gray 8.Osborne, Inc. G&O#20593
CONSULflNC ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 12/24/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 229.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 1.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 230.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 31.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
/_
COPIES TO: GRAY&OSBORNE,INC. P AN dV AGE -'
CITY OF RENTON RESIDEN ' ' SPECTs ' (Signature)
REED TRUCKING&EXCAVATING,INC. DATE: 2/24/21
REPORT NO.: 51
Li 1+
Page 1 of 1
WEEKLY WORKING DAYS REPORT
40A0 CITY OF RENTON
DUVALL AVENUE NE
Grimy 8Z Oaboxime, Lac. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 12/17/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 224.5 V. WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 V. WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 229.5 ✓ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 32.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA
CITY OF RENTON RESIDENT INSPE R( i ture)
REED TRUCKING&EXCAVATING,INC. DATE: 12/17/2022
REPORT NO.: 50
V
Page 1 of 1
W KLY WORKING DAYS REPC__I
(at* CITY OF RENTON
DUVALL AVENUE NE
Gray 8z Osborne,Imo. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING.INC. WEEK ENDING: 12/10/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 219.5 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 V. WORKING DAYS
8_ TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 224.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 37.5 I/WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PI&VAN EARWA
CITY OF RENTON RESIDENT INSPECTOR .''gnaturc)
REED TRUCKING&EXCAVATING,INC. DATE: 12/10/2022
REPORT NO.: 49
Page 1 of 1
'MEEKLY WORKING DAYS REIuiT
4000 CITY OF RENTON
DUVALL AVENUE NE
Gray 4 Osborne, Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 12/03/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START (p,S
(FROM PRECEDING REPORT,ITEM 8): M.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 3.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START z9• c�
(SUM OF ITEMS 6 AND 7): V 234.5 WORKING DAYS
42,S
9. BALANCE OF DAYS REMAINING IN CONTRACT: V" 41.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: No work Tuesday and Thursday do to Snow
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARW --�
CITY OF RENTON RESIDENT INSPECTOR gnature)
REED TRUCKING&EXCAVATING, INC. DATE: 12/3/2022
REPORT NO.: 48
Page 1 of 1
\%icinKLY WORKING DAYS REPOKT
4R5t0 CITY OF RENTON
DUVALL AVENUE NE
Ggp&Osborn.e,Irte. G&O#20593
CGNSUL11NG ENGINEERS
REED TRUCKING& EXCAVATING,INC. WEEK ENDING: 11/26/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 214.5 / WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 2.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 216.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 45.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: No work Tuesday do too heavy rains
No work Thursday and Friday,Thanksgiving Holiday
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARW
CITY OF RENTON RESIDENT INSPECTOR y ature)
REED TRUCKING&EXCAVATING,INC. DATE: 11/26/2022
REPORT NO.: 47 revised
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4X1) CITY OF RENTON
DUVALL AVENUE NE
Gray 8r O &m e,LONG G&O#20593
CONSULTNC ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 11/19/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 208.5 v WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 6.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 214.5 V WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 47.5 / WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: Worked on Saturday installing striping
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA /4/
CITY OF RENTON RESIDENT INSPEC OR gnature)
REED TRUCKING&EXCAVATING,INC. DATE: 11/19/2022
REPORT NO.: 46 revised
Page 1 of 1
WEEKLY WORKING DAYS REPORT
(a> CITY OF RENTON
DUVALL AVENUE NE
Gray &Osborn , Lou. G&O#20593
CONSUL:1NG ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 11/12/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 204.5 !f WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 / WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 208.5 t// WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 53.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: No work Friday due tAVeterans Holiday
TO: GRAY&OSBORNE,INC. PHIL VAN • #1;4 /
COPIES
CITY OF RENTON RESIDENT INSPECT ' (Signature)
REED TRUCKING&EXCAVATING,INC. DATE: 11/12/202
REPORT NO.: 45
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4221* CITY OF RENTON
DUVALL AVENUE NE
