HomeMy WebLinkAboutApproved_Civil Construction Plan WSK & 243 Bldg ApronsRENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22 CITY OF RENTON RENTON MUNICIPAL AIRPORT (RNT) WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION CAG-25-013 FEBRUARY 2025 SHEET INDEX SHEET NO.SHEET NAME PROJECT LOCATION VICINITY MAP PROJECT SITE 243 BLDG APRON & PARKING LOT WIND SOCK GA APRON C1 COVER SHEETABBREVIATIONSLEGEND LUA24-000299C25000687PR24-000063DEVELOPMENT ENGINEERING yqi 02/18/2025 RAMP PAVED PAVED PAVED PAVED PARKINGPAVEDPAVED PAVED WIND SOCK AIRPORTPROPERTY FH PAVED PAVED PAVED MBX 600 BLDG500 BLDG 540 BLDG 800 BLDG 750 BLDG 616 BLDG AIRPORT BEACON AIRPORT MAINTENANCE BLDG 243 BLDG WORK AREA #1 WORK AREA #2 BOEING AIRCRAFT BRIDGE VEHICLE GATE V10 VEHICLE GATE V7 PED GATE P10 RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C2CONSTRUCTION SITE PLANGENERAL NOTES: LEGEND: PERMIT INFORMATION: ABBREVIATIONS: LUA24-000299 4. The applicant shall comply with the recommendations found in the submitted Geotechnical Report, prepared by HWA Geosciences, Inc., dated November 2, 2023, and any future addenda DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 RAMP PAVED PAVED PAVED PAVED PARKINGPAVEDPAVED PAVED WIND SOCK AIRPORTPROPERT Y FH PAVED PAVED PAVED MBX RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C3SURVEY CONTROL PLANSURVEY NOTES:SURVEY CONTROL: LEGEND: SURVEY CONTROL POINT TABLE: DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 44.50' 44.50' CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA WORK AREA BIRD CANNON PLACE BARRICADES TO BLOCK OFF PEDESTRIAN ACCESS 100-YEAR FLOOD LINE 20' MIN FIRE LANE NON-MOVEMENT AREA LINE - DO NOT CROSS AT ANY TIME 3'RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C4CONSTRUCTION SAFETY &PHASING PLANWORK AREA #1 - PHASE 1: WINDSOCK APRON PAVEMENT REHABILITATION ALLOWED DURATION: 28 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN IMPORTANT PHASE NOTES: 1)CONTRACTOR SHALL PLACE LOW-PROFILE BARRICADES ON APRON SIDE OF NON-MOVEMENT LINE PRIOR TO BEGINNING ANY WORK DAY. 2)CONTRACTOR SHALL NOT CROSS NON-MOVEMENT AREA LINE AT ANY TIME WITHOUT ATCT CLEARANCE. PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK): 1)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1 WEEK PRIOR TO PROJECT COMMENCEMENT. 2)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN RELOCATED PRIOR TO THE START OF WORK. 3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE AIRCRAFT OPERATIONAL AREAS DURING PHASE 1 MUST VIEW FAA GUIDE TO GROUND VEHICLE OPERATIONS PRIOR TO THE START OF WORK. 4)PLACE LOW PROFILE BARRICADES AS SHOWN. 5)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 4)INSTALL NEW TIEDOWN ANCHORS 5)COMPLETE INITIAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 1. LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE FIRE LANE PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 WORK AREA #1 - PHASE 1 NOTES: CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 44.50' 44.50' CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA WORK AREA BIRD CANNON PLACE BARRICADES TO BLOCK OFF PEDESTRIAN ACCESS 20' MIN. FIRE LANE 100-YEAR FLOOD LINE NON-MOVEMENT AREA LINE - DO NOT CROSS AT ANY TIME 3'RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C5CONSTRUCTION SAFETY &PHASING PLANWORK AREA #1 - PHASE 2: WINDSOCK APRON FINAL PAVEMENT MARKINGS ALLOWED DURATION: 4 HOURS (WITHIN TIME ALLOTTED FOR WORK AREA 2) ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN IMPORTANT PHASING NOTES: 1.CONTRACTOR SHALL PLACE LOW-PROFILE BARRICADES ON APRON SIDE OF NON-MOVEMENT LINE PRIOR TO BEGINNING ANY WORK. 2.CONTRACTOR SHALL NOT CROSS NON-MOVEMENT AREA LINE AT ANY TIME WITHOUT ATCT CLEARANCE. PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK): 1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN RELOCATED PRIOR TO THE START OF WORK. 2)PLACE LOW PROFILE BARRICADES AS SHOWN. