Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutImages for PSRC VISION 2050 Award_v.2
26+ acres
encumbered by
high-power
transmission
line easements
Secondary
Primary
Main
Building
standards to
provide:
• interesting
building
forms
• massing relief
• human-
scaled
development