Gr. y&Osborne,Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 11/05/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 200.5 / WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 V. WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 204.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 57.5 IVORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: No work Friday due to heavy rains
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG
CITY OF RENTON RESIDENT INSPECT a ' ( nature)
REED TRUCKING&EXCAVATING,INC. DATE: 11/5/2022
REPORT NO.: 44
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4!2C0 CITY OF RENTON
DUVALL AVENUE NE
G=-B.y&Osborrke,Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 10/29/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 195.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 200.5 ✓ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 61.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGE 4
CITY OF RENTON RESIDENT INSPECT (Si e)
REED TRUCKING&EXCAVATING,INC. DATE: 10/29/2022
REPORT NO.: 43
Page 1 of 1
WEEKLY WORKING DAYS REPORT
*2) CITY OF RENTON
DUVALL AVENUE NE
Gray 8z Osborne, Irk G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 10/22/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 190.5 ✓ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 195.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 66.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG
�.---
CITY OF RENTON RESIDENT INSPECT R(Sig1 tore)
REED TRUCKING&EXCAVATING,INC. DATE: 10/22/2022
REPORT NO.: 4
Page 1 of 1
WEEKLY WORKING DAYS REPORT
415t* CITY OF RENTON
DUVALL AVENUE NE
Gray 8&Chborne. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 10/15/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 185.5 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 1/' WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START /
(SUM OF ITEMS 6 AND 7): 190.5 ✓ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 71.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGa
CITY OF RENTON RESIDENT INSPECTOR atur
REED TRUCKING&EXCAVATING,INC. DATE: 10/15/2022
REPORT NO.: 4 I
� 77
Page 1 of 1
WEEKLY WORKING DAYS REPORT
(a> CITY OF RENTON
DUVALL AVENUE NE
Gray&Osborne,Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 10/08/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START /
(FROM PRECEDING REPORT,ITEM 8): 180.5 / WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 -I WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 185.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 76.5 }/WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA i, /IfIIIF
CITY OF RENTON RESIDENT INSPEC •R(S.yi. I e)
REED TRUCKING&EXCAVATING,INC. DATE: 10/8/2022
REPORT NO.: 41
Page 1 of 1
WEEKLY WORKING DAYS REPORT
CITY OF RENTON
DUVALL AVENUE NE
Gray 8z Osborne,Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 10/01/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START /
(FROM PRECEDING REPORT,ITEM 8): 175.5 (WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 ✓WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 180.5 I WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 81.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA tW
CITY OF RENTON RESIDENT INSPECTOR ,.Jgnah re
REED TRUCKING&EXCAVATING,INC. DATE: 10/1/2022
REPORT NO.: 39
Page 1 of 1
WEEKLY WORKING DAYS REPORT
46i** CITY OF RENTON
DUVALL AVENUE NE
Gray 8z Osborne, Inc. G&O#20593
CONSLLT1NG ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 09/24/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 170.5 WORKING DAYS 1/
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 175.5 WORKING DAYS L-
9. BALANCE OF DAYS REMAINING IN CONTRACT: 86.5 WORKING DAYS
(1;1'bM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA
CITY OF RENTON RESIDENT INSPEC OR 1y ture)
REED TRUCKING&EXCAVATING,INC. DATE: 9/24/2022
REPORT NO.: 38
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4k2) CITY OF RENTON
DUVALL AVENUE NE
Cirray f8iL Osborne, .' G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 09/17/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 165.5 tl WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 170.5 t/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 91.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
11/
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG
CITY OF RENTON RESIDENT INSPECTOR f gnature)
REED TRUCKING&EXCAVATING,INC. DATE: 9/17/2022 I
REPORT NO.: 37
1/
Pagel of1
WEEKLY WORKING DAYS REPORT
Ca) CITY OF RENTON
DUVALL AVENUE NE
C iray &Osborne,Im. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING.INC. WEEK ENDING: 09/10/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): • 161.5 ✓ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 V.
WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 165.5 ✓ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 96.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: No work Monday 9/5/22 Holiday
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWACC
CITY OF RENTON RESIDENT INSPECTOR ature)
REED TRUCKING&EXCAVATING,INC. DATE: 9/10/2022
REPORT NO.: 6
Page 1 of 1
WEEKLY WORKING DAYS REPORT
1251) CITY OF RENTON
DUVALL AVENUE NE
Gray 0 Osbome, G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 09/03/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 156.5 / WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 I/ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 161.5 '✓ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 100.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGIO
CITY OF RENTON RESIDENT INSPECTO*(' ature)
REED TRUCKING&EXCAVATING,INC. DATE: 9/3/2022
REPORT NO.: 3 5
✓ I
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4a1110 CITY OF RENTON
DUVALL AVENUE NE
Cry&Oeb1e+LNG. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING, INC. WEEK ENDING: 08/27/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 151.5 "' WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 ✓ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 156.5 1.-r WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 105.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGEI/J
CITY OF RENTON RESIDENT INSPECTOR(Si ature)
REED TRUCKING&EXCAVATING,INC. DATE: 8/27/2022
REPORT NO.: 34
Page 1 of 1
WEEKLY WORKING DAYS REPORT
<442) CITY OF RENTON
DUVALL AVENUE NE
GI-may&Osbor e, Inc.a G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 08/20/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 146.5 "V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING V
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 151.5 v WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 110.5 !/ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. /
CITY OF RENTON I, NT ►!.P. • . : ature)
REED TRUCKING&EXCAVATING,INC. DAT 22/2022
REPORT i.: 33
Page 1 of 1
_�KLY WORKING DAYS REPI„l.r
CITY OF RENTON
DUVALL AVENUE NE
Grxmcy&Osborne, Lac. G&O#20593
C ONSUL11NG ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 08/13/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 141.5 J WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 J WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 146.5 J WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 115.5 J WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGaZ 4
t v '-
CITY OF RENTON RESIDENT INSPECTOR( ature)
REED TRUCKING&EXCAVATING,INC. DATE: 8/13/2022
REPORT NO.: 32
MB
Page 1 of 1
WEEKLY WORKING DAYS REPORT
415b CITY OF RENTON
DUVALL AVENUE NE
Cray&Osborne, G&O#20593
CONSULSING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 08/06/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 136.5 ✓WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 141.5 ✓ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 120.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGE
CITY OF RENTON RESIDENT INSPECTO (Si 9 tore)
REED TRUCKING&EXCAVATING,INC. DATE: 8/6/2022
REPORT NO.: 31
Page 1 of 1
WEEKLY WORKING DAYS REPORT
415i2) CITY OF RENTON
DUVALL AVENUE NE
C_Irra.y&Osborne,Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 07/30/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 131.5 u' WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 V. WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 136.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 125.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG /7i_
CITY OF RENTON RESIDENT INSPECT' (S. ature)
REED TRUCKING&EXCAVATING,INC. DATE: 7/30/2022
REPORT NO.: 30
1,1Z-5
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4R200 CITY OF RENTON
DUVALL AVENUE NE
Gri.a9Ly 8Z Osborne.,Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 07/23/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 126.5 ,/ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF IYEN'S 6 AND 7): 131.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 130.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG$,J —
CITY OF RENTON RESIDENT INSPECTOR ature)
REED TRUCKING&EXCAVATING,INC. DATE: 7/23/2022
REPORT NO.: 29
✓75
Page 1 of 1
WEEKLY WORKING DAYS REPORT
(arb CITY OF RENTON
DUVALL AVENUE NE
Gray 8&Osborne,Ii G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 07/16/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 121.5 ✓ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 1/ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 126.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 135.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA 0
!'
