Loading...
HomeMy WebLinkAboutChange Order - 2Docusign Envelope ID: E501AE54-A391-4ACB-8D85-788492E04C0A CITY OF RENTON CONTRACT CAG#: Public Works Department CONTRACT CHANGE ORDER AGREEMENT CAG-22-178 C.0.# 2 PROJECT NAME: Cedar River Maintenance Dredge Project -Vegetation Management CONTRACTOR: Applied Ecology, LLC SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: BID ITEM NO. A-01 A-02 A-03 A-04 NEW A-09 CONTRACT AGREEMENT Additional Quantities Under This Change Order Description Trees Increased total number of trees to be installed from 4 to 8. Shrubs Increased total number of shrubs to be installed from 234 to 384. Livestakes Increased total number of livestakes to be installed from 1200 to 1400. Invasive Species Control Increased the total number of invasive species control sweeps from 12 to 16. 2025 Site Walk and Documentation Added 2025 site walk to show Applied Ecology the areas of work and added 2025 required documentation denoting when/where work is completed to be submitted to the City of Renton. TERM OF AGREEMENT: EXTENSION Contract expiration date revised from February 28, 2025 to February 28, 2026. Total Unit Type EA EA EA EA LS N/A Est. Qty. 4 150 200 4 1 N/A Unit Price $43.00 $28.00 $9.00 $8,400.00 $10,000.00 N/A Total Amount $172.00 $4,200.00 $1,800.00 $33,600.00 $10,000.00 N/A $49,772.00 \\RV22FS02-PWCED\Depts\PW\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3634 Cedar River Maintenance Dredge\1604 Vegetation Management\2025\Applied Ecology Docs:fha:f'2 Order\CO#2\Working Docs\6_CO2 to CAG-22-178 0 CAG-22-178, CO #2-25 2/18/25 2/25/2025 Approved by Cheryl Beyer via email 2/24/2025