Loading...
HomeMy WebLinkAboutTransportation Committee - 06 Jan 2025 - Agenda - Pdf CITY OF RENTON AGENDA - Transportation Committee Meeting 6:00 PM - Monday, January 6, 2025 7th Floor Council Conference Room/Videoconference 1. 120 DAY CLOSURE OF HOUSER WAY N a) AB - 3716 Public Works Transportation Systems Division recommends adoption of a resolution authorizing a 120-day closure of Houser Way N, between January 21, 2025 and May 22, 2025, for the purpose of installing a watermain and improving storm drainage facilities in support of the I-405 to Bellevue Widening and Express Toll Lane project. 2. EMERGING ISSUES IN TRANSPORTATION a) Traffic Safety Improvements - Puget Drive Briefing If you would like to attend this week's meeting remotely, you can do so by going to https://us02web.zoom.us/j/83331604294?pwd=U3BLbUJZK0ExeWJaTFNWYWx5WGE0dz09 Zoom Meeting ID: 833 3160 4294, Passcode: 352696 You can call through Zoom at (253) 215-8782 and use the Meeting ID. AB - 3716 City Council Regular Meeting - 09 Dec 2024 SUBJECT/TITLE: 120 Day Closure – Houser Way North RECOMMENDED ACTION: Refer to Transportation (Aviation) Committee DEPARTMENT: Public Works Transportation Systems Division STAFF CONTACT: Jim Seitz, Transportation Systems Director EXT.: 7245 FISCAL IMPACT SUMMARY: There is no fiscal impact to the city by adopting the resolution. SUMMARY OF ACTION: The I-405, Renton to Bellevue Widening and Express Toll Lanes (ETL) Project is intended to increase the capacity of the I-405 freeway. The project also builds infrastructure for Sound Transit’s Stride Bus Rapid Transit system including a new inline transit station at Northeast 44th Street in Renton. Bus rapid transit, paired with the ETL system, will provide more reliable transportation options for people. As part of this project, a 120-day closure of Houser Way North between Lake Washington Boulevard North and Lowe’s business access road is needed in 2025 to perform vital work for the project. This project needs to complete the installation of a City of Renton watermain, install shoring, and excavate to construct two large drainage outfall structures. This 120-day closure is anticipated to occur between January 21, 2025, and May 22, 2025, with notifications provided to the public in accordance with the Public Outreach Plan in Exhibit A. All business access will be maintained throughout the duration of the closure. Work performed during this period includes the following: 1. Installation of a 12” City of Renton watermain. 2. Installation of soldier pile shoring to support two storm drainage outfall structures. 3. Storm drainage structure excavation. 4. Jack and bore of (3) 42” diameter storm drainage pipes. This milestone will create the space needed to install City water infrastructure and provide improved storm drainage as part of the I-405, Renton to Bellevue, Widening and Express Toll Lanes Project. WSDOT’s public outreach plan is attached and includes one flier for businesses within proximity to the street closure along with the localized detour plan. EXHIBITS: A. Public Outreach Plan B. WSDOT Project Flier with Primary Detour Routes C. Resolution STAFF RECOMMENDATION: AGENDA ITEM #1. a) Adopt the resolution authorizing the 120-day closure to occur between January 21, 2025, and May 22, 2025, for the purpose of installing the City of Renton watermain and improving storm drainage facilities supporting the I-405, Renton to Bellevue, Widening and Express Toll Lane Project. AGENDA ITEM #1. a) Page | 1 I- 5Renton to Bellevue Wideningand Express Toll Lanes Project 2025 Closure of Houser Way North between Lake Washington Boulevard North and the Lowe’s Business Access Road Houser Way North: 120 Day Closure – occurring between January 21, 2025, and May 22, 2025 Scope of work: 120-day closure of Houser Way North between Lake Washington Boulevard North and Lowes Business Access to install a City of Renton watermain and construct storm drainage improvements. Completing this work supports the construction of WSDOT Express Toll Lanes and Sound Transit Bus Rapid Transit systems. Outreach methods: • 14-day advanced notification to businesses and residents • Fliers to businesses and residents outlined in the Figure 1 map to the right • Flier provided to City of Renton for internal distribution • Social media and WSDOT Blog posts notifying the public of the closure o Coordination with the City of Renton to share social media posts from the project • Hotline