CITY OF RENTON RESIDENT INSPECTOR( ature)
REED TRUCKING&EXCAVATING,INC. DATE: 7/16/2022
REPORT NO.: 28
r7 2
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4E2;0 CITY OF RENTON
DUVALL AVENUE NE
GI-My&10.916c e,I G&O#20593
CONSUL11NG ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 07/09/22
CONTRACTOR
I. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3.2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 1 16.5 1/ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 ./ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 121.5 / WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 140.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: 7-4-22 no work Holiday
7-9-22 work on Saturday charged working day
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGE
CITY OF RENTON RESIDENT INSPECTOR(Sign )
REED TRUCKING&EXCAVATING,INC. DATE: 7/9/2022
REPORT NO.: 27
Page 1 of 1
WEEKLY WO G DAYS REPORT
Ca) CITY OF RENTON
DUVALL AVENUE NE
IGx'ap&Osborne, Lac. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 07/02/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START /
(FROM PRECEDING REPORT,ITEM 8): 111.5 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING /
(WEEK COVERED BY THIS REPORT): 5.0 '. WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 116.5 L/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 145.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGII
a-7-,
CITY OF RENTON RESIDENT INSPECTOR i a/�ture)
REED TRUCKING&EXCAVATING,INC. DATE: 7/2/2022
REPORT NO.: 26
I
Pa 1ofi
Wiii K .Y WO NG DAYS REPORT
(a> CITY OF RENTON
DUVALL AVENUE NE
Gray&Os6 ari ie, Izx:. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 06/25/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 •ND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM S IART
(FROM PRECEDING REPORT,ITEM 8): 106.5 1/ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 ✓ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 1 1 1.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CON " •CT: 150.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS K:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG j // '
CITY OF RENTON RESIDENT INSPECTO (Sip . re)
REED TRUCKING&EXCAVATING,1 INC. DATE: 6/25/2022
REPORT NO.: 25
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4615t) CITY OF RENTON
DUVALL AVENUE NE
Gray&Osborrie, Ire:. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 06/18/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 101.5 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 1/ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 106.5 IV WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 155.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG
CITY OF RENTON RESIDENT INSPECTOR(Si .. ture
REED TRUCKING&EXCAVATING,INC. DATE: 6/18/2022 r
REPORT NO.: 24
Page 1 of 1
WEEKLY WORKING DAYS REPORT
Ira} CITY OF RENTON
DUVALL AVENUE NE
G`�p OsI oiri , G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 06/11/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 97.5 ✓ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START /
(SUM OF ITEMS 6 AND 7): 101.5 V WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 160.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: Non-working day do to heavy rains 6-10-22
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG //
CITY OF RENTON RESIDENT INSPECTOR(' :: attire)
REED TRUCKING&EXCAVATING,INC. DATE: 6/11/2022
REPORT NO.: 23
V �
Page 1 of 1
WEEKLY WORKING DAYS REPORT
1151;0 CITY OF RENTON
DUVALL AVENUE NE
Gray 8r Osborne,Iz G&O#20593
C GNSULTING CHGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 06r04/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 93.5 t,' WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 ✓ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 97.5 t/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 164.5 Li WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: Non-working day do to Holiday 5-31-22
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG
CITY OF RENTON RESIDENT INSPECT (Si ture)
REED TRUCKING&EXCAVATING,INC. DATE: 6/4/2022
REPORT NO.: 22
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4R210 CITY OF RENTON
DUVALL AVENUE NE
Gray 8z Osborn, Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 05/28/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 88.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 93.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 168.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGE
CITY OF RENTON RESIDENT INSPECTOR(Sign Lure)
