Loading...
HomeMy WebLinkAboutM_Backflow report domestic vault_20250304_v1Make/Model Gauge #Calibration Date: Tester Signature:Cert. No.: I certify that this report is accurate, and I have used WAC 246-290-490 approved test methods and test equipment. PVBA/SVBA Initial Test DCVA / RPBA CHECK VALVE #1 Air Inlet Leaked Leaked PSID PSID PSID Opened at Did not Open Opened at Failed Passed DCVA / RPBA CHECK VALVE #2 RPBA PSID#1 Check Air Gap Check Valve PSIDHeld at Leaked Cleaned Repaired Test After Repairs New Parts and Repairs Contact Name Phone:FAX: Make of Assembly: Serial Number Size:Model: ExistingNew Install Replacement Old SN#Proper Installation? Yes No Hazard Type PVBA AGDCVA RPBA Other Service Address Zip:City: Facility Name Equip Location Failed Passed Leaked Leaked PSID PSID PSID PSID Opened at Air Inlet PSID#1 Check PSIDCheck Clean Replace Part Clean Replace Part Clean Replace Part Authorized Tester: Line PressureRemarks: Confined Space PSI Date: Tester Name Printed:Testers Phone #( ) Repaired By:Date: Final Test By:Cert. No.:Date: Air Gap Inspection:Supply Pipe Diameter:Separation: FailPass"" TEST REPORTS MUST BE SUBMITTED IN ACCORDANCE WITH SEATTLE PUBLIC UTILITIES GUIDELINES. Commercial: Residential: PSID Schedule Code Return reports to:BACKFLOW PREVENTION ASSEMBLY TEST REPORT Assembly ID SPU_Backflow@seattle.gov