HomeMy WebLinkAboutAddendum - 3AMENDMENT NO. 3 TO AGREEMENT FOR 116TH AVE SE
SIDEWALK PROJECT CAG-23-387
THIS AMENDMENT, dated for reference purposes only as February 10, 2025, is by and between
the City of Renton (the “City”), a Washington municipal corporation, and Shea Carr and Jewell,
Inc (dba SCJ Alliance) (“Consultant”), a Washington Corporation. The City and the Consultant are
referred to collectively in this Amendment as the “Parties.” Once fully executed by the Parties,
this Amendment is effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-23-387, dated
November 9, 2023, to provide necessary services for the 116 th Ave SE Sidewalk Project (referred
to herein as the “Agreement”);
Whereas, the Parties wish to amend the Agreement to change the scope of work, and change the
compensation in order to complete storm water drainage report, updated construction cost
estimate, and collect additional survey.
NOW THEREFORE, It is mutually agreed upon that CAG-23-387 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-3, which is attached and incorporated herein.
2.Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit A-3. All Work shall be performed by no later than
December 31, 2025.
3.Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $25,375.95 from $241,128.35 to
$266,504.30, including any applicable state and local sales taxes. The additional
compensation shall be paid based upon Work actually performed according to the rate(s)
or amounts specified in Exhibit A-3, which is attached and incorporated herein.
4.All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
CAG-23-387, Adden #3-25
PAGE 2 OF 2
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Martin Pastucha
Public Works Administrator
Aaron Knight, PE
Principal
_____________________________
Date
_____________________________
Date
Attest
_____________________________
Jason A. Seth
City Clerk
Approved as to Legal Form
By: __________________________
Cheryl Beyer
Senior Assistant City Attorney
Contract Template Updated 06/17/2021
y:___________________________________________________________________
Aarororoooooooooooooooooooooooooooooooooooooooooooooonnn Knight, PE
2/11/2025
ĐůďϮͬϭϮͬϮϱϮϴϱϮ
N/A
Approved by Cheryl Beyer via 2/12/2025 email
Exhibit A-3
Amendment #3
Scope of Work
116th Avenue SE Sidewalk Project
Renton, WA
Prepared For: Blake Costa, PE, PTOE
City of Renton
1055 South Grady Way, Renton, WA 98057
Prepared By: George Hilen, PE, Project Manager
Date Prepared: February 10, 2025
Overview
The City was awarded construction funds from the Transportation Improvement Board and an amendment to
the original contract to accommodate added design elements was needed. This amendment (Amendment #3)
covers added design efforts associated with the following design changes:
i Added utility coordination effort
i Addressing additional City comments on the final Drainage Report submitted in November 2024
i Addition of Cultural Resources documentation
i Addition of geotechnical investigation to provide pavement design
Assumptions
The following assumptions were made to establish the scope and budget for this project. Changes to these
assumptions may require an amendment to this scope of work.
i The scope and fee estimate in this Amendment #3 assumes the project will go out to advertise before
June 2025.
i The contract duration has been extended through December 31, 2025.
i All assumptions and work in the original project contract, Amendment #1 and Amendment #2 still apply,
unless otherwise noted in this amendment.
Phase 1 Management/Coordination/Administration (Modified)
The level of effort included in the fee estimate covers the additional effort to manage the project due to the
scope change, including contract and subconsultant administration.
City of Renton
116th Ave SE Sidewalk Project – Amendment #3
February 10, 2025
Page 2 of 3
2727 Hollycroft Street, Suite 230 Gig Harbor, WA 98335 Office 253.201.0777 Fax 360.352.1509 scjalliance.com
Phase 2 Survey and Right-of-Way Base Mapping
The City requested to have the two (2) proposed fire hydrant relocations staked in the field by the surveyor. This
work is to assist Soos Creek Water and Sewer District with their relocation of the hydrants. Please see the
attached scope of work prepared by MTN2Coast.
Phase 3 Conceptual Design
No changes.
Phase 4 Utility Coordination (Modified)
Task 1 Utility Coordination (Modified)
The level of effort included in the fee estimate covers the additional effort associated with added utility
coordination due to complexity of coordination with regards to Soos Creek Water and Sewer District.
Phase 5 60% Design
No changes.