REED TRUCKING&EXCAVATING,INC. DATE: 5/28/2022
REPORT NO.: 21
Page 1 of 1
I.IIKLY WORKING DAYS REPORT
ilk*" CITY OF RENTON
DUVALL AVENUE NE
G-=,ay Osborne,kliC- G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 05/21/22
CONTRACTOR
I. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 83.5 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START V
(SUM OF ITEMS 6 AND 7): 88.5 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 173.5 ✓ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGE / ' /G L"''r
CITY OF RENTON RESIDENT INSPECTOR(Si a/ture) 1
REED TRUCKING&EXCAVATING,INC. DATE: 5/21/2022
REPORT NO.: 20
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4R2100 CITY OF RENTON
DUVALL AVENUE NE
Chap&Osborne, km, G&O#20593
CONSULTING ENGINEERS
REED TRUCKING& EXCAVATING, INC. WEEK ENDING: 05/14/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 78.5 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 83.5 1/' WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 178.5 ✓ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAi - / /1
CITY OF RENTON RESIDENT INSPEC OR .ignature)
REED TRUCKING&EXCAVATING,INC. DATE: 5/14/2022
REPORT NO.: 19
Page 1 of 1
WEEKLY WORKING DAYS REPORT
CITY OF RENTON
DUVALL AVENUE NE
Gray>O rne>.Im G&O#20593
CONSULTNG ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 05/07/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 74.0 d WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.5 ./ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 78.5 ./ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 183.5 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: 1/2 day due to heavy rains 5-6-22 Il
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGE(`f
CITY OF RENTON RESIDENT INSPECTOR(Si ture)
REED TRUCKING&EXCAVATING,INC. DATE: 5/7/2022
REPORT NO.: 18
Page 1 of 1
WEEKLY WORKING DAYS REPORT
CITY OF RENTON
DUVALL AVENUE NE
Crap&Osborne, Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 04/30/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 69.0 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 ✓ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 74.0 ,/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 188.0 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARW•
CITY OF RENTON RESIDENT INSPEC OR( e)
REED TRUCKING&EXCAVATING,INC. DATE: 4/30/2022
REPORT NO.: 17
✓ 4'
Page 1 of 1
WEEKLY WORKING DAYS REPORT
41k2"0 CITY OF RENTON
DUVALL AVENUE NE
Gray 8z Osborne, Imo. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 04/23/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT;ITEM 8): 64.0 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 69.0 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 193.0 WORKING DAYS
(r1'hM5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG ltdture711
CITY OF RENTON RESIDENT INSPECT (Si
REED TRUCKING&EXCAVATING,INC. DATE: 4/23/2022
REPORT NO.: 16
Page 1 of 1
WLLKLY WORKING DAYS REP( C
(4t2:0 CITY OF RENTON
DUVALL AVENUE NE
Gray&OsLorrxe,Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 04/16/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 59.0. ✓ WORKING DAYS.
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 64.0 t/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 198.0 V WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA .
CITY OF RENTON RESIDENT INSPEC '• ' (' •ture)
REED TRUCKING&EXCAVATING,INC. DATE: 4/16/2022
REPORT NO.: 5
l/
Page 1 of 1
WEEKLY WORKING DAYS REPORT
46leA)) CITY OF RENTON
DUVALL AVENUE NE
G:nay 8e Osborne,l G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 04/09/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 54.0 't/ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 ‘/ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 59.0 `. WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 203.0 ✓ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG It� .
CITY OF RENTON RESIDENT INSPECTOR(Si ature)
REED TRUCKING&EXCAVATING,INC. DATE: 4/9/2022
REPORT NO.: 14
Page 1 of 1
WEEKLY WORKING DAYS REPORT
45a:0 CITY OF RENTON
DUVALL AVENUE NE
Grrap&Osborne,Ino G&O#20593
CONSOLING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 04/02/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 49.0 WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 54.0 V WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 208.0 ✓ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGa / /1
CITY OF RENTON RESIDENT INSPECTOR( . e)
REED TRUCKING&EXCAVATING,INC. DATE: 4/2/2022
REPORT NO.: 13
V T
Page 1 of 1
WEEKLY WORKING DAYS REPORT
CITY OF RENTON
DUVALL AVENUE NE
