Loading...
HomeMy WebLinkAboutRNT - Bid Final Plans - WSK & 243 Bldg Aprons_BIDRE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 CITY OF RENTON RENTON MUNICIPAL AIRPORT (RNT) WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION CAG-25-013 FEBRUARY 2025 SHEET INDEX SHEET NO.SHEET NAME PROJECT LOCATION VICINITY MAP PROJECT SITE 243 BLDG APRON & PARKING LOT WIND SOCK GA APRON C1 CO V E R S H E E T ABBREVIATIONSLEGEND RA M P PAV E D PAVED PAVED PAVED PARKING PAVED PAV E D PAVED WIND SOCK AIRP O R T PRO P E R T Y FH PAVED PAV E D PAV E D MBX TAXIWAY A RAINIER AVE N LOGAN AV E N RUNWAY 16-34 W. PERIMETER R O A D 600 BLDG 500 BLDG 540 BLDG 800 BLDG E. PERIMETER R O A D TAXIWAY B WIND SOCK GA APRON APRON CAPRON B AI R P O R T W A Y APRON D COMPASS ROSE APRON R 750 BLDG A7 B 7 B6 A6 B 5 A5 B4 A4 B3 A 3 A2 A1 TAXIWAY B 616 BLDG AIRPORT BEACON AIRPORT MAINTENANCE BLDG 243 BLDG WORK AREA #1 WORK AREA #2 BOEING AIRCRAFT BRIDGE VEHICLE GATE V10 VEHICLE GATE V7 APRON A PED GATE P10 CEDAR RIVER C O M M E R C I A L W A T E R W A Y RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C2 CO N S T R U C T I O N S I T E P L A N GENERAL NOTES: LEGEND: PERMIT INFORMATION: ABBREVIATIONS: RA M P PAV E D PAVED PAVED PAVED PARKING PAVED PAV E D PAVED WIND SOCK AIR P O R T PRO P E R T Y FH PAVED PAV E D PAV E D MBX TAXIWAY A RAINIER AVE N CEDAR RIVER C O M M E R C I A L W A T E R W A Y LOGAN AV E N RUNWAY 16-34 W. PERIMETER R O A D E. PERIMETER R O A D TAXIWAY B WIND SOCK GA APRON APRON CAPRON B APRON A AI R P O R T W A Y APRON D COMPASS ROSE APRON R RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C3 SU R V E Y C O N T R O L P L A N SURVEY NOTES:SURVEY CONTROL: LEGEND: SURVEY CONTROL POINT TABLE: CEDAR RIV E R C O M M E R C I A L W A T E R W A Y COMPASS ROSE TAXIWAY B BLDG 749B BLDG 749A TW Y B 4 T W Y B 5 E. PERIMETE R R O A D RUNWAY 16-34 PROPERTY L I N E 44.50' 44.50' CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA WORK AREA BIRD CANNON PLACE BARRICADES TO BLOCK OFF PEDESTRIAN ACCESS 100-YEAR FLOOD LINE 20' MIN FIRE LANE NON-MOVEMENT AREA LINE - DO NOT CROSS AT ANY TIME 3' RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C4 CO N S T R U C T I O N S A F E T Y & PH A S I N G P L A N WORK AREA #1 - PHASE 1: WINDSOCK APRON PAVEMENT REHABILITATION ALLOWED DURATION: 28 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN IMPORTANT PHASE NOTES: 1)CONTRACTOR SHALL PLACE LOW-PROFILE BARRICADES ON APRON SIDE OF NON-MOVEMENT LINE PRIOR TO BEGINNING ANY WORK DAY. 2)CONTRACTOR SHALL NOT CROSS NON-MOVEMENT AREA LINE AT ANY TIME WITHOUT ATCT CLEARANCE. PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK): 1)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1 WEEK PRIOR TO PROJECT COMMENCEMENT. 2)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN RELOCATED PRIOR TO THE START OF WORK. 3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE AIRCRAFT OPERATIONAL AREAS DURING PHASE 1 MUST VIEW FAA GUIDE TO GROUND VEHICLE OPERATIONS PRIOR TO THE START OF WORK. 4)PLACE LOW PROFILE BARRICADES AS SHOWN. 5)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 4)INSTALL NEW TIEDOWN ANCHORS 5)COMPLETE INITIAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 1. LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE FIRE LANE PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 WORK AREA #1 - PHASE 1 NOTES: CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS CEDAR RIV E R C O M M E R C I A L W A T E R W A Y COMPASS ROSE TAXIWAY B BLDG 749B BLDG 749A TW Y B 4 T W Y B 5 E. PERIMETE R R O A D RUNWAY 16-34 PROPERTY L I N E 44.50' 44.50' CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA WORK AREA BIRD CANNON PLACE BARRICADES TO BLOCK OFF PEDESTRIAN ACCESS 20' MIN. FIRE LANE 100-YEAR FLOOD LINE NON-MOVEMENT AREA LINE - DO NOT CROSS AT ANY TIME 3' RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C5 CO N S T R U C T I O N S A F E T Y & PH A S I N G P L A N WORK AREA #1 - PHASE 2: WINDSOCK APRON FINAL PAVEMENT MARKINGS ALLOWED DURATION: 4 HOURS (WITHIN TIME ALLOTTED FOR WORK AREA 2) ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN IMPORTANT PHASING NOTES: 1.CONTRACTOR SHALL PLACE LOW-PROFILE BARRICADES ON APRON SIDE OF NON-MOVEMENT LINE PRIOR TO BEGINNING ANY WORK. 2.CONTRACTOR SHALL NOT CROSS NON-MOVEMENT AREA LINE AT ANY TIME WITHOUT ATCT CLEARANCE. PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK): 1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN RELOCATED PRIOR TO THE START OF WORK. 2)PLACE LOW PROFILE BARRICADES AS SHOWN. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)COMPLETE FINAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK): 1)COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF WORK AREA 1 PHASE 2. WORK AREA #1 - PHASE 2 NOTES: CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE FIRE LANE PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS J-B O X J-B O X 62' AI R P O R T W A Y W. P E R I M E T E R R O A D 243 BLDG DRIVE L A N E APRON 250 HANGAR PARKING LOT TW Y A 7 TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD EXISTING VEHICLE GATE V7 PR O P E R T Y L I N E APRON B PEDESTRIAN GATE P10 CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C6 CO N S T R U C T I O N S A F E T Y & PH A S I N G P L A N PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS WORK AREA #2 - PHASE 1: BUILDING 243 APRON PAVEMENT REHABILITATION ALLOWED DURATION: 13 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:NORTH HALF OF 243 BUILDING APRON CLOSED, WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN IMPORTANT PHASING NOTES: 1)COORDINATE WITH AIRPORT ENGINEER A MINIMUM OF 72-HOURS PRIOR TO STARTING WORK IN THIS PHASE TO ALLOW FOR RELOCATION OF AIRCRAFT IN 250 HANGAR. PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK): 1)COORDINATE WITH AIRPORT STAFF TO REMOVE AIRCRAFT FROM EXISTING HANGAR PRIOR TO START OF CONSTRUCTION. 2)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1 WEEK PRIOR TO PROJECT COMMENCEMENT. 3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE AIRCRAFT OPERATIONAL AREAS DURING PHASE 1 MUST VIEW FAA GUIDE TO GROUND VEHICLE OPERATIONS PRIOR TO THE START OF WORK. 4)PLACE LOW PROFILE BARRICADES AS SHOWN. 5)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR. 6)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS. 4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 5)INSTALL NEW TIEDOWN ANCHORS 6)COMPLETE INITIAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF WORK AREA 2, PHASE 1.. LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA LANE CLOSURE C12 1 WORK AREA #2 - PHASE 1 NOTES: CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 J-B O X J-B O X J-B O X J-B O X 62.00' AI R P O R T W A Y W. P E R I M E T E R R O A D 243 BLDG DRIV E L A N E APRON 250 HANGAR PARKING LOT TW Y A 7 TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD VEHICLE GATE V10 PR O P E R T Y L I N E APRON B CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA PEDESTRIAN GATE P10 WORK AREA PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C7 CO N S T R U C T I O N S A F E T Y & PH A S I N G P L A N WORK AREA #2 - PHASE 2: BUILDING 243 APRON RECONSTRUCTION ALLOWED DURATION: 5 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:ALL TAXIWAYS/TAXILANES OPEN APRON STATUS:SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK): 1)PLACE LOW PROFILE BARRICADES AS SHOWN. 2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS. 4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 5)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 2. WORK AREA #2 - PHASE 2 NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 J-B O X J-B O X AI R P O R T W A Y W. P E R I M E T E R R O A D 243 BLDG DRIVE L A N E APRON 250 HANGAR PARKING LOT TW Y A 7 TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA EXISTING VEHICLE GATE V7 PR O P E R T Y L I N E APRON B WORK AREA 62.00' PEDESTRIAN GATE P10 RELOCATED VEHICLE GATE V7 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C8 CO N S T R U C T I O N S A F E T Y & PH A S I N G P L A N WORK AREA #2 - PHASE 3A: BUILDING 243 DRIVE LANE REHABILITATION (OUTSIDE AOA) ALLOWED DURATION: 8 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:ALL OPEN TAXIWAY/TAXILANE STATUS:ALL OPEN APRON STATUS:ALL OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 3A WORK): 1)PLACE LOW PROFILE BARRICADES AS SHOWN. 