and project inbox information provided on fliers, blogposts, and project website • Message boards will be placed 14 days before the closure to notify the traveling public • Emergency services briefing ahead of closure • WSDOT availability for media Figure 1: Business flier area AGENDA ITEM #1. a) I-405, Renton to Bellevue Widening a n d Express Toll Lanes Project 120-day Closure of Houser Way North between Lake Washington Boulevard North and the Lowe’s Business Access Overview Crews working for the Washington State Department of Transportation are fully closing Houser Way North for 120 days for crews to install a City of Renton water main and construct critical storm drainage infrastructure. Houser Way North will be closed between Lake Washington Boulevard North and the Lowe’s Business Access. Detours will be provided for bicyclists and pedestrians within the work area. Motorists and material deliveries will be routed to Garden Avenue and North 8th Street. Access to all businesses is maintained throughout the duration of the closure. This key milestone for the I-405, Renton to Bellevue Widening and Express Toll Lanes project is necessary to complete widening of the I-405 freeway. Work during this closure period will include:  Installation of a 12” City of Renton Watermain  Installation of soldier pile shoring to support two storm drainage outfall structures  Storm drainage structure excavation Houser Way North will be closed between Lake Washington Boulevard North and Lowe’s Business Access Road. Access to all businesses is maintained.  Jack and bore of (3) 42” diameter storm drainage pipes Lane and Ramp Closures 120-day closure between January 21, 2025 and May 22, 2025 (advance notice provided)-Full closure of Houser Way North between Lake Washington Boulevard North and Lowe’s Business Access AGENDA ITEM #1. a) 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. _______ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING TEMPORARY FULL STREET CLOSURE OF HOUSER WAY NORTH BETWEEN LAKE WASHINGTON BOULEVARD NORTH AND LOWE’S BUSINESS ACCESS ROAD. WHEREAS, the Washington State Department of Transportation (WSDOT) is constructing the I-405, Renton to Bellevue Widening and Express Toll Lanes (ETL) project; and WHEREAS, this construction activity will require a temporary street closure of Houser Way North between Lake Washington Boulevard and Lowe’s business access road; and WHEREAS, pursuant to the City Code section 9-9-3, such street closures require City Council authorization by means of a resolution; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The City Council does hereby authorize the temporary closure of Houser Way North between Lake Washington Boulevard North and Lowe’s business access road for a 120-day period to occur between the dates of January 21, 2025 through May 22, 2025 for the purpose of completing construction activities related to the I-405, Renton to Bellevue Widening and Express Toll Lanes (ETL) project . SECTION II. Notice of the closure shall be posted and published as required by RMC 9-9-2 and RMC 9-9-3. PASSED BY THE CITY COUNCIL the day of , 2024. AGENDA ITEM #1. a) RESOLUTION NO. _______ 2 ______________________________ Jason A. Seth, City Clerk APPROVED BY THE MAYOR this day of , 2024. ______________________________ Armondo Pavone, Mayor Approved as to form: __________________________ Shane Moloney, City Attorney RES- PW:24RES029:11/26/2024 AGENDA ITEM #1. a) I-405, Renton to Bellevue Widening and Express Toll Lanes Project 120-day closure of Houser Way N - between Lake Washington Boulevard North and the Lowe’s Business Access Material Delivery Road January 2025 AG E N D A I T E M # 1 . a ) Agenda 2 •Project overview •Planned work overview •Extent of closure •Intended detour routes •Questions AG E N D A I T E M # 1 . a ) Major multimodal project elements •New capacity and interchange improvements •Dual express toll lane system •Direct access ramps •Northeast 44th Street in Renton •112th Avenue Southeast •Main Street Bridge replacement •Bus Rapid Transit infrastructure (with Sound Transit) •Eastrail segments (with King County) •Coordination with Mountains to Sound Greenway trail Status: •Construction work along the corridor on-going 3 Renton to Bellevue project overview AG E N D A I T E M # 1 . a ) 4 Work during this closure period will include: •Installation of a 12” City of Renton watermain •Installation of soldier pile shoring to support two storm drainage outfall structures •Storm drainage structure excavation •Jack and bore of (3) 42” diameter storm drainage pipes Extent: Full closure of Houser Way North between Lake Washington Boulevard North and the Lowe’s business access material delivery road *Access to all businesses is maintained throughout the closure period **FLJV completed outreach to business owners with material deliveries that use the access road. They have confirmed the closure will not impact their operations. 