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)COMPLETE FINAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK): 1)COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF WORK AREA 1 PHASE 2. WORK AREA #1 - PHASE 2 NOTES: CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE FIRE LANE PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 J-BOX J-BOX 62' EXISTING VEHICLE GATE V7 PEDESTRIAN GATE P10 CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C6CONSTRUCTION SAFETY &PHASING PLANPHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS WORK AREA #2 - PHASE 1: BUILDING 243 APRON PAVEMENT REHABILITATION ALLOWED DURATION: 13 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:NORTH HALF OF 243 BUILDING APRON CLOSED, WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN IMPORTANT PHASING NOTES: 1)COORDINATE WITH AIRPORT ENGINEER A MINIMUM OF 72-HOURS PRIOR TO STARTING WORK IN THIS PHASE TO ALLOW FOR RELOCATION OF AIRCRAFT IN 250 HANGAR. PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK): 1)COORDINATE WITH AIRPORT STAFF TO REMOVE AIRCRAFT FROM EXISTING HANGAR PRIOR TO START OF CONSTRUCTION. 2)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1 WEEK PRIOR TO PROJECT COMMENCEMENT. 3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE AIRCRAFT OPERATIONAL AREAS DURING PHASE 1 MUST VIEW FAA GUIDE TO GROUND VEHICLE OPERATIONS PRIOR TO THE START OF WORK. 4)PLACE LOW PROFILE BARRICADES AS SHOWN. 5)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR. 6)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS. 4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 5)INSTALL NEW TIEDOWN ANCHORS 6)COMPLETE INITIAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF WORK AREA 2, PHASE 1.. LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA LANE CLOSURE C12 1 WORK AREA #2 - PHASE 1 NOTES: CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 J-BOX J-BOX J-BOX J-BOX 62.00' VEHICLE GATE V10 CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA PEDESTRIAN GATE P10 WORK AREA PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C7CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 2: BUILDING 243 APRON RECONSTRUCTION ALLOWED DURATION: 5 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:ALL TAXIWAYS/TAXILANES OPEN APRON STATUS:SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK): 1)PLACE LOW PROFILE BARRICADES AS SHOWN. 2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS. 4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 5)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 2. WORK AREA #2 - PHASE 2 NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 J-BOX J-BOX CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA EXISTING VEHICLE GATE V7 WORK AREA 62.00' PEDESTRIAN GATE P10 RELOCATED VEHICLE GATE V7 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C8CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 3A: BUILDING 243 DRIVE LANE REHABILITATION (OUTSIDE AOA) ALLOWED DURATION: 8 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:ALL OPEN TAXIWAY/TAXILANE STATUS:ALL OPEN APRON STATUS:ALL OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 3A WORK): 1)PLACE LOW PROFILE BARRICADES AS SHOWN. 2)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)CONFIRM TEMPORARY CONE OR DRUM LOCATIONS WITH THE ENGINEER 3)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 4)RELOCATE EXISTING FENCE, GATE AND ASSOCIATED APPARATUSES. 5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 6)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 3A WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 3A. WORK AREA #2 - PHASE 3A NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 J-BOX J-BOX CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA EXISTING VEHICLE GATE V7 62.00' PEDESTRIAN GATE P10 WORK AREA RELOCATED VEHICLE GATE V7 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C9CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 3A: BUILDING 243 DRIVE LANE REHABILITATION (OUTSIDE AOA) ALLOWED DURATION: 2 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:ALL OPEN TAXIWAY/TAXILANE STATUS:ALL OPEN APRON STATUS:ALL OPEN IMPORTANT PHASE NOTES: 1)COORDINATE WITH AIRPORT ENGINEER A MINIMUM OF 72-HOURS PRIOR TO STARTING WORK IN THIS PHASE TO ALLOW FOR RELOCATION OF AIRCRAFT IN 250 HANGAR. PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 3A WORK): 1)PLACE LOW PROFILE BARRICADES AS SHOWN. 2)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)CONFIRM TEMPORARY CONE OR DRUM LOCATIONS WITH THE ENGINEER 3)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 4)RELOCATE EXISTING FENCE, GATE AND ASSOCIATED APPARATUSES. 5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 6)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 3A WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 3A. WORK AREA #2 - PHASE 3B NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 J-BOX J-BOX CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA 62.00' PEDESTRIAN GATE P10 PROPOSED VEHICLE GATE V7 WORK AREA PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C10CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 4: BUILDING 243 PARKING LOT RECONSTRUCTION ALLOWED DURATION: 8 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:ALL OPEN TAXIWAY/TAXILANE STATUS:ALL OPEN APRON STATUS:ALL OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 4 WORK): 1)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN. 2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM TEMPORARY TRAFFIC CONE OR DRUM LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS. 4)COMPLETE EXTRUDED CURB REMOVAL 5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 6)CONSTRUCT LANDSCAPE ISLANDS. 7)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 4 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 4. WORK AREA #2 - PHASE 4 NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 J-BOX J-BOX 62.00' CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA VEHICLE GATE V7 WORK AREA PEDESTRIAN GATE P10 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C11CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 5: BUILDING 243 APRON FINAL PAVEMENT MARKINGS ALLOWED DURATION: 4 HOURS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN IMPORTANT PHASE NOTES: 1)COORDINATE WITH AIRPORT ENGINEER A MINIMUM OF 72-HOURS PRIOR TO STARTING WORK IN THIS PHASE TO ALLOW FOR RELOCATION OF AIRCRAFT IN 250 HANGAR. PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 5 WORK): 1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN RELOCATED PRIOR TO THE START OF WORK. 2)PLACE LOW PROFILE BARRICADES AS SHOWN. 3)PLACE TRAFFIC CONE AND DRUMS AS SHOWN. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)CONFIRM TRAFFIC CONE AND DRUM LOCATIONS WITH THE ENGINEER. 3)COMPLETE FINAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 5 WORK): 3) COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF PHASE 5. LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 WORK AREA #2 - PHASE 5 NOTES: CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 The existing lift station located under aircraft apron and associated 4-inch cast iron force main shall be removed. A separate electrical permit shall be required. DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063cap the end of the abandoned force main RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22CONSTRUCTION SAFETY &PHASING DETAILSLOW PROFILE BARRICADE DETAIL LOW PROFILE BARRICADE NOTES: C12 GENERAL CONSTRUCTION SAFETY AND PHASING NOTES: DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 44.50' 44.50' SAWCUT ALONG EXISTING JOINT 20' MIN FIRE LANE 100-YEAR FLOOD LINE RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C13SITE PREPARATION & TESC PLANLEGEND: PROPERTY LINE STORM DRAIN INLET PROTECTION SILT FENCE TRIANGULAR SILT DIKE TAXIWAY OBJECT FREE AREA EXISTING WATER EXISTING STORM DRAIN EXISTING ELECTRICAL EXISTING TELECOMMUNICATIONS EXISTING GAS EXISTING PAVEMENT EDGE EXISTING FENCE PROPOSED SAWCUT REMOVE EXISTING EXTRUDED CURB REMOVE EXISTING PAINT MARKING CLEARING AND GRUBBING AND EXCAVATION AS NEEDED ASPHALT REMOVAL CONCRETE REMOVAL FLOODWAY 1.EROSION CONTROL METHODS MUST BE IN PLACE PRIOR TO COMMENCEMENT OF SITE PREPARATION AND REMOVALS. 2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND SAFELY DISPOSED OF. 3.PROTECT ALL EXISTING UTILITY LINES IN PLACE. EROSION CONTROL KEYNOTES: 1.INSTALL STORM DRAIN INLET PROTECTION PER WSDOT STD PLAN I-40.20-00. 2.INSTALL SILT FENCE PER WSDOT STD PLAN I-30.15-02. 3.INSTALL TRIANGULAR SILT DIKE PER DTL ON SHEET C15. EROSION CONTROL GENERAL NOTES: SITE PREPARATION KEYNOTES: 1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT PAVEMENT. 2.CLEAR AND GRUB AND EXCAVATE TO FINISHED GRADE, AS NEEDED. 3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE. ADJUST RIM AS NEEDED. 4.PROTECT EXISTING FENCE IN PLACE. 5.REMOVE EXISTING EXTRUDED CURB. 6.SAWCUT EXISTING PAVEMENT. 7.REMOVE EXISTING PAINT MARKING. 8.PROTECT EXISTING CATCH BASIN IN PLACE. SEE PLAN FOR PROPOSED RIM ADJUSTMENTS. Know what'sbelow. before you dig.Call R per cor std plan, 216.30, typ. per cor std plan, 214.00, typ. DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 J-BOX 62' RELOCATE EXISTING VEHICLE GATE V7, FENCE AND ALL ASSOCIATED EQUIPMENT, SEE SHEET C19. PEDESTRIAN GATE P10 TAXIWAY A CL RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C14SITE PREPARATION & TESC PLANLEGEND: PROPERTY LINE STORM DRAIN INLET PROTECTION SILT FENCE TRIANGULAR SILT DIKE TAXIWAY OBJECT FREE AREA EXISTING WATER EXISTING STORM DRAIN EXISTING ELECTRICAL EXISTING TELECOMMUNICATIONS EXISTING GAS EXISTING PAVEMENT EDGE EXISTING FENCE PROPOSED SAWCUT REMOVE EXISTING EXTRUDED CURB CLEARING AND GRUBBING AND EXCAVATION AS NEEDED ASPHALT REMOVAL CONCRETE REMOVAL FLOODWAY 1.EROSION CONTROL METHODS MUST BE IN PLACE PRIOR TO COMMENCEMENT OF SITE PREPARATION AND REMOVALS. 2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND SAFELY DISPOSED OF. 3.PROTECT ALL EXISTING UTILITY LINES IN PLACE. EROSION CONTROL KEYNOTES: 1.INSTALL STORM DRAIN INLET PROTECTION PER WSDOT STD PLAN I-40.20-00. 2.INSTALL SILT FENCE PER WSDOT STD PLAN I-30.15-02. 3.INSTALL TRIANGULAR SILT DIKE PER DTL ON SHEET C15. EROSION CONTROL GENERAL NOTES: SITE PREPARATION KEYNOTES: 1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT PAVEMENT. 2.CLEAR AND GRUB AND EXCAVATE TO FINISHED GRADE, AS NEEDED. 3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE. ADJUST RIM AS NEEDED. 4.PROTECT EXISTING FENCE IN PLACE. 5.REMOVE EXISTING EXTRUDED CURB. 6.SAWCUT EXISTING PAVEMENT. 