2)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)CONFIRM TEMPORARY CONE OR DRUM LOCATIONS WITH THE ENGINEER 3)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 4)RELOCATE EXISTING FENCE, GATE AND ASSOCIATED APPARATUSES. 5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 6)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 3A WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 3A. WORK AREA #2 - PHASE 3A NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 J-B O X J-B O X AI R P O R T W A Y W. P E R I M E T E R R O A D 243 BLDG DRIVE L A N E APRON 250 HANGAR PARKING LOT TW Y A 7 TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA EXISTING VEHICLE GATE V7 PR O P E R T Y L I N E APRON B 62.00' PEDESTRIAN GATE P10 WORK AREA RELOCATED VEHICLE GATE V7 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C9 CO N S T R U C T I O N S A F E T Y & PH A S I N G P L A N WORK AREA #2 - PHASE 3A: BUILDING 243 DRIVE LANE REHABILITATION (OUTSIDE AOA) ALLOWED DURATION: 2 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:ALL OPEN TAXIWAY/TAXILANE STATUS:ALL OPEN APRON STATUS:ALL OPEN IMPORTANT PHASE NOTES: 1)COORDINATE WITH AIRPORT ENGINEER A MINIMUM OF 72-HOURS PRIOR TO STARTING WORK IN THIS PHASE TO ALLOW FOR RELOCATION OF AIRCRAFT IN 250 HANGAR. PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 3A WORK): 1)PLACE LOW PROFILE BARRICADES AS SHOWN. 2)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)CONFIRM TEMPORARY CONE OR DRUM LOCATIONS WITH THE ENGINEER 3)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 4)RELOCATE EXISTING FENCE, GATE AND ASSOCIATED APPARATUSES. 5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 6)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 3A WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 3A. WORK AREA #2 - PHASE 3B NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 J-B O X J-B O X AI R P O R T W A Y W. P E R I M E T E R R O A D 243 BLDG DRIVE L A N E APRON 250 HANGAR PARKING LOT TW Y A 7 TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD PR O P E R T Y L I N E APRON B CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA 62.00' PEDESTRIAN GATE P10 PROPOSED VEHICLE GATE V7 WORK AREA PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C10 CO N S T R U C T I O N S A F E T Y & PH A S I N G P L A N WORK AREA #2 - PHASE 4: BUILDING 243 PARKING LOT RECONSTRUCTION ALLOWED DURATION: 8 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:ALL OPEN TAXIWAY/TAXILANE STATUS:ALL OPEN APRON STATUS:ALL OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 4 WORK): 1)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN. 2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM TEMPORARY TRAFFIC CONE OR DRUM LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS. 4)COMPLETE EXTRUDED CURB REMOVAL 5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 6)CONSTRUCT LANDSCAPE ISLANDS. 7)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 4 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 4. WORK AREA #2 - PHASE 4 NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 J-B O X J-B O X 62.00' AI R P O R T W A Y W. P E R I M E T E R R O A D 243 BLDG DRIVE L A N E APRON 250 HANGAR TW Y A 7 TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA VEHICLE GATE V7 PR O P E R T Y L I N E APRON B WORK AREA PEDESTRIAN GATE P10 PARKING LOT PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3A VEHICLE GATE V10 RELOCATION AND DRIVE AISLE (OUTSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 3B DRIVE AISLE (INSIDE AOA) FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 2 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS TOTAL ALLOWABLE CONSTRUCTION DURATION FOR ALL WORK 66 WORKING DAYS RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C11 CO N S T R U C T I O N S A F E T Y & PH A S I N G P L A N WORK AREA #2 - PHASE 5: BUILDING 243 APRON FINAL PAVEMENT MARKINGS ALLOWED DURATION: 4 HOURS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN IMPORTANT PHASE NOTES: 1)COORDINATE WITH AIRPORT ENGINEER A MINIMUM OF 72-HOURS PRIOR TO STARTING WORK IN THIS PHASE TO ALLOW FOR RELOCATION OF AIRCRAFT IN 250 HANGAR. PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 5 WORK): 1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN RELOCATED PRIOR TO THE START OF WORK. 2)PLACE LOW PROFILE BARRICADES AS SHOWN. 