HomeMy WebLinkAbout031025 Administrative report
Mayor’s Office
Memorandum
DATE: March 5, 2025
TO: James Alberson, Jr., Council President
Members of the Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• The City of Renton is partnering with the nonprofit organization Voice of Planet to host
“Holi, Renton Festival of Colors.” Mark your calendar for Saturday, March 15 from
12-4 p.m. and join us at Liberty Park, 1101 Bronson Way North, for festivities, food trucks,
music, and much more, including the throwing of colored powders.
• Join Mayor Armondo Pavone for the City of Renton’s 2025 State of the City address
Wednesday, March 26, at 6:30 p.m. The event will take place at the Hyatt Regency Lake
Washington at Seattle's Southport, located at 1053 Lake Washington Boulevard North.
Doors will open at 5:30 p.m., and light refreshments will be served.
This is a chance to hear firsthand about the city's progress and future plans. Don't
miss this opportunity to engage with local officials and fellow community
members and learn about what's in store for Renton in the coming year.
• Please stop by to chat with Chief Administrative Officer Ed VanValey at the next
What’s Brewing, Wednesday, March 19 at the Berliner Pub, 221 Main Avenue
South, from 5:30-6:30 p.m. All ages are welcome. Check out the Facebook Event
for more details.
• The draft 2025 Stormwater Management Program Plan is available on the city
website. Public comments will be accepted through March 21. The Plan and
instructions for making comments may be found on our website at
rentonwa.gov/npdes.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open.
Monday, March 10 through Friday, March 14, 8:00am-3:00pm. Intermittent lane
closure on S 7th St for construction work. Approved traffic control plans were issued for
all work and will be followed. Questions may be directed to Tom Main, 206-999-1833.
James Alberson, Jr., Council President
Members of the Renton City Council
Page 2 of 2
March 5, 2025
Monday, March 10 through Friday, March 14, 8:00am-3:00pm. Steel sheets on
Aberdeen Ave NE at the 2000 block for construction work. Approved traffic control
plans were issued for all work and will be followed. Questions may be directed to Pat
DeCaro, 425-207-6013.
Monday, March 10 through Friday, March 14, 8:00am-3:00pm. Burnett Ave S will be
closed to thru traffic from S 2nd St to Tobin Ave S. Approved traffic control plans were
issued and will be followed, including a detour with flaggers on onsite to assist local
traffic. Questions may be directed to Rob Blackburn, 206-379-1489.
Monday, March 10 through Friday, March 14, 8:00am-3:00pm. Intermittent lane
closure on Rainier Ave N between Airport Way and S 3rd St for construction work.
Approved traffic control plans were issued for all work and will be followed. Questions
may be directed to Joe Nerlfi, 425-757-9657.
Monday, March 10 through Friday, March 14, 8:00am-3:00pm. Intermittent lane
closure on NE Sunset Blvd between Edmonds Ave NE and Kirkland Ave NE for
construction work. Approved traffic control plans were issued for all work and will be
followed. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, March 10 through Friday, March 14, 8:00am-3:00pm. Shifting lane closures
both east and west on NE Sunset Blvd between Redmond Pl NE to Union Ave NE for
utility installation and frontage improvements. Approved traffic control plans were
issued for all work and will be followed. Questions may be directed to Brad Stocco, 425-
282-2373.
Monday, March 10 through Friday, March 14, 8:00am-3:00pm. Intermittent lane
closure on Talbot Rd S for construction work. Approved traffic control plans were
issued for all work and will be followed. Questions may be directed to Tom Main, 206-
999-1833.
Monday, March 10 through Friday, March 14, 8:00am-3:00pm. Intermittent lane
closure on Wells Ave S north of S 2nd St for construction work. Approved traffic control
plans were issued for all work and will be followed. Questions may be directed to Casey
Grant, 206-532-4380.
On-going Street Closure January 21 through May 22, 2025 (City of Renton
Resolution No. 4545). FULL STREET CLOSURE on Houser Way N between Lake
Washington Blvd N and Lowe’s Business Access Road in support of WSDOT I-405
Renton to Bellevue Widening and Express Toll Lane project. Approved traffic control
plans were issued for all work and will be followed. Questions may be directed to Justin
Johnson, 425-902-7102.