HomeMy WebLinkAboutApproved_Civil Construction Plan WSK & 243 Bldg ApronsRENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22
CITY OF RENTON
RENTON MUNICIPAL AIRPORT (RNT)
WINDSOCK & 243 BLDG. GA APRON &
PARKING LOT REHABILITATION
CAG-25-013
FEBRUARY 2025
SHEET INDEX
SHEET NO.SHEET NAME
PROJECT LOCATION
VICINITY MAP
PROJECT
SITE
243 BLDG
APRON &
PARKING
LOT
WIND SOCK
GA APRON
C1 COVER SHEETABBREVIATIONSLEGEND LUA24-000299C25000687PR24-000063DEVELOPMENT ENGINEERING
yqi 02/18/2025
RAMP
PAVED
PAVED
PAVED
PAVED PARKINGPAVEDPAVED
PAVED
WIND SOCK AIRPORTPROPERTY
FH
PAVED
PAVED
PAVED
MBX
600 BLDG500
BLDG
540
BLDG
800
BLDG
750 BLDG
616 BLDG
AIRPORT BEACON
AIRPORT MAINTENANCE BLDG
243
BLDG
WORK AREA #1
WORK AREA #2
BOEING AIRCRAFT BRIDGE
VEHICLE GATE V10
VEHICLE GATE V7
PED GATE P10
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C2CONSTRUCTION SITE PLANGENERAL NOTES:
LEGEND:
PERMIT INFORMATION:
ABBREVIATIONS:
LUA24-000299
4. The applicant shall comply with the recommendations found in the submitted
Geotechnical Report,
prepared by HWA Geosciences, Inc., dated November 2, 2023, and any future addenda
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
RAMP
PAVED
PAVED
PAVED
PAVED PARKINGPAVEDPAVED
PAVED
WIND SOCK AIRPORTPROPERT
Y
FH
PAVED
PAVED
PAVED
MBX
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C3SURVEY CONTROL PLANSURVEY NOTES:SURVEY CONTROL:
LEGEND:
SURVEY CONTROL POINT TABLE:
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
44.50'
44.50'
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
WORK AREA
BIRD CANNON
PLACE BARRICADES TO
BLOCK OFF PEDESTRIAN ACCESS
100-YEAR FLOOD LINE
20' MIN
FIRE LANE
NON-MOVEMENT AREA LINE -
DO NOT CROSS AT ANY TIME
3'RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C4CONSTRUCTION SAFETY &PHASING PLANWORK AREA #1 - PHASE 1: WINDSOCK APRON PAVEMENT REHABILITATION
ALLOWED DURATION: 28 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER
TAXIWAYS/TAXILANES OPEN
APRON STATUS:WINDSOCK APRON CLOSED, ALL
OTHER APRONS OPEN
IMPORTANT PHASE NOTES:
1)CONTRACTOR SHALL PLACE LOW-PROFILE BARRICADES ON
APRON SIDE OF NON-MOVEMENT LINE PRIOR TO BEGINNING
ANY WORK DAY.
2)CONTRACTOR SHALL NOT CROSS NON-MOVEMENT AREA LINE
AT ANY TIME WITHOUT ATCT CLEARANCE.
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK):
1)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1
WEEK PRIOR TO PROJECT COMMENCEMENT.
2)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS
HAVE BEEN RELOCATED PRIOR TO THE START OF WORK.
3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE
AIRCRAFT OPERATIONAL AREAS DURING PHASE 1 MUST VIEW
FAA GUIDE TO GROUND VEHICLE OPERATIONS PRIOR TO THE
START OF WORK.
4)PLACE LOW PROFILE BARRICADES AS SHOWN.
5)CONFIRM LIMITS OF FULL DEPTH PAVEMENT
RECONSTRUCTION WITH THE RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE
ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES
AROUND WORK AREAS.
3)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
4)INSTALL NEW TIEDOWN ANCHORS
5)COMPLETE INITIAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF
PHASE 1.
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
FIRE LANE
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C12
1
WORK AREA #1 - PHASE 1 NOTES:
CONSTRUCTION PHASING KEYNOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C12
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL DEPTH
RECONSTRUCTION, TIEDOWN
INSTALLATION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3A
VEHICLE GATE V10 RELOCATION
AND DRIVE AISLE (OUTSIDE AOA)
FULL DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
3B
DRIVE AISLE (INSIDE AOA) FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING
DAYS
4
BUILDING 243 PARKING LOT FULL
DEPTH RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING
DAYS
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
44.50'
44.50'
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
WORK AREA
BIRD CANNON
PLACE BARRICADES TO
BLOCK OFF PEDESTRIAN ACCESS
20' MIN.
FIRE LANE
100-YEAR FLOOD LINE
NON-MOVEMENT AREA LINE -
DO NOT CROSS AT ANY TIME
3'RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C5CONSTRUCTION SAFETY &PHASING PLANWORK AREA #1 - PHASE 2: WINDSOCK APRON FINAL PAVEMENT MARKINGS
ALLOWED DURATION: 4 HOURS (WITHIN TIME ALLOTTED
FOR WORK AREA 2)
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER
TAXIWAYS/TAXILANES OPEN
APRON STATUS:WINDSOCK APRON CLOSED, ALL
OTHER APRONS OPEN
IMPORTANT PHASING NOTES:
1.CONTRACTOR SHALL PLACE LOW-PROFILE BARRICADES ON
APRON SIDE OF NON-MOVEMENT LINE PRIOR TO BEGINNING
ANY WORK.
2.CONTRACTOR SHALL NOT CROSS NON-MOVEMENT AREA LINE
AT ANY TIME WITHOUT ATCT CLEARANCE.
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK):
1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS
HAVE BEEN RELOCATED PRIOR TO THE START OF WORK.