Phase 6 SEPA Checklist
No changes.
Phase 7 100% Design
Task 1 100% Design Plans
The level of effort included in the fee estimate covers the additional effort to revise the design plans for the
revisions to the pavement section as recommended by the geotechnical engineer.
Task 2 100% Project Manual
The level of effort included in the fee estimate covers the additional effort to revise the project manual for
the revisions to the pavement section as recommended by the geotechnical engineer.
Task 3 100% Design Cost Estimate
The level of effort included in the fee estimate covers the additional effort to revise the design cost estimate
for the revisions to the pavement section as recommended by the geotechnical engineer.
Task 4 Full Drainage Report (Modified)
The level of effort included in the fee estimate covers the additional effort to address the City’s additional
comments from the final Drainage Report submitted with the 60% resubmittal.
City of Renton
116th Ave SE Sidewalk Project – Amendment #3
February 10, 2025
Page 3 of 3
2727 Hollycroft Street, Suite 230 Gig Harbor, WA 98335 Office 253.201.0777 Fax 360.352.1509 scjalliance.com
Deliverables
i Final Drainage Report addressing the City’s comments from previous report
i Response to the City’s Final Drainage Report comments
Assumptions
i This task is for one (1) Final Submittal of the drainage report. Addressing additional revisions resulting
from City comments on the Final report will require an additional amendment.
Phase 8 Bid Documents
No changes.
Phase 9 Management Reserve
Part of the funding for this request will be sourced from the Management Reserve Fund.
Phase 10 Cultural Resources (New)
Task 1 Cultural Resources (New)
Task 1.1 Background Research and Records Review: The consultant will conduct a review of soils and
geomorphological information, development history of the project area, County Assessor’s records, DAHP’s
Washington Information System for Architectural and Archaeological Records Data (WISAARD) database for
previous sites and surveys within one mile of the project alignment, EPA’s NEPAssist Data, and other
pertinent environmental and historical sources.
Task 1. 2 Reporting and Deliverables: the consultant will prepare the DAHP EZ/Project Form in
compliance with GEO 21-02. The form will contain information gathered in the background research and
records review, along with project specific information about the proposed action. The consultant will
submit a draft EZ form to the City for review. Any comments will be addressed and a revised form will be
provided to the City for final submittal to DAHP and any concerned Tribes.
Assumptions
i Project plans, detailed project description, shapefiles, and previous communication with agencies and
Tribes will be provided by the City.
i The City of Renton will conduct formal consultation with DAHP and the Tribes.
i If DAHP determines that an archaeological survey or history property inventory forms are required, an
amendment to this scope of work may be required.
Phase 11 Geotechnical Engineering by HWA Geoscience (New)
Please see the attached scope of work from HWA Geoscience.
Subconsultant Labor Hour Estimate
SCJ Alliance
Client:City of Renton Template Version:12/11/2024
Project:116th Ave SE Sidewalks Contract Type:Billing Rate Schedule No. of Sheets: No. of Sheets: N/A
Job #:23-000984 No. of Lots: No. of Lots: N/A
File Name:2025-0205 Renton 116th Ave SE Sidewalks Fee Estimate - A Totals:273 209 177 118 268 142
Phase &
Task No.Principal PM2 Project
Manager E4 Engineer E1 Engineer
Senior
Consultant
Project
Accountant
Total Direct
Labor Hours &
Cost
Total Cost
PHASE 1 #REF!
Task 1 5,032.00$
1 20.0 6.0 26.0 5,032.00$
Subtotal Hours: 20.0 6.0 26.0 5,032.00$
Total Phase Hours:20.0 6.0 26.0 26.0
Total Phase Direct Labor: $4,180.00 $852.00 $5,032.00
5,032.00$
PHASE 2 #REF!
Task 1 -$
1 -$
Subtotal Hours:-$
Total Phase Hours:-$
Total Phase Direct Labor:-$
PHASE 4 #REF!
Task 1 4,180.00$
3 20.0 20.0 4,180.00$
Subtotal Hours: 20.0 20.0 4,180.00$
Total Phase Hours:20.0 20.0 20.0$
Total Phase Direct Labor: $4,180.00 $4,180.00 4,180.00$
PHASE 7 #REF!
