Loading...
HomeMy WebLinkAboutTransportation Committee - 17 Mar 2025 - Agenda - Pdf CITY OF RENTON AGENDA - Transportation Committee Meeting 4:45 PM - Monday, March 17, 2025 7th Floor Council Conference Room/Videoconference 1. ADAPTIVE SIGNAL CONTROL PURCHASE & AGREEMENT WITH WESTERN SYSTEMS a) AB - 3769 Public Works Transportation Systems Division recommends approval to purchase vehicle detection and signal cabinet equipment for the installation of adaptive signal controls at five (5) intersections; and approval to execute Amendment No. 3 to CAG-20-340, contractor Western Systems, in the amount of $123,516.01 for adaptive signal control licensing and consulting services. b) Presentation 2. AGREEMENT WITH GRAY & OSBORNE FOR RENTON SCHOOL & PEDESTRIAN CROSSING NO. 2 PROJECT a) AB - 3771 Public Works Transportation Systems Division recommends execution of an agreement with Gray & Osborne, Inc., in the amount of $135,481 for Design and Construction Engineering Services for the Renton School & Pedestrian Crossings No. 2 project. b) Presentation 3. EMERGING ISSUES IN TRANSPORTATION a) Eastside Transportation Partnership (ETP) If you would like to attend this week's meeting remotely, you can do so by going to https://us02web.zoom.us/j/83331604294?pwd=U3BLbUJZK0ExeWJaTFNWYWx5WGE0dz09 Zoom Meeting ID: 833 3160 4294, Passcode: 352696 You can call through Zoom at (253) 215-8782 and use the Meeting ID. AB - 3769 City Council Regular Meeting - 10 Mar 2025 SUBJECT/TITLE: Adaptive Signal Control at 5 intersections as part of Amazon Mitigation RECOMMENDED ACTION: Refer to Transportation (Aviation) Committee DEPARTMENT: Public Works Transportation Systems Division STAFF CONTACT: Flora Lee, Transportation Principal Civil Engineer EXT.: 7423 FISCAL IMPACT SUMMARY: Amazon submitted a deposit to the City of Renton in the amount of $400,000 in traffic mitigation as part of a Land Use Decision. These funds will be used for the implementation of Adaptive Signal Control at five (5) intersections as part of Amazon Mitigation. The amount received from Amazon in account number 003.119005.015.542.95.31.000 was approved in 2024. This budget will be allocated to fund the TIP ITS Program 317.122162.015.595.30.63.001 as part of the 2025 first quarter budget adjustment. This brings the total 2025 budget for the ITS Program to $846,099. SUMMARY OF ACTION: In accordance with Land-Use Decision LUA21-000233 Condition of Approval #1: “Amazon shall comply with the mitigation measures required as part of the Mitigated Determination of Non-significance issued by the Renton Environmental Review Committee on April 5, 2022.” Specifically, subsection d: “Amazon shall submit a deposit in the amount of $100,000 per intersection (four (4) intersections total) to implement the Adaptive Traffic following the at (SCOOT) Technique Split Offset Cycle Systems Control Optimization intersections: Oakesdale Ave SW and SW Grady Way, Oakesdale Ave SW and SW 16th St, Lind Ave SW and SW Grady Way, Lind Ave SW and SW 16thSt.  In order to complete the adaptive corridor, the city is installing adaptive signal control at the intersection of Powell Ave SW and SW Grady Way. The Transportation Section obtained Quote WA10140 from Sierra Technologies who is a sole source distributor for Washington State in the amount of $171,351.05 to procure video detection equipment for adaptive signal control vehicle detection. We also obtained Quote Q-17241 from Western Systems who is on state contract in the amount of $150,705.18 to procure traffic signal cabinets and Quote Q-17451 in the amount of $123,516.01 for additional SCOOT licensing and consulting services to expand the existing adaptive signal control SCOOT system. City staff will install the equipment. The vendor will add and configure the five (5) intersections to the City’s existing SCOOT system. EXHIBITS: A. Vehicle DetectionEquipment Quote B. Signal CabinetEquipment Quote C. Amendment No. 3 to Agreement CAG-20-340 for SCOOT D. Project Vicinity Map STAFF RECOMMENDATION: AGENDA ITEM #1. a) (1) Authorize the purchase in the amount of $322,056.23 for vehicle detection and signal cabinet equipment for the installation of adaptive signal control at five (5) intersections; (2) Authorize Mayor and City Clerk to execute Amendment No. 3 to CAG-20-340 with Western Systems in the amount of $123,516.01for adaptive signal control SCOOT licensing and consulting services. AGENDA ITEM #1. a) ESTIMATE DATE 9/6/2024 EST # WA10140 R3 PAYMENT TERMS NET 30 FREIGHT INCLUDED PROJECT NAME WA10140 - APEX VDS (4-WAY & 2-WAY) NOTES CITY OF RENTON PAST DUE INVOICES INCUR 18% INTEREST PER ANNUM. CREDIT CARD PAYMENTS INCUR A 4% PROCESSING FEE. TOTAL SUBTOTAL SALES TAX (10.3%) DESCRIPTIONQTY EACH TOTAL 4-WAY APEX VECTOR SYSTEM - INCLUDES: - (1 EACH) APEX CABLE (1000' SPOOL) - (1 EACH) SPM-10YR - (1 EACH) VLIVE-CELL-10YR - (1 EACH) APEX-CAB-INT-PAK - (1 EACH) APEX-PWR-3W-PAK - (4 EACH) APEX-VEC-3W - (1 EACH) MON-10LCD-SL - (1 EACH) MON-BRKT-SWVL - (1 EACH) TS2CABLE - (1 EACH) TURN-ON TECHNICAL SUPPORT [+NOTE: FOR SCHEDULING SUPPORT, PLEASE PROVIDE 3 WEEKS ADVANCE NOTICE TO JASON@SIERRATT.COM.] 3 41,320.00 123,960.00 2-WAY APEX VECTOR SYSTEM - INCLUDES: - (1 EACH) APEX