HomeMy WebLinkAboutMFP25000808.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP25000808
IVR Number: 25000808
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:02/18/2025Application Date:2923059134Parcel Number: 10408 SE 174TH ST
Permit Type:02/27/2025Issue Date:Franchise
Permit Work Class:02/27/2026Expiration Date:Minor Utility
Job Number: 108154342Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO PARK IN ROW.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
108154342
10408 SE 174TH ST
EVAN HYETT 253-820-5166
MFP25000808
Monday Friday 8:00am 3:00pm
Scott Warlick CED 2/27/2025
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
10408 SE 174th St Renton WA 98055 USASE 174TH ST106TH PL SEMILL AVE S
CEDAR AVE SEV01
12 12
1
2
1
2
12 12 1111W20-1ROADWORKAHE
AD
B
E
P
R
E
P
A
R
E
D
T
O
S
T
O
P
W3-4X'≥RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREX'≥W20-1ROAD
WORK
AHEAD W20-4ONE LANE
ROADAHEADX'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'≥X'≥X'≥W20-7ASTOPSTOP 1414W20-1ROAD WORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥FROM TO
TOW AWAY AREA
PHONE 684-5444
NAME OF FIRM XXX-XXX-XXXX
NO PARKINGPLACE SIGNS BOTHSIDES OF WORK AREAS 36TH PLW20-1
ROADWORKAHEADBEPREPAREDTOSTOPW3-4
X'≥X'≥X'≥
W20-7A
STOP
V02J01NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVMatlock Highbarger808-375-4152Matlock.Highbarger@pse.com1 OF 110408 SE 174th St, Renton, WA2 11990106 02/17/2025Notes:1. All signs and spacing to conform to theMUTCD and City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements.Weekend work between 9 a.m. and 5 p.m.8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPUG/BOX/VAULTVAULTTEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425MFP25000808
1217
SE 174TH ST
10408CEDAR AVE S1212
P# 2923059134
112.5 KVA
120/208V
225 kVA
120/208V
INTERCEPT &
RE-ROUTE
CONDUIT INTO
WEST END OF
J01
AØ4093
BØ4094
CØ4095
AØ4078
BØ4079
CØ4080
AØ4081
BØ4082
CØ4083
AØ4090
BØ4091
CØ4092
112.5 KVA
120/208V
AØ4087
BØ4088
CØ4089
225 KVA
120/208V
AØEJP775
BØEJP776
CØEJP777
AØ4078
BØ4079
CØ4080
AØ4081
BØ4082
CØ4083
AØ4090
BØ4091
CØ4092
112.5 KVA
120/208V
AØ4087
BØ4088
CØ4089
120/208V
225 KVA
108154342UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
E. HYETT 253-820-5166 12/18/24
L. NEELY 253-569-2523 12/18/24
N/A N/A N/A
E. HYETT 253-820-5166 12/18/24
RW-132415 RENTON
ROL-15 961195 CREW2 10408 SE 175
CONVERT SWITCH TO J-BOX
10408 SE 174TH ST RENTON WA 98055
O-961195 N/A
N/A 108154342
AS NOTED 1/2
KING N/A N/A QCSOKE
SW-29-05-23 N/A N/A
2305E115 2305E136 2305E115 ROL-15
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
ORDER#NOTIF#PROJECT PHASE
MAINTENENCE
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
11990106 108154342
N/A
N/A
594159273
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
OVERHEAD CIRCUIT MAP: 2305E136
SCALE: 6" = 1 MILE
SITE SPECIFIC NOTES
S01 (316606-166175)
-REMOVE EXISTING SWITCH U57
-INSTALL 2-4" CONDUIT TO J01 APPROX. 5'
-SPLICE & EXTEND EXIST. PRI CABLES AØ4081, BØ4082, CØ4083 TO J01 (6041.2000 SPL10JX)
-SPLICE & EXTEND EXIST. PRI CABLES AØ4090, BØ4091, CØ4092 TO J01 (6041.2000 SPL10JX)
-INSTALL NEW LID (MID: 7656400)
J01 (316617-166167)
-INSTALL NEW 575 J-BOX 5' WEST OF S01 (6055.1030 JBOX15L)
-INSTALL 3-4 POS J-BUS (MID: 7625900)
-INSTALL (12) PRI ELBOWS (6041.1000 ELB10J)
-INTERCEPT & REROUTE EXIST. PRI CABLES AØ4078, BØ4079, CØ4080 TO WEST END OF J01
IN NEW CONDUIT APPROX. 15'