Task 1 1,171.50$
1 0.5 1.0 2.0 4.0 7.5 1,171.50$
Subtotal Hours: 0.5 1.0 2.0 4.0 7.5 1,171.50$
Task 2 972.50$
1 0.5 4.0 4.5 972.50$
Subtotal Hours: 0.5 4.0 4.5
972.50$
Task 3 1,289.50$
1 0.5 1.0 4.0 2.0 7.5 1,289.50$
Subtotal Hours: 0.5 1.0 4.0 2.0 7.5
1,289.50$
Task 5 1,962.00$
1 2.0 8.0
10.0 1,962.00$
Subtotal Hours: 2.0 8.0 29.5 1,962.00$
Total Phase Hours:3.5 6.0 14.0 6.0 29.5 29.5$
Total Phase Direct Labor: $955.50 $1,254.00 $2,478.00 $708.00 $5,395.50
5,395.50$
Management/Coordination/Administration
Management
Management
100% Design Cost Estimate
100% Design Plans
100% Design Plans
100% Project Manual
100% Project Manual
100% Design Cost Estimate
Survey and Right-of-Way Base Mapping
Survey and Right-of-Way Base Mapping
Survey and Right-of-Way Base Mapping
Utility Coordination
Utility Coordination Tracking
Utility Coordination
100% Design
Full Drainage Report
Final Draft
Phase & Task Title
1 of 2 2/6/2025
Subconsultant Labor Hour Estimate
SCJ Alliance
Client:City of Renton Template Version:12/11/2024
Project:116th Ave SE Sidewalks Contract Type:Billing Rate Schedule No. of Sheets: No. of Sheets: N/A
Job #:23-000984 No. of Lots: No. of Lots: N/A
File Name:2025-0205 Renton 116th Ave SE Sidewalks Fee Estimate - A Totals:273 209 177 118 268 142
Phase &
Task No.Principal PM2 Project
Manager E4 Engineer E1 Engineer
Senior
Consultant
Project
Accountant
Total Direct
Labor Hours &
Cost
Total CostPhase & Task Title
PHASE 10 #REF!
Task 1 4,696.00$
1 8.0 8.0 2,144.00$
2 2.0 6.0 4.0 12.0 2,552.00$
Subtotal Hours: 2.0 6.0 12.0 20.0 4,696.00$
Total Phase Hours:2.0 6.0 12.0 20.0 20.0$
Total Phase Direct Labor: $418.00 $1,062.00 $3,216.00 $4,696.00
4,696.00$
PHASE 11 #REF!
Task 1 -$
1 -$
Subtotal Hours:-$
Total Phase Hours:-$
Total Phase Direct Labor:-$
Total Hours All Phases 3.5 48.0 20.0 6.0 12.0 6.0 95.5
95.5
Total Direct Labor Estimate All Phases $955.50 $10,032.00 $3,540.00 $708.00 $3,216.00 $852.00 $19,303.50 19,303.50$
Indirect Costs
Subconsultants:
Mnt2Coast Surveying $1,200.00
HWA Geoscience $18,869.00
Subconsultant Subtotal:20,069.00$
Subconsultant Markup:1,003.45$
Subconsultant Total:21,072.45$
Reimbursable Expenses:
Copies, Printing, etc.-$
Mileage -$
Expenses Subtotal:-$
Expenses Markup:-$
Expenses Total:-$
Management Reserve:(15,000.00)$
Total Indirect Costs:6,072.45$
Total:25,375.95$
Geotechnical Engineering
Geotechnical Engineering
Geotechnical Engineering
Cultural Resources
Cultural Resources
Background Research and Records Review