7.PROTECT EXISTING CATCH BASIN IN PLACE. SEE PLAN FOR PROPOSED RIM ADJUSTMENTS. 8.PROTECT EXISTING AV FUEL SIGN IN PLACE. 9.REMOVE AND SALVAGE GATE V7 AND ALL ASSOCIATED EQUIPMENT, INCLUDING GATE, OPERATOR ON NEW CONCRETE FOUNDATION, POWER CONTROL RACK AND CABINET, ACCESS CONTROL ANTENNAS, STROBE SENSOR, GATE CATCH STANCHION, SIGNS ON ADJACENT FENCE, CARD READER PEDESTAL AND CARD READERS, AND ALL ASSOCIATED EQUIPMENT TO PROVIDE A FULLY FUNCTIONING RELOCATED GATE Know what'sbelow. before you dig.Call R per cor std plan, 216.30, typ. per cor std plan, 214.00, typ. DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22SITE PREPARATION &TESC DETAILSTRIANGULAR SILT DIKE DETAIL C15Know what'sbelow. before you dig.Call R DEVELOPMENT ENGINEERING yqi 02/18/2025 TRIANGULAR SILT DIKE DETAIL LUA24-000299C25000687PR24-000063 WIND SOCK 15' TYP.15' TYP. 23.33 2 3 . 3 3 23.32 2 3 . 3 3 23.36 23.39 23.42 2 3 . 4 3 23.42 2 3 . 4 8 23.55 2 3 . 6 1 23.26 2 3 . 2 5 23.26 2 3 . 2 8 23.31 23.33 23.34 2 3 . 3 4 23.34 2 3 . 4 0 23.48 2 3 . 5 5 23.17 2 3 . 1 8 23.19 2 3 . 2 2 23.25 23.28 23.27 2 3 . 2 6 23.25 2 3 . 3 2 23.40 2 3 . 4 9 23.08 2 3 . 0 9 23.12 2 3 . 1 6 23.19 23.23 23.21 2 3 . 1 9 23.17 2 3 . 2 4 23.33 2 3 . 4 2 23.01 2 3 . 0 2 23.05 2 3 . 0 9 23.13 23.17 23.15 2 3 . 1 2 23.09 2 3 . 1 7 23.27 2 3 . 3 8 22.95 2 2 . 9 6 22.98 2 3 . 0 3 23.08 23.12 23.08 2 3 . 0 5 23.01 2 3 . 1 0 23.23 2 3 . 3 6 22.90 2 2 . 9 0 22.91 2 2 . 9 6 23.02 23.07 23.02 2 2 . 9 7 22.93 2 3 . 0 3 23.19 2 3 . 3 5 22.88 2 2 . 8 4 22.84 2 2 . 9 0 22.96 23.01 22.96 2 2 . 9 0 22.85 2 2 . 9 7 23.15 2 3 . 3 4 22.90 2 2 . 8 1 22.77 2 2 . 8 3 22.90 22.96 22.89 2 2 . 8 3 22.76 2 2 . 9 0 23.11 2 3 . 3 2 22.91 2 2 . 7 7 22.70 2 2 . 7 7 22.84 22.91 22.83 2 2 . 7 6 22.68 2 2 . 8 3 23.06 2 3 . 2 8 22.94 2 2 . 7 4 22.62 2 2 . 7 0 22.78 22.85 22.77 2 2 . 6 9 22.60 2 2 . 7 5 22.99 2 3 . 2 4 22.96 2 2 . 7 3 22.55 2 2 . 6 6 22.74 22.80 22.74 2 2 . 6 5 22.54 2 2 . 6 8 22.94 2 3 . 2 0 22.98 2 2 . 7 5 22.60 2 2 . 6 8 22.76 22.84 22.75 2 2 . 6 6 22.57 2 2 . 6 9 22.93 2 3 . 1 6 23.02 2 2 . 8 0 22.66 2 2 . 7 3 22.81 22.88 22.79 2 2 . 7 1 22.62 2 2 . 7 4 22.95 2 3 . 1 7 23.09 2 2 . 8 7 22.72 2 2 . 7 9 22.86 2 2 . 9 2 22.84 2 2 . 7 6 22.67 2 2 . 7 9 22.98 2 3 . 1 9 23.16 2 2 . 9 3 22.78 2 2 . 8 4 22.91 2 2 . 9 7 22.89 2 2 . 8 0 22.72 2 2 . 8 1 23.00 2 3 . 1 8 23.20 2 2 . 9 8 22.84 2 2 . 8 9 22.95 2 3 . 0 1 22.93 2 2 . 8 5 22.78 2 2 . 8 4 22.99 2 3 . 1 5 23.21 2 3 . 0 2 22.90 2 2 . 9 5 23.00 2 3 . 0 5 22.98 2 2 . 9 0 22.83 2 2 . 9 0 22.97 2 3 . 0 8 23.27 2 3 . 0 8 22.95 2 3 . 0 0 23.05 2 3 . 1 0 23.03 2 2 . 9 7 22.89 2 2 . 9 7 23.04 2 3 . 0 0 23.35 2 3 . 1 6 23.01 2 3 . 0 6 23.10 2 3 . 1 4 23.09 2 3 . 0 4 22.99 2 3 . 0 6 23.13 2 3 . 1 7 2 3 . 2 0 23.07 2 3 . 1 1 23.15 2 3 . 1 8 23.15 2 3 . 1 3 23.10 2 3 . 1 5 23.21 2 3 . 2 5 2 3 . 1 6 23.12 2 3 . 1 3 23.17 2 3 . 2 2 23.23 2 3 . 2 2 23.20 2 3 . 2 4 23.28 2 3 . 3 1 2 3 . 0 2 23.06 2 3 . 1 2 23.17 2 3 . 2 7 23.31 2 3 . 3 2 23.32 2 3 . 3 3 23.35 2 3 . 3 7 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 6 ± 2 3 . 6 ± 2 3 . 6 ± 2 3 . 7 ± 2 3 . 6 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 23.5± 2 3 . 7 ±23.4±23.3±23.2±23.1±23.0±23.0±22.9±22.9±23.0±23.0±23.1±23.1±23.1±23.1±23.2±23.3±23.3±23.3±23.3±23.4±23.4±23.2±23.1±22.8±22.8± 2 2 . 8 ± 2 3 . 0 ± 2 3 . 1 ± 2 3 . 1 ± 2 3 . 3 ± 2 3 . 4 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 23.4±23.39 23.3 3 23.2 8 23.2 3 23.1 7 23.1 2 23.0222.96 22.9 1 22.8 6 22.8 0 22.8 4 22.8 8 23.2 7 23.3± START GRID N=182932.69 E=1299021.95 44.50' 44.50' 100-YEAR FLOOD LINE 21' MIN TRAVEL LANE RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C16GRADING PLAN - WINDSOCKAPRONGENERAL NOTES LEGEND: EXISTING GROUND CONTOUR FINISHED GRADE CONTOUR ASPHALT PAVEMENT RECONSTRUCTION TAXIWAY OBJECT FREE AREA (TOFA) FG ELEVATION DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 J-BO X J-BO X 14' TYP 14'TYP2' 15' TYP 15' TYP START GRID N=180196.38 E=1298454.88 START GRID N=180359.59 E=1298346.30 3 0 . 5 ± 3 0 . 2 ± 3 0 . 2 ± 3 0 . 0 ± 2 9 . 9 ± 2 9 . 8 ± 29.7 ± 29.5 ±29.4± 3 0 . 3 ± FC: 30.35 FC: 30.50 FC: 30.50 FC: 30.25 FC: 30.25 FC: 30.23 FC: 30.37 FC: 30.62 FC: 30.56 FC: 30.29 FC: 30.24 FC: 30.34FC: 30.35 FC: 30.47 3 0 . 5 3 3 0 . 4 6 30.43 30.3 830.35 30.3130.27 30.2 0 30.16 30.20 30.36 3 0 . 5 1 3 0 . 4 430.39 30.3 5 30.2 9 30.2 3 30.16 30.07 30.0 2 30.04 30.1 8 3 0 . 4 1 30.36 30.3 0 30.24 30.16 30.05 29.9 429.8529.8229.86 29.27 29.55 29.6 9 29.8 1 29.95 30.1 0 30.2 0 30.26 30.32 3 0 . 4 ± 30.2 930.24 FC: 30.30 FC: 30.30 FC: 30.41 FC: 30.36 FC: 30.39 FC: 30.40 FC: 30.55 FC: 30.54 FC: 30.42 FC: 30.57 FC: 30.42 FC: 30.41 FC: 30.54FC: 30.54 FC: 30.64 FC: 30.30 FC: 30.40 FC: 30.44 FC: 30.38 FC: 30.30 29 . 9 3 2 9 . 7 9 2 9 . 6 6 2 9 . 5 0 2 9 . 3 3 29 . 2 0 2 9 . 1 4 2 9 . 0 8 2 9 . 0 1 28.9 5 28 . 9 0 2 9 . 0 2 2 9 . 8 0 2 9 . 6 1 2 9 . 4 4 2 9 . 2 6 2 9 . 0 7 2 8 . 9 3 2 8 . 8 7 2 8 . 8 1 2 8 . 7 4 2 8 . 6 8 2 8 . 6 4 2 8 . 7 1 29.67 29.42 29.22 29.0228.81 28.6 5 28.60 28.5 428.4728.4028.3528.44 29.59 29.34 29.1 4 28.9 4 28.73 28.57 28.53 28.4 7 28.3 9 28.3 2 28.28 28.3 7 29.5429.32 29.1 4 28.9 5 28.7 6 28.63 28.5728.51 28.4 5 28.4 0 28.35 28.40 29.3 029.1328.9628.7828.69 28.6328.5828.52 28.4 7 28.4 2 28.41 29.1 8 29.0 2 28.8 7 28.7 4 28.7 3 28.71 28.67 28.6 428.5928.5428.48 29.04 28.87 28.8 0 28.80 28.80 28.79 28.7 7 28.7 6 28.7 4 28.6 9 28.61 29.1±28.9± 28.9 ± 28.9 ± 28.9 ± 28.9 ± 28.9± 28.9± 28.9± 28.9± 28.8± 28.8± 2 9 . 0 0 28.7328.60 28.58 28.5 7 28.48 28.51 28.5 6 28.6 ±29.85 28.90 28.8528.8 6 28.85 28.7 9 30.17 28.9±28.9 ±28.9±28.9±28.8±28.8± 28.6±28.7 ± 28.9 8 29.1± 29.3 ± 2 8 . 9 ± 28.7 9 28.7±28.7±28.8± 29.2629.3 7 29.4 8 29.7 5 28.7 ± 2 9 . 1 ± 2 9 . 5 ± 2 9 . 5 ± 2 9 . 9 ± 3 0 . 1 ± 29.8 ± 2 9 . 2 ± 2 9 . 4 6 2 9 . 4 6 29.66 29.72 2 9 . 8 3 29.82 30.4 ± 30.5 ± 30.5± 30.4± 30.4± 30.4 ± 30.4±30.3± 30.3 ± 30.4 ± 3 0 . 5 ± 3 0 . 5 ± 3 0 . 6 ± 3 0 . 4 ± 30 . 3 ± 3 0 . 4 ± 30.5 ± 3 0 . 6 ± 30.7± 30.5 ± 3 0 . 5 ± 29.95 30.5± 30.5±30.5± 30.4 ± 30.4 ± 30.4 ± 30.5 ± 30.4± 3 0 . 4 ± FC: 30.50 FC: 30.30 3 0 . 4 ± 30 . 5 ± 3 0 . 5 ± 3 0 . 5 ± 3 0 . 8 ± 3 0 . 1 ± 29.9± 2 9 . 7 7 3 0 . 6 ± 3 0 . 2 ± 30.15 3 0 . 0 8 30.03 3 0 . 1 4 29.8 929.7329.58 2 9 . 4 0 2 9 . 2 3 3 0 . 0 ± 3 0 . 7 ± 3 0 . 7 ± 3 0 . 7 ± 3 0 . 7 ± 30 . 6 ± 3 0 . 6 ± 28.8028.7 8 28.8 2 28.86 28.7 428.73 28.6 9 28.6 428.6 3 28.53 28.4728.4328.3328.31 3 0 . 0 8 30 . 0 0 29.9 330.0 5 28.98 28.48 28.3928.49 28.3 6 28.2 4 28.30 28.37 28.44 28.51 28.54 28.72 28.93 29.15 29.3 5 29.6 2 29.9 0 2 9 . 9 ± 30.2 7 30.22 29.79 29.73 29.93 30.0 1 29.81 29.9530.1 2 30.27 30.1 5 3 0 . 2 4 29.52 FC: 30.56 29.7±29.6 ± 29.5 ± 29.7±29.8± 30.0±29.6± 30.1 5 30.3 4 30.20 30.26 30.9 8 30.40 30.94 31.00 30.1 9 30.77 30.2530.1130.3 2 30.39 30.35 30.1 930.0430.27 30.2 3 29.96 30.1 4 30.32 30.31 30.0 829.8930.1 9 30.2 5 29.9 4 30.14 30.3430.36 30.1730.0 830.37 30.48 30.2 2 30.25 3 0 . 9 030.30 30.3530.40 30.38 30.54 30.5 8 30.49 30 . 5 7 30.6 3 30.59 30.5 6 30.5 2 30.44 30.6 2 30.5 6 30.40 30.6±30.4± 30.4 ±30.4±30.2 ±30.0±30.0± 30.1±30.2± 30.3± 30.3± 30.4± 30.4± 30.4± 30.4 ±30.4± 30.4± 30.5 ± 30.5 ±30.5±30.5± 30 . 4 ± 30.4± 30.4± 30.6± 3 0 . 7 ± 3 0 . 6 ± 30.6± 3 0 . 7 ±RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C17GRADING PLAN - BUILDING 243 APRON &PARKING LOTGENERAL NOTES LEGEND: EXISTING GROUND CONTOURS FINISHED GRADE CONTOURS ASPHALT PAVEMENT RECONSTRUCTION TAXIWAY OBJECT FREE AREA (TOFA) FG ELEVATION DEVELOPMENT ENGINEERING yqi 02/18/2025 TOPSOIL & MULCHING LUA24-000299C25000687PR24-000063 31.60'31.60' 44.50' 44.50' 31.60'31.60'31.60'31.60' TIEDOWN N=182611.31 E=1299207.48 TIEDOWN N=182607.47 E=1299161.64 TIEDOWN N=182603.63 E=1299115.81 TIEDOWN N=182599.79 E=1299069.97 TIEDOWN N=182680.70 E=1299063.18 TIEDOWN N=182684.54 E=1299109.02 TIEDOWN N=182688.38 E=1299154.86 TIEDOWN N=182692.23 E=1299200.70 TIEDOWN N=182723.40 E=1299175.01 TIEDOWN N=182719.56 E=1299129.17 TIEDOWN N=182715.71 E=1299083.33 TIEDOWN N=182794.70 E=1299053.63 TIEDOWN N=182829.71 E=1299073.77 TIEDOWN N=182798.54 E=1299099.47 TIEDOWN N=182833.56 E=1299119.61 TIEDOWN N=182802.38 E=1299145.31 TIEDOWN N=182837.40 E=1299165.45 TIEDOWN N=182806.23 E=1299191.15 TIEDOWN N=182920.23 E=1299181.59 TIEDOWN N=182916.38 E=1299135.75 TIEDOWN N=182912.54 E=1299089.91 TIEDOWN N=182908.70 E=1299044.07 START 6" YELLOW ℄ N=182653.69 E=1299227.01 START 6" YELLOW ℄ N=182767.69 E=1299217.46 START 6" YELLOW ℄ N=182881.69 E=1299207.90 END NON-MOVEMENT AREA MARKING MATCH EXISTING MARKING N=182932.47 E=1299022.10 START NON-MOVEMENT AREA MARKING N=182576.20 E=1299052.03 N85°12'31"E 211.70' Δ=84°15'27" R=19.15' L=28.17' Δ=84°15'27" R=19.15' L=28.17' Δ=45°39'49" R=19.00' L=15.14' S39°32'42"W 9.27' N85°12'34"E 206.43' Δ=90°00'00" R=19.00' L=29.85' Δ=90°00'00" R=19.00' L=29.85' Δ=90°00'00" R=19.00' L=29.85' N85°12'34"E 206.52' Δ=90°00'00" R=19.00' L=29.85' S4°47'29"E 357.53' 51.20'51.20' GRADE BREAK N=182941.19 E=1299126.20 46.00' TYP 46.00'TYP46.00'TYP46.00'TYPRENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C18SITE AND STRIPING PLAN -WINDSOCK APRON100-YEAR FLOOD LINE SITE PLAN AND MARKING KEYNOTES: 1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND 3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR TIEDOWN MARKING (TYP). 2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL 1 ON SHEET C22. 3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING WITH GLASS BEADS. 4.PAINT 4" WHITE MARKING (TYP). 5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD PLAN 101. 6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE DETAIL 4 ON SHEET C21. 7.CONSTRUCT STANDARD 45° PARKING STALL. SEE DETAIL 3 ON SHEET C22 8.CONSTRUCT STANDARD PARKING STALL. SEE DETAIL 4 ON SHEET C22 . 9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE DETAIL 5 ON SHEET C22. 10.PLACE TOPSOIL AND MULCH LANDSCAPED AREAS. TOPSOIL AND MULCHING AREAS COMPLY WITH CITY OF RENTON MUNICIPAL CODE SECTION 4-4-070, LANDSCAPING AREA REQUIREMENTS. 11.PROTECT EXISTING AV FUEL SIGN IN PLACE. 12.INSTALL NEW TYPE 2 JUNCTION BOX FOR FUTURE FIBER CONNECTION (GATES PROJECT) 13.INSTALL 3" SCHEDULE 40 PVC CONDUIT WITH PULL CABLE FOR FUTURE FIBER CONNECTION (GATES PROJECT) 14.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2, AND 3 ON SHEET C21. USE TIEDOWN REFERENCE POINT PER DETAIL 2 ON SHEET C22 TO LOCATE ANCHORS BUT DO NOT APPLY TIEDOWN MARKINGS. 15.INSTALL NEW 25-TA ELECTRICAL VAULT AND STUB UP NEW EMPTY CONDUITS. 