Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_250228_v1Construction Mitigation Description a. Proposed construction dates; 5/1/2025 through 4/30/2026 (with option to extend for one year as indicated with the permit approval and through lease extension with Kennydale Gateway LLC) b. Hours and days of operation; The proposed use of this project requires the use of daytime and nighttime shifts. Typical daytime working hours are 6am to 7pm, Monday through Friday. Night shift hours are typically 7pm-6am, Sunday through Friday. The construction schedule may dictate the need for work on Saturdays and Sundays. If weekend work is required, the daytime and nighttime shifts will remain the same. c. Proposed hauling/transportation routes; Hauling within the project area moves in a counterclockwise direction throughout the parcel. When exiting the site, haul trucks and delivery trucks will exit the property, turning right onto NE 44th Street. From NE 44th Street, trucks will either take the SB I-405 on ramp to head south, or they will cross over I-405, turning left onto the NE 44th Street to NB I-405 on ramp, heading north. d.