Loading...
HomeMy WebLinkAboutChange Order - 02Docusign Envelope ID: 86FDAE36-046D-48B3-86B9-A2F573EDF705 CONTRACT: CONTRACTOR: CHANGE ORDER: CITY OF RENTON Parks and Recreation Department CONTRACT CHANGE ORDER AGREEMENT Demolition Services at 2718 Duvall Ave NE, Renton, WA 98059 CAG-24-074 A & D Quality Construction Co., L.L.C. C0#2 SUMMARY OF PROPOSED CHANGE: Reason/Justification: An old oil tank was discovered during demolition of the structures. Oil tank will need to be removed. Work will include excavating around the tank for access and removal, pump out and disposal of any existing oil and removal of the tank. Price excludes the removal of any contaminated dirt if found. DESCRIPTION: Item Qty. Description Unit Price 2/6/2025 Amount No. w/WSST 1 1-time Oil tank removal at 2718 Duvall Ave NE, Renton, WA 98059 See Scope of Work= Exhibit "A" $ 5,610.99 Total this Change Order: $ 5,610.99 ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT (W/ WSST) AMOUNT THIS ORDER (W/ WSST) TOTAL AFTER CHANGE $63,137.15 $63,137.15 $ 5,610.99 $ 68,748.14 Additional Calendar Days: N/A The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original agreement. All of the other terms of the original agreement remain in effect. SIGNATURES: Contractor: Project Manager: Approved By: Annette Demps post oappovaa11horityJ Digitally �gned by Annette Demps Dale: 2025 02 11 1 S:00:17 -08'00' Date: Date Date: 02.11.2025 2/14/2025 I 11:41 AM PST CAG-24-074,CO #2-25