16.INSTALL SALVAGED GATE V7 AND ALL ASSOCIATED EQUIPMENT, INCLUDING GATE, OPERATOR ON NEW CONCRETE FOUNDATION, POWER CONTROL RACK AND CABINET, ACCESS CONTROL ANTENNAS, STROBE SENSOR, GATE CATCH STANCHION, SIGNS ON ADJACENT FENCE, CARD READER PEDESTAL AND CARD READERS, AND ALL ASSOCIATED EQUIPMENT TO PROVIDE A FULLY FUNCTIONING RELOCATED GATE. 17.INSTALL NEW BLACK CHAINLINK FENCE. LEGEND: ASPHALT PAVEMENT RECONSTRUCTION TOPSOIL & MULCHING PAVEMENT EDGE PROPOSED TIEDOWN ANCHOR TAXIWAY OBJECT FREE AREA (TOFA) FLOODWAY DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-0000633 62.00'AIRPORT WAY243 BLDG DRIVE LAN E EXISTING HANGAR TWY A7TAXIWAY A W. PERIMETER ROAD PROPERTY LINEW. PERIMETER ROADJ-BOXJ-BOXTIEDOWN N=180286.16 E=1298517.67 TIEDOWN N=180282.18 E=1298471.85 TIEDOWN N=180278.19 E=1298426.02 TIEDOWN N=180274.21 E=1298380.19 START N=180320.24 E=1298349.72 N85°01'48"E 211.34' Δ=43°52'08" R=19.00' L=14.55' N41°09'40"E 65.39' Δ=85°39'49" R=19.00' L=28.41' 14.25' START 4" WHITE EDGE LINE N=180159.13 E=1298651.03 START 4" WHITE EDGE LINE N=180126.90 E=1298655.14 END 4" WHITE EDGE LINE N=180379.50 E=1298535.00 END 4" WHITE EDGE LINE N=180375.26 E=1298514.85 20.00' TYP 15.00' TYP 25.00' TYP END 4" DASHED WHITE ℄ N=180371.67 E=1298526.24 START 4" DASHED WHITE CL N=180175.23 E=1298623.52 46.00' TYP GRADE BREAK N=180297.16 E=1298540.26 10.00' TYP RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C19SITE AND STRIPING PLAN - BUILDNG 243APRON & PARKING LOTR12.00' R9.00' R1.25' R10.00' R4.00' R3.50' R84.75' R20.00' R2.00' R301.10' R1.00' R36.00' R1.00' R1.00' R2.50' PEDESTRIAN GATE P10 EXISTING MANUAL GATE TO REMAIN SITE PLAN AND MARKING KEYNOTES: 1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND 3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR TIEDOWN MARKING (TYP) 2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL 1 ON SHEET C22 3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING WITH GLASS BEADS. 4.PAINT 4" WHITE MARKING (TYP) 5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD PLAN 101 6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE DETAIL 4 ON SHEET C21 7.CONSTRUCT STANDARD 45° PARKING STALL. SEE DETAIL 3 ON SHEET C22 8.CONSTRUCT STANDARD PARKING STALL. SEE DETAIL 4 ON SHEET C22 9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE DETAIL 5 ON SHEET C22 10.PLACE 6" DEPTH MULCHING PER SPECIFICATION T-908 11.PROTECT EXISTING AV FUEL SIGN IN PLACE 12.INSTALL NEW TYPE 2 JUNCTION BOX FOR FUTURE FIBER CONNECTION (GATES PROJECT) 13.INSTALL NEW 3" SCHEDULE 40 PVC CONDUIT WITH PULL CABLE FOR FUTURE FIBER (GATES PROJECT) PER DETAIL 1 SHEET C20. SWEEP NEW CONDUIT INTO NEW JUNCTION BOXES SHOWN. 14.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2, AND 3 ON SHEET C21. USE TIEDOWN REFERENCE POINT PER DETAIL 2 ON SHEET C22 TO LOCATE ANCHORS BUT DO NOT APPLY TIEDOWN MARKINGS 15.INSTALL NEW 25-TA ELECTRICAL VAULT AND STUB UP NEW EMPTY CONDUITS 16.INSTALL SALVAGED GATE V7 AND ALL ASSOCIATED EQUIPMENT, INCLUDING GATE, OPERATOR ON NEW CONCRETE FOUNDATION, POWER CONTROL RACK AND CABINET, ACCESS CONTROL ANTENNAS, STROBE SENSOR, GATE CATCH STANCHION, SIGNS ON ADJACENT FENCE, CARD READER PEDESTAL AND CARD READERS, AND ALL ASSOCIATED EQUIPMENT TO PROVIDE A FULLY FUNCTIONING RELOCATED GATE 17.INSTALL NEW BLACK VINYL COATED CHAINLINK FENCE PER SPECIFICATION F-162 LEGEND: ASPHALT PAVEMENT RECONSTRUCTION TOPSOIL & MULCHING PAVEMENT EDGE PROPOSED TIEDOWN ANCHOR TAXIWAY OBJECT FREE AREA (TOFA) FLOODWAY identify and show the new 6-inch sewer service line installed DEVELOPMENT ENGINEERING yqi 02/18/2025 4 5 LUA24-000299C25000687PR24-000063 RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22TYPICAL SECTIONSC20 CONSTRUCTION NOTES KEY NOTES DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22CIVIL DETAILSC21 CONSTRUCTION NOTES: AIRCRAFT MOORING EYE NOTES PLAN VIEW SECTION A-A SECTION B-B DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063 RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22MARKING DETAILSC22 DEVELOPMENT ENGINEERING yqi 02/18/2025 LUA24-000299C25000687PR24-000063