HomeMy WebLinkAboutAB-4195Please provide additional info regarding the following items:1. Conduit runs along Union Ave (See RFI 17) - please provide alignment and elevations.2. Utility stubup location / orientation for future Portland Loo.3. Irrigation sleeves / tie-in at existing west pathway and landscape buffer4. Northern Union Ave terminus - fence and retaining wall alignments5. Old septic tank locationCONFORMS TO DESIGN CONCEPTCONFORMS TO DESIGN CONCEPT WITHREVISIONS / NOTATIONS AS SHOWNNON-CONFORMANCE -- REVISE & RESUBMITTHIS SHOP DRAWING / SUBMITTAL HAS BEEN REVIEWED FORGENERAL CONFORMANCE WITH DESIGN CONCEPT ONLY AND DOESNOT RELIEVE THE FABRICATOR / VENDOR OF RESPONSIBILITY FORCONFORMANCE WITH DESIGN DRAWINGS AND SPECIFICATIONS, ALLOF WHICH HAVE PRIORITY OVER THIS SHOP DRAWING / SUBMITTAL.BY __________________________________ DATE ___________________BRUCE DEES & ASSOCIATESMike Faulknern09/13/2023 5'-0"Decommissioned SepticTank Location