3)PLACE TRAFFIC CONE AND DRUMS AS SHOWN. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)CONFIRM TRAFFIC CONE AND DRUM LOCATIONS WITH THE ENGINEER. 3)COMPLETE FINAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 5 WORK): 3) COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF PHASE 5. LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C12 1 WORK AREA #2 - PHASE 5 NOTES: CONSTRUCTION PHASING KEYNOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C12 1 RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 CO N S T R U C T I O N S A F E T Y & PH A S I N G D E T A I L S LOW PROFILE BARRICADE DETAIL LOW PROFILE BARRICADE NOTES: C12 GENERAL CONSTRUCTION SAFETY AND PHASING NOTES: CEDAR RIV E R C O M M E R C I A L W A T E R W A Y TAXIWAY B BLDG 749B BLDG 749A TW Y B 4 T W Y B 5 E. PERIMET E R R O A D PROPERTY L I N E 44.50' 44.50' SAWCUT ALONG EXISTING JOINT 20' MIN FIRE LANE 100-YEAR FLOOD LINE RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C13 SI T E P R E P A R A T I O N & T E S C P L A N LEGEND: PROPERTY LINE STORM DRAIN INLET PROTECTION SILT FENCE TRIANGULAR SILT DIKE TAXIWAY OBJECT FREE AREA EXISTING WATER EXISTING STORM DRAIN EXISTING ELECTRICAL EXISTING TELECOMMUNICATIONS EXISTING GAS EXISTING PAVEMENT EDGE EXISTING FENCE PROPOSED SAWCUT REMOVE EXISTING EXTRUDED CURB REMOVE EXISTING PAINT MARKING CLEARING AND GRUBBING AND EXCAVATION AS NEEDED ASPHALT REMOVAL CONCRETE REMOVAL FLOODWAY 1.EROSION CONTROL METHODS MUST BE IN PLACE PRIOR TO COMMENCEMENT OF SITE PREPARATION AND REMOVALS. 2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND SAFELY DISPOSED OF. 3.PROTECT ALL EXISTING UTILITY LINES IN PLACE. EROSION CONTROL KEYNOTES: 1.INSTALL STORM DRAIN INLET PROTECTION PER COR STD PLAN 216.30. 2.INSTALL SILT FENCE PER COR STD PLAN 214.00. 3.INSTALL TRIANGULAR SILT DIKE PER DETAIL ON SHEET C15. EROSION CONTROL GENERAL NOTES: SITE PREPARATION KEYNOTES: 1.DEMOLISH EXISTING ASPHALT PAVEMENT 2.CLEAR AND GRUB AND EXCAVATE TO FINISHED GRADE, AS NEEDED 3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE. ADJUST RIM AS NEEDED 4.PROTECT EXISTING FENCE IN PLACE 5.REMOVE EXISTING EXTRUDED CURB 6.SAWCUT EXISTING PAVEMENT 7.REMOVE EXISTING PAINT MARKINGS 8.PROTECT EXISTING CATCH BASIN IN PLACE. SEE PLAN FOR PROPOSED RIM ADJUSTMENTS Know what's below. before you dig.Call R 1.CALL 811 TO LOCATE UNDERGROUND UTILITIES AT LEAST TWO FULL BUSINESS DAYS PRIOR TO ANY EXCAVATION. 2.IN ADDITION TO 811, CALL THE FOLLOWING UTILITIES TO REQUEST A CONSULTATION PRIOR TO PERFORMING ANY CONSTRUCTION OR EXCAVATION ACTIVITIES: A.WILLIAMS NORTHWEST PIPELINE: 425-868-1010 B.OLYMPIC PIPELINE: 425-235-7736 C.PUGET SOUND ENERGY: 425-375-3397 3.ADDITIONAL PRIVATE UTILITY LOCATES MAY BE REQUIRED WITHIN THE AIRPORT BOUNDARY. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH PRIVATE UTILITY LOCATES. UTILITY LOCATE GENERAL NOTES: J- B O X 62' TLOFA AI R P O R T W A Y 243 BLDG DRIVE LA N E EXISTING HANGAR TW Y A 7 TAXIWA Y A W. PERIMETER ROAD PR O P E R T Y L I N E W. P E R I M E T E R R O A D RELOCATE EXISTING VEHICLE GATE V7, FENCE AND ALL ASSOCIATED EQUIPMENT, SEE SITE PREPARATION KEY NOTE 7 AND SHEET C19. PEDESTRIAN GATE P10 TAXIWAY A CL TAXIWAY A EDGE NON-MOVEMENT LINE CAP EXISTING ABANDONED SEWER FORCE MAIN AT EDGE OF WORK AREA RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C14 SI T E P R E P A R A T I O N & T E S C P L A N LEGEND: PROPERTY LINE STORM DRAIN INLET PROTECTION SILT FENCE TRIANGULAR SILT DIKE TAXIWAY OBJECT FREE AREA EXISTING WATER EXISTING STORM DRAIN EXISTING ELECTRICAL EXISTING TELECOMMUNICATIONS EXISTING GAS EXISTING PAVEMENT EDGE EXISTING FENCE PROPOSED SAWCUT REMOVE EXISTING EXTRUDED CURB REMOVE SANITARY SEWER FORCE MAIN CLEARING AND GRUBBING AND EXCAVATION AS NEEDED ASPHALT REMOVAL CONCRETE REMOVAL FLOODWAY 1.EROSION CONTROL METHODS MUST BE IN PLACE PRIOR TO COMMENCEMENT OF SITE PREPARATION AND REMOVALS. 