2)PLACE LOW PROFILE BARRICADES AS SHOWN.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE
ENGINEER.
2)COMPLETE FINAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK):
1)COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF
WORK AREA 1 PHASE 2.
WORK AREA #1 - PHASE 2 NOTES:
CONSTRUCTION PHASING KEYNOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C12
1
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
FIRE LANE
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C12
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL DEPTH
RECONSTRUCTION, TIEDOWN
INSTALLATION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3A
VEHICLE GATE V10 RELOCATION
AND DRIVE AISLE (OUTSIDE AOA)
FULL DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
3B
DRIVE AISLE (INSIDE AOA) FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING
DAYS
4
BUILDING 243 PARKING LOT FULL
DEPTH RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING
DAYS
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
J-BOX J-BOX
62'
EXISTING VEHICLE
GATE V7
PEDESTRIAN
GATE P10
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C6CONSTRUCTION SAFETY &PHASING PLANPHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL DEPTH
RECONSTRUCTION, TIEDOWN
INSTALLATION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3A
VEHICLE GATE V10 RELOCATION
AND DRIVE AISLE (OUTSIDE AOA)
FULL DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
3B
DRIVE AISLE (INSIDE AOA) FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING
DAYS
4
BUILDING 243 PARKING LOT FULL
DEPTH RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING
DAYS
WORK AREA #2 - PHASE 1: BUILDING 243 APRON PAVEMENT REHABILITATION
ALLOWED DURATION: 13 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL
OTHER TAXIWAYS/TAXILANES OPEN
APRON STATUS:NORTH HALF OF 243 BUILDING APRON
CLOSED, WINDSOCK APRON CLOSED, ALL
OTHER APRONS OPEN
IMPORTANT PHASING NOTES:
1)COORDINATE WITH AIRPORT ENGINEER A MINIMUM OF 72-HOURS PRIOR
TO STARTING WORK IN THIS PHASE TO ALLOW FOR RELOCATION OF
AIRCRAFT IN 250 HANGAR.
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK):
1)COORDINATE WITH AIRPORT STAFF TO REMOVE AIRCRAFT FROM
EXISTING HANGAR PRIOR TO START OF CONSTRUCTION.
2)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1 WEEK PRIOR
TO PROJECT COMMENCEMENT.
3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE AIRCRAFT
OPERATIONAL AREAS DURING PHASE 1 MUST VIEW FAA GUIDE TO
GROUND VEHICLE OPERATIONS PRIOR TO THE START OF WORK.
4)PLACE LOW PROFILE BARRICADES AS SHOWN.
5)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR.
6)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH
THE RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS.
4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
5)INSTALL NEW TIEDOWN ANCHORS
6)COMPLETE INITIAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF WORK
AREA 2, PHASE 1..
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
LANE CLOSURE
C12
1
WORK AREA #2 - PHASE 1 NOTES:
CONSTRUCTION PHASING KEYNOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C12
1
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
J-BOX J-BOX
J-BOX J-BOX
62.00'
VEHICLE GATE V10
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
PEDESTRIAN
GATE P10
WORK AREA
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL DEPTH
RECONSTRUCTION, TIEDOWN
INSTALLATION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3A
VEHICLE GATE V10 RELOCATION
AND DRIVE AISLE (OUTSIDE AOA)
FULL DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
3B
DRIVE AISLE (INSIDE AOA) FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING
DAYS
4
BUILDING 243 PARKING LOT FULL
DEPTH RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING
DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C7CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 2: BUILDING 243 APRON RECONSTRUCTION
ALLOWED DURATION: 5 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:ALL TAXIWAYS/TAXILANES OPEN
APRON STATUS:SOUTH HALF OF 243 BUILDING APRON CLOSED,
ALL OTHER APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK):
1)PLACE LOW PROFILE BARRICADES AS SHOWN.
2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR.
3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE
RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS.
4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
5)COMPLETE INITIAL PAINT MARKINGS.
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 2.
WORK AREA #2 - PHASE 2 NOTES:
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C12
1
CONSTRUCTION PHASING KEYNOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C12
1
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
J-BOX J-BOX
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
EXISTING VEHICLE
GATE V7
WORK AREA
62.00'
PEDESTRIAN
GATE P10
RELOCATED VEHICLE
GATE V7
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL DEPTH
RECONSTRUCTION, TIEDOWN
INSTALLATION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3A
VEHICLE GATE V10 RELOCATION
AND DRIVE AISLE (OUTSIDE AOA)
FULL DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
3B
DRIVE AISLE (INSIDE AOA) FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING
DAYS
4
BUILDING 243 PARKING LOT FULL
DEPTH RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING
DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C8CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 3A: BUILDING 243 DRIVE LANE REHABILITATION (OUTSIDE AOA)
ALLOWED DURATION: 8 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:ALL OPEN
TAXIWAY/TAXILANE STATUS:ALL OPEN
APRON STATUS:ALL OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 3A WORK):
1)PLACE LOW PROFILE BARRICADES AS SHOWN.
2)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN.
3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE
RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)CONFIRM TEMPORARY CONE OR DRUM LOCATIONS WITH THE ENGINEER
3)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
4)RELOCATE EXISTING FENCE, GATE AND ASSOCIATED APPARATUSES.
5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
6)COMPLETE INITIAL PAINT MARKINGS.
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 3A WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 3A.