Reporting and Delvierables
2 of 2 2/6/2025
SCJ Alliance
Client:
Project:
Job #:Template Version:
File Name: 2025-0205 Renton 116th Ave SE Sidewalks Fee Estimate - Amendment #3.xlsm Contract Type:
Consultant Fee Determination
DIRECT SALARY COST
Classification Hours Fully Burdened Rate Amount
Principal 3.5 $273.00 $955.50
PM2 Project Manager 48.0 $209.00 $10,032.00
E4 Engineer 20.0 $177.00 $3,540.00
E1 Engineer 6.0 $118.00 $708.00
Senior Consultant 12.0 $268.00 $3,216.00
Project Accountant 6.0 $142.00 $852.00
TOTAL SALARY COST Total Salary Cost $19,303.50
SUBCONSULTANTS Yes
$1,200
$18,869
x
Subconsultant Fee Subtotal:$0 $20,069.00
Q Subconsultant Markup:5%$1,003.45
REIMBURSABLE EXPENSES
Copies, Printing, etc. 0.0% of the Total Salary Costs $0.00
Mileage 0 miles at $0.670 per mile $0.00
Expenses Subtotal:$0.00
Expenses Markup:0%$0.00
SUBTOTAL (SALARY, SUBCONSULTANTS AND EXPENSES)
Subtotal (Salary, Subconsultants and Expenses)$40,375.95
MANAGEMENT RESERVE FUND (MRF)
Management Reserve: -$15,000 ($15,000.00)
Total Estimated Budget: $25,375.95
HWA Geoscience PHASE 11 Geotechnical Engineering
Billing Rate Schedule
Survey and Right-of-Way Base Map
Subconsultant Fee Determination Summary
Mnt2Coast Surveying PHASE 2
116th Ave SE Sidewalks
12/11/202423-000984
City of Renton
2/6/2025 Page 1
Ci
t
y
o
f
R
e
n
t
o
n
11
6
t
h
A
v
e
n
u
e
S
E
S
i
d
e
w
a
l
k
P
r
o
j
e
c
t
-
A
m
e
n
d
m
e
n
t
#
3
02
/
0
6
/
2
0
2
5
Co
n
t
r
a
c
t
F
e
e
S
u
m
m
a
r
y
Ph
a
s
e
#
Ph
a
s
e
T
i
t
l
e
Or
i
g
i
n
a
l
C
o
n
t
r
a
c
t
Am
o
u
n
t
Co
n
t
r
a
c
t
Am
e
n
d
m
e
n
t
#
1
6/
1
4
/
2
0
2
4
Co
n
t
r
a
c
t
Am
e
n
d
m
e
n
t
#
2
9/
1
7
/
2
0
2
4
Co
n
t
r
a
c
t
Am
e
n
d
m
e
n
t
#
3
02
/
0
6
/
2
0
2
5
C
o
n
t
r
a
c
t
T
o
t
a
l
s
SC
J
L
a
b
o
r
01
M
a
n
a
g
e
m
e
n
t
/
C
o
o
r
d
i
n
a
t
i
o
n
/
A
d
m
i
n
s
t
r
a
t
i
o
n
1
5
,
4
0
3
.
0
5
$
-
$
1
6
,
4
9
4
.
0
5
$
5
,
0
3
2
.
0
0
$
3
6
,
9
2
9
.
1
0
$
02
S
u
r
v
e
y
a
n
d
R
i
g
h
t
o
f
W
a
y
B
a
s
e
M
a
p
p
i
n
g
1
5
,
0
2
5
.
5
0
$
9
,
2
9
2
.
5
0
$
-
$
1
,
2
6
0
.
0
0
$
2
5
,
5
7
8
.
0
0
$
03
C
o
n
c
e
p
t
u
a
l
D
e
s
i
g
n
2
1
,
5
5
8
.
4
5
$
-
$
-
$
-
$
2
1
,
5
5
8
.
4
5
$
04
U
t
i
l
i
t
y
C
o
o
r
d
i
n
a
t
i
o
n
7
,
7
5
2
.
4
0
$
-
$
-
$
4
,
1
8
0
.
0
0
$
1
1
,
9
3
2
.
4
0
$
05
6
0
%
D
e
s
i
g
n
4
0
,
7
3
3
.
7
5
$
1
6
,
4
1
6
.
3
5
$
2
7
,
7
2
0
.
4
0
$
-
$
8
4
,
8
7
0
.
5
0
$
06
S
E
P
A
C
h
e
c
k
l
i
s
t
5
,
9
6
7
.
0
0
$
-
$
-
$
-
$
5
,
9
6
7
.
0
0
$
07
1
0
0
%
D
e
s
i
g
n
2
9
,
9
3
6
.
5
5
$
-
$
3
,
6
6
6
.
0
0
$
5
,
3
9
5
.
