HomeMy WebLinkAbout18 Retainage Selection18. Retainage Selection
CITY OF RENTON
SE 172nd Street
Green Stormwater Infrastructure Project
SWP-27-4037
RETAINAGE SELECTION
Per Standard Specifications Section 1-09.9(1) Retainage, and RCW 60.28, a sum of 5-percent of the
monies earned by the Contractor will be retained from progress estimates. The retainage will be
used as a trust fund for the protection and payment of (1) the State with respect to taxes, and (2) the
claims of any person arising under the Contract.
Retainage shall be placed in a fund held by the City (non-interest bearing), unless the Contractor
selects a one of the options listed below and completes all arrangements needed for that option to
the satisfaction of the City.
Other retainage fund options:
__ 1. Deposited by the City in an escrow account (interest bearing) in a bank, mutual savings bank, or
savings and loan association. Deposits will be in the name of the Contractor and bank; and are
not allowed to be withdrawn without the City’s written authorization, or
__ 2. The City, at its’ option, may accept a bond from the Contractor in lieu of retainage.
If the Contractor selects option 1 or 2 it is fully responsible for selecting the bank or association to be
used, and for making all arrangements and paying all costs associated with that option.
All arrangements and forms needed for option 1 or 2 shall be submitted to the City for review and
approval.
Release of the Retainage will be made 60 days following the Completion Date provided the
conditions in Special Provisions Section 1-09.9(1), and applicable State Regulations, are met.
SIGNED:_________________________________________________
PRINT NAME:_________________________________________________
COMPANY:_________________________________________________
DATE:_________________________________________________