Loading...
HomeMy WebLinkAboutNOA_Project Acceptance_20250226NOTICE OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 27, 2025 /  PROJECT NAME/NUMBER: Redevelopment of former Bank of America at Benson Center / LUA25-000052 /PR25-000019   PROJECT LOCATION: 17803 108th Ave SE (APN 3223059065)   APPLICANT/PROJECT CONTACT PERSON: Bill Barton / 19401 40th Ave West, Suite 420, Lynnwood, WA 98036 / bbarton@pmdginc   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://rb.gy/gs82a5  PROJECT DESCRIPTION: The applicant is requesting an Administrative Conditional Use Permit (CUP) and a Street Standards Waiver for a new restaurant with a drive-through window. The project site totals 157,868 square feet (3.62 acres) in area and is zoned Commercial Arterial (CA) and is located within Urban Design District D. The project site is currently developed with an existing 3,193 square foot building that was previously a Bank of America and 28 stall surface parking lot. The applicant proposes to remodel the existing building for a restaurant use with an accessory drive-through window. No expansions to the existing building footprint are proposed. The proposal includes the removal of the existing sloped roof and the replacement with a new flat roof with parapets. No change in access is proposed. A Street Standards Waiver request was submitted to waive a portion of the frontage improvements and to limit the installation of frontage improvements to the frontage directly abutting the existing building and surface parking lot. According to City of Renton (COR) Maps, the site is mapped with sensitive slopes (slopes with a grade between 25 and 40%).  DATE OF APPLICATION: February 26, 2025  NOTICE OF COMPLETE APPLICATION: February 27, 2025  PERMITS/REVIEW REQUESTED: Administrative Conditional Use Permit (CUP) and a Street Standards Waiver  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Sign Permit  REQUESTED STUDIES: Arborist Report, Drainage Report, Geotechnical Report, Traffic Study  Comments on the above application must be submitted in writing by 5:00 PM on March 13, 2025. Please submit comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project.   CONTACT PROJECT PLANNER: Jill Ding, Senior Planner, 425-430-6598, jding@rentonwa.gov /