Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_250123_v130 S. Meridian Street, Suite 1100 Indianapolis, IN 46204 Kite Realty Group | Phone: 317 577 5600 | Fax: 317 577 5605 | kiterealty.com January 23, 2025 Jill Ding, Sr. Planner Planning Department City of Renton RE: Construction Mitigation Description Redevelopment of Former Bank at North Benson Center 17803 108th Ave SE Renton, WA Dear Jill: Regarding the redevelopment of the former Bank of America located at 17803 108 th Avenue SE, and the required CUP application, we’ve composed the following description for construction mitigatio n. When a contractor is selected for the project, this may need to be updated. a. Proposed construction dates: June 2025 – October 2025 b. Hours and days of operation: Per City of Renton standards, 7:00 AM – 8:00 PM, Monday - Friday. c. Proposed hauling/transportation routes: To be submitted by contractor prior to commercial construction permit. d. Measures to be implemented to minimize dust, traffic, and transportation impacts, erosion, mud, noise, and any other noxious characteristics: To be submitted by contractor prior to commercial construction permit. e. Any special hours proposed for construction or hauling: N/A f. Preliminary traffic control plan: To be submitted by contractor prior to commercial construction permit. Sincerely, Respectfully, Tony Halsey, PE Kite Realty Group