2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND SAFELY DISPOSED OF. 3.PROTECT ALL EXISTING UTILITY LINES IN PLACE. EROSION CONTROL KEY NOTES: EROSION CONTROL GENERAL NOTES: SITE PREPARATION KEY NOTES: 1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT PAVEMENT. 2.CLEAR AND GRUB AND EXCAVATE TO FINISHED GRADE, AS NEEDED. 3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE. ADJUST RIM TO FINISHED GRADE. 4.PROTECT EXISTING FENCE IN PLACE 5.REMOVE EXISTING EXTRUDED CURB 6.SAWCUT EXISTING PAVEMENT 7.PROTECT EXISTING CATCH BASIN IN PLACE. SEE PLAN FOR PROPOSED RIM ADJUSTMENTS. 8.PROTECT EXISTING AV FUEL SIGN IN PLACE. 9.REMOVE AND SALVAGE GATE V7 AND ALL ASSOCIATED EQUIPMENT FOR REUSE, INCLUDING BUT NOT LINMITED TO GATE, OPERATOR, POWER CONTROL RACK AND CABINET, ACCESS CONTROL ANTENNAS, STROBE SENSOR, GATE CATCH STANCHION, SIGNS ON ADJACENT FENCE, CARD READER PEDESTAL AND CARD READERS. 10.REMOVE EXISTING SANITARY SEWER FORCE MAIN. OBTAIN COR ELECTRICAL PERMIT AS REQUIRED. CAP MAIN AT END OF WORK AREA. Know what's below. before you dig.Call R 1.CALL 811 TO LOCATE UNDERGROUND UTILITIES AT LEAST TWO FULL BUSINESS DAYS PRIOR TO ANY EXCAVATION. 2.IN ADDITION TO 811, CALL THE FOLLOWING UTILITIES TO REQUEST A CONSULTATION PRIOR TO PERFORMING ANY CONSTRUCTION OR EXCAVATION ACTIVITIES: A.WILLIAMS NORTHWEST PIPELINE: 425-868-1010 B.OLYMPIC PIPELINE: 425-235-7736 C.PUGET SOUND ENERGY: 425-375-3397 3.ADDITIONAL PRIVATE UTILITY LOCATES MAY BE REQUIRED WITHIN THE AIRPORT BOUNDARY. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH PRIVATE UTILITY LOCATES. UTILITY LOCATE GENERAL NOTES: 1.INSTALL STORM DRAIN INLET PROTECTION PER COR STD PLAN 216.30. 2.INSTALL SILT FENCE PER COR STD PLAN 214.00. 3.INSTALL TRIANGULAR SILT DIKE PER DETAIL ON SHEET C15. RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 SI T E P R E P A R A T I O N & TE S C D E T A I L S TRIANGULAR SILT DIKE DETAIL C15 Know what's below. before you dig.Call RCOR STD PLAN 216.30 - CB FILTER COR STD PLAN 214.00 - SILT FENCE WIND SOCK CEDAR RIVER C O M M E R C I A L W A T E R W A Y TAXIWAY B BLDG 749B BLDG 749A TW Y B 4 T W Y B 5 E. PERIMETER R O A D 15' TYP.15' TYP. 23.3 3 2 3 . 3 3 23.3 2 2 3 . 3 3 23.3 6 23.3 9 23.4 2 2 3 . 4 3 23.4 2 2 3 . 4 8 23.5 5 2 3 . 6 1 23.2 6 2 3 . 2 5 23.2 6 2 3 . 2 8 23.3 1 23.3 3 23.3 4 2 3 . 3 4 23.3 4 2 3 . 4 0 23.4 8 2 3 . 5 5 23.1 7 2 3 . 1 8 23.1 9 2 3 . 2 2 23.2 5 23.2 8 23.2 7 2 3 . 2 6 23.2 5 2 3 . 3 2 23.4 0 2 3 . 4 9 23.0 8 2 3 . 0 9 23.1 2 2 3 . 1 6 23.1 9 23.2 3 23.2 1 2 3 . 1 9 23.1 7 2 3 . 2 4 23.3 3 2 3 . 4 2 23.0 1 2 3 . 0 2 23.0 5 2 3 . 0 9 23.1 3 23.1 7 23.1 5 2 3 . 1 2 23.0 9 2 3 . 1 7 23.2 7 2 3 . 3 8 22.9 5 2 2 . 9 6 22.9 8 2 3 . 0 3 23.0 8 23.1 2 23.0 8 2 3 . 0 5 23.0 1 2 3 . 1 0 23.2 3 2 3 . 3 6 22.9 0 2 2 . 9 0 22.9 1 2 2 . 9 6 23.0 2 23.0 7 23.0 2 2 2 . 9 7 22.9 3 2 3 . 0 3 23.1 9 2 3 . 3 5 22.8 8 2 2 . 8 4 22.8 4 2 2 . 9 0 22.9 6 23.0 1 22.9 6 2 2 . 9 0 22.8 5 2 2 . 9 7 23.1 5 2 3 . 3 4 22.9 0 2 2 . 8 1 22.7 7 2 2 . 8 3 22.9 0 22.9 6 22.8 9 2 2 . 8 3 22.7 6 2 2 . 9 0 23.1 1 2 3 . 3 2 22.9 1 2 2 . 7 7 22.7 0 2 2 . 7 7 22.8 4 22.9 1 22.8 3 2 2 . 7 6 22.6 8 2 2 . 8 3 23.0 6 2 3 . 2 8 22.9 4 2 2 . 7 4 22.6 2 2 2 . 7 0 22.7 8 22.8 5 22.7 7 2 2 . 6 9 22.6 0 2 2 . 7 5 22.9 9 2 3 . 2 4 22.9 6 2 2 . 7 3 22.5 5 2 2 . 6 6 22.7 4 22.8 0 22.7 4 2 2 . 6 5 22.5 4 2 2 . 6 8 22.9 4 2 3 . 2 0 22.9 8 2 2 . 7 5 22.6 0 2 2 . 6 8 22.7 6 22.8 4 22.7 5 2 2 . 6 6 22.5 7 2 2 . 6 9 22.9 3 2 3 . 1 6 23.0 2 2 2 . 8 0 22.6 6 2 2 . 7 3 22.8 1 22.8 8 22.7 9 2 2 . 7 1 22.6 2 2 2 . 7 4 22.9 5 2 3 . 1 7 23.0 9 2 2 . 8 7 22.7 2 2 2 . 7 9 22.8 6 2 2 . 9 2 22.8 4 2 2 . 7 6 22.6 7 2 2 . 7 9 22.9 8 2 3 . 1 9 23.1 6 2 2 . 9 3 22.7 8 2 2 . 8 4 22.9 1 2 2 . 9 7 22.8 9 2 2 . 8 0 22.7 2 2 2 . 8 1 23.0 0 2 3 . 1 8 23.2 0 2 2 . 9 8 22.8 4 2 2 . 8 9 22.9 5 2 3 . 0 1 22.9 3 2 2 . 8 5 22.7 8 2 2 . 8 4 22.9 9 2 3 . 1 5 23.2 1 2 3 . 0 2 22.9 0 2 2 . 9 5 23.0 0 2 3 . 0 5 22.9 8 2 2 . 9 0 22.8 3 2 2 . 9 0 22.9 7 2 3 . 0 8 23.2 7 2 3 . 0 8 22.9 5 2 3 . 0 0 23.0 5 2 3 . 1 0 23.0 3 2 2 . 9 7 22.8 9 2 2 . 9 7 23.0 4 2 3 . 0 0 23.3 5 2 3 . 1 6 23.0 1 2 3 . 