5
0
$
3
8
,
9
9
8
.
0
5
$
08
B
i
d
D
o
c
u
m
e
n
t
s
1
4
,
0
8
3
.
8
5
$
-
$
1
,
8
8
2
.
0
0
$
-
$
1
5
,
9
6
5
.
8
5
$
09
M
a
n
a
g
e
m
e
n
t
R
e
s
e
r
v
e
1
5
,
0
0
0
.
0
0
$
-
$
-
$
(
1
5
,
0
0
0
.
0
0
)
$
-
$
10
C
u
l
t
u
r
a
l
R
e
s
o
u
r
c
e
s
-
$
-
$
-
$
4
,
6
9
6
.
0
0
$
4
,
6
9
6
.
0
0
$
11
G
e
o
t
e
c
h
n
i
c
a
l
E
n
g
i
n
e
e
r
i
n
g
-
$
-
$
-
$
1
9
,
8
1
2
.
4
5
$
1
9
,
8
1
2
.
4
5
$
Su
b
t
o
t
a
l
$1
6
5
,
4
6
0
.
5
5
$
2
5
,
7
0
8
.
8
5
$
4
9
,
7
6
2
.
4
5
$
2
5
,
3
7
5
.
9
5
$
2
6
6
,
3
0
7
.
8
0
Re
i
m
b
u
r
s
a
b
l
e
E
x
p
e
n
s
e
s
99
R
e
i
m
b
u
r
s
a
b
l
e
E
x
p
e
n
s
e
s
1
9
6
.
5
0
$
-
$
-
$
-
$
1
9
6
.
5
0
$
Su
b
t
o
t
a
l
$1
9
6
.
5
0
$
0
.
0
0
$
0
.
0
0
$
0
.
0
0
$
1
9
6
.
5
0
Su
m
m
a
r
y
To
t
a
l
$
1
6
5
,
6
5
7
.
0
5
$
2
5
,
7
0
8
.
8
5
$
4
9
,
7
6
2
.
4
5
$
2
5
,
3
7
5
.
9
5
$
2
6
6
,
5
0
4
.
3
0
:ĂŶƵĂƌLJϮ͕ϮϬϮϱ
'ĞŽƌŐĞ,ŝůĞŶ͕W
^:ůůŝĂŶĐĞ
'ĞŽƌŐĞ͘ŚŝůĞŶΛƐĐũĂůůŝĂŶĐĞ͘ĐŽŵ
K͗Ϯϱϯ͘ϮϬϭ͘Ϭϳϳϳ͕Ğdžƚ͘Ϯϵϰ
D͗Ϯϱϯ͘ϱϬϵ͘ϰϵϬϰ
ZĞ͗^ƚĂŬŝŶŐŝŶƚŚĞĂƌĞĂŽĨϭϲϬϭϱϭϭϲƚŚǀĞ^͕ZĞŶƚŽŶʹ,LJĚƌĂŶƚ^ƚĂŬŝŶŐ
ĞĂƌ'ĞŽƌŐĞ͗