CABLE (500' SPOOL) - (1 EACH) SPM-10YR - (1 EACH) VLIVE-CELL-10YR - (1 EACH) APEX-CAB-INT-PAK - (1 EACH) APEX-PWR-3W-PAK - (2 EACH) APEX-VEC-3W - (1 EACH) MON-10LCD-SL - (1 EACH) MON-BRKT-SWVL - (1 EACH) TS2CABLE - (1 EACH) TURN-ON TECHNICAL SUPPORT [+NOTE: FOR SCHEDULING SUPPORT, PLEASE PROVIDE 3 WEEKS ADVANCE NOTICE TO JASON@SIERRATT.COM.] 1 31,390.00 31,390.00 ESTIMATE VALID THROUGH 10/06/2024; DUE TO SUPPLY CHAIN AND ECONOMIC INFLUENCES, PRICING IS SUBJECT TO CHANGE IF RELEASED AFTER 30 DAYS FROM ESTIMATE ISSUE DATE. UNLESS OTHERWISE NOTED, ESTIMATE DOES NOT INCLUDE TECHNICAL SUPPORT, TRAINING, ASSEMBLY, INSTALLATION, INTEGRATION, DOCUMENTATION, TESTING, CABLING, POLES, OR SIGNAGE. $171,351.05 $155,350.00 $16,001.05 AGENDA ITEM #1. a) 1 of 3 Quotation 1122 Industry Street, Bldg. B, Everett, WA 98203 Phone: (425) 438-1133 | Fax: (425) 438-1585 Date Quote #Rev # 08/30/24 Q-17241 Project Agency: (4) Signal Cabinets Grady Way City of Renton, WA Prepared For:To place an order: Contact:Phone: Contact:Kai Antrim Company:City of Renton, WA Phone:+1 4255309017 Email:Fax:(425) 438-1585 Address:3555 Northeast 2nd Street Email:kantrim@westernsystems-inc.com City/State:Renton, WA 98056 *This order is subject to the terms & conditions Qty Part #Description Unit Price Ext. Price 4 3017500080 ENCLOSURE TYPE ITSP+ (UL) RS HANDLE (F) RH SOCKET (S) NO GEN DOOR (UNFINISHED)$5,522.88 $22,091.52 4 2515509990 CONTROLLER CABINET (TS2-1); RENTON TYPE ITSP+ (ALPHA) 32CH (2019) USA $15,489.85 $61,959.40 64 2010000040 RED JUMPERS UNUSED PHASES $3.20 $204.80 4 5070070250 POWER SUPPLY (PS250) SHELF MOUNT 5A EDI $584.20 $2,336.80 64 5020010620 LOAD SWITCH (SSS87I/O) CUBE WITH I/O INDICATORS (PDC)$45.31 $2,899.84 4 5030010887 FLASHER (SSF87) CUBE (PDC)$41.55 $166.20 32 5040040020 FLASH TRANSFER RELAY 295 (430) DELTROL CONTROLS (120V)$48.25 $1,544.00 16 5060050710 BUS INTERFACE UNIT 1/2 WIDTH (BIU700H) EDI $354.20 $5,667.20 4 8025000115 UPS POWER MODULE HP 1100W W/(6) RELAYS & 120V INPUT/OUTPUT IP/SNMP $1,574.49 $6,297.96 4 8025015000 AUTOMATIC TRANSFER SWITCH ASSEMBLY 19" RM WITH SURGE & RECEPTACLES 120VAC (020-168-25)$852.27 $3,409.08 4 8025095500 RBMS; CONTROLLER, SENSOR INT CABLES, (1) CAT5E CBLS, (4) BS3B-12-4-EQ SENSORS (4 BATTERY SYSTEM)$899.52 $3,598.08 4 8025050032 BATTERY CABLE HARNESS KIT 48V 8FT 1/4-20 TERMINALS FXM SERIES W/13IN BLK EXT (334/P+)$309.78 $1,239.12 16 8025040085 BATTERY ALPHACELL 240XTV (112AH / 75LB) (240XTV)$335.54 $5,368.64 4 0210020047 LAMP LED 48VAC/VDC BLUE 22MM (NOARK)$5.66 $22.64 4 4040050000 CONTROLLER-EDGE DEVICE YUTRAFFIC BLADE; TS1-TS2- ATC / QUAD-CORE CPU / SEPAC ENGINE BOARD / HOTSPOT $4,956.70 $19,826.80 Terms:Net 30 Subtotal $136,632.08 AGENDA ITEM #1. a) 2 of 3 Freight Terms:FOB DstFrt PP&ADD Shipping $0.00 Material Lead Time:Tax 10.30%$14,073.10 See General Conditions below for exceptions and changes to freight and lead time policies Grand Total $150,705.18 AGENDA ITEM #1. a) 3 of 3 GENERAL CONDITIONS OF SALE All information contained within this quote is valid for 30 days from the date of the quotation. Thereafter, all prices and applicable charges are subject to change. The acceptance of this quotation implies the acceptance of the following terms and conditions which cannot be varied or waived except by express written authorization by a Western Systems representative. These terms govern the sale of goods and services supplied by Western Systems. Differing terms from Buyer in any purchase order or written communication shall not be binding on Western Systems." TERMS AND CONDITIONS Purchase Order: All purchases require a formal purchase order. Emails or verbal communication does not constitute an acceptable purchase order. Delivery: Material lead time date is based after the release of the order. During the Covid-19 outbreak, Western Systems lead time dates will be estimates based on our best information available. Clarification on Shipping During Covid-19; FOB Destination and FOB Destination, Prepay & Add terms as quoted imply that the customer will be available to receive material deliveries. Any repeated delivery attempts, trucking reroutes, en route cancellations or product factory returns which incur additional shipping costs shall be billed to the customer will be passed onto the purchaser. Taxes/Fees: Unless current resale certificate is on file with Western Systems, purchaser shall be responsible for all, tariffs, duties or sales or use taxes in addition to the quoted prices herein. Any tax listed is an estimate only. Payment Terms: Payment terms are based on approval of credit. If credit is approved, terms are Net 30 days. Western Systems imposes a surcharge of 2 % on the transaction amounts when paying with a Visa or MasterCard. We are unable to accept other credit cards for payment options. All prices are quote s in USD funds. Non-Payment Penalties: If payment has not been received within terms, the purchaser will be considered in default. Western Systems will be entitled, with out prejudice to our other rights, without serving notice of default, to charge the purchaser for all costs incurred such as administration, storage, legal advice etc. The unpaid portion of any amount due to