Loading...
HomeMy WebLinkAboutRE_ RRFB Pole relocation 156th AVE SE_ Cedar Ridge DevelopmentHi Scott, The below depiction for relocation is acceptable and approved with comments: * Location shall comply with PROWAG standards, specifically pushbutton shall be a maximum 10” from the pedestrian access route. * Foundation shall, at minimum, match existing (LxWxH) * Relocation shall be depicted in the record drawings Regards, NATHAN JANDERS, PE, Development Engineering Manager City of Renton // Development Engineering Virtual Permit Center <https://www.rentonwa.gov/city_hall/community_and_economic_development/permit_services> // Online Applications and Inspections <https://permitting.rentonwa.gov/#/home> office 425-430-7382 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 From: scottn@transportationsystemsinc.com <scottn@transportationsystemsinc.com> Sent: Tuesday, March 11, 2025 2:53 PM To: Nathan Janders <NJanders@Rentonwa.gov> Cc: Huy Huynh <HHuynh@rentonwa.gov>; vasi@crewsedevelopment.com Subject: RRFB Pole relocation 156th AVE SE, Cedar Ridge Development CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Good afternoon, I have a new location proposed to relocate the RRFB pole. What does the City Need to see? Will a sketch and a detailed asbuilt work? This is what is proposed Thank You Scott