Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNOA_Public_Outreach_Sign_241107_v1.pdf19 New Townhomes
2- and 3-bedroom homes
Highly energy efficient
1132 Edmonds Avenue NE
Renton, WA 98056
Completion Estimated
December 2026
Construction schedule subject to delay
PHASE I (COMPLETE)
COMING SOON: Willowcrest Townhomes Phase II
DEVELOPER:
Homestead Community
Land Trust
412 Maynard Ave S. Suite 201
Seattle, WA 98101
Contact: Eric Pravitz
www.homesteadclt.org
WEBSITE:
www.willowcrestownhomes.com
GENERAL CONTRACTOR:
Edge Community Builders
1225 S. Weller St. Suite 555
Seattle, WA 98144
Contact: Evan Chan
ARCHITECT AND LANDSCAPE ARCHITECT:
Third Place Design Co-operative
304 Alaskan Ave S. Suite 301
Seattle, WA 98104
Contact: Caitlyn Salters
STRUCTURAL ENGINEER:
I.L. Gross
23914 56th Ave W Suite 200
Mountlake Terrace, WA 98403
Contact: Robyn Mah
TRAFFIC:
TranspoGroup
12131 113th Ave NE #203
Kirkland, WA 98034
Contact: Stefanie Herzstein
CITY CONTACT:
Alex Morganroth
amorganroth@rentonwa.gov
CIVIL ENGINEER:
Coterra Engineering, PLLC
6413 Phinney Ave N.
Seattle, WA 98103
Contact: Peter Apostal
Homestead
C o m m u n i t y L a n d T r u s t
Wıllowcrest