0 6 23.1 0 2 3 . 1 4 23.0 9 2 3 . 0 4 22.9 9 2 3 . 0 6 23.1 3 2 3 . 1 7 2 3 . 2 0 23.0 7 2 3 . 1 1 23.1 5 2 3 . 1 8 23.1 5 2 3 . 1 3 23.1 0 2 3 . 1 5 23.2 1 2 3 . 2 5 2 3 . 1 6 23.1 2 2 3 . 1 3 23.1 7 2 3 . 2 2 23.2 3 2 3 . 2 2 23.2 0 2 3 . 2 4 23.2 8 2 3 . 3 1 2 3 . 0 2 23.0 6 2 3 . 1 2 23.1 7 2 3 . 2 7 23.3 1 2 3 . 3 2 23.3 2 2 3 . 3 3 23.3 5 2 3 . 3 7 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 6 ± 2 3 . 6 ± 2 3 . 6 ± 2 3 . 7 ± 2 3 . 6 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 23.5 ± 2 3 . 7 ± 23.4 ± 23.3 ± 23.2 ± 23.1 ± 23.0 ± 23.0 ± 22.9 ± 22.9 ± 23.0 ± 23.0 ± 23.1 ± 23.1 ± 23.1 ± 23.1 ± 23.2 ± 23.3 ±23.3 ±23.3 ±23.3 ±23.4 ±23.4 ±23.2 ±23.1 ±22.8 ± 22.8 ± 2 2 . 8 ± 2 3 . 0 ± 2 3 . 1 ± 2 3 . 1 ± 2 3 . 3 ± 2 3 . 4 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 23.4 ± 23.3 9 23.3 3 23.2 8 23.2 3 23.1 7 23.1 2 23.0 2 22.9 6 22.9 1 22.8 6 22.8 0 22.8 4 22.8 8 23.2 7 23.3 ± START GRID N=182932.69 E=1299021.95 44.50' 44.50' 100-YEAR FLOOD LINE 21' MIN TRAVEL LANE RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C16 GR A D I N G P L A N - W I N D S O C K AP R O N GENERAL NOTES LEGEND: EXISTING GROUND CONTOUR FINISHED GRADE CONTOUR ASPHALT PAVEMENT RECONSTRUCTION TAXIWAY OBJECT FREE AREA (TOFA) FG ELEVATION J- B O X J- B O X 243 BUILDING W. PERIMETER ROAD DRIVE LANE AI R P O R T W A Y EXISTING HANGAR TW Y A 7 W. P E R I M E T E R R O A D TAXIWAY A 14' TYP 14 ' TY P 2' 15' TYP 15' TYP START GRID N=180196.38 E=1298454.88 START GRID N=180359.59 E=1298346.30 3 0 . 5 ± 3 0 . 2 ± 3 0 . 2 ± 3 0 . 0 ± 2 9 . 9 ± 2 9 . 8 ± 29.7 ± 29.5 ± 29.4 ± 3 0 . 3 ± FC: 30.35 FC: 30.50 FC: 30.50 FC: 30.25 FC: 30.25 FC: 30.23 FC: 30.37 FC: 30.62 FC: 30.56 FC: 30.29 FC: 30.24 FC: 30.34FC: 30.35 FC: 30.47 3 0 . 5 3 3 0 . 4 6 30.4 3 30.3 8 30.3 5 30.3 1 30.2 7 30.2 0 30.1 6 30.2 0 30.3 6 3 0 . 5 1 3 0 . 4 4 30.3 9 30.3 5 30.2 9 30.2 3 30.1 6 30.0 7 30.0 2 30.0 4 30.1 8 3 0 . 4 1 30.3 6 30.3 0 30.2 4 30.1 6 30.0 5 29.9 4 29.8 5 29.8 2 29.8 6 29.2 7 29.5 5 29.6 9 29.8 1 29.9 5 30.1 0 30.2 0 30.2 6 30.3 2 3 0 . 4 ± 30.2 9 30.2 4 FC: 30.30 FC: 30.30 FC: 30.41 FC: 30.36 FC: 30.39 FC: 30.40 FC: 30.55 FC: 30.54 FC: 30.42 FC: 30.57 FC: 30.42 FC: 30.41 FC: 30.54 FC: 30.54 FC: 30.64 FC: 30.30 FC: 30.40 FC: 30.44 FC: 30.38 FC: 30.30 2 9 . 9 3 2 9 . 7 9 2 9 . 6 6 2 9 . 5 0 2 9 . 3 3 2 9 . 2 0 2 9 . 1 4 2 9 . 0 8 2 9 . 0 1 28.9 5 2 8 . 9 0 2 9 . 0 2 2 9 . 8 0 2 9 . 6 1 2 9 . 4 4 2 9 . 2 6 2 9 . 0 7 2 8 . 9 3 2 8 . 8 7 2 8 . 8 1 2 8 . 7 4 2 8 . 6 8 2 8 . 6 4 2 8 . 7 1 29.6 7 29.4 2 29.2 2 29.0 2 28.8 1 28.6 5 28.6 0 28.5 4 28.4 7 28.4 0 28.3 5 28.4 4 29.5 9 29.3 4 29.1 4 28.9 4 28.7 3 28.5 7 28.5 3 28.4 7 28.3 9 28.3 2 28.2 8 28.3 7 29.5 4 29.3 2 29.1 4 28.9 5 28.7 6 28.6 3 28.5 7 28.5 1 28.4 5 28.4 0 28.3 5 28.4 0 29.3 0 29.1 3 28.9 6 28.7 8 28.6 9 28.6 3 28.5 8 28.5 2 28.4 7 28.4 2 28.4 1 29.1 8 29.0 2 28.8 7 28.7 4 28.7 3 28.7 1 28.6 7 28.6 4 28.5 9 28.5 4 28.4 8 29.0 4 28.8 7 28.8 0 28.8 0 28.8 0 28.7 9 28.7 7 28.7 6 28.7 4 28.6 9 28.6 1 29.1 ± 28.9 ± 28.9 ± 28.9 ± 28.9 ± 28.9 ± 28.9 ± 28.9 ± 28.9 ± 28.9 ± 28.8 ± 28.8 ± 2 9 . 0 0 28.7 3 28.6 0 28.5 8 28.5 7 28.4 8 28.5 1 28.5 6 28.6 ± 29.8 5 28.9 0 28.8 5 28.8 6 28.8 5 28.7 9 30.1 7 28.9 ± 28.9 ± 28.9 ± 28.9 ± 28.8 ± 28.8 ± 28.6 ±28.7 ± 28.9 8 29.1 ± 29.3 ± 2 8 . 9 ± 28.7 9 28.7 ± 28.7 ± 28.8 ± 29.2 6 29.3 7 29.4 8 29.7 5 28.7 ± 2 9 . 1 ± 2 9 . 5 ± 2 9 . 5 ± 2 9 . 9 ± 3 0 . 1 ± 29.8 ± 2 9 . 2 ± 2 9 . 4 6 2 9 . 4 6 29.6 6 29.7 2 2 9 . 8 3 29.8 2 30.4 ± 30.5 ± 30.5 ± 30.4 ± 30.4 ± 30.4 ± 30.4 ± 30.3 ± 30.3 ± 30.4 ± 3 0 . 5 ± 3 0 . 5 ± 3 0 . 6 ± 3 0 . 4 ± 3 0 . 3 ± 3 0 . 4 ± 30.5 ± 3 0 . 6 ± 30.7 ± 30.5 ± 3 0 . 5 ± 29.9 5 30.5 ± 30.5 ± 30.5 ± 30.4 ± 30.4 ± 30.4 ± 30.5 ± 30.4 ± 3 0 . 4 ± FC: 30.50 FC: 30.30 3 0 . 4 ± 3 0 . 5 ± 3 0 . 5 ± 3 0 . 5 ± 3 0 . 8 ± 3 0 . 1 ± 29.9 ± 2 9 . 7 7 3 0 . 6 ± 3 0 . 2 ± 30.1 5 3 0 . 0 8 30.0 3 3 0 . 1 4 29.8 9 29.7 3 29.5 8 2 9 . 4 0 2 9 . 2 3 3 0 . 0 ± 3 0 . 7 ± 3 0 . 7 ± 3 0 . 7 ± 3 0 . 7 ± 3 0 . 6 ± 3 0 . 6 ± 28.8 0 28.7 8 28.8 2 28.8 6 28.7 4 28.7 3 28.6 9 28.6 428.6 3 28.5 3 28.4 7 28.4 3 28.3 328.3 1 3 0 . 0 8 3 0 . 0 0 29.9 3 30.0 5 28.9 8 28.4 8 28.3 9 28.4 9 28.3 6 28.2 4 28.3 0 28.3 7 28.4 4 28.5 1 28.5 4 28.7 2 28.9 3 29.1 5 29.3 5 29.6 2 29.9 0 2 9 . 9 ± 30.2 7 30.2 2 29.7 9 29.7 3 29.9 3 30.0 1 29.8 1 29.9 5 30.1 2 30.2 7 30.1 5 3 0 . 2 4 29.5 2 FC: 30.56 29.7 ± 29.6 ± 29.5 ± 29.7 ± 29.8 ± 30.0 ± 29.6 ± 30.1 5 30.3 4 30.2 0 30.2 6 30.9 8 30.4 0 30.9 4 31.0 0 30.1 9 30.7 7 30.2 530.1 130.3 2 30.3 9 30.3 5 30.1 930.0 430.2 7 30.2 3 29.9 6 30.1 4 30.3 2 30.3 1 30.0 829.8 930.1 9 30.2 5 29.9 4 30.1 4 30.3 4 30.3 6 30.1 730.0 830.3 7 30.4 8 30.2 2 30.2 5 3 0 . 9 0 30.3 0 30.3 530.4 0 30.3 8 30.5 4 30.5 8 30.4 9 3 0 . 5 7 30.6 3 30.5 9 30.5 6 30.5 2 30.4 4 30.6 2 30.5 6 30.4 0 30.6 ± 30.4 ± 30.4 ±30.4 ±30.2 ±30.0 ±30.0 ± 30.1 ± 30.2 ± 30.3 ± 30.3 ± 30.4 ± 30.4 ± 30.4 ± 30.4 ± 30.4 ± 30.4 ± 30.5 ± 30.5 ± 30.5 ± 30.5 ± 3 0 . 4 ± 30.4 ± 30.4 ± 30.6 ± 3 0 . 7 ± 3 0 . 6 ± 30.6 ± 3 0 . 7 ± RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C17 GR A D I N G P L A N - B U I L D I N G 2 4 3 A P R O N & PA R K I N G L O T GENERAL NOTES LEGEND: EXISTING GROUND CONTOURS FINISHED GRADE CONTOURS ASPHALT PAVEMENT RECONSTRUCTION TAXIWAY OBJECT FREE AREA (TOFA) FG ELEVATION TAXIWAY B BLDG 749B BLDG 749A TW Y B 4 T W Y B 5 E. PERIMET E R R O A D PROPERTY L I N E 31.60'31.60' 44.50' 44.50' 31.60'31.60'31.60'31.60' TIEDOWN N=182611.31 E=1299207.48 TIEDOWN N=182607.47 E=1299161.64 TIEDOWN N=182603.63 E=1299115.81 TIEDOWN N=182599.79 E=1299069.97 TIEDOWN N=182680.70 E=1299063.18 TIEDOWN N=182684.54 E=1299109.02 TIEDOWN N=182688.38 E=1299154.86 TIEDOWN N=182692.23 E=1299200.70 TIEDOWN N=182723.40 E=1299175.01 TIEDOWN N=182719.56 E=1299129.17 TIEDOWN N=182715.71 E=1299083.33 TIEDOWN N=182794.70 E=1299053.63 TIEDOWN N=182829.71 E=1299073.77 TIEDOWN N=182798.54 E=1299099.47 TIEDOWN N=182833.56 E=1299119.61 TIEDOWN N=182802.38 E=1299145.31 TIEDOWN N=182837.40 E=1299165.45 TIEDOWN N=182806.23 E=1299191.15 TIEDOWN N=182920.23 E=1299181.59 TIEDOWN N=182916.38 E=1299135.75 TIEDOWN N=182912.54 E=1299089.91 TIEDOWN N=182908.70 E=1299044.07 START 6" YELLOW ℄ N=182653.69 E=1299227.01 START 6" YELLOW ℄ N=182767.69 E=1299217.46 START 6" YELLOW ℄ N=182881.69 E=1299207.90 END NON-MOVEMENT AREA MARKING MATCH EXISTING MARKING N=182932.47 E=1299022.10 START NON-MOVEMENT AREA MARKING N=182576.20 E=1299052.03 N85°12'31"E 211.70' Δ=84°15'27" R=19.15' L=28.17' Δ=84°15'27" R=19.15' L=28.17' Δ=45°39'49" R=19.00' L=15.14' S39°32'42"W 9.27' N85°12'34"E 206.43' Δ=90°00'00" R=19.00' L=29.85' Δ=90°00'00" R=19.00' L=29.85' Δ=90°00'00" R=19.00' L=29.85' N85°12'34"E 206.52' Δ=90°00'00" R=19.00' L=29.85' S4°47'29"E 357.53' 51.20'51.20' GRADE BREAK N=182941.19 E=1299126.20 46.00' TYP 46 . 0 0 ' TY P 46 . 0 0 ' TY P 46 . 0 0 ' TY P CEDAR RIV E R C O M M E R C I A L W A T E R W A Y RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C18 SI T E A N D S T R I P I N G P L A N - WI N D S O C K A P R O N 100-YEAR FLOOD LINE SITE PLAN AND MARKING KEYNOTES: 1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND 3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR TIEDOWN MARKING (TYP). 2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL 1 ON SHEET C22. 3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING WITH GLASS BEADS. 4.PAINT 4" WHITE MARKING (TYP). 5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD PLAN 101. 6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE DETAIL 4 ON SHEET C21. 7.CONSTRUCT STANDARD 45° PARKING STALL. SEE DETAIL 3 ON SHEET C22 8.CONSTRUCT STANDARD PARKING STALL. SEE DETAIL 4 ON SHEET C22 . 9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE DETAIL 5 ON SHEET C22. 10.PLACE TOPSOIL AND MULCH LANDSCAPED AREAS. TOPSOIL AND MULCHING AREAS COMPLY WITH CITY OF RENTON MUNICIPAL CODE SECTION 4-4-070, LANDSCAPING AREA REQUIREMENTS. 11.PROTECT EXISTING AV FUEL SIGN IN PLACE. 12.INSTALL NEW TYPE 2 JUNCTION BOX FOR FUTURE FIBER CONNECTION (GATES PROJECT) 13.INSTALL 3" SCHEDULE 40 PVC CONDUIT WITH PULL CABLE FOR FUTURE FIBER CONNECTION (GATES PROJECT) 14.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2, AND 3 ON SHEET C21. USE TIEDOWN REFERENCE POINT PER DETAIL 2 ON SHEET C22 TO LOCATE ANCHORS BUT DO NOT APPLY TIEDOWN MARKINGS. 15.INSTALL NEW 25-TA ELECTRICAL VAULT AND STUB UP NEW EMPTY CONDUITS. 16.INSTALL SALVAGED GATE V7 AND ALL ASSOCIATED EQUIPMENT, INCLUDING GATE, OPERATOR ON NEW CONCRETE FOUNDATION, POWER CONTROL RACK AND CABINET, ACCESS CONTROL ANTENNAS, STROBE SENSOR, GATE CATCH STANCHION, SIGNS ON ADJACENT FENCE, CARD READER PEDESTAL AND CARD READERS, AND ALL ASSOCIATED EQUIPMENT TO PROVIDE A FULLY FUNCTIONING RELOCATED GATE. 17.INSTALL NEW BLACK CHAINLINK FENCE. LEGEND: ASPHALT PAVEMENT RECONSTRUCTION TOPSOIL & MULCHING PAVEMENT EDGE PROPOSED TIEDOWN ANCHOR TAXIWAY OBJECT FREE AREA (TOFA) FLOODWAY 62.00' AI R P O R T W A Y 243 BLDG DRIVE LA N E EXISTING HANGAR TW Y A 7 TAXIWA Y A W. PERIMETER ROAD PR O P E R T Y L I N E W. P E R I M E T E R R O A D J- B O X J-B O X TIEDOWN N=180286.16 E=1298517.67 TIEDOWN N=180282.18 E=1298471.85 TIEDOWN N=180278.19 E=1298426.02 TIEDOWN N=180274.21 E=1298380.19 START N=180320.24 E=1298349.72 N85°01'48"E 211.34' Δ=43°52'08" R=19.00' L=14.55' N41°09'40"E 65.39' Δ=85°39'49" R=19.00' L=28.41' 14.25' START 4" WHITE EDGE LINE N=180159.13 E=1298651.03 START 4" WHITE EDGE LINE N=180126.90 E=1298655.14 END 4" WHITE EDGE LINE N=180379.50 E=1298535.00 END 4" WHITE EDGE LINE N=180375.26 E=1298514.85 20.00 ' TYP 15.00' TYP 25.00' TYP END 4" DASHED WHITE ℄ N=180371.67 E=1298526.24 START 4" DASHED WHITE CL N=180175.23 E=1298623.52 46.00' TYP GRADE BREAK N=180297.16 E=1298540.26 10.00 ' TYP RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 C19 SI T E A N D S T R I P I N G P L A N - B U I L D N G 2 4 3 AP R O N & P A R K I N G L O T R12.00' R9.00' R1.25' R10.00' R4.00' R3.50' R84.75' R20.00' R2.00' R301.10' R1.00' R36.00' R1.00' R1.00' R2.50' PEDESTRIAN GATE P10 EXISTING MANUAL GATE TO REMAIN SITE PLAN AND MARKING KEYNOTES: 1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND 3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR TIEDOWN MARKING (TYP). 2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL 1 ON SHEET C22. 3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING WITH GLASS BEADS. 4.PAINT 4" WHITE MARKING (TYP). 5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD PLAN 101. 6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE DETAIL 4 ON SHEET C21. 7.CONSTRUCT STANDARD 45° PARKING STALL. SEE DETAIL 3 ON SHEET C22 8.CONSTRUCT STANDARD PARKING STALL. SEE DETAIL 4 ON SHEET C22 . 9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE DETAIL 5 ON SHEET C22. 10.PLACE TOPSOIL AND MULCH LANDSCAPED AREAS. TOPSOIL AND MULCHING AREAS COMPLY WITH CITY OF RENTON MUNICIPAL CODE SECTION 4-4-070, LANDSCAPING AREA REQUIREMENTS. 11.PROTECT EXISTING AV FUEL SIGN IN PLACE. 12.INSTALL NEW TYPE 2 JUNCTION BOX FOR FUTURE FIBER CONNECTION (GATES PROJECT) 13.INSTALL 3" SCHEDULE 40 PVC CONDUIT WITH PULL CABLE FOR FUTURE FIBER CONNECTION (GATES PROJECT) 14.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2, AND 3 ON SHEET C21. USE TIEDOWN REFERENCE POINT PER DETAIL 2 ON SHEET C22 TO LOCATE ANCHORS BUT DO NOT APPLY TIEDOWN MARKINGS. 15.INSTALL NEW 25-TA ELECTRICAL VAULT AND STUB UP NEW EMPTY CONDUITS. 16.INSTALL SALVAGED GATE V7 AND ALL ASSOCIATED EQUIPMENT, INCLUDING GATE, OPERATOR ON NEW CONCRETE FOUNDATION, POWER CONTROL RACK AND CABINET, ACCESS CONTROL ANTENNAS, STROBE SENSOR, GATE CATCH STANCHION, SIGNS ON ADJACENT FENCE, CARD READER PEDESTAL AND CARD READERS, AND ALL ASSOCIATED EQUIPMENT TO PROVIDE A FULLY FUNCTIONING RELOCATED GATE. 17.INSTALL NEW BLACK CHAINLINK FENCE. LEGEND: ASPHALT PAVEMENT RECONSTRUCTION TOPSOIL & MULCHING PAVEMENT EDGE PROPOSED TIEDOWN ANCHOR TAXIWAY OBJECT FREE AREA (TOFA) FLOODWAY RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 TR E N C H D E T A I L & T Y P I C A L S E C T I O N S C20 CONSTRUCTION NOTES KEY NOTES RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 CI V I L D E T A I L S C21 CONSTRUCTION NOTES: AIRCRAFT MOORING EYE NOTES PLAN VIEW SECTION A-A SECTION B-B RE N T O N M U N I C I P A L A I R P O R T ( R N T ) - R E N T O N , W A WW W . D O W L . C O M WI N D S O C K & 2 4 3 B L D G . G A A P R O N & P A R K I N G L O T R E H A B I L I T A T I O N 22 C2 5 0 0 0 6 8 7 LU A 2 4 - 0 0 0 2 9 9 PR 2 4 - 0 0 0 0 6 3 MA R K I N G D E T A I L S C22