HomeMy WebLinkAboutChange Order - 2Docusign Envelope ID: E501AE54-A391-4ACB-8D85-788492E04C0A
CITY OF RENTON
CONTRACT CAG#:
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CAG-22-178 C.0.# 2
PROJECT NAME: Cedar River Maintenance Dredge Project -Vegetation Management
CONTRACTOR: Applied Ecology, LLC
SUMMARY OF PROPOSED CHANGE:
Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the
extra work as outlined below:
BID ITEM NO.
A-01
A-02
A-03
A-04
NEW
A-09
CONTRACT
AGREEMENT
Additional Quantities Under This Change Order
Description
Trees
Increased total number of trees to be installed from 4 to 8.
Shrubs
Increased total number of shrubs to be installed from 234 to
384.
Livestakes
Increased total number of livestakes to be installed from 1200
to 1400.
Invasive Species Control
Increased the total number of invasive species control sweeps
from 12 to 16.
2025 Site Walk and Documentation
Added 2025 site walk to show Applied Ecology the areas of
work and added 2025 required documentation denoting
when/where work is completed to be submitted to the City of
Renton.
TERM OF AGREEMENT: EXTENSION
Contract expiration date revised from February 28, 2025 to
February 28, 2026.
Total
Unit
Type
EA
EA
EA
EA
LS
N/A
Est.
Qty.
4
150
200
4
1
N/A
Unit Price
$43.00
$28.00
$9.00
$8,400.00
$10,000.00
N/A
Total
Amount
$172.00
$4,200.00
$1,800.00
$33,600.00
$10,000.00
N/A
$49,772.00
\\RV22FS02-PWCED\Depts\PW\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3634 Cedar River Maintenance Dredge\1604 Vegetation Management\2025\Applied Ecology Docs:fha:f'2 Order\CO#2\Working Docs\6_CO2 to CAG-22-178 0
CAG-22-178, CO #2-25
2/18/25
2/25/2025
Approved by Cheryl Beyer via email 2/24/2025