Gray 8z Osborne,Inc. G&O#20593
CONSULGNG ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 03/26/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 44.0 v WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 ✓ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 49.0 1/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 213.0 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG:►/ `��..�—
CITY OF RENTON RESIDENT INSPECTOR(Si Nature)
REED TRUCKING&EXCAVATING,INC. DATE: 3/26/2022
REPORT NO.: 12
11 )
Page 1 of 1
WEEKLY WORKING DAYS REPOni
41R*0 CITY OF RENTON
DUVALL AVENUE NE
Gray 8E Osborri , G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 03/19/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 39.0 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 44.0 ✓ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 218.0 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA /,4
CITY OF RENTON RESIDENT INSPEC OR ' i.� ature)
REED TRUCKING&EXCAVATING,INC. DATE: 3/19/2022
REPORT NO.: 11
Page 1 of 1
WEEKLY WORKING DAYS REPORT
145t0 CITY OF RENTON
DUVALL AVENUE NE
Orrt:.y fir.Osborne, Inc.a G&O#20593
C ONSUL1ING ENGINEF..RS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 03/12/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS 2.0 \/ WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 262.0 L/ WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 34.0 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 ✓ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 39.0 1/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 223.0 WORKING DAYS
(ITEM 5-ITEM 8)
CO #7 Approved by City adds 2 working days
EXPLANATION OF WORKING DAYS LOST THIS WEEK: _
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG• /
/�
CITY OF RENTON RESIDENT INSPECTOR(' atu
REED TRUCKING&EXCAVATING,INC. DATE: 3/12/2022
REPORT NO.: 10
1w
Page 1 of 1
N.L,IKLY WORKING DAYS REPORT
(alb, CITY OF RENTON
DUVALL AVENUE NE
Gray 8z OsibOr'1e' Inc- G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 03/05/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS ,2-.1tr
0 WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) Z62O WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 30.0 ✓ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 * WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 34.0 '✓ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: J2&(0 ZZCr WORKING DAYS
(11'EM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: No work Monday rain day L/J.
V o let -c,r (fAh,1 �I2p rZ/VA
COPIES TO: GRAY&OSBORNE,INC. P A 41 AGE
CITY OF RENTON RESIDE /7 SPECTOR(Signature)
REED TRUCKING&EXCAVATING,INC. DATE: 3/5/2022
REPORT NO.: 9
Page 1 of 1
WEEKLY WORKING DAYS REPORT
*AO CITY OF RENTON
DUVALL AVENUE N
Gray 8z Osborne, Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 02/26/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WE#RKING DAYS
I �
4. TIME INCREASED BY CHANGE ORDERS WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 260.0 WORKING DAYS',
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8) ! 26.0 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): I 4.0 V WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 30.0 ✓ W RKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 230.0 W RKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: No work Holiday 2-21-22
{
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG
CITY OF RENTON RESIDENT INSPECT (S- aturc)
REED TRUCKING&EXCAVATING,INC. DATE: 2/26/2022
REPORT NO.: 8
v, 17 '
Page 1 of 1
I
WEEKLY WORKING DAYS REPORT
4510 CITY OF RENTON
DUVALL AVENUE 144E
Cray Rz O$boanc'Loc.. G&O#20593
CONSULTING ENGINEERS
i
REED TRUCKING&EXCAVATING,INC. ( WEEK ENDING: 02/19/22
CONTRACTOR
1. NOTICE TO PROCEED DATE:
January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 ORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 260.0 WORKING DAYS
1
i II
6. TOTAL PREVDOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 21.0 IV WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): i I 5.0 1/ RKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 26.0 RKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: : 234.0 f3RIUNG DAYS
(ITEM 5-ITEM 8)
I
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
,, i
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGE( !/r--�"-
CITY OF RENTON RESIDENT INSPECTOR(Si ature)
REED TRUCKING&EXCAVATING,INC. DATE: 2/19/2022
REPORT NO.: 7
I y7A
1
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4R130 ITY OE RENTON
DUVALL AVENUE NE
Gray 8z Osboc-rie, I G&O#20593
CONSULTING ENGINIZRS
REED TRUCKING&EXCAVATING,INC.