WORK AREA #2 - PHASE 3A NOTES:
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C12
1
CONSTRUCTION PHASING KEYNOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C12
1
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
J-BOX J-BOX
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
EXISTING VEHICLE
GATE V7
62.00'
PEDESTRIAN
GATE P10
WORK AREA
RELOCATED VEHICLE
GATE V7
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL DEPTH
RECONSTRUCTION, TIEDOWN
INSTALLATION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3A
VEHICLE GATE V10 RELOCATION
AND DRIVE AISLE (OUTSIDE AOA)
FULL DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
3B
DRIVE AISLE (INSIDE AOA) FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING
DAYS
4
BUILDING 243 PARKING LOT FULL
DEPTH RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING
DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C9CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 3A: BUILDING 243 DRIVE LANE REHABILITATION (OUTSIDE AOA)
ALLOWED DURATION: 2 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:ALL OPEN
TAXIWAY/TAXILANE STATUS:ALL OPEN
APRON STATUS:ALL OPEN
IMPORTANT PHASE NOTES:
1)COORDINATE WITH AIRPORT ENGINEER A MINIMUM OF 72-HOURS PRIOR TO
STARTING WORK IN THIS PHASE TO ALLOW FOR RELOCATION OF AIRCRAFT
IN 250 HANGAR.
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 3A WORK):
1)PLACE LOW PROFILE BARRICADES AS SHOWN.
2)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN.
3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE
RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)CONFIRM TEMPORARY CONE OR DRUM LOCATIONS WITH THE ENGINEER
3)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
4)RELOCATE EXISTING FENCE, GATE AND ASSOCIATED APPARATUSES.
5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
6)COMPLETE INITIAL PAINT MARKINGS.
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 3A WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 3A.
WORK AREA #2 - PHASE 3B NOTES:
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C12
1
CONSTRUCTION PHASING KEYNOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C12
1
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
J-BOX J-BOX
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
62.00'
PEDESTRIAN
GATE P10
PROPOSED VEHICLE
GATE V7
WORK AREA
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL DEPTH
RECONSTRUCTION, TIEDOWN
INSTALLATION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3A
VEHICLE GATE V10 RELOCATION
AND DRIVE AISLE (OUTSIDE AOA)
FULL DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
3B
DRIVE AISLE (INSIDE AOA) FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING
DAYS
4
BUILDING 243 PARKING LOT FULL
DEPTH RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING
DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C10CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 4: BUILDING 243 PARKING LOT RECONSTRUCTION
ALLOWED DURATION: 8 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:ALL OPEN
TAXIWAY/TAXILANE STATUS:ALL OPEN
APRON STATUS:ALL OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 4 WORK):
1)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN.
2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR.
3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE
RPR.
WORK ELEMENTS:
1)CONFIRM TEMPORARY TRAFFIC CONE OR DRUM LOCATIONS WITH THE
ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS.
4)COMPLETE EXTRUDED CURB REMOVAL
5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
6)CONSTRUCT LANDSCAPE ISLANDS.
7)COMPLETE INITIAL PAINT MARKINGS.
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 4 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 4.
WORK AREA #2 - PHASE 4 NOTES:
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C12
1
CONSTRUCTION PHASING KEYNOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C12
1
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
J-BOX J-BOX
62.00'
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
VEHICLE GATE V7
WORK AREA
PEDESTRIAN
GATE P10
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL DEPTH
RECONSTRUCTION, TIEDOWN
INSTALLATION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3A
VEHICLE GATE V10 RELOCATION
AND DRIVE AISLE (OUTSIDE AOA)
FULL DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
3B
DRIVE AISLE (INSIDE AOA) FULL
DEPTH RECONSTRUCTION AND
INITIAL MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING
DAYS
4
BUILDING 243 PARKING LOT FULL
DEPTH RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY 16-34
OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY 16-34
OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS AND
TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING
DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C11CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 5: BUILDING 243 APRON FINAL PAVEMENT MARKINGS
ALLOWED DURATION: 4 HOURS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL
OTHER TAXIWAYS/TAXILANES OPEN
APRON STATUS:243 BUILDING APRON CLOSED, ALL OTHER
APRONS OPEN
IMPORTANT PHASE NOTES:
1)COORDINATE WITH AIRPORT ENGINEER A MINIMUM OF 72-HOURS PRIOR
TO STARTING WORK IN THIS PHASE TO ALLOW FOR RELOCATION OF
AIRCRAFT IN 250 HANGAR.
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 5 WORK):
1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN
RELOCATED PRIOR TO THE START OF WORK.
2)PLACE LOW PROFILE BARRICADES AS SHOWN.
3)PLACE TRAFFIC CONE AND DRUMS AS SHOWN.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)CONFIRM TRAFFIC CONE AND DRUM LOCATIONS WITH THE ENGINEER.
3)COMPLETE FINAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 5 WORK):
3) COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF PHASE 5.
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C12
1
WORK AREA #2 - PHASE 5 NOTES:
CONSTRUCTION PHASING KEYNOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C12
1
The existing lift station located under
aircraft apron and associated 4-inch
cast iron force main shall be removed.
A separate electrical permit shall be
required.
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063cap the end of the
abandoned force main
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22CONSTRUCTION SAFETY &PHASING DETAILSLOW PROFILE BARRICADE DETAIL
LOW PROFILE BARRICADE NOTES:
C12
GENERAL CONSTRUCTION SAFETY AND PHASING NOTES:
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
44.50'
44.50'
SAWCUT ALONG EXISTING JOINT
20' MIN
FIRE LANE
100-YEAR FLOOD LINE
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C13SITE PREPARATION & TESC PLANLEGEND:
PROPERTY LINE
STORM DRAIN INLET PROTECTION
SILT FENCE
TRIANGULAR SILT DIKE
TAXIWAY OBJECT FREE AREA
EXISTING WATER
EXISTING STORM DRAIN
EXISTING ELECTRICAL
EXISTING TELECOMMUNICATIONS
EXISTING GAS
EXISTING PAVEMENT EDGE
EXISTING FENCE
PROPOSED SAWCUT
REMOVE EXISTING EXTRUDED CURB
REMOVE EXISTING PAINT MARKING
CLEARING AND GRUBBING AND
EXCAVATION AS NEEDED
ASPHALT REMOVAL
CONCRETE REMOVAL
FLOODWAY
1.EROSION CONTROL METHODS MUST BE IN PLACE
PRIOR TO COMMENCEMENT OF SITE PREPARATION
AND REMOVALS.
