Major Franchise Permit: MFP25000768
IVR Number: 25000768
Permit Information
Permit Name: Comcast Cable Franchise Permit - 425 S 7th St - JB-2059760
Address/Location:02/17/2025Application Date:1923059025Parcel Number: 425 S 7TH ST
Permit Type:03/17/2025Issue Date:Franchise
Permit Work Class:03/17/2026Expiration Date:Major Utility
Job Number: JB-2059760Franchise Type:Cable
Description: Comcast JB 2059760
96ct Fiber 2416' overlash, 1027' pulled through existing conduit. placing new splice cases.
Contacts
Name Address PhoneTypeBilling
Jacob Neu
ADP-Resources, LLC
163 SW Academy St.
Dallas, OR 97338
ApplicantX
Laurie Dietz
Comcast - Finance Questions
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Contact
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Contact
Permitting Department
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contact
Permitting Department
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contractor
Business License Number: 20838Electrical Contractor: CANNOCL7941N
Construction Contractor: CANNOCL791JK
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Emergency
Contact
PEPKA CHARLES F PO BOX 880
RENTON , WA 98057
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
TCP-1
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP-2
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP-3
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP-4
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP-5
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP-6
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP-7
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP-8
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
BICYCLE
ACCOMMODATION
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
PEDESTRIAN
ACCOMMODATION
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
APPROACH PLAN
LABOR:
AERIAL:
OVERLASH = 2416’
TOTAL AERIAL FOOTAGES = 2416’
TOTAL POLES = 20
UNDERGROUND:
ROD & ROPE = 1027’
TOTAL UG FOOTAGES = 1027’
PERMITS TO BE SUBMITTED:
POLE ATTACHMENT
CITY OF RENTON
TRAFFIC CONTROL PLAN
Legend
FIELD DATE 2-11-2025
Reference DG
110′120′
140′
163′
98′
170′
200′
232′
230′
75′
5’ FROM POLE 1:
(E) SP.WAKV.1504
(N) 96CT FIBER TIE POINT
PLACE (N) SP1209.WABU 10’ FROM POLE 1
PLACE (N) SP1205.WABU AND TIE IN (N) 96CT
FIBER
1
2
3
4
5
6
7
8
NOTE: ALL PEDS/VAULTS
ARE EXISTING
POLE TAGS AS FOLLOWS:
1: NT
2: 317610166072
3: 3176251660644: 31763916605335: 3176501660546: NT7: 3176791660548: 376881660549: 31769716600810: 31769716599111: 31769816597912: 31769916596713: 31768416596614: 31766816596615: 31765216596616: 31764216596817: 31762716596518: 31761116596519: 31759416596520: 317588165963
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP -1
TCP -2
TCP -3
TCP -5
APPROACH PLAN
Legend
FIELD DATE 2-11-2025
Reference DG
335′
93′
161′
142′
129′140′200′
165′
9101112
13
14
15
16
5’ FROM POLE 5:
PLACE (N) SP1207.WABU
NOTE: ALL PEDS/VAULTS
ARE EXISTING
POLE TAGS AS FOLLOWS:
1: NT
2: 317610166072
3: 3176251660644: 31763916605335: 3176501660546: NT7: 3176791660548: 376881660549: 31769716600810: 31769716599111: 31769816597912: 31769916596713: 31768416596614: 31766816596615: 31765216596616: 31764216596817: 31762716596518: 31761116596519: 31759416596520: 317588165963
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP -4
TCP -4
TCP -6TCP -6
TCP -6
APPROACH PLAN
Legend
FIELD DATE 2-11-2025
Reference DG
17
18
19
2060′
165′
150′
165′
5’ FROM POLE 16:
PLACE (N) SP1206.WABU NOTE: ALL PEDS/VAULTS
ARE EXISTING
POLE TAGS AS FOLLOWS:
1: NT
2: 317610166072
3: 3176251660644: 31763916605335: 3176501660546: NT7: 3176791660548: 376881660549: 31769716600810: 31769716599111: 31769816597912: 31769916596713: 31768416596614: 31766816596615: 31765216596616: 31764216596817: 31762716596518: 31761116596519: 31759416596520: 317588165963
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP -4
TCP -7
APPROACH PLAN
Legend
FIELD DATE 2-11-2025
Reference DG
NOTE: ALL PEDS/VAULTS
ARE EXISTING
SPLICE INTO (E)
SP0266.WAKV
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP -1
APPROACH PLAN
Legend
FIELD DATE 2-11-2025
Reference DG
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
NOTE: ALL PEDS/VAULTS
ARE EXISTING
SPLICE INTO (E)
SP.WAKV.0697 &
(E) SP.WAKV.0927TCP -8
ADP Resources, LLC
163 SW Academy St
Dallas, OR 97338
2/17/2025
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JB-2059760
To whom it may concern:
ADP Resources, LLC has been contracted to permit this project on behalf of Comcast Cable
Communications Management. Comcast is applying for a variance request in order to upgrade
existing facilities.