-OPEN TRENCH & INSTALL NEW 4" CONDUIT FROM J01 TO V01 APPROX. 10'
-PULL NEW 3Ø 1/0 PRI CABLE FROM J01 TO V01 APPROX. 40'
-INSTALL NEW CABLE TAGS: EJP775, EJP776, EJP777 FROM J01 TO V01
V01 (316607-166175)
-INSTALL (3) PRI TERMS (6041.3000 TER10JC)
V02 (316608-166191)
-INSTALL 12" 504 RISER (MID: 7807201)
SITE PLAN
SCALE: 1:50
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
PRIMARY UG MAP
(PRE-CONSTRUCTION): 2305E115
SCALE: 1:100
PRIMARY UG MAP (POST
CONSTRUCTION): 2305E115
SCALE: 1:100
VAULT & EQUIPMENT TABLE
SITE GRID
NUMBER VAULT SIZE & COVER TYPE & SIZE
EQUIPMENT IN VAULT
PRIMARY
BUSHINGS TRANSFORMER
ID NUMBERS
(COMPANY ID)
REMARKS
LB DC
S01 316606
166175 --REMOVE SWITCH & INSTALL NEW LID
MID: 7656400
V01 316607
166175
EXISTING 225 KVA
PDMT XFMR
EXISTING 225 KVA
PDMT XFMR --INSTALL (3) NEW TERMS
J01 316617
166167
HH 4'8" X 7' X 5' W/ 2-3'
SQ DOORS MATID:
7663200
J-BOX BELOW GRADE
W/ 3-4 POS. J-BUS
MATID: 7625900
12 -INSTALL NEW 4'8" X 7' X 5' J-BOX WIRE
CREW TO INSTALL GRID NUMBERS
V02 316608
166191 EXISTING 504 VAULT EXISTING 112.5 KVA
PDMT XFMR --INSTALL NEW 12" 504 RISER (MID: 7807201)
TOTALS :12 -
EXISTING SWITCH
HH 4'8" SQ VAULT
EXISTING 3PH S&C
MARK1 4WAY W/ (12)
1/0 TERMS
VAULT BELOW GRADE
JOB SITE
VINCINITY MAP
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
J01 J- BOX CABLE ENTRY DETAIL
NOT TO SCALE 12kV CABLE ROUTING
Work appears to be on private property and will require additional
approval from the property owner.
MFP25000808
4090 - AØ
4091 - BØ
4092 - CØ
EXIST. TO
REMAIN
4081 - AØ
4082 - BØ
4083 - CØ
EXIST. TO
REMAIN
4078 - AØ
4079 - BØ
4080 - CØ
INTERCEPT
CONDUIT &
RE-ROUTE
2-4" - L______'
1-4" - L______'
EJP775 - AØ
EJP776 - BØ
EJP777 - CØ
4081 - AØ
4082 - BØ
4083 - CØ
4090 - AØ
4091 - BØ
4092 - CØ
108154342Potelco, Inc.DESIGNED BY
PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE)
LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE
(gal.)REMARKS
FROM TO SIZE
(in)QTY
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
TYPE BENDS PULL
(lbs)
PULL
REV
(lbs)
SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only
Check applicable box
DB120 HDPE SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS
BUILT
J01 INT.4 1 15 --1/0 AL JKT 30 ---0.1
S01 J01 4 2 10 --1/0 AL JKT 40 4081/4090 4082/4091 4083/4092 0
J01 V01 4 1 10 --1/0 AL JKT 40 EJP775 EJP776 EJP777 0
TOTAL 4"35'TOTAL 3Ø 110'TOTAL LUBE 0.2
TOTAL QTS GLUE 0.1
PRIMARY CABLE & CONDUIT DIAGRAM
NOT TO SCALE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
E. HYETT 253-820-5166 12/18/24
L. NEELY 253-569-2523 12/18/24
N/A N/A N/A
E. HYETT 253-820-5166 12/18/24
RW-132415 RENTON
ROL-15 961195 CREW2 10408 SE 175
CONVERT SWITCH TO J-BOX
10408 SE 174TH ST RENTON WA 98055
O-961195 N/A
N/A 108154342
AS NOTED 2/2
KING N/A N/A QCSOKE
SW-29-05-23 N/A N/A
2305E115 2305E136 2305E115 ROL-15
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
SWITCH# U57 INTERNAL WORLD
2"
Excavation - 19-1/2 cubic yards
SIDE VIEW
5'-4"Crushed
6"
Rock
TOP VIEW
9'
11'
7'-0"
4'-0"
1'
4'-8"
4,750 lbs
2,490 lbs
VAULT & EXCAVATION DETAIL
Not to scale 6055.1030
VOLUME OF DISTURBANCE TABLE
TYPE DESCRIPTION PROPERTY
CLASSIFCATION
SIZE (FT)REM CU YD
(APPX)
GRAVEL FILL
CU YD (APPX)
COMMON SURFACE
TYPES
REMARKS
OPEN TRENCH TRENCH PVT PROP 1 X 15 X 3 1.7 1.7 GRASS
OPEN TRENCH TRENCH PVT PROP 1 X 10 X 3 1.1 1.1 GRASS
TOTAL PVT PROP CU YDS (APPX)1.1 1.1
TOTAL ROW CU YDS (APPX)0.0 0.0
TOTAL CU YDS (APPX)1.1 1.1
MFP25000808