WEEK ENDING: 02/12/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 260.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 16.0 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 q/ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEIVS 6 AND 7): 21.0 t/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 239.0 ✓ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGI ��i d "
CITY OF RENTON RESIDENT INSPECTOR(S}g tature)
REED TRUCKING&EXCAVATING,INC. DATE: 2/12/2022 f/
REPOR T NO.: 6
Page 1 of 1
A
V r,KLY WORKING DAYS REPORT
44100 CITY OF RENTON
DUVALL AVENUE NE
`sray 8c Osborne, Ire G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 02/05/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 260.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 13.0 V WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 3.0 ✓ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 16.0 1/ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 244.0 ,/ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: Rain Days 2-3-22,2-4-22 no work
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG 67
CITY OF RENTON RESIDENT INSPECTOR(Si ia re)
REED TRUCKING&EXCAVATING,INC. DATE: 2/5/2022 /
REPORT NO.: 5
Page 1 of 1
WEEKLY WORKING DAYS REPORT
4a310 CITY OF RENTON
DUVALL AVENUE NE
Gay 8r Osborrie, I G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 01/30/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED:
260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 260.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START /
(FROM PRECEDING REPORT,ITEM 8): 8.0 WORKING DAYS V
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 5.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 13.0 WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 247.0 WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK:
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGE
CITY OF RENTON RESIDENT INSPECTOR(Si )
REED TRUCKING&EXCAVATING,INC. DATE: 1/30/2022
REPORT NO.: 4
Page 1 of 1
VI __ICILY WORKING DAYS REPk,nT
45t118) CITY OF RENTON
DUVALL AVENUE NE
Gray-&Osborne,Lac. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 01/23/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 260.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 4.0 .✓ WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 4.0 .,/ WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 8.0 L WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 252.0 t/ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: Holiday 1-17-22 MLK day
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAG
CITY OF RENTON RESIDENT INSPECTOR( attire)
REED TRUCKING&EXCAVATING,INC. DATE: 1/23/2022 ,
REPORT NO.: 3
✓`Ci"
Page 1 of 1
WLIKLY WORKING DAY REPORT
(UDO CITY OF RENTON
DUVALL AVENUE NE
Gray tar Osb01 , IYac. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 01/16/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 260.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 'O C WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): _are"4,U WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 4.0 ✓ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 256.0 1/ WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: Heavy Rains no work 1-13-22
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWA
CITY OF RENTON
RESIDENT INSPECTOR(S afore)
REED TRUCKING&EXCAVATING,INC. DATE: 1/16/2022
REPORT NO.: 2
Page 1 of 1
WEEKLY WORKING DAYS i' 'ORT
(tS) CITY OF RENTON
DUVALL AVENUE NE
Gray 8z Osborrim,Inc. G&O#20593
CONSULTING ENGINEERS
REED TRUCKING&EXCAVATING,INC. WEEK ENDING: 01/09/22
CONTRACTOR
1. NOTICE TO PROCEED DATE: January 3,2022
2. OFFICIAL START DATE: January 3,2022
3. CONTRACT TIME ALLOWED: 260.0 WORKING DAYS
4. TIME INCREASED BY CHANGE ORDERS WORKING DAYS
5. TOTAL TIME ALLOWED(SUM OF ITEMS 3 AND 4) 260.0 WORKING DAYS
6. TOTAL PREVIOUS EXPIRED DAYS FROM START
(FROM PRECEDING REPORT,ITEM 8): 0.0 V- WORKING DAYS
7. TOTAL DAYS FOR WEEK ENDING
(WEEK COVERED BY THIS REPORT): 0.0 WORKING DAYS
8. TOTAL DAYS EXPIRED SINCE START
(SUM OF ITEMS 6 AND 7): 0.0 ./ WORKING DAYS
9. BALANCE OF DAYS REMAINING IN CONTRACT: 260.0 '" WORKING DAYS
(ITEM 5-ITEM 8)
EXPLANATION OF WORKING DAYS LOST THIS WEEK: Snow on roadway,winter storm all week
COPIES TO: GRAY&OSBORNE,INC. PHIL VAN EARWAGQ A�---,�
CITY OF RENTON RES:DENT INSPECTOR(S. ature)
REED TRUCKING&EXCAVATING,INC. DATE: 1/9/2022
REPORT NO.: I
Page 1 of 1