Renton Airport director and staff report
Paving the Way for Better Access
We’re making significant improvements to our pavement areas
with two key projects:
•Windsock Area and Tie-Down Parking: Upgrades include
improved pavement and new tie-down configuration and
anchor points. This will allow for adequate spacing between
aircraft creating a cleaner ramp area, and better serve our
tenants.
•Southwest Corner Parking: Four new transient parking
stalls are being developed for public use. These spaces will
improve access for pilots and visitors, strengthening the
connection between our airport and the GA Community.
Renton Airport director and staff report
Enhanced Security for a Safer Airport
Security is always a top priority, and we’re excited to announce
comprehensive upgrades to our airport’s systems. These
improvements include:
•New gates and badge readers for improved access control.
•Nine additional security cameras strategically placed around
the airport.
•Fiber optic connectivity extending from the south end of the
airport to the seaplane base, enhancing our ability to monitor
and secure the area.
Renton Airport director and staff report
Seaplane Dock Dredging Project
We’re making progress on the seaplane dock and surrounding
area with a dredging project. The design phase has moved
beyond 30%, and we plan to issue environmental permits to the
relevant agencies by the end of 2026. While the process is
lengthy, each step brings us closer to completion.
Renton Airport director and staff report
Demolition of Southeast Corner Buildings
An important project is the demolition of three vacant buildings
in the southeast corner of the airport. The design phase will be
completed by summer, with construction starting by the fall.
This effort will improve the overall appearance and
functionality of the airport.
Renton Airport director and staff report
Taxiway A Rehabilitation
We’re continuing to work on securing funding for the
rehabilitation of Taxiway A. This project will address cracking,
reduce the need for temporary fixes, and ensure the long-term
usability of this critical taxiway.
Renton Airport director and staff report
Laying the Foundation for a New Control Tower
Thanks to one grant anticipated to be received this year, we’ve
started the preliminary work for a new control tower site study.
This is a key step toward securing a modern tower, which will
enhance operations and safety for years to come.
Renton Airport director and staff report
Improving Daily Operations
Our new sweeper has been a game-changer, keeping the airside
and landside areas clean and free of debris. We are also
implementing 1200 Aero, a real-time traffic system that offers:
•Live air and ground operations tracking, along with live
CTAF and tower audio, accessible through our website.
•Improved accuracy in tracking-based aircraft and annual
operations.
•Enhanced analytics to better address noise complaints.
•Comprehensive activity tracking at both the airport and the
W36 seaplane base, giving us a full picture of operations.
Renton Airport director and staff report
Ground Rate Appraisals and Facility Updates
We’re working with our consultants to complete a ground rate
appraisal and assess several buildings, ensuring we’re prepared
for updates due in 2025.
Renton Airport director and staff report
Hangar and Tie-down Rate Increases to tenants will go out
this week. Increase will be effective June 1, 2025.
Renton Airport director and staff report
Looking Ahead
Our focus for the year remains on preventative maintenance,
particularly through improved pavement management and
leveraging our online Airport Management System (Veoci) for
efficient work order handling.
These projects and initiatives represent our commitment to
making Renton Airport a better place for everyone—pilots,
tenants, staff, and visitors alike. While some of these efforts will
take time, each step is a move toward creating an airport we can
all be proud of.
Renton Airport director and staff report
r Ò Ù …‡ ¡╓ˉ − ∑∑Ò…‡ ¡╓∑þ∑‡ ˇ╛
Renton Airport director and staff report
The winter edition is here.