Western Systems will bear interest at the rate of 1.5% per month simple interest. Western Systems reserves t he right to hold goods until customer balances their account. Western Systems will not be subject to any project retainage of any kind. Material purchases are due and payable upon receipt. Unpaid balances will be sub ject to Non-Payment Penalties. Collections: Upon Buyer default of these terms, Western Systems may, in addition to any other rights or remedies at contract or law, declare the entire balance of Buyer’s account immediately due and payable. If unpaid balance is referred for collections, Buyer agrees to pay Western Systems, to the extent permitted by law, reasonable attorney fees in addition to all damages otherwise available, plus any court costs or expenses incurred by Western Systems, plus any finance charges accrued on any unpaid balance owed by Purchaser. Deferment or Cancellation Policy: Order deferment or cancellation once materials have been released will be subject to cancellation and/or restocking fee s. Documentation: Any operational documentation supplied as a part of this quotation remains the property of Western Systems and may not be copied, repr oduced, transmitted, or communicated to 3rd parties without the express written consent of Western Systems. On-Site Services: On-site services such as signal or video system turn-on support shall be scheduled three weeks in advance. If services need to be cancelled or postponed, any non-reimbursable travel expenses will be billed to purchaser. This quotation does not provide nor imply any on-site support services unless mentioned specifically herein. If on-site support services are required, and not included as part of this proposed scope of work, please contact Western Systems for a revised quotation. Warranty: Standard one-year warranty on material goods manufactured or supplied by Western Systems from the date of manufacturers factory shipment, unless superseded by an additional manufacturer’s warranty, provided such goods are maintained and operated in accordance with manufacturers standard method of operation. For additional information on Western Systems warranty, please send an email to info@westernsystems-inc.com. Return and Restocking Policy: Western Systems will be the sole source in determining whether any item is eligible for return. To be eligible the item(s) mu st be standard product models, new and unused, in the original packaging, and invoiced within the last 90 days. Restocking fees are applied to all returns a nd can vary between 20-50% based on annual sales activity. In no case will Western Systems be obligated to take returns for materials, including items that are obsolete, custom orders, or past the 90-day invoice period. Delivery Inspection: All materials deliveries must be inspected upon receipt from freight carrier. Any freight damages must be reported to the carrier at the time of receipt of goods. Any materials shortages or inaccuracies in shipment must be reported to Western Systems within ten days receipt of goods. There after, any discrepancies will be considered incidental and the responsibility of the receiver. Force Majeure: Western Systems, Inc. shall in no event be responsible for delays in performance due to actions beyond its reasonable control including wit hout limitation acts of God, strikes, labor shortage or disturbance, fire, accident, war, civil disturbance, or carrier delays. Western Systems, Inc. accepts no liability for errors or omissions or the accuracy or the completeness of this quotation. It has been prepared to the best of o ur knowledge per plans, specifications, documentation, and communications provided but we do not guarantee these to be accurate or of the latest revision. Determination of accuracy of this quotation and final quantities are the sole responsibility of recipient. Western Systems, Inc. shall in no event be liable for a ny special, consequential, incidental, or liquidated damages (including without limitation damages for loss of use of facilities or equipment, loss of revenue, l oss of profits or loss of goodwill), regardless of whether seller (a) has been informed of the possibility of such damages or (b) is negligent. AGENDA ITEM #1. a) AMENDMENT NO. 3 TO AGREEMENT FOR CAG-20-340 THIS AMENDMENT, dated for reference purposes only as _________________, _____, is by and between the City of Renton (the “City”), a Washington municipal corporation, and Western Systems, Inc. (“Consultant”), a Washington Corporation. The City and the Consultant are referred to collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-20-340, dated October 7, 2020, to provide necessary services for the additional SCOOT licenses and services (referred to herein as the “Agreement”); Whereas, the Parties wish to amend the Agreement to change the scope of work, and change the compensation] in order to implement SCOOT adaptive signal control for additional intersections. NOW THEREFORE, It is mutually agreed upon that CAG-20-340 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-3, which is attached and incorporated herein. 2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit A-3. All Work shall be performed by no later than December 31, 2027. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $123,516.01 from $ 130,550.93 to $254,066.94, including any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit B-3 of the Agreement. 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT AGENDA ITEM #1. a) PAGE 2 OF 2 By:_____________________________ By:____________________________ Armondo Pavone Mayor Kai Antrim Sales Manager _____________________________ Date _____________________________ Date Attest _____________________________ Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Shane Moloney City Attorney Contract Template Updated 06/17/2021 clb 1-30-25 (1321) 2/19/2025 AGENDA ITEM #1. a) EXHIBIT A-3 Project description The City of Renton requires an expansion of the existing SCOOT system. The Project shall be identified as the SCOOT Expansion – Grady Way. Draft Assumed Schedule The draft schedule assumes contract agreement as identified in the fee section and a signed NTP from the City of Renton not later than 31-December-2024. Project work will begin January-2025 with the target objective of completing the project in 2025-2026 if practicable. Project Understanding, Approach, and Close Out The current paradigm of Covid 19 may necessitate remote VPN connection. Programming, engineering, and observations that cannot be completed remotely will be done at the Renton Traffic Management Center. The Project Tasks will include: 1.Project Management Support 2.Detection and Detector Zone Layout 3.Concept of Operation Coordination 4.SCOOT Communication System (SCS) Configuration 5.Node Architecture and UTC/SCOOT Database 6.Preliminary System Operation & System Diagnostics 7.Calibration and Validation of SCOOT Model 8.Fine Tuning 9.Schedules, CASTS, and Region Settings 10.System Inspection Support 11.30-Day System Monitoring 12.Project Close Out Project Management Reporting Reporting will be a streamlined consistent with the goals of progress reporting and flagging issues needing attention. Telephone coordination meetings will be made regularly, with monthly reporting through to the project Close Out report at completion. If an issue arises that is considered to be problematic, the Consultant will contact the Western Systems Project Manager consistent with the degree of the problem. AGENDA ITEM #1. a) Introduction The proposal that follows has been prepared at the request of The City of Renton. The following key terms, or abbreviations included in this proposal: o Scope of Work – SOW o Systems Engineering – SE o Construction Management – CM o Concept of Operations – Con Ops o Graphical User Interface – GUI or “maps” o YUNEX (formerly SIEMENS) Urban Traffic Control – UTC o Notice to Proceed – NTP o Transit Signal Priority – TSP o Virtual Private Network – VPN o Commands Actioned and Stored Together – CAST o Request for Proposal of this project - RFP AGENDA ITEM #1. a) Project Tasks The SCOOT Expansion is divided among the following tasks, with the fee breakout as shown in the Project Fee section. Task 1 Project Management Support The Consultant will provide support for the Western Systems, Inc. Project Manager throughout the duration of the project. This will include providing any project schedule updates via regular telephone/email/web-conferencing coordination throughout the project, monthly progress reports and other documents identified in this SOW and attend project meetings with the City of Renton by teleconference. The Consultant will contact the Western Systems, Inc. Project manager, by phone or email in the event of issues arising during the project that may require more immediate attention than the weekly reports. Deliverables (PDF format): •Updates via teleconference or email throughout the project. •Minutes of the key meetings attended with City of Renton staff. •Project Schedule and updates. Task 2 Concept of Operations Coordination The Consultant will set up a brief teleconference to include the City of Renton and the Western Systems Project Manager to discuss the Concept of Operations. The Con Ops will help to guide the objectives for coordination and determining traffic management decisions for programming SCOOT. Deliverables (PDF format): •Agenda for meeting(s). •Minutes of the key points of the meeting. Task 3 Detection Zone Layout This task will include providing support to detection designer(s), field Technician and/or the detection Contractor to assist in intersection detection zone placement and configuration for the project. The Consultant will support the design task for detection & detection zones either in advance and/or at the time of the project. Task 4 SCS Configuration The existing SCS for the City of Renton is configured for 32 ports and the City of Renton has SCOOT license providing up to 30 intersections, with 22 of these currently active. The Consultant will program the SCOOT Communication Server for the intersections within the project, however cumulative projects may require SCS reconfiguration, and this task may require support from Western Systems, Inc./YUNEX. If an adder SCOOT License is needed, the Consultant will inform Western Systems, Inc. as soon as possible. AGENDA ITEM #1. a) Task 5 Node Architecture and UTC/SCOOT Database VPN access for the consultant may be required for this task. Existing TACTICS timing, phasing and other parameters will be acquired for the SCOOT operational programming in the UTC and SCOOT databases. TACTICS phase bank 4 and the TACTICS SCOOT module will be configured for the intersections in the project. The node architecture will be configured with consideration for future expansion. Deliverables: •Data will be loaded into the UTC/SCOOT and TACTICS databases on site and remotely using VPN access as much as possible. •Spreadsheet of UTC and SCOOT traffic model parameters for preliminary programming will be provided in pdf format to COR. •Node Architecture Schematic will be provided in pdf format to COR. Task 6 Preliminary System Operation & System Diagnostics Each of the intersections will be brought online with SCOOT operation for diagnostics. The purpose of this task is to conduct basic detection, communication and systems diagnostics, and where issues exist, coordinate for support with City of Renton crew as necessary. Task Assumptions: •The City of Renton crew available for on-call, site support. Task 7 Calibration and Validation of SCOOT Model Following the diagnostics task and associated revisions, the field calibration activities will begin. In this task, adjustments are made at individual intersections based upon field observations so that the model more reasonably reflects the real-world conditions. These observations are made during the AM, midday and PM peak periods. After observing that the SCOOT model outcomes are reasonable and consistent with the observed traffic conditions, the model will be considered Validated at the intersection level. Deliverables (PDF format): •The Consultant will revise the UTC and SCOOT databases as needed and provide any updates. Task Assumptions: •The City of Renton crew is available via on-call, site support. AGENDA ITEM #1. a) Task 8 Fine Tuning After the SCOOT traffic model has been Validated on an intersection basis, the fine-tuning task will be undertaken. In this task, groups of SCOOT intersections are brought online together for observations of platoon progression, congestion and other issues, with programming adjustments made to the system parameters as needed. Particular attention is given to adjustments in the program that provide for improved progression via optimal bandwidth, offsets, congestion settings and other parameters. The goals for this are based upon the Con Ops and traffic engineering judgement. Deliverables: •The Consultant will revise the UTC and SCOOT databases and provide updates as needed. Task 9 Schedules, CASTS, and Region Settings The Consultant will create Schedules (Timetables) to implement various timing, stage (phasing) and traffic engineering strategies, CASTS for the SCOOT program to implement these strategies, and Region coding for the groups of signals as defined in the Con Ops and traffic observations. Deliverables: •Schedule (Timetable) in SCOOT database for Saturday, Sunday, and weekdays. •CASTS in the SCOOT database to provide traffic operations. •UTC and SCOOT updates in database for the regions within the system. Task 10 System Inspection Support This task will be scheduled by the Consultant and will be completed by the City of Renton. The Consultant will support the City of Renton in any activities that are needed to accept the system as having satisfied the operational commitments of the Contract. The Consultant will make any SCOOT programming changes specifically identified (i.e., “…change offsets for five seconds earlier.”) by the City of Renton Inspection punch list within 30 calendar days, after which period, the Consultant Tasks 1-10 for the Rainier Corridor SCOOT expansion project shall be closed. The City of Renton will waive their opportunity for inspection punch list corrections if they do not identify SCOOT programming that is not satisfactory and/or requiring corrections within seven calendar days of the inspection date. Note that any changes made as part of this task will not be reprogrammed after the specific change has been made. AGENDA ITEM #1. a) Task 11 30-Day System Monitoring Each of the intersections within the project will be placed into automatic, scheduled operation and the for a 30-day burn-in period. The SCOOT system log will be used to determine any programming changes (i.e., bug fixes) that may be needed, and Diagnostics, if necessary, will be completed with associated changes made as are necessary from the findings. This task may entail the support of others if an issue is related to communication, detection, or other non-SCOOT issue. Deliverables: •Final revised UTC/SCOOT spreadsheet as needed. Assumptions: •Support from others may be necessary depending upon correction that is needed. Task 12 Project Close Out The Consultant will compile a report memo to document the project. This report memo will include observations of the system performance, recommendations for future detection changes and potential programming variables that could be explored for improving operations. Deliverables (PDF format): •Project report memo. •Final schematic of the Node