HomeMy WebLinkAboutAddendum - 3Washington State Department of Transportation
Supplemental Agreement
Number 3
Original Agreement Number
CAG-23-0 1 5
Project Number
Project Title S 7th Street Corridor Improvements Description of Work
Organization and Address City of Renton Public Works Department 1055 South Grady Way, Renton, Washington 98057 Phone: 425-430-73 1 8
Execution Date
03/09/2023
New Maximum Amount Payable
1 ,252,490.42
Completion Date
12/3 1 /2030
Transpo Group USA, Inc. (Consultant) will provide engineering services to the City of Renton ( City) for the
design of bicycle and pedestrian improvements, including sidewalks and shared use paths, curb line
adj ustments, pavement markings, signage, curb ramps, medi ans, and traffic signal modification in the City
of Renton, Washington. KB A, KPFF and HWA Geosciences will provide supplemental services, and
Transpo will provide additional services as described herein to support construction of the proj ect.
The Local Agency of -=-R=e=n=to=n"-------------------------------
desires to supplement the agreement entered in to with �T=r=an=s ..... p=o�G=r�o�u..,.p _____________ _
and executed on 03/09/2023 and identified as Agreement No . ....,,C"'"A-"'-'G""--"-2""'3'--0><...1 ..... 5'----------
AII provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
See attached amended Scope of Work.
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
for completion of the work to read: -=-N_,_,_._A"--------------------------
111
Section V, PAYMENT, shall be amended as follows:
The maximum amount of compensation payable to Transpo Group and it's subconsultants is increased by
$33 1 ,1 54.68 from $92 1 ,335.74 to $1 ,252,490.42.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By: Kevin Collins
��, Digitally signed by Kevin R Collins
Date: 2024 .12.1118:41:18-08'00'
Consultant Signature
DOT Form 140-063
Revised 09/2005
By: ______________ _
Approving Authority Signature
Date
CAG-23-015, Adden #3-25
Armondo Pavone
2/10/2025
Attest:_____________________________________
Jason A. Seth
Client Name:
Project Name:
Exhibit Dated:
Attachment A-1 -Scope of Work
City of Renton
S 7th Street -Amendment 3
December 4, 2024 TG: 1.20204.02
Scope of Services
Transpo Group USA, Inc. (Transpo) will provide supplemental engineering services to the City of Renton
(City) for the final bid-ready design of projects defined and developed under the original agreement and
Supplements. Transpo is referred to as the "Consultant" in the following scope.
Refer to the original agreement and Supplement for project locations and project element descriptions.
The following task is added, at the request of the City of Renton:
Task 6. Construction Support
Other tasks and elements of the original and previously amended scope of work remain applicable.
Assumptions
The Consultant has developed this scope with the assumption of the project elements identified in the
Project Definition Section of the original Scope and Supplement as the basis of design. Modifications to
these project elements at the request of the City, including the addition or removal of project elements such
as new curbing, increased signage, relocation of improvements or additional pavement markings may
require a negotiated fee and schedule modification between the Consultant and the City. The Consultant
will notify the City as soon as possible of the anticipated impact of changes to project elements on fee and
schedule.
Task 6.1 Engineering Su��ort during Construction
See tasks as provided in Task 6.2 for the Engineer of Record.
Task 6.2 Construction Management
The Consultant team will add KBA, Inc. (KBA) to the project team for the purposes of providing construction
phase support to the City of Renton.
Table of contents
1.1 General
a.Construction Management
b.Consultant's Responsibilities
c.City's Responsibilities
d.Other's Responsibilities
e.Directing the Contractor
Page 1 of 30
3
3
4
4
4
4
f.Duty of KBA 5
g.Deliverables 5
2.Responsibilities
a.Construction Manager 5
b.Resident Engineer 5
C.Construction Observer 6
d.Documentation Specialist 7
e.Testing Laboratory 7
f.Project Manager 7
g.Engineer 8
h.Engineer of Record 8
i.Permit and Environmental Compliance Manager 9
j.City Public Works Department 9
3.Tasks
a.Advertisement 9
b.Contract Addenda 9
C.Bidder Questions 9
d.Bid Deadline 9
e.Bid Opening 9
f.Conformed Contract Documents 9
g.ROM 10
h.Non-Material Submittal List 10
i.Bid Analysis 10
j.Determination of Bid Responsiveness and Bidder Responsibility 10
k.Pre-Award Meeting 10
I.Preparation of Contract Documents for execution 11
m.Award 11
n.Execution 11
0.Record Keeping 11
p.Non-Materials Submittal Schedule 12
q.Materials 13
r.Build America Buy America 13
s.Subcontractors 13
t.DBE Subcontractors 14
u.Progress Schedule 15
V.Preconstruction Meeting 15
w.Labor 16
x.Project Labor List 17
y.Contractor's Equipment Rate List 17
Page 2 of30
z.Construction Observer and Documentation Specialist Oversight 17
aa. Notice to Proceed 17
bb. Mobilization 18
cc.Weekly Construction Meetings 18
dd.Safety 19
ee. Meeting Minutes 20
ff. Weekly Statement of Working Days 20
gg. Contractor's Weekly Look-Ahead Schedule 20
hh. Conformity With and Deviations From Plans and Stakes 21
ii.Testing 21
jj. Permanent Monuments 21
kk. Correction Notices 22
II.Environmental 22
mm.Work Suspension 22
nn. Photographs 23
oo. Diary 23
pp. Field Notebooks 23
qq. lDR's 24
rr. Pay Notes/ Field Note Records 24
ss. As-Built Plans 24
tt. Requests for Information (RFl's) 24
uu. Serial Letters 25
vv.Progress Payment Forms 25
ww. Force Account 25
xx.Progress Payments 25
yy. Materials on Hand 26
zz.
