FIELD REPORT
Project No. 6430.01 Page 1 of 3 Report ID 6430.01 S 2025 0219
Date Wed 2/19/2025 Weather 51°F, Mostly Cloudy
Arrival/Departure Time(s) 14:30 – 14:45 Travel Time (hr) 1.0
Project Name Grant Place
Location 1600 Grant Ave S, Renton
ESNW Rep., CESCL No., Phone No. & Report Statement
Sophia Garnica, ECO-3-5062412, (206) 591-4786
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Client Info/Contact Apex Enterprises Group, LLC | Siki Chang
Permit No(s). WAR304993
Reviewed By MLP
Initials/Date
N/A
Field Supervisor Project Manager Initials/Date
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying
with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole
responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Type of visit: Weekly Monthly Post–Storm Event
Precipitation since last inspection (approximate): 0.92 inches
Precipitation in last 24 hours (approximate): 0.05 inches
Phase of active construction (check all that apply):
Pre-construction Clearing, demolition, or grading Infrastructure or roads
Concrete pours Vertical construction Utilities
Off-site improvements Site temporarily stabilized Final stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
• Record results in the table below.
• Hanna Turbidity Meter No. 36
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of
Discharge Notes
MP 1 Storm Vault - - Storm vault is plugged
MP 2 Storm Vault - - Storm vault is plugged
Report ID 6430.01 S 2025 0219 Page 2 of 3
Earth Solutions NW, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas
• Silt Fence G N -Silt fence along the site perimeter
2. Establish Construction Access • Fabric; Quarry Spalls
• Wheel Wash
• Sweeper Truck
G N -Site entrances are stabilized with quarry spalls
3. Control Flow Rates
• Stormwater Vault or Facility • Straw Wattles
• Check Dams
G N -Underground storm system installed
-Storm vault onsite and plugged
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers • Vegetation
• Straw
• Sediment Ponds, Traps & Filters
• Treatment • Water Truck
G N -Silt fence along the site perimeter
5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock
• Hydroseeding; Grass
• Plastic Sheeting • Stockpiles
F Y
-Cover any exposed soil that is unworked for 2+
days -All lots are vegetated
-Straw on exposed soil
-Reduced straw coverage was in some areas;
add more straw
-Storm vault area is covered with gravel
-Extra straw bales are onsite
-Stockpiles are covered with plastic sheeting cover
6. Protect Slopes
• Benching; Track-Walking
• Pipe Slope Drains
• Plastic Sheeting; Anchors
- - N/A
7. Protect Drain Inlets • Catch Basin Inserts F Y -CB inserts are installed
-CB insert is filled; empty the CB insert
8. Stabilize Channels and Outlets • Channel Lining
• Check Dam
• Outlet Protection
• Nets and Blankets
- - N/A
9. Control Pollutants • Chemical Storage Area Covered
• Concrete Handling - - N/A
10. Control Dewatering - - -Notify ESNW prior to any discharging from site
11. Maintain BMPs F Y -See any details below
12. Maintain SWPPP & Site Logbook G N -Available upon request
13. Protect Low-Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities • Permeable Pavement - - N/A
Do existing BMPs need to be modified or removed, or do other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
5 Reduced straw coverage in some areas Add more straw
7 CB insert filled Empty the CB insert
Report ID 6430.01 S 2025 0219 Page 3 of 3
Earth Solutions NW, LLC
BMP LEGEND
MONITORING POINT
STORMWATER VAULT
ACTIVE HOMEBUILDING LOTS
SILT FENCE
CONSTRUCTION ENTRANCE
CATCH BASIN INSERT
STRAW
VEGETATED LOTS
STOCKPILE
PLASTIC SHEETING
Empty the CB
insert
Reduced straw