No preview available
HomeMy WebLinkAboutChange Order - 20 (2)Joni Dombrowski Digitally signed by Joni Dombrowski DN: C=US, E=jonid@olsonbrothers.net, O="Olson Brothers Excavating, Inc.", CN=Joni Dombrowski Date: 2025.02.04 14:35:54-08'00' Docusign Envelope ID: C59A1D4F-82EF-4A3D-BEE0-2B0DBF819066 3/31/2025 | 8:55 AM PDT THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Description: The contractor iHtirected in the field to utilize a vactor truck as a less invasive excavation method around the seven unidentified conduits discovered during the installation of the storm system on Park Ave N. Proposal Schedule of Prices: Add the following to schedule A: A97 Vactor and Excavation Specification and/or Special Provision: Materials: Measurement : The new bid item "A97 Vactor and Excavation" shall be measured by Lump Sum. Payment: The new Bid Item "A97 Vactor and Excavation" shall be paid as a lump and shall cover the complete cost of providing all labor, materials, tools, equipment required to complete the Work. Plans: Reason for Change: During the storm system installation along Park Avenue North, seven unlocated conduits were discovered. Due to their proximity to the old Boeing Duct Bank system, both the Contractor and the City were concerned that these conduits might be electrical. A vactor truck was therefore used to excavate around the unidentified conduits as a less invasive method of excavation. This was decided in the field. Change Order No. Contract Title: Contract No. Page 2 of 4 Docusign Envelope ID: C59A1D4F-82EF-4A3D-BEE0-2B0DBF819066 Docusign Envelope ID: C59A1D4F-82EF-4A3D-BEE0-2B0DBF819066 Docusign Envelope ID: C59A1D4F-82EF-4A3D-BEE0-2B0DBF819066