HomeMy WebLinkAbout00b Table of Contents
Public Works Department
SE 172ND STREET
GREEN STORMWATER INFRASTRUCTURE PROJECT
Project: SWP-27-4037
CONTRACT DOCUMENT TABLE OF CONTENTS
1. Summary of Fair Practices Policy
2. Summary of Americans with Disability Act Policy
3. Scope of Work
4. Project Location Map
5. Instructions to Bidders
6. Call for Bids
7. *Proposal and Combined Affidavit & Certificate Form: Non-Collusion, Anti-Trust Claims, Minimum Wage
8. *Proposal Bid Bond Form
9. *Department of Labor and Industries Certificate Registration
10. *Schedule of Prices
11. *Acknowledgement of Receipt of Addenda
12. *Certification of Compliance with Wage Payment Statutes
13. *Acknowledgement of Apprentice Utilization Requirement
14. *Subcontractor List
15. Contract Bond to the City of Renton
16. Fair Practices Policy Affidavit of Compliance
17. Contract Agreement
18. Retainage Selection
19. City of Renton Insurance Requirements
20. Washington State Prevailing Minimum Hourly Wage Rates Reference
21. Statement of Intent to Pay Prevailing Wages
22. Affidavit of Prevailing Wages Paid
23. Traffic Control Plan Application
24. Project Special Provisions
25. Standard Details
26. Department of Ecology Specifications Insert
27. Survey Monument Destruction and Reestablishment
28. Geotechnical Report
29. Draft Stormwater Pollution Prevention Plan
30. Construction Stormwater General Permit
31. Puget Sound Energy Gas Main Relocation plan (Work to be completed by others)
32. Utility Pothole Data
33. Inadvertent Discovery Plan
34. Construction Plans (Bound Separately)
Documents marked as follows must be submitted at the time noted and must be executed by the Contractor,
President and Vice President or Secretary if corporation by-laws permit. All pages must be signed. In the
event another person has been duly authorized to execute contracts, a copy of the corporation minutes
establishing this authority must be attached to the bid document.
* Submit with Bid
Submit after Notice of Award (at the latest)