Loading...
HomeMy WebLinkAboutM_Shoreline_Tracking_Worksheet_171113_v1DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT 1 J:\2017 Project Files\174041 - Gene Coulon Park Struct Repairs\F. Permits\01_Applications\Shoreline Exemption Docs\GeneCoulon_ShorelineTrackingWorksheet_11.09.17.docx Rev: 08/2016 SHORELINE TRACKING WORKSHEET Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 | www.rentonwa.gov The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report every eight years to comply with the Shoreline Management Act requirements. SHORELINE STABILIZATION 1. Is there currently a bulkhead on your site?  Yes  No; If yes, fill out table below. If no, see “Site Conditions”, Section 2 below. What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard Materials: N/A Linear Feet of Soft Materials: Examples of Types of Bulkheads: Hard (e.g. rocks, wood); Soft (e.g. sand, plants); Combination-soft materials at the water with hard materials further inland, or a combination of hard and soft materials at the water. SITE CONDITIONS 2. List the size (in square feet) and type of all structures (1st floor only) on your property (e.g. 2,000 sq. ft. house, 125 sq. ft. greenhouse). There are many structures across 57 acres. Many are not applicable to this project. Those that are applicable are described in the table below. 3. List distance (in feet) from the water to the closest point of each structure. List each building separately (e.g. shed, dock, carport). All elements of the project are overwater. 3. List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area, walkway, patio). X 2 J:\2017 Project Files\174041 - Gene Coulon Park Struct Repairs\F. Permits\01_Applications\Shoreline Exemption Docs\GeneCoulon_ShorelineTrackingWorksheet_11.09.17.docx Rev: 08/2016 There are many structures across 57 acres. Many are not applicable to this project. Those that are applicable are overwater. 4. List distance (in feet) from the water to the closest point of each impervious surface (hard surface). All elements of the project are overwater. The Ivar’s Deck boarders a parking lot and sidewalk. 5. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in squ are feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care or grown for decorative purposes) should not be counted. Vegetation consists of City maintained grasses and ornamental plantings. Proposed tree removal is on city parks property, which includes natural vegetation and maintained vegetation. The purpose of the Shoreline Exemption is for dangerous tree removal. No other vegetation is proposed for removal. No tree removal proposed. 6. Will the project require any added fill? If so, how many cubic yards will be added: No fill proposed. IN WATER AND OVER WATER STRUCTURES 7. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)?  Yes  No; If yes, fill out the table below. Describe the in- and over-water structures on your site The city property includes docks and other park-related structures. Type (e.g. dock, float, bridge, mooring pile, boat lift, etc.) Surface Area (in square feet, if applicable) Light Penetrating Materials (the percentage of the surface area that is made of material that allows light to reach the water) Existing structures to remain 1. Trestle Bridge 2. Sailing Club Floats 3. Ivar’s Deck Repair 4. North Waterwalk Wave Skirt 5. Transient Moorage Float 6. Boat Launch Wave Barrier 7. Boat Launch Pier 8. South Waterwalk 3. Ivar’s Deck Repair – 7180 SF 5. Transient Moorage Float – 2080 SF All other tasks are N/A 3. Ivar’s Deck Repair - 88% 5. Transient Moorage Float - 50% All other tasks are N/A Existing structures that will be removed N/A N/A N/A X 3 J:\2017 Project Files\174041 - Gene Coulon Park Struct Repairs\F. Permits\01_Applications\Shoreline Exemption Docs\GeneCoulon_ShorelineTrackingWorksheet_11.09.17.docx Rev: 08/2016 Proposed structures N/A N/A N/A