Architecture. •Final Spreadsheet of UTC settings in Excel and PDF format. •Final Spreadsheet of SCOOT model fleld parameters in Excel and PDF format. AGENDA ITEM #1. a) Project Schedule The project schedule goals will be provided after the Agreement has been signed and NTP from the City of Renton AGENDA ITEM #1. a) Optional Tasks The “Quote 2” adder (SW Grady Way & Powell Ave SW) includes all the task items described for the project in the SOW AGENDA ITEM #1. a) General Assumptions: •NTP will be considered in affect after notiflcation from the City of Renton. •Support documentation for SCOOT/SEPAC software upgrades as well as remote support and/or training for such upgrade revisions shall be provided to the Consultant if requested and without cost to cost to the Consultant. •Consultant remote/VPN access will be provided (if practicable) at the time of Notice to Proceed (NTP) or shortly thereafter. •Training is NOT part of the project unless modifled by SOW Amendment. •Contractor, or agency crew are available throughout the project for on-site support if requested. •All work may be conducted during normal weekdays, from 6 AM to 6 PM and on weekends as agreed upon by City of Renton staff. •Controller, cabinet upgrades and/or replacements, detection and communications infrastructure necessary for deployment, are in place by others in a timely manner consistent with the schedule. •Uniformed Police Officer traffic control and/or fiaggers are not required for the work or will be provided by others. •Transit/Bus Priority is not included in the project. •None of the intersections require more than the eight stages available in SCOOT. •Software bug issues will be resolved by YUNEX. •Software license and software installations provided by Western Systems, Inc. or YUNEX. •Graphical User Interface for the project provided by Western Systems, Inc. AGENDA ITEM #1. a) Rev # 1 Flora Lee Phone: (425) 430-7303 Contact: Phone: Fax: Email: Qty 1 1 1 1 1 Subtotal Shipping Tax 10.30% Grand Total 9750010050 9750010040 9750010065 0000000000 $33,600.00 $16,730.00 $16,730.00 $18,671.88 CONSULTING SERVICES / SCOOT PROJECT MANAGEMENT Grady Way Intersections 1. Project Management Support 2. Detection Layout 3. Concept of Operation Coordination 4. SCS Configuration 5. Node Architecture and UTC/SCOOT Database CONSULTING SERVICES / SCOOT FIELD TUNING & VALIDATION 1. Preliminary System Operation & System Diagnostics 2. Calibration and Validation of SCOOT Model 3. Fine Tuning 4. Schedules, CASTS, and Region Settings CONSULTING SERVICES / SYSTEM VERIFICATION 1. System Inspection Support 2. 30-Day System Monitoring 3. Project Close Out Grady Way Adder (City of Renton Intersection- Non Amazon) All Tasks Above if Completed Simultaneously $33,600.00 $16,730.00 $16,730.00 $18,671.88 See General Conditions below for exceptions and changes to freight and lead time policies $111,981.88 Prepared For:To place an order: *This order is subject to the terms & conditions Date 09/25/24 1122 Industry Street, Bldg. B, Everett, WA 98203 Phone: (425) 438-1133 | Fax: (425) 438-1585 Quote # Q-17451 Address: City/State: Net 30 $26,250.00 3555 Northeast 2nd Street Renton, WA 98056 Description $0.00 $11,534.13 $123,516.01 Freight Terms:FOB DESTINATION Material Lead Time: Kai Antrim kantrim@westernsystems-inc.com Ext. Price $26,250.00SOFTWARE SCOOT ADAPTIVE; UTC LICENSES (QTY 10) Terms: Quotation Contact: Company: Email: Project Agency: City of Renton, WAGrady Way SCOOT +1 4255309017 (425) 438-1585 City of Renton, WA flee@rentonwa.gov Part # 4740050425 Unit Price 1 of 2 Exhibit B-3AGENDA ITEM #1. a) TERMS AND CONDITIONS Delivery: Material lead time date is based after the release of the order. During the Covid-19 outbreak, Western Systems lead time dates will be estimates based on our best information available. Clarification on Shipping During Covid-19; FOB Destination and FOB Destination, Prepay & Add terms as quoted imply that the customer will be available to receive material deliveries. Any repeated delivery attempts, trucking reroutes, en route cancellations or product factory returns which incur additional shipping costs shall be billed to the customer will be passed onto the purchaser. Deferment or Cancellation Policy: Order deferment or cancellation once materials have been released will be subject to cancellation and/or restocking fees. Purchase Order: All purchases require a formal purchase order. Emails or verbal communication does not constitute an acceptable purchase order. Taxes/Fees: Unless current resale certificate is on file with Western Systems, purchaser shall be responsible for all, tariffs, duties or sales or use taxes in addition to the quoted prices herein. Any tax listed is an estimate only. Payment Terms: Payment terms are based on approval of credit. If credit is approved, terms are Net 30 days. Western Systems imposes a surcharge of 2% on the transaction amounts when paying with a Visa or MasterCard. We are unable to accept other credit cards for payment options. All prices are quotes in USD funds. Non-Payment Penalties: If payment has not been received within terms, the purchaser will be considered in default. Western Systems will be entitled, without