2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND
SAFELY DISPOSED OF.
3.PROTECT ALL EXISTING UTILITY LINES IN PLACE.
EROSION CONTROL KEYNOTES:
1.INSTALL STORM DRAIN INLET PROTECTION PER
WSDOT STD PLAN I-40.20-00.
2.INSTALL SILT FENCE PER WSDOT STD PLAN
I-30.15-02.
3.INSTALL TRIANGULAR SILT DIKE PER DTL ON SHEET
C15.
EROSION CONTROL GENERAL NOTES:
SITE PREPARATION KEYNOTES:
1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT
PAVEMENT.
2.CLEAR AND GRUB AND EXCAVATE TO FINISHED
GRADE, AS NEEDED.
3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE.
ADJUST RIM AS NEEDED.
4.PROTECT EXISTING FENCE IN PLACE.
5.REMOVE EXISTING EXTRUDED CURB.
6.SAWCUT EXISTING PAVEMENT.
7.REMOVE EXISTING PAINT MARKING.
8.PROTECT EXISTING CATCH BASIN IN PLACE. SEE
PLAN FOR PROPOSED RIM ADJUSTMENTS.
Know what'sbelow.
before you dig.Call
R
per cor std plan,
216.30, typ.
per cor std plan,
214.00, typ.
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
J-BOX
62'
RELOCATE EXISTING
VEHICLE GATE V7, FENCE AND
ALL ASSOCIATED EQUIPMENT,
SEE SHEET C19.
PEDESTRIAN
GATE P10
TAXIWAY A CL
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C14SITE PREPARATION & TESC PLANLEGEND:
PROPERTY LINE
STORM DRAIN INLET PROTECTION
SILT FENCE
TRIANGULAR SILT DIKE
TAXIWAY OBJECT FREE AREA
EXISTING WATER
EXISTING STORM DRAIN
EXISTING ELECTRICAL
EXISTING TELECOMMUNICATIONS
EXISTING GAS
EXISTING PAVEMENT EDGE
EXISTING FENCE
PROPOSED SAWCUT
REMOVE EXISTING EXTRUDED CURB
CLEARING AND GRUBBING AND
EXCAVATION AS NEEDED
ASPHALT REMOVAL
CONCRETE REMOVAL
FLOODWAY
1.EROSION CONTROL METHODS MUST BE IN PLACE
PRIOR TO COMMENCEMENT OF SITE PREPARATION
AND REMOVALS.
2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND
SAFELY DISPOSED OF.
3.PROTECT ALL EXISTING UTILITY LINES IN PLACE.
EROSION CONTROL KEYNOTES:
1.INSTALL STORM DRAIN INLET PROTECTION PER
WSDOT STD PLAN I-40.20-00.
2.INSTALL SILT FENCE PER WSDOT STD PLAN
I-30.15-02.
3.INSTALL TRIANGULAR SILT DIKE PER DTL ON SHEET
C15.
EROSION CONTROL GENERAL NOTES:
SITE PREPARATION KEYNOTES:
1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT
PAVEMENT.
2.CLEAR AND GRUB AND EXCAVATE TO FINISHED
GRADE, AS NEEDED.
3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE.
ADJUST RIM AS NEEDED.
4.PROTECT EXISTING FENCE IN PLACE.
5.REMOVE EXISTING EXTRUDED CURB.
6.SAWCUT EXISTING PAVEMENT.
7.PROTECT EXISTING CATCH BASIN IN PLACE. SEE
PLAN FOR PROPOSED RIM ADJUSTMENTS.
8.PROTECT EXISTING AV FUEL SIGN IN PLACE.
9.REMOVE AND SALVAGE GATE V7 AND ALL
ASSOCIATED EQUIPMENT, INCLUDING GATE,
OPERATOR ON NEW CONCRETE FOUNDATION,
POWER CONTROL RACK AND CABINET, ACCESS
CONTROL ANTENNAS, STROBE SENSOR, GATE
CATCH STANCHION, SIGNS ON ADJACENT FENCE,
CARD READER PEDESTAL AND CARD READERS,
AND ALL ASSOCIATED EQUIPMENT TO PROVIDE A
FULLY FUNCTIONING RELOCATED GATE
Know what'sbelow.
before you dig.Call
R
per cor std plan,
216.30, typ.
per cor std plan,
214.00, typ.
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22SITE PREPARATION &TESC DETAILSTRIANGULAR SILT DIKE DETAIL
C15Know what'sbelow.
before you dig.Call
R
DEVELOPMENT ENGINEERING
yqi 02/18/2025
TRIANGULAR SILT DIKE DETAIL LUA24-000299C25000687PR24-000063
WIND SOCK
15'
TYP.15'
TYP.
23.33
2
3
.
3
3
23.32
2
3
.
3
3
23.36
23.39
23.42
2
3
.
4
3
23.42
2
3
.
4
8
23.55
2
3
.
6
1
23.26
2
3
.
2
5
23.26
2
3
.
2
8
23.31
23.33
23.34
2
3
.
3
4
23.34
2
3
.
4
0
23.48
2
3
.
5
5
23.17
2
3
.
1
8
23.19
2
3
.
2
2
23.25
23.28
23.27
2
3
.
2
6
23.25
2
3
.
3
2
23.40
2
3
.
4
9
23.08
2
3
.
0
9
23.12
2
3
.
1
6
23.19
23.23
23.21
2
3
.
1
9
23.17
2
3
.
2
4
23.33
2
3
.
4
2
23.01
2
3
.
0
2
23.05
2
3
.
0
9
23.13
23.17
23.15
2
3
.
1
2
23.09
2
3
.
1
7
23.27
2
3
.
3
8
22.95
2
2
.
9
6
22.98
2
3
.
0
3
23.08
23.12
23.08
2
3
.
0
5
23.01
2
3
.
1
0
23.23
2
3
.
3
6
22.90
2
2
.
9
0
22.91
2
2
.
9
6
23.02
23.07
23.02
2
2
.
9
7
22.93
2
3
.
0
3
23.19
2
3
.
3
5
22.88
2
2
.
8
4
22.84
2
2
.
9
0
22.96
23.01
22.96
2
2
.
9
0
22.85
2
2
.
9
7
23.15
2
3
.
3
4
22.90
2
2
.
8
1
22.77
2
2
.
8
3
22.90
22.96
22.89
2
2
.
8
3
22.76
2
2
.
9
0
23.11
2
3
.
3
2
22.91
2
2
.
7
7
22.70
2
2
.
7
7
22.84
22.91
22.83
2
2
.
7
6
22.68
2
2
.
8
3
23.06
2
3
.
2
8
22.94
2
2
.
7
4
22.62
2
2
.
7
0
22.78
22.85
22.77
2
2
.
6
9
22.60
2
2
.
7
5
22.99
2
3
.
2
4
22.96
2
2
.
7
3
22.55
2
2
.
6
6
22.74
22.80
22.74
2
2
.
6
5
22.54
2
2
.
6
8
22.94
2
3
.
2
0
22.98
2
2
.
7
5
22.60
2
2
.
6
8
22.76
22.84
22.75
2
2
.
6
6
22.57
2
2
.
6
9
22.93
2
3
.
1
6
23.02
2
2
.
8
0
22.66
2
2
.
7
3
22.81
22.88
22.79
2
2
.
7
1
22.62
2
2
.
7
4
22.95
2
3
.
1
7
23.09
2
2
.
8
7
22.72
2
2
.
7
9
22.86
2
2
.
9
2
22.84
2
2
.
7
6
22.67
2
2
.
7
9
22.98
2
3
.
1
9
23.16
2
2
.
9
3
22.78
2
2
.
8
4
22.91
2
2
.
9
7
22.89
2
2
.
8
0
22.72
2
2
.
8
1
23.00
2
3
.
1
8
23.20
2
2
.
9
8
22.84
2
2
.
8
9
22.95
2
3
.
0
1
22.93
2
2
.
8
5
22.78
2
2
.
8
4
22.99
2
3
.
1
5
23.21
2
3
.
0
2
22.90
2
2
.
9
5
23.00
2
3
.
0
5
22.98
2
2
.
9
0
22.83
2
2
.
9
0
22.97
2
3
.
0
8
23.27
2
3
.
0
8
22.95
2
3
.
0
0
23.05
2
3
.
1
0
23.03
2
2
.
9
7
22.89
2
2
.
9
7
23.04
2
3
.
0
0
23.35
2
3
.
1
6
23.01
2
3
.
0
6
23.10
2
3
.
1
4
23.09
2
3
.
0
4
22.99
2
3
.
0
6
23.13
2
3
.
1
7
2
3
.
2
0
23.07
2
3
.
1
1
23.15
2
3
.
1
8
23.15
2
3
.
1
3
23.10
2
3
.
1
5
23.21
2
3
.
2
5
2
3
.
1
6
23.12
2
3
.
1
3
23.17
2
3
.
2
2
23.23
2
3
.
2
2
23.20
2
3
.
2
4
23.28
2
3
.
3
1
2
3
.
0
2
23.06
2
3
.
1
2
23.17
2
3
.
2
7
23.31
2
3
.
3
2
23.32
2
3
.
3
3
23.35
2
3
.
3
7
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
6
±
2
3
.
6
±
2
3
.
6
±
2
3
.
7
±
2
3
.
6
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
23.5±
2
3
.
7
±23.4±23.3±23.2±23.1±23.0±23.0±22.9±22.9±23.0±23.0±23.1±23.1±23.1±23.1±23.2±23.3±23.3±23.3±23.3±23.4±23.4±23.2±23.1±22.8±22.8±
2
2
.
8
±
2
3
.
0
±
2
3
.
1
±
2
3
.
1
±
2
3
.
3
±
2
3
.
4
±
2
3
.
5
±
2
3
.
5
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
23.4±23.39 23.3
3
23.2
8
23.2
3
23.1
7
23.1
2 23.0222.96 22.9
1
22.8
6
22.8
0
22.8
4
22.8
8
23.2
7 23.3±
START GRID
N=182932.69
E=1299021.95
44.50'
44.50'
100-YEAR FLOOD LINE
21' MIN
TRAVEL LANE
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C16GRADING PLAN - WINDSOCKAPRONGENERAL NOTES
LEGEND:
EXISTING GROUND CONTOUR
FINISHED GRADE CONTOUR
ASPHALT PAVEMENT
RECONSTRUCTION
TAXIWAY OBJECT FREE AREA (TOFA)
FG ELEVATION
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
J-BO
X
J-BO
X
14'
TYP
14'TYP2'
15'
TYP
15'
TYP
START GRID
N=180196.38
E=1298454.88
START GRID
N=180359.59
E=1298346.30
3
0
.
5
±
3
0
.
2
±
3
0
.
2
±
3
0
.
0
±
2
9
.
9
±
2
9
.
8
±
29.7
±
29.5
±29.4±
3
0
.