Comcast proposes to TIE INTO EXISTING SPLICE CASE SP.WAKV.1504, PLACE NEW SPLICE CASE
SP1209.WABU 10’ FROM POLE 1, OVERLASH (1) 96CT FIBER ON EXISTING STRAND FOR 200’ AND
GO UNDERGROUND TO EXISTING CONDUIT ALONG S GRADY WAY. FROM POLE 3 OVERLASH (1)
96CT FIBER FOR 646’ ALONG WILLIAMS AVE AND GO UNDERGROUND TO EXISTING CONDUIT.
FROM POLE 9, OVERLASH (1) 96CT FIBER 469’ ALONG S 5TH ST AND PLACE NEW SPLICE CASE
SP1207.WABU 5’ FROM POLE 12. CONTINUE OVERLASH FOR 561’ AND PLACE NEW SPLICE CASE
SP1206.WABU 5’ FROM POLE 16 AND CONTINUE OVERLASH FOR 540’ ALONG MORRIS AVE S.
Comcast is requesƟng that the City of Renton approve this variance request based on the fact
that the requirements for undergrounding this proposed overlash on exisƟng plant will cause
undue hardship:
1. InstallaƟon of undergrounding faciliƟes will increase the total cost of construcƟon
roughly 15-25 Ɵmes the amount of an aerial over-lash on the exisƟng Comcast strand.
2. Risk of potenƟal damage to underground faciliƟes will be increased.
3. Over-lash will not cause substanƟal adverse impact to other persons or enƟƟes in the
immediate area. Over-lashing the cable will be accomplished in a few days, and the
residents will not noƟce any impact. Comcast will clean up the over-lashed spans as
necessary and idenƟfy and remove any exisƟng dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased
construcƟon costs if forced to install the proposed extension underground.
5. The granƟng of the variance will not be materially detrimental to the public welfare.
Comcast does agree to parƟcipate in future underground improvements for its
proporƟonate share of the undergrounding costs, waiving the obligaƟon into the future
when all other uƟliƟes are undergrounded to prevent an undue hardship against
Comcast currently.
Upon the granƟng of the variance, Comcast will coordinate construcƟon and traffic control as
per your requirements. Comcast and their contractors want to cooperate at the highest level
and agree to adhere to all provisions and requirements set forth by the City of Renton to insure
safe installaƟon and maintenance of the proposed faciliƟes.
If you have any further questions regarding this project, please contact Josh Ashley, 503-939-7931,
Joshua_ashley@comcast.com
Thank you for your consideration in this matter.
Jacob Neu
Permit Department Manager
ADP Resources, LLC
503-673-8256 | row_permits@adp-resources.com
March 17, 2025
Jacob Neu
ADP Resources, LLC
163 SW academy St
Dallas, OR 97338
Via Email: row_permits@adp-resources.com
SUBJECT: Request for Undergrounding Exemption (JB#2059760, MFP25000768, 425 S 7th St)
Dear Mr. Neu:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC)
4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed
underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction Inc overlash new fiber for a total of approximately 2,416 lineal
feet to existing Puget Sound Energy (PSE) poles along S Grady Way, Williams Ave S, S 5th St, Morris Ave S, and S 7th
St within the City. See the enclosed Site Plan showing the proposed overlashing limits.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720 grants
Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and
across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the
franchise ordinance states that if all of the distribution lines all the wireline service providers, such as
telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator
(collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its
Cable System’s distribution cables underground within that area; provided that such underground locations are
actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the
Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to
the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for,
any existing obsolete cable will need to be removed; staff recommends these as conditions of approval.
Therefore, the City is granting an exemption with conditions, per the Comcast franchise agreement which allows
new overhead facilities to be placed overhead provided there are other similar providers overhead as well.
Comcast is required to obtain all necessary private utility easements for work on private property.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as
requested by the applicant is approved with conditions subject to the conditions below as the request complies
with the Comcast Franchise Agreement.
Comcast Job JB#2059760
Page 2 of 2
March 17, 2025
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of construction. New
aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction
is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take place until
the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the
future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are
undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the
Project Reach, in which case the Applicant shall participate in the joint use trench installation for the
purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that
will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or
approved otherwise by the City of Renton Community and Economic Development Administrator or
designee, from the first event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the
date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk,
along with the required appeal fee, by 5:00 pm, March 31, 2025. Appeals must be submitted electronically to the
City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The
appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is
submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department.
Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal
process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Director
cc: Justin Johnson, Construction Engineering Manager
Nathan Janders, Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Engineering Specialist III
Franchise Permits
Enclosures: Site Plan
APPROACH PLAN
LABOR:
AERIAL:
OVERLASH = 2416’
TOTAL AERIAL FOOTAGES = 2416’
TOTAL POLES = 20
UNDERGROUND:
ROD & ROPE = 1027’
TOTAL UG FOOTAGES = 1027’
PERMITS TO BE SUBMITTED:
POLE ATTACHMENT
CITY OF RENTON
TRAFFIC CONTROL PLAN
Legend
FIELD DATE 2-11-2025
Reference DG
110′120′
140′
163′
98′
170′
200′
232′
230′
75′
5’ FROM POLE 1:
(E) SP.WAKV.1504
(N) 96CT FIBER TIE POINT
PLACE (N) SP1209.WABU 10’ FROM POLE 1
PLACE (N) SP1205.WABU AND TIE IN (N) 96CT
FIBER
1
2
3
4
5
6
7
8
NOTE: ALL PEDS/VAULTS
ARE EXISTING
POLE TAGS AS FOLLOWS:
1: NT
2: 317610166072
3: 3176251660644: 31763916605335: 3176501660546: NT7: 3176791660548: 376881660549: 31769716600810: 31769716599111: 31769816597912: 31769916596713: 31768416596614: 31766816596615: 31765216596616: 31764216596817: 31762716596518: 31761116596519: 31759416596520: 317588165963
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP -1
TCP -2
TCP -3
TCP -5
MFP25000768
APPROACH PLAN
Legend
FIELD DATE 2-11-2025
Reference DG
335′
93′
161′
142′
129′140′200′
165′
9101112
13
14
15
16
5’ FROM POLE 5:
PLACE (N) SP1207.WABU
NOTE: ALL PEDS/VAULTS
ARE EXISTING
POLE TAGS AS FOLLOWS:
1: NT
2: 317610166072
3: 3176251660644: 31763916605335: 3176501660546: NT7: 3176791660548: 376881660549: 31769716600810: 31769716599111: 31769816597912: 31769916596713: 31768416596614: 31766816596615: 31765216596616: 31764216596817: 31762716596518: 31761116596519: 31759416596520: 317588165963
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP -4
TCP -4
TCP -6TCP -6
TCP -6
MFP25000768
APPROACH PLAN
Legend
FIELD DATE 2-11-2025
Reference DG
17
18
19
2060′
165′
150′
165′
5’ FROM POLE 16:
PLACE (N) SP1206.WABU NOTE: ALL PEDS/VAULTS
ARE EXISTING
POLE TAGS AS FOLLOWS:
1: NT
2: 317610166072
3: 3176251660644: 31763916605335: 3176501660546: NT7: 3176791660548: 376881660549: 31769716600810: 31769716599111: 31769816597912: 31769916596713: 31768416596614: 31766816596615: 31765216596616: 31764216596817: 31762716596518: 31761116596519: 31759416596520: 317588165963
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP -4
TCP -7
MFP25000768
APPROACH PLAN
Legend
FIELD DATE 2-11-2025
Reference DG
NOTE: ALL PEDS/VAULTS
ARE EXISTING
SPLICE INTO (E)
SP0266.WAKV
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
TCP -1 MFP25000768
APPROACH PLAN
Legend
FIELD DATE 2-11-2025
Reference DG
JB-2059760
Renton Coil Spring
425 S 7TH ST RENTON WA 98057
NOTE: ALL PEDS/VAULTS
ARE EXISTING
SPLICE INTO (E)
SP.WAKV.0697 &
(E) SP.WAKV.0927TCP -8
MFP25000768
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP25000768
Engineering
1 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
2 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
3 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
4 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".
Page 1 of 1