prejudice to our other rights, without serving notice of default, to charge the purchaser for all costs incurred such as administration, storage, legal advice etc. The unpaid portion of any amount due to Western Systems will bear interest at the rate of 1.5% per month simple interest. Western Systems reserves the right to hold goods until customer balances their account. Western Systems will not be subject to any project retainage of any kind. Material purchases are due and payable upon receipt. Unpaid balances will be subject to Non-Payment Penalties. Collections: Upon Buyer default of these terms, Western Systems may, in addition to any other rights or remedies at contract or law, declare the entire balance of Buyer’s account immediately due and payable. If unpaid balance is referred for collections, Buyer agrees to pay Western Systems, to the extent permitted by law, reasonable attorney fees in addition to all damages otherwise available, plus any court costs or expenses incurred by Western Systems, plus any finance charges accrued on any unpaid balance owed by Purchaser. All information contained within this quote is valid for 30 days from the date of the quotation. Thereafter, all prices and applicable charges are subject to change. The acceptance of this quotation implies the acceptance of the following terms and conditions which cannot be varied or waived except by express written authorization by a Western Systems representative. These terms govern the sale of goods and services supplied by Western Systems. Differing terms from Buyer in any purchase order or written communication shall not be binding on Western Systems." GENERAL CONDITIONS OF SALE Force Majeure: Western Systems, Inc. shall in no event be responsible for delays in performance due to actions beyond its reasonable control including without limitation acts of God, strikes, labor shortage or disturbance, fire, accident, war, civil disturbance, or carrier delays. Western Systems, Inc. accepts no liability for errors or omissions or the accuracy or the completeness of this quotation. It has been prepared to the best of our knowledge per plans, specifications, documentation, and communications provided but we do not guarantee these to be accurate or of the latest revision. Determination of accuracy of this quotation and final quantities are the sole responsibility of recipient. Western Systems, Inc. shall in no event be liable for any special, consequential, incidental, or liquidated damages (including without limitation damages for loss of use of facilities or equipment, loss of revenue, loss of profits or loss of goodwill), regardless of whether seller (a) has been informed of the possibility of such damages or (b) is negligent. Documentation: Any operational documentation supplied as a part of this quotation remains the property of Western Systems and may not be copied, reproduced, transmitted, or communicated to 3rd parties without the express written consent of Western Systems. On-Site Services: On-site services such as signal or video system turn-on support shall be scheduled three weeks in advance. If services need to be cancelled or postponed, any non-reimbursable travel expenses will be billed to purchaser. This quotation does not provide nor imply any on-site support services unless mentioned specifically herein. If on-site support services are required, and not included as part of this proposed scope of work, please contact Western Systems for a revised quotation. Warranty: Standard one-year warranty on material goods manufactured or supplied by Western Systems from the date of manufacturers factory shipment, unless superseded by an additional manufacturer’s warranty, provided such goods are maintained and operated in accordance with manufacturers standard method of operation. For additional information on Western Systems warranty, please send an email to info@westernsystems-inc.com. Return and Restocking Policy: Western Systems will be the sole source in determining whether any item is eligible for return. To be eligible the item(s) must be standard product models, new and unused, in the original packaging, and invoiced within the last 90 days. Restocking fees are applied to all returns and can vary between 20-50% based on annual sales activity. In no case will Western Systems be obligated to take returns for materials, including items that are obsolete, custom orders, or past the 90-day invoice period. Delivery Inspection: All materials deliveries must be inspected upon receipt from freight carrier. Any freight damages must be reported to the carrier at the time of receipt of goods. Any materials shortages or inaccuracies in shipment must be reported to Western Systems within ten days receipt of goods. Thereafter, any discrepancies will be considered incidental and the responsibility of the receiver. 