Loading...
HomeMy WebLinkAbout00b Table of Contents Public Works Department SE 172ND STREET GREEN STORMWATER INFRASTRUCTURE PROJECT Project: SWP-27-4037 CONTRACT DOCUMENT TABLE OF CONTENTS 1. Summary of Fair Practices Policy 2. Summary of Americans with Disability Act Policy 3. Scope of Work 4. Project Location Map 5. Instructions to Bidders 6. Call for Bids 7. *Proposal and Combined Affidavit & Certificate Form: Non-Collusion, Anti-Trust Claims, Minimum Wage 8. *Proposal Bid Bond Form 9. *Department of Labor and Industries Certificate Registration 10. *Schedule of Prices 11. *Acknowledgement of Receipt of Addenda 12. *Certification of Compliance with Wage Payment Statutes 13. *Acknowledgement of Apprentice Utilization Requirement 14. *Subcontractor List 15. Contract Bond to the City of Renton 16. Fair Practices Policy Affidavit of Compliance 17. Contract Agreement 18. Retainage Selection 19. City of Renton Insurance Requirements 20. Washington State Prevailing Minimum Hourly Wage Rates Reference 21. Statement of Intent to Pay Prevailing Wages 22. Affidavit of Prevailing Wages Paid 23. Traffic Control Plan Application 24. Project Special Provisions 25. Standard Details 26. Department of Ecology Specifications Insert 27. Survey Monument Destruction and Reestablishment 28. Geotechnical Report 29. Draft Stormwater Pollution Prevention Plan 30. Construction Stormwater General Permit 31. Puget Sound Energy Gas Main Relocation plan (Work to be completed by others) 32. Utility Pothole Data 33. Inadvertent Discovery Plan 34. Construction Plans (Bound Separately) Documents marked as follows must be submitted at the time noted and must be executed by the Contractor, President and Vice President or Secretary if corporation by-laws permit. All pages must be signed. In the event another person has been duly authorized to execute contracts, a copy of the corporation minutes establishing this authority must be attached to the bid document. * Submit with Bid  Submit after Notice of Award (at the latest)