No preview available
HomeMy WebLinkAboutC_On-Hold Letter_Solera Townhome_250215February 13, 2025 Michelle Freeman, PE KPFF Consulting Engineers 1601 5th Ave Unit: 1600 Seattle, WA 98101 SUBJECT: "On Hold" Notice Solera Phase 2 (Blocks C & D), LUA24-000375, SA-M, SA-H Dear Ms. Freeman, The Planning Division of the City of Renton determined that the subject application was complete according to submittal requirements December 13, 2024. Upon further review of the application, staff determined that additional information related to drainage and the building designs is needed in order to complete the review. The applicant shall submit updated civil plans and an updated Technical Information Report reflecting the proposed plan for bioretention planters proposed in the open areas. In addition, the applicant shall provide conceptual renderings indicating how the bioretention planters can be “dual-purpose” by providing educational opportunities with signage, additional seating, or other alternatives. The applicant shall provide updated elevations, as well as renderings, of the proposed townhomes. The updated elevations and renderings shall incorporate additional façade modulation/articulation, material differentiation on the upper floors, more prominent front entries/porches, and roof elements such as dormers, pitch variations, etc. At this time, your project has been placed “on hold” pending receipt of the updated project documents identified above and in the attached memo. The maximum time for resubmittal shall be within ninety (90) days of this notice, unless an extension is approved by the Current Planning Project Manager. Please contact me at (425) 430- if you have any questions. Sincerely, Alex Morganroth Principal Planner cc: Solera Manager LLC/ Owner(s) Richard Rawlings/Applicant