dŚĂŶŬLJŽƵĨŽƌƚŚĞŽƉƉŽƌƚƵŶŝƚLJƚŽƉƌŽǀŝĚĞƉƌŽĨĞƐƐŝŽŶĂůƐƵƌǀĞLJŝŶŐƐĞƌǀŝĐĞƐ͘
,LJĚƌĂŶƚ^ƚĂŬŝŶŐ
DdEϮK^d͕>>;DϮͿǁŝůůƐƚĂŬĞƚŚĞůŽĐĂƚŝŽŶŽĨϮƉƌŽƉŽƐĞĚĨŝƌĞŚLJĚƌĂŶƚƐŝŶƚŚĞĨŝĞůĚŽŶĞƚŝŵĞŽŶůLJ͘ůŝĞŶƚǁŝůů
ƉƌŽǀŝĚĞĂƉƉƌŽǀĞĚƉůĂŶƐĞƚŝŶƉĚĨĨŽƌŵĂƐǁĞůůĂƐĂĐŽƉLJŽĨƚŚĞĨŝůĞ͘
ĞůŝǀĞƌĂďůĞƐ
DϮǁŝůůĚĞůŝǀĞƌƚŚĞĨŽůůŽǁŝŶŐ͗
• ^ƚĂŬĞƐƐĞƚŝŶĨŝĞůĚ͘
DϮĨĞĞĨŽƌĐŽŵƉůĞƚŝŶŐƚŚĞƐƵƌǀĞLJƐŚĂůůďĞůƵŵƉƐƵŵĂƐĨŽůůŽǁƐ͗
,LJĚƌĂŶƚ^ƚĂŬŝŶŐ Ψϭ͕ϮϬϬ>ƵŵƉ^Ƶŵ;ŝŶĐůƵĚĞƐƌĞĐŽƌĚŝŶŐĨĞĞͿ
DϮ͛Ɛ'ĞŶĞƌĂůŽŶĚŝƚŝŽŶƐŽĨŽŶƚƌĂĐƚ͕ĂƚƚĂĐŚĞĚ͕ĂƌĞŝŶĐůƵĚĞĚĂƐƉĂƌƚŽĨƚŚŝƐŐƌĞĞŵĞŶƚĨŽƌƉƌŽĨĞƐƐŝŽŶĂůƐĞƌǀŝĐĞƐ͘
WůĞĂƐĞƐŝŐŶĂĐŽƉLJŽĨƚŚŝƐůĞƚƚĞƌĂŶĚƌĞƚƵƌŶƚŽDϮĂƐŶŽƚŝĐĞƚŽƉƌŽĐĞĞĚ͘WůĞĂƐĞĨĞĞůĨƌĞĞƚŽĐŽŶƚĂĐƚŵĞĂƚ
W:ΛŵƚŶϮĐŽĂƐƚ͘ĐŽŵŽƌďLJƉŚŽŶĞĂƚϯϲϬ͘ϲϴϴ͘ϭϵϰϵŝĨLJŽƵŚĂǀĞĂŶLJƋƵĞƐƚŝŽŶƐ͘
ĞƐƚƌĞŐĂƌĚƐ͕WƌŽƉŽƐĂůĂŶĚ'ĞŶĞƌĂůŽŶĚŝƚŝŽŶƐŽĨŽŶƚƌĂĐƚĐĐĞƉƚĞĚ
DdEϮK^d͕>>^:ůůŝĂŶĐĞ
W͘:͘ŽƵŐŚĂů͕W>^ ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
^ŝŐŶĂƚƵƌĞ ĂƚĞ͗ͺͺͺͺͺͺͺͺͺͺ
3U
R
M
H
F
W
&
R
V
W
(
V
W
L
P
D
W
H
+:
$
5
H
I
5H
Q
W
R
Q
W
K
$
Y
H
6
(
,
P
S
U
R
Y
H
P
H
Q
W
V
7D
V
N
*H
R
W
H
F
K
Q
L
F
D
O
6
H
U
Y
L
F
H
V
'D
W
H
)
H
E
5H
Q
W
R
Q
:
D
V
K
L
Q
J
W
R
Q
3U
H
S
D
U
H
G
%
\
-
7
:
%
.