2 of 2 AGENDA ITEM #1. a) R Adaptive – SCOOT A SW Grady Way, Amazon-funded (2024) Rainier Ave, EXISTING SCOOT SW Grady Way, City-funded C G G G R R R R R R R R G Ra i n i e r A v e S La k e Av e S Sh a t t u c k Av e S Wi l l i a m Av e S Be n s o n R d S Ma i n A v e S S 3rd St S 2nd St Mi l l A v e S SW 16th St S 4th St Cedar Ave SW Grady Way, Future C A A A A G G G G G G AG E N D A I T E M # 1 . a ) AG E N D A I T E M # 1 . b ) AG E N D A I T E M # 1 . b ) AG E N D A I T E M # 1 . b ) AG E N D A I T E M # 1 . b ) AG E N D A I T E M # 1 . b ) AG E N D A I T E M # 1 . b ) AB - 3771 City Council Regular Meeting - 10 Mar 2025 SUBJECT/TITLE: Renton School & Pedestrian Crossings 2 Project (TIP #24-08), Gray & Osborne, Inc., P.S. contract RECOMMENDED ACTION: Refer to Transportation (Aviation) Committee DEPARTMENT: Public Works Transportation Systems Division STAFF CONTACT: Ethen Belen, Project Manager EXT.: 7221 FISCAL IMPACT SUMMARY: This professional services agreement for design and construction engineering support with Gray & Osborne, Inc. totals $135,481. The expenses incurred under this agreement will be funded through the Traffic Safety Program. An additional $500,000 has been allocated for each year to the 2025-2026 bi-annual budget. Furthermore, staff will carry over a balance of $27,207.75 from the 2024 budget, which will be reflected in the Q1 budget adjustment. The total balance in the account at this time is $493,035. SUMMARY OF ACTION: This professional services agreement retains the services of Gray & Osborne, Inc. for design andconstruction engineering servicesfor the project. The scope of services outlined in this agreement includes the following deliverables: a 30% design submittal, a 90% design submittal, and a bid-ready document submittal, which will include plans, specifications, and a cost estimate. Additionally, the agreement covers support throughout the construction phase, including revisions to drawings and addressing contractor inquiries. The Renton School & Pedestrian Crossings No. 2 project will improve three (3)marked crosswalks at the following intersections (Please see Project Locations Map): 1. Union Ave NE at NE 8th St (north side of intersection) 2. SE 165th St and 116th Ave SE 3. Hoquiam Ave NE at NE 5th St (south side of intersection) These improvements include constructing rectangular rapid flashing beacons (RRFBs) at each crossing and ADA compliant curb ramps. These improvements will enhance pedestrian connectivity for all locations, making it safer and easier for pedestrians to use the corridors and provide better access to schools and school bus stops. EXHIBITS: A.G&O Professional Services Agreement B. Project Locations Map STAFF RECOMMENDATION: AGENDA ITEM #2. a) Authorize the Mayor and City Clerk to execute the agreement with Gray & Osborne, Inc. in the amount of $135,481 for Design and Construction Engineering Services on the Renton School & Pedestrian Crossings No. 2 project. AGENDA ITEM #2. a) PAGE 1 OF 10 AGREEMENT FOR RENTON SCHOOL AND PEDESTRIAN CROSSINGS NO. 2 THIS AGREEMENT, dated for reference purposes only as January 31, 2025, is by and between the City of Renton (the “City”), a Washington municipal corporation, and Gray & Osborne, Inc. (“Consultant”), Washington Corporation. The City and the Consultant are referred to collectively in this Agreement as the “Parties.” Once fully executed by the Parties, this Agreement is effective as of the last date signed by both parties. 1. Scope of Work: Consultant agrees to provide design services as specified in Exhibit Exhibit A, which is attached and incorporated herein and may hereinafter be referred to as the “Work.” 2. Changes in Scope of Work: The City, without invalidating this Agreement, may order changes to the Work consisting of additions, deletions or modifications. Any such changes to the Work shall be ordered by the City in writing and the Compensation shall be equitably adjusted consistent with the rates set forth in Exhibit A or as otherwise mutually agreed by the Parties. 3. Time of Performance: Consultant shall commence performance of the Agreement pursuant to the schedule(s) set forth in Exhibit A. All Work shall be performed by no later than January 1, 2027. 4. Compensation: A. Amount. Total compensation to Consultant for Work provided pursuant to this Agreement shall not exceed $135,481.00, plus any applicable state and local sales taxes. Compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit A. The Consultant agrees that any hourly or flat rate charged by it for its Work shall remain locked at the negotiated rate(s) unless otherwise agreed to in writing or provided in Exhibit A. Except as specifically provided herein, the Consultant shall be solely responsible for payment of any taxes imposed as a result of the performance and payment of this Agreement. B. Method of Payment. On a monthly or no less than quarterly basis during any quarter ain which Work is performed, the Consultant shall submit a voucher or invoice in a AGENDA ITEM #2. a) PAGE 2 OF 20 name of the personnel performing such Work, and any hourly labor charge rate for such personnel. The Consultant shall also submit a final bill upon completion of all Work. Payment shall be made by the City for Work performed within thirty (30) calendar days after receipt and approval by the appropriate City representative of the voucher or invoice. If the Consultant’s performance does not meet the requirements of this Agreement, the Consultant will correct or modify its performance to comