HomeMy WebLinkAboutRE_ RRFB Pole relocation 156th AVE SE_ Cedar Ridge DevelopmentHi Scott,
The below depiction for relocation is acceptable and approved with comments:
* Location shall comply with PROWAG standards, specifically pushbutton shall be a maximum 10” from the pedestrian access route.
* Foundation shall, at minimum, match existing (LxWxH)
* Relocation shall be depicted in the record drawings
Regards,
NATHAN JANDERS, PE, Development Engineering Manager
City of Renton // Development Engineering
Virtual Permit Center <https://www.rentonwa.gov/city_hall/community_and_economic_development/permit_services> // Online Applications and Inspections <https://permitting.rentonwa.gov/#/home>
office 425-430-7382
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From: scottn@transportationsystemsinc.com <scottn@transportationsystemsinc.com>
Sent: Tuesday, March 11, 2025 2:53 PM
To: Nathan Janders <NJanders@Rentonwa.gov>
Cc: Huy Huynh <HHuynh@rentonwa.gov>; vasi@crewsedevelopment.com
Subject: RRFB Pole relocation 156th AVE SE, Cedar Ridge Development
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Good afternoon,
I have a new location proposed to relocate the RRFB pole. What does the City Need to see? Will a sketch and a detailed asbuilt work?
This is what is proposed
Thank You
Scott