120-day full closure of Houser Way North To occur between January 21, 2025, to May 22, 2025 AG E N D A I T E M # 1 . a ) Detour route 12 Southbound Detour Route: •Traffic headed southbound on Lake Washington Blvd N will be rerouted southward onto Garden Ave N, turning left onto N 8th St., and left onto Houser Way N. Northbound Detour Route: •Traffic headed northbound on Logan Avenue N will turn right onto Garden Ave N, taking a left onto N 8th St., and then left onto Houser Way N. AG E N D A I T E M # 1 . a ) Outreach strategy 6 Outreach methods: •Send mailer to residents and businesses as outlined in the figure to the right •Flier provided to City of Renton for internal distribution •Social media and WSDOT Blog posts notifying the public of the closure •Coordination with the City of Renton to share social media posts from the project •Hotline and project inbox information provided on fliers, blogposts, and project website •Message boards will be placed 14 days prior to the closure to notify the traveling public •Emergency services briefing ahead of the closure •WSDOT availability for media AG E N D A I T E M # 1 . a ) Questions? 15 AG E N D A I T E M # 1 . a ) AG E N D A I T E M # 2 . a ) Traffic Improvement Requests PUBLIC WORKS -TRANSPORTATION SYSTEMS DIVISION 2024 Citizen Requests 2024 Work Orders Month Received Completed Ending Total (Open) Engineering Sent Shop Completed Ending Total (Open) January 15 9 951 3 4 2 February 20 26 89 8 4 6 March 8 10 87 13 11 8 April 25 11 101 7 8 7 May 14 15 100 3 5 5 June 21 15 106 6 4 4 July 21 22 105 4 1 7 August 24 30 99 6 2 11 September2 17 18 98 6 5 12 October2 14 8 104 11 13 9 November2 14 7 111 1 1 9 December2 13 19 105 2 11 TOTAL 206 190 105 70 58 11 189 requests carried over from December 2023 2Working with GIS to improve Rotation Feedback Sign Program AG E N D A I T E M # 2 . a ) Puget Drive Southeast –Traffic Calming PUBLIC WORKS -TRANSPORTATION SYSTEMS DIVISION •Puget Drive Southeast has been a route with a history of excessive speeding and crashes – 35 MPH Speed Limit with 45 MPH 85th percentile speeds •Project to install traffic devices completed by Transportation in October 2024 •Small scale project consisted of 32 units of Tuff Curb XLP with delineators spaced every 100’ and narrow lane width to 10 ‘ •Three crosswalks were upgraded with pedestrian activated Rectangular Rapid Flashing Beacon (RRFB) •Radar Feedback Speed Signs will be relocated with one for each direction •Total Cost: ~$51,000 `` RRFB Locations Ro l l i n g H i l l s A v e S E 11 6 th Av e S E AG E N D A I T E M # 2 . a ) Puget Drive Southeast –Traffic Calming PUBLIC WORKS -TRANSPORTATION SYSTEMS DIVISION Push Button Rectangular Rapid Flashing Beacon (RRFB) AG E N D A I T E M # 2 . a ) Puget Drive Southeast –Before and After Study PUBLIC WORKS -TRANSPORTATION SYSTEMS DIVISION All speed studies were conducted on Puget Drive SE, east and west of SE 19th Street. Direction Average Vehicle Volume Average Speed 85th Percentile Speed (mph) Percent of drivers Travelling More than 40mph Westbound 2788 37 45 26% Eastbound 2647 36 49 26% Before After Direction Average Vehicle Volume Average Speed 85th Percentile Speed (mph) Percent of drivers Travelling More than 40mph Westbound 3970 36 40 15% Eastbound 3757 35 39 11%AG E N D A I T E M # 2 . a ) Smithers Avenue South -Speed Cushions PUBLIC WORKS -TRANSPORTATION SYSTEMS DIVISION •Smithers Avenue South has been a cut-through route with a history of excessive speeding – 25 MPH Speed Limit with 35 MPH 85th percentile speeds •Project completed by Street Maintenance and Transportation Maintenance in November 2024 •Small scale project consisting of 2 sets of speed cushions, 3 speed cushions per set, total of 6 speed cushions •Total Cost: ~$11,000 •Total Cost per Speed Cushion: ~$1,850. Compared to ~$6,500 for contractor installed total cost per speed cushion (Lake Washington Blvd N) VMC Smithers Ave S AG E N D A I T E M # 2 . a ) Questions? AG E N D A I T E M # 2 . a )