aaa.
bbb.
CCC.
ddd.
Field Directives
Change Orders
Protests
Notices
City Public Works Department Notification
4.Controlling Order of Contract Documents
5.CM Construction Office
1.GENERAL
26
26
27
27
28
28
28
a.Construction Management. KBA shall manage the Project Construction as set
forth in the South 7 th Street Corridor Improvements Contract Construction
Page 3 of30
Documents, WSDOT LAG Manual, 2024 WSDOT Standard Specifications, and the
WSDOT Construction Manual except as may be modified below.
b.KBA Responsibilities.
i.KBA's staff consists of:
1.Construction Manager
2.Resident Engineer
3.Construction Observer
4.Documentation Specialist -
5.Materials Testing Sub-Consultant per section .f below
ii.KBA responsibilities are the tasks assigned to KBA staff as described within
the task descriptions below.
iii.KBA tasks, as assigned below, may be reassigned by KBA. KBA must notify
Project Manager The City of Renton of such reassignment. The
Construction Manager shall remain responsible for completeness,
accuracy, and timeliness of the KBA's work.
c.City's Responsibilities
i.The City staff consists of:
1.Project Manager
2.Engineer
ii.The City's responsibilities are the tasks assigned to City staff as described
within the task descriptions below.
d.Others Responsibilities
i.Engineer of Record, Permit and Environmental Compliance Manager, and
City Public Works Department shall be independently responsible for tasks
assigned as described within the task descriptions below.
e.Directing the Contractor
Page 4 of30
i.The Contractor is responsible to get its direction from the contract
documents.
ii.Clarification will be made in writing in RFl's.
iii.Representatives of the Engineer are not authorized to accept Work, to
accept materials, to issue instructions, or to give advice that is contrary to
the Contract. Work done or material furnished which does not meet the
Contract requirements shall be at the Contractor's risk and shall not be a
basis for a claim even if the representatives purport to change the Contract
(Std. Spec. 1-05.2). In the event City or KBA staff finds it necessary to give
direction to the Contractor, the entity giving direction may be found
responsible for the work so directed. A written record of the directive must
be made.
f.Duty of the KBA. The presence of the Project Manager and/or the Engineer during
construction or discussions with the Contractor does not change the duties and
responsibilities of the KBA, City, or Contractor.
g.Deliverables The required deliverables, if any, are described in each of the tasks
below.
2.RESPONSIBILITIES
a.
b.
Page 5 of30
i.Staff management
ii.Progress review
iii.Billing
iv.Preconstruction meeting {3.v.)
v.Construction Observer and Documentation Specialist oversight (3.z.)
vi.Weekly construction meetings (3.cc.)
vii.Serial letters (3.vv.)
viii.Protests (3.bbb.)
Resident Engineer
i.ROM (3.g.)
ii.Non-materials submittal list (3.h.)
iii.Bid analysis (3.i.)
iv.Pre-award meeting {3.k.)
V.Record keeping (3.o.)
vi.Materials (3.q.)
vii.Build America Buy America (3.r.)
viii.Subcontractors (3.s.)
ix.DBE subcontractors (3.t.)
X.Progress schedule (3.u.)
xi.Preconstruction meeting {3.v.)
xii.Labor (3.w.)
xiii.Project labor list (3.x.)
xiv.Contractor's equipment rate list (3.y.)
xv.Construction Observer and Documentation Specialist oversight (3.z.)
xvi.Weekly construction meetings (3.cc.)
xvii.Safety (3.dd.)
xviii.Weekly statements of working days (3.ff.)
xix.Contractor's weekly look-ahead schedule (3.gg.)
xx.Conformity with and deviations from plans and stakes.(3.hh.)
xxi.Permanent monuments {3.jj.)
xxii.Correction notices (3.kk.)
xxiii.Work suspension. (3.mm.)