HomeMy WebLinkAbout03-14-2025 - Addendum No. 1Cedar Ave Sidewalk ADDENDUM NO. 1 March 12, 2025 Page 1 of 2 Addendum No. 1 Cedar Ave Sidewalk Date of Issue: March 12, 2025 Bid Due Date: March 18, 2025 (REMAINS UNCHANGED) Date of Bid Opening: March 20, 2025 (REMAINS UNCHANGED) ATTENTION: ALL BIDDERS AND PLAN HOLDERS: The Bid Documents for the above-named project are modified as described below. Bidders shall take this Addendum into consideration when preparing and submitting their bids. Bidders shall attach this addendum to their copy of the Contract Documents, and shall acknowledge receipt of this Addendum on the Proposal Signature Page. A Proposal may be considered irregular and may be rejected if the receipt of Addenda is not acknowledged. A Proposal will be considered irregular and will be rejected if the Schedule of Prices included i n this Addendum is not completed and submitted with the Proposal. THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: 1. PROPOSAL – SCHEDULE OF PRICES REPLACE the Schedule of Prices in the Proposal (3 pages) with the revised Schedule of Prices (3 pages) attached to this Addendum. The Schedule of Prices was r evised to reflect the following: • Item No. 27 “SOLID WALL PVC DRAIN PIPE, 4 IN. DIAM” was renamed to “SOLID WALL PVC DRAIN PIPE, 6 IN. DIAM”. 2. SPECIAL PROVISIONS The following special provision sections are revised for this contract as follows: Section 8-24.2 Materials, located on page SP 104, the first paragraph in this section is revised to read: “The face of the wall shall consist of a rock-face type appearance. Modular block units shall be precast concrete straight face, or Contracting Agency approved equal. The unit block color shall be concrete gray.The depth of each unit block shall be a minimum of 21 inches.Unit blocks shall allow concave and convex curves per the wall alignments indicated on the Plans.” 3.PLANS (VOLUME 2 OF 2) REPLACE the following post call outs on the Fence Layout Plan shown on Sheet SR-i with the following: “BRACE POST STA iO+52.25,20.i’LT BRACE POST STA iO+62.25,20.i’LT BRACE POST STA iO+72.25,20.i’LT BRACE POST STA ii+ii,20.i’LT BRACE POST STA ii+i9.82,2i.9’LT” ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT. CITY OF RENTON e’kl kztJ-IA IF o17&rh If%hs o1 Robert M.anson,P.E. Transportation Design Manager Cedar Ave Sidewalk ADDENDUM NO.1 March 12,2025 Page 2 of 2 ADDENDUM NO. 1 ITEM NO.ITEM DESCRIPTION SPEC. SECTION UNIT QUANTITY UNIT PRICE* EXTENSION 1 ADA FEATURE SURVEYING 1-05.4 LS 1 2 CONTRACTOR SURVEYING 1-05.4 LS 1 3 SPCC PLAN 1-07.15(1) LS 1 4 MOBILIZATION 1-09.7 LS 1 5 PROJECT TEMPORARY TRAFFIC CONTROL 1-10.5(2) LS 1 6 TRAFFIC CONTROL SUPERVISOR 1-10.5(2) LS 1 7 PEDESTRIAN TRAFFIC CONTROL 1-10.5(2) LS 1 8 FLAGGERS 1-10.5(2) HR 540 9 OTHER TRAFFIC CONTROL LABOR 1-10.5 HR 30 10 CLEARING AND GRUBBING 2-01.5 AC 0.04 11 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 2-02.5 LS 1 12 REMOVING CURB AND GUTTER 2-02.5 LF 130 13 REMOVING CEMENT CONC. SIDEWALK 2-02.5 SY 75 14 REMOVING ASPHALT CONC. PAVEMENT 2-02.5 SY 30 15 SAWCUTTING 2-02.5 LF 130 16 ROADWAY EXCAVATION, INCL. HAUL 2-03.5 CY 220 17 GRAVEL BACKFILL FOR WALL 2-06.5 TN 120 SCHEDULE OF PRICES Cedar Ave Sidewalk ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID NOTE: Unit prices for all items, all extensions, and total amount of bid shall be shown. Enter unit prices in numerical figures only, in dollars and cents to two (2) decimal places (including whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be regarded as nonresponsive and rejected. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. Cedar Ave Sidewalk Page 1R of 3 Schedule of Prices 2025 ADDENDUM NO. 1 ITEM NO.ITEM DESCRIPTION SPEC. SECTION UNIT QUANTITY UNIT PRICE* EXTENSION 18 LOCATE EXISTING UTILTIES 2-09.5 LS 1 19 POTHOLE 2-09.5 EACH 2 20 CRUSHED SURFACING TOP COURSE 4-04.5 TON 75 21 CRUSHED SURFACING BASE COURSE 4-04.5 TON 40 22 ADJUST CATCH BASIN 5-04.5 EACH 1 23 HMA CL. 1/2" PG 58H-22 5-04.5 TON 10 24 CEMENT CONC. COPING 6-02.5 CY 15 25 CEMENT CONC. STAIR WALL 6-02.5 CY 60 26 STAIR RAILING 6-03.5 LS 1 27 SOLID WALL PVC DRAIN PIPE, 6 IN. DIAM.7-01.5 LF 20 28 CONNECTION TO DRAINAGE STRUCTURE 7-05.5 EACH 1 29 EROSION CONTROL AND WATER POLLUTION PREVENTION 8-01.5 LS 1 30 INLET PROTECTION 8-01.5 EACH 2 31 SILT FENCE 8-01.5 LF 95 32 PROPERTY RESTORATION 8-02.5 EST 1 $20,000.00 $20,000.00 33 SOD INSTALLATION 8-02.5 SY 105 34 TOPSOIL, TYPE A 8-02.5 CY 30 35 BARK OR WOOD CHIP MULCH 8-02.5 CY 10 36 CEMENT CONC. TRAFFIC CURB AND GUTTER 8-04.5 LF 135 37 CHAIN LINK FENCE, TYPE 4 8-12.5 LF 110 38 CEMENT CONC. STAIRWAY 8-14.5 SY 7 Cedar Ave Sidewalk Page 2R of 3 Schedule of Prices 2025 ADDENDUM NO. 1 ITEM NO.ITEM DESCRIPTION SPEC. SECTION UNIT QUANTITY UNIT PRICE* EXTENSION 39 CEMENT CONC. SIDEWALK 8-14.5 SY 60 40 CEMENT CONC. CURB RAMP, TYPE SINGLE DIRECTIONAL 8-14.5 EACH 1 41 MAILBOX SUPPORT, TYPE 1 8-18.5 EACH 1 42 PERMANENT SIGNING 8-21.5 LS 1 43 GRAVITY BLOCK WALL 8-24.5 SF 620 TOTAL BID AMOUNT = *NOTE: All applicable sales tax shall be included in the unit and lump sum bid price per section 1-07.2(1) and WAC 458-20-171. Cedar Ave Sidewalk Page 3R of 3 Schedule of Prices 2025