+
6F
R
S
H
R
I
:
R
U
N
'H
Y
H
O
R
S
(
[
S
O
R
U
D
W
L
R
Q
:
R
U
N
3
O
D
Q
D
Q
G
7
H
P
S
R
U
D
U
\
7
U
D
I
I
L
F
&
R
Q
W
U
R
O
3
O
D
QV
7
&
3
V
6
X
E
P
L
W
W
R
&
L
W
\
I
R
U
5
L
J
K
W
R
I
:
D
\
8
V
H
5
2
:
S
H
U
P
L
W
3H
U
I
R
U
P
V
L
W
H
Y
L
V
L
W
W
R
H
Y
D
O
X
D
W
H
S
D
Y
H
P
H
Q
W
F
R
Q
G
L
W
L
R
Q
V
P
D
U
N
S
D
Y
H
P
H
QW
F
R
U
H
H
[
S
O
R
U
D
W
L
R
Q
O
R
F
D
W
L
R
Q
V
D
Q
G
V
X
E
P
L
W
X
W
L
O
L
W
\
Q
R
W
L
I
L
F
D
W
L
R
Q
UH
T
X
H
V
W
&R
Q
G
X
F
W
S
D
Y
H
P
H
Q
W
F
R
U
L
Q
J
D
W
O
R
F
D
W
L
R
Q
V
6
K
D
O
O
R
Z
K
D
Q
G
G
X
J
H
[
S
O
R
U
DW
L
R
Q
V
X
S
W
R
I
H
H
W
G
H
H
S
Z
L
O
O
E
H
F
R
P
S
O
H
W
H
G
D
W
HD
F
K
F
R
U
H
O
R
F
D
W
L
R
Q
%
D
F
N
I
LO
O
HD
F
K
F
R
U
H
K
R
O
H
Z
L
W
K
F
R
P
S
D
F
W
H
G
V
R
L
O
V
D
Q
G
S
D
W
F
K
Z
L
W
K
$
T
X
D
S
K
D
O
W
&U
H
D
W
H
S
K
R
W
R
J
U
D
S
K
L
F
S
D
Y
H
P
H
Q
W
F
R
U
H
O
R
J
V
D
Q
G
D
V
V
L
J
Q
O
D
E
R
U
D
W
R
U
\
W
H
VW
L
Q
J
3H
U
I
R
U
P
H
Q
J
L
Q
H
H
U
L
Q
J
D
Q
D
O
\
V
H
V
I
R
U
Q
H
Z
S
D
Y
H
P
H
Q
W
G
H
V
L
J
Q
3U
H
S
D
U
H
D
G
U
D
I
W
U
H
S
R
U
W
S
U
H
V
H
Q
W
L
Q
J
W
K
H
U
H
V
X
O
W
V
R
I
W
K
H
H
[
S
O
R
U
D
W
L
R
QV
O
D
E
R
U
D
W
R
U
\
W
H
V
W
L
Q
J
D
Q
G
H
Q
J
L
Q
H
H
U
L
Q
J
U
H
F
R
P
P
H
Q
G
D
W
L
R
Q
V
)L
Q
D
O
L
]
H
W
K
H
U
H
S
R
U
W
X
S
R
Q
U
H
F
H
L
S
W
R
I
U
H
Y
L
H
Z
F
R
P
P
H
Q
W
V
(6
7
,
0
$
7
(
'
+
:
$
/
$
%
2
5
*H
R
O
9
,
,
,
(
Q
J
U
9
,
,
,
(
Q
J
U
9
*
H
R
O
,
,
,
*
H
R
O
,
,
&
R
Q
W
U
D
F
W
V
&
$
'
&
O
H
U
L
F
D
O
7
2
7
$
/
7
2
7
$
/
+
2
8
5
6
$
0
2
8
1
7
3U
R
M
H
F
W
6
H
W
X
S
&
R
R
U
G
L
Q
D
W
L
R
Q
'H
Y
H
O
R
S
(
[
S
O
R
U
D
W
L
R
Q
3
O
D
Q
D
Q
G
7
&
3
V
D
Q
G
6
X
E
P
L
W
W
R
&
L
W
\
6L
W
H
9
L
V
L
W
7
R
0
D
U
N
3
D
Y
H
P
H
Q
W
&
R
U
H
V
$
U
U
D
Q
J
H
8
W
L
O
L
W
\
/
R
F
D
W
H
V
&R
Q
G
X
F
W
3
D
Y
H
P
H
Q
W
&
R
U
L
Q
J
*H
Q
H
U
D
W
H
3
D
Y
H
P
H
Q
W
&
R
U
H
/
R
J
V
$
V
V
L
J
Q
/
D
E
7
H
V
W
L
Q
J
3H
U
I
R
U
P
(
Q
J
L
Q
H
H
U
L
Q
J
$
Q
D
O
\
V
H
V
I
R
U
3
D
Y
H
P
H
Q
W
'
H
V
L
J
Q
3U
H
S
D
U
H
'
U
D
I
W
5
H
S
R
U
W
3U
H
S
D
U
H
)
L
Q
D
O
5
H
S
R
U
W
&R
Q
V
X
O
W
D
W
L
R
Q
3
U
R
M
H
F
W
0
D
Q
D
J
H
P
H
Q
W
4
$
4
&
',
5
(
&
7
6
$
/
$
5
<
&
2
6
7
*(
2
7
(
&
+
1
,
&
$
/
/
$
%
2
5
$
7
2
5
<
7
(
6
7
6
8
0
0
$
5
<
(
6
7
,
0
$
7
(
'
'
,
5
(
&
7
(
;
3
(
1
6
(
6
(V
W
1
R
8
Q
L
W
7
R
W
D
O
0
L
O
H
D
J
H
7H
V
W
7
H
V
W
V
&
R
V
W
&
R
V
W
7
U
D
I
I
L
F
&
R
Q
W
U
R
O
3
O
D
Q
V
0R
L
V
W
X
U
H
&
R
Q
W
H
Q
W
7
U
D
I
I
L
F
&
R
Q
W
U
R
O
G
X
U
L
Q
J
F
R
U
L
Q
J
*U
D
L
Q
6
L
]
H
'
L
V
W
U
L
E
X
W
L
R
Q
3
D
Y
H
P
H
Q
W
&
R
U
H
&
K
D
U
J
H
F
R
U
H
*U
D
L
Q
6
L
]
H
Z
L
W
K
+
\
G
U
R
P
H
W
H
U
/
D
E
R
U
D
W
R
U
\
7
H
V
W
L
Q
J
$W
W
H
U
E
H
U
J
/
L
P
L
W
V
S
O
D
V
W
L
F
L
W
\
L
Q
G
H
[
72
7
$
/
'
,
5
(
&
7
(
;
3
(
1
6
(
6
/$
%
2
5
$
7
2
5
<
7
2
7
$
/
'L
U
H
F
W
6
D
O
D
U
\
&
R
V
W
'
6
&
2+
#
'
6
&
)H
H
#
'
6
&
7R
W
D
O
/
D
E
R
U
&
R
V
W
V
'L
U
H
F
W
(
[
S
H
Q
V
H
V
$V
V
X
P
H
G
&
R
Q
G
L
W
L
R
Q
V
*5
$
1
'
7
2
7
$
/
$
O
O
K
R
X
U
V
D
Q
G
L
W
H
P
V
D
U
H
H
V
W
L
P
D
W
H
G
D
Q
G
P
D
\
E
H
V
K
L
I
W
H
G
E
H
W
Z
H
HQ
W
D
V
N
V
Z
L
W
K
L
Q
W
K
H
O
L
P
L
W
V
R
I
W
K
H
W
R
W
D
O
E
X
G
J
H
W
D
W
W
K
H
G
L
V
F
U
H
W
L
R
Q
R
I
+
:
$
V
S
U
R
M
H
F
W
P
D
Q
D
J
H
U
$
V
V
X
P
H
V
W
K
D
W
Q
R
S
H
U
P
L
W
I
H
H
Z
L
O
O
E
H
U
H
T
X
L
U
H
G
E
\
W
K
H
&
L
W
\
$
V
V
X
P
H
V
W
K
D
W
D
8
Q
L
I
R
U
P
3
R
O
L
F
H
2
I
I
L
F
H
U
Z
L
O
O
Q
R
W
E
H
U
H
T
X
L
U
H
G
I
RU
7
H
P
S
R
U
D
U
\
7
U
D
I
I
L
F
&
R
Q
W
U
R
O
$
V
V
X
P
H
V
6
L
W
H
6
S
H
F
L
I
L
F
7
U
D
I
I
L
F
9
R
O
X
P
H
'
D
W
D
Z
L
O
O
E
H
S
U
R
Y
L
G
H
G
R
WK
H
U
V
$
V
V
X
P
H
V
Q
R
P
D
F
K
L
Q
H
G
U
L
O
O
H
G
E
R
U
L
Q
J
V
R
U
L
Q
I
L
O
W
U
D
W
L
R
Q
W
H
V
W
L
Q
J
Z
LO
O
E
H
F
R
P
S
O
H
W
H
G
G
X
U
L
Q
J
W
K
L
V
W
D
V
N
3(
5
6
2
1
1
(
/
+
2
8
5
/
<
5
$
7
(
6
:2
5
.
7
$
6
.
'(
6
&
5
,
3
7
,
2
1
5
H
Q
W
R
Q
W
K
$
Y
H
6
(
,
P
S
U
R
Y
H
P
H
Q
W
V
[
O
V