3
±
FC: 30.35
FC: 30.50
FC: 30.50
FC: 30.25
FC: 30.25 FC: 30.23
FC: 30.37
FC: 30.62
FC: 30.56
FC: 30.29
FC: 30.24
FC: 30.34FC: 30.35
FC: 30.47
3
0
.
5
3
3
0
.
4
6
30.43
30.3
830.35
30.3130.27
30.2
0
30.16
30.20
30.36
3
0
.
5
1
3
0
.
4
430.39
30.3
5
30.2
9
30.2
3
30.16
30.07
30.0
2
30.04
30.1
8
3
0
.
4
1
30.36
30.3
0
30.24
30.16
30.05
29.9
429.8529.8229.86
29.27
29.55
29.6
9
29.8
1
29.95
30.1
0
30.2
0
30.26
30.32
3
0
.
4
±
30.2
930.24
FC: 30.30
FC: 30.30
FC: 30.41
FC: 30.36
FC: 30.39
FC: 30.40
FC: 30.55
FC: 30.54
FC: 30.42
FC: 30.57
FC: 30.42
FC: 30.41
FC: 30.54FC: 30.54
FC: 30.64
FC: 30.30
FC: 30.40
FC: 30.44
FC: 30.38
FC: 30.30
29
.
9
3
2
9
.
7
9
2
9
.
6
6
2
9
.
5
0
2
9
.
3
3
29
.
2
0
2
9
.
1
4
2
9
.
0
8
2
9
.
0
1
28.9
5
28
.
9
0
2
9
.
0
2
2
9
.
8
0
2
9
.
6
1
2
9
.
4
4
2
9
.
2
6
2
9
.
0
7
2
8
.
9
3
2
8
.
8
7
2
8
.
8
1
2
8
.
7
4
2
8
.
6
8
2
8
.
6
4
2
8
.
7
1
29.67
29.42
29.22
29.0228.81
28.6
5
28.60
28.5
428.4728.4028.3528.44
29.59
29.34
29.1
4
28.9
4
28.73
28.57
28.53
28.4
7
28.3
9
28.3
2
28.28
28.3
7
29.5429.32
29.1
4
28.9
5
28.7
6
28.63
28.5728.51
28.4
5
28.4
0
28.35
28.40
29.3
029.1328.9628.7828.69 28.6328.5828.52
28.4
7
28.4
2
28.41
29.1
8
29.0
2
28.8
7
28.7
4
28.7
3
28.71
28.67
28.6
428.5928.5428.48
29.04
28.87
28.8
0
28.80
28.80
28.79
28.7
7
28.7
6
28.7
4
28.6
9
28.61
29.1±28.9±
28.9
±
28.9
±
28.9
±
28.9
±
28.9±
28.9±
28.9±
28.9±
28.8±
28.8±
2
9
.
0
0
28.7328.60 28.58
28.5
7
28.48 28.51
28.5
6
28.6
±29.85
28.90 28.8528.8
6
28.85
28.7
9
30.17
28.9±28.9
±28.9±28.9±28.8±28.8±
28.6±28.7
±
28.9
8 29.1±
29.3
±
2
8
.
9
±
28.7
9
28.7±28.7±28.8±
29.2629.3
7
29.4
8
29.7
5
28.7
±
2
9
.
1
±
2
9
.
5
±
2
9
.
5
±
2
9
.
9
±
3
0
.
1
±
29.8
±
2
9
.
2
±
2
9
.
4
6
2
9
.
4
6
29.66
29.72
2
9
.
8
3
29.82
30.4
±
30.5
±
30.5±
30.4±
30.4±
30.4
±
30.4±30.3±
30.3
±
30.4
±
3
0
.
5
±
3
0
.
5
±
3
0
.
6
±
3
0
.
4
±
30
.
3
±
3
0
.
4
±
30.5
±
3
0
.
6
±
30.7±
30.5
±
3
0
.
5
±
29.95
30.5±
30.5±30.5±
30.4
±
30.4
±
30.4
±
30.5
±
30.4±
3
0
.
4
±
FC: 30.50
FC: 30.30 3
0
.
4
±
30
.
5
±
3
0
.
5
±
3
0
.
5
±
3
0
.
8
±
3
0
.
1
±
29.9±
2
9
.
7
7
3
0
.
6
±
3
0
.
2
±
30.15
3
0
.
0
8
30.03
3
0
.
1
4
29.8
929.7329.58
2
9
.
4
0
2
9
.
2
3
3
0
.
0
±
3
0
.
7
±
3
0
.
7
±
3
0
.
7
±
3
0
.
7
±
30
.
6
±
3
0
.
6
±
28.8028.7
8
28.8
2
28.86
28.7
428.73
28.6
9
28.6
428.6
3
28.53
28.4728.4328.3328.31
3
0
.
0
8
30
.
0
0
29.9
330.0
5
28.98
28.48 28.3928.49
28.3
6
28.2
4
28.30
28.37
28.44
28.51
28.54
28.72
28.93
29.15
29.3
5
29.6
2
29.9
0
2
9
.
9
±
30.2
7
30.22
29.79 29.73
29.93
30.0
1
29.81
29.9530.1
2
30.27
30.1
5
3
0
.
2
4
29.52
FC: 30.56
29.7±29.6
±
29.5
±
29.7±29.8±
30.0±29.6±
30.1
5
30.3
4
30.20
30.26
30.9
8
30.40
30.94
31.00
30.1
9
30.77
30.2530.1130.3
2
30.39
30.35
30.1
930.0430.27
30.2
3
29.96
30.1
4
30.32
30.31
30.0
829.8930.1
9
30.2
5
29.9
4
30.14
30.3430.36
30.1730.0
830.37
30.48
30.2
2
30.25 3
0
.
9
030.30
30.3530.40
30.38
30.54
30.5
8
30.49
30
.
5
7
30.6
3
30.59
30.5
6
30.5
2
30.44
30.6
2
30.5
6
30.40 30.6±30.4±
30.4
±30.4±30.2
±30.0±30.0±
30.1±30.2±
30.3±
30.3±
30.4±
30.4±
30.4±
30.4
±30.4±
30.4±
30.5
±
30.5
±30.5±30.5±
30
.
4
±
30.4±
30.4±
30.6±
3
0
.
7
±
3
0
.
6
±
30.6±
3
0
.
7
±RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C17GRADING PLAN - BUILDING 243 APRON &PARKING LOTGENERAL NOTES
LEGEND:
EXISTING GROUND CONTOURS
FINISHED GRADE CONTOURS
ASPHALT PAVEMENT
RECONSTRUCTION
TAXIWAY OBJECT FREE AREA (TOFA)
FG ELEVATION
DEVELOPMENT ENGINEERING
yqi 02/18/2025
TOPSOIL & MULCHING LUA24-000299C25000687PR24-000063
31.60'31.60'
44.50'
44.50'
31.60'31.60'31.60'31.60'
TIEDOWN
N=182611.31
E=1299207.48
TIEDOWN
N=182607.47
E=1299161.64
TIEDOWN
N=182603.63
E=1299115.81
TIEDOWN
N=182599.79
E=1299069.97
TIEDOWN
N=182680.70
E=1299063.18
TIEDOWN
N=182684.54
E=1299109.02
TIEDOWN
N=182688.38
E=1299154.86
TIEDOWN
N=182692.23
E=1299200.70
TIEDOWN
N=182723.40
E=1299175.01
TIEDOWN
N=182719.56
E=1299129.17
TIEDOWN
N=182715.71
E=1299083.33
TIEDOWN
N=182794.70
E=1299053.63
TIEDOWN
N=182829.71
E=1299073.77
TIEDOWN
N=182798.54
E=1299099.47
TIEDOWN
N=182833.56
E=1299119.61
TIEDOWN
N=182802.38
E=1299145.31
TIEDOWN
N=182837.40
E=1299165.45
TIEDOWN
N=182806.23
E=1299191.15
TIEDOWN
N=182920.23
E=1299181.59
TIEDOWN
N=182916.38
E=1299135.75
TIEDOWN
N=182912.54
E=1299089.91
TIEDOWN
N=182908.70
E=1299044.07
START 6" YELLOW ℄
N=182653.69
E=1299227.01
START 6" YELLOW ℄
N=182767.69
E=1299217.46
START 6" YELLOW ℄
N=182881.69
E=1299207.90
END NON-MOVEMENT AREA MARKING
MATCH EXISTING MARKING
N=182932.47
E=1299022.10
START NON-MOVEMENT AREA MARKING
N=182576.20
E=1299052.03
N85°12'31"E
211.70'
Δ=84°15'27"
R=19.15'
L=28.17'
Δ=84°15'27"
R=19.15'
L=28.17'
Δ=45°39'49"
R=19.00'
L=15.14'
S39°32'42"W
9.27'
N85°12'34"E
206.43'
Δ=90°00'00"
R=19.00'
L=29.85'
Δ=90°00'00"
R=19.00'
L=29.85'
Δ=90°00'00"
R=19.00'
L=29.85'
N85°12'34"E
206.52'
Δ=90°00'00"
R=19.00'
L=29.85'
S4°47'29"E
357.53'
51.20'51.20'
GRADE BREAK
N=182941.19
E=1299126.20
46.00'
TYP 46.00'TYP46.00'TYP46.00'TYPRENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C18SITE AND STRIPING PLAN -WINDSOCK APRON100-YEAR FLOOD LINE
SITE PLAN AND MARKING KEYNOTES:
1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND
3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR
TIEDOWN MARKING (TYP).
2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL
1 ON SHEET C22.
3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING
WITH GLASS BEADS.
4.PAINT 4" WHITE MARKING (TYP).
5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB
AND GUTTER PER COR STD PLAN 101.
6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE
DETAIL 4 ON SHEET C21.
7.CONSTRUCT STANDARD 45° PARKING STALL. SEE
DETAIL 3 ON SHEET C22
8.CONSTRUCT STANDARD PARKING STALL. SEE
DETAIL 4 ON SHEET C22 .
9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE
DETAIL 5 ON SHEET C22.
10.PLACE TOPSOIL AND MULCH LANDSCAPED AREAS.
TOPSOIL AND MULCHING AREAS COMPLY WITH CITY
OF RENTON MUNICIPAL CODE SECTION 4-4-070,
LANDSCAPING AREA REQUIREMENTS.
11.PROTECT EXISTING AV FUEL SIGN IN PLACE.
12.INSTALL NEW TYPE 2 JUNCTION BOX FOR FUTURE
FIBER CONNECTION (GATES PROJECT)
13.INSTALL 3" SCHEDULE 40 PVC CONDUIT WITH PULL
CABLE FOR FUTURE FIBER CONNECTION (GATES
PROJECT)
14.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2, AND
3 ON SHEET C21. USE TIEDOWN REFERENCE POINT
PER DETAIL 2 ON SHEET C22 TO LOCATE ANCHORS
BUT DO NOT APPLY TIEDOWN MARKINGS.
15.INSTALL NEW 25-TA ELECTRICAL VAULT AND STUB
UP NEW EMPTY CONDUITS.
16.INSTALL SALVAGED GATE V7 AND ALL ASSOCIATED
EQUIPMENT, INCLUDING GATE, OPERATOR ON NEW
CONCRETE FOUNDATION, POWER CONTROL RACK
AND CABINET, ACCESS CONTROL ANTENNAS,
STROBE SENSOR, GATE CATCH STANCHION, SIGNS
ON ADJACENT FENCE, CARD READER PEDESTAL
AND CARD READERS, AND ALL ASSOCIATED
EQUIPMENT TO PROVIDE A FULLY FUNCTIONING
RELOCATED GATE.
17.INSTALL NEW BLACK CHAINLINK FENCE.
LEGEND:
ASPHALT PAVEMENT RECONSTRUCTION
TOPSOIL & MULCHING
PAVEMENT EDGE
PROPOSED TIEDOWN ANCHOR
TAXIWAY OBJECT FREE AREA (TOFA)
FLOODWAY
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-0000633
62.00'AIRPORT WAY243
BLDG
DRIVE LAN
E
EXISTING
HANGAR
TWY A7TAXIWAY
A
W. PERIMETER ROAD
PROPERTY LINEW. PERIMETER ROADJ-BOXJ-BOXTIEDOWN
N=180286.16
E=1298517.67
TIEDOWN
N=180282.18
E=1298471.85
TIEDOWN
N=180278.19
E=1298426.02
TIEDOWN
N=180274.21
E=1298380.19
START
N=180320.24
E=1298349.72
N85°01'48"E
211.34'
Δ=43°52'08"
R=19.00'
L=14.55'
N41°09'40"E
65.39'
Δ=85°39'49"
R=19.00'
L=28.41'
14.25'
START 4" WHITE EDGE LINE
N=180159.13
E=1298651.03
START 4" WHITE EDGE LINE
N=180126.90
E=1298655.14
END 4" WHITE EDGE LINE
N=180379.50
E=1298535.00
END 4" WHITE EDGE LINE
N=180375.26
E=1298514.85
20.00'
TYP
15.00'
TYP
25.00'
TYP
END 4" DASHED WHITE ℄
N=180371.67
E=1298526.24
START 4" DASHED WHITE CL
N=180175.23
E=1298623.52
46.00'
TYP
GRADE BREAK
N=180297.16
E=1298540.26
10.00'
TYP
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C19SITE AND STRIPING PLAN - BUILDNG 243APRON & PARKING LOTR12.00'
R9.00'
R1.25'
R10.00'
R4.00'
R3.50'
R84.75'
R20.00'
R2.00'
R301.10'
R1.00'
R36.00'
R1.00'
R1.00'
R2.50'
PEDESTRIAN
GATE P10
EXISTING MANUAL
GATE TO REMAIN
SITE PLAN AND MARKING KEYNOTES:
1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND
3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR
TIEDOWN MARKING (TYP)
2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL
1 ON SHEET C22
3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING
WITH GLASS BEADS.
4.PAINT 4" WHITE MARKING (TYP)
5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB
AND GUTTER PER COR STD PLAN 101
6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE
DETAIL 4 ON SHEET C21
7.CONSTRUCT STANDARD 45° PARKING STALL. SEE
DETAIL 3 ON SHEET C22
8.CONSTRUCT STANDARD PARKING STALL. SEE
DETAIL 4 ON SHEET C22
9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE
DETAIL 5 ON SHEET C22
10.PLACE 6" DEPTH MULCHING PER SPECIFICATION
T-908
11.PROTECT EXISTING AV FUEL SIGN IN PLACE
12.INSTALL NEW TYPE 2 JUNCTION BOX FOR FUTURE
FIBER CONNECTION (GATES PROJECT)
13.INSTALL NEW 3" SCHEDULE 40 PVC CONDUIT WITH
PULL CABLE FOR FUTURE FIBER (GATES PROJECT)
PER DETAIL 1 SHEET C20. SWEEP NEW CONDUIT
INTO NEW JUNCTION BOXES SHOWN.
14.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2, AND
3 ON SHEET C21. USE TIEDOWN REFERENCE POINT
PER DETAIL 2 ON SHEET C22 TO LOCATE ANCHORS
BUT DO NOT APPLY TIEDOWN MARKINGS
15.INSTALL NEW 25-TA ELECTRICAL VAULT AND STUB
UP NEW EMPTY CONDUITS
16.INSTALL SALVAGED GATE V7 AND ALL ASSOCIATED
EQUIPMENT, INCLUDING GATE, OPERATOR ON NEW
CONCRETE FOUNDATION, POWER CONTROL RACK
AND CABINET, ACCESS CONTROL ANTENNAS,
STROBE SENSOR, GATE CATCH STANCHION, SIGNS
ON ADJACENT FENCE, CARD READER PEDESTAL
AND CARD READERS, AND ALL ASSOCIATED
EQUIPMENT TO PROVIDE A FULLY FUNCTIONING
RELOCATED GATE
17.INSTALL NEW BLACK VINYL COATED CHAINLINK
FENCE PER SPECIFICATION F-162
LEGEND:
ASPHALT PAVEMENT RECONSTRUCTION
TOPSOIL & MULCHING
PAVEMENT EDGE
PROPOSED TIEDOWN ANCHOR
TAXIWAY OBJECT FREE AREA (TOFA)
FLOODWAY
identify and show the
new 6-inch sewer
service line installed
DEVELOPMENT ENGINEERING
yqi 02/18/2025
4
5 LUA24-000299C25000687PR24-000063
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22TYPICAL SECTIONSC20
CONSTRUCTION NOTES KEY NOTES
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22CIVIL DETAILSC21
CONSTRUCTION NOTES:
AIRCRAFT MOORING EYE NOTES
PLAN VIEW SECTION A-A SECTION B-B
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22MARKING DETAILSC22
DEVELOPMENT ENGINEERING
yqi 02/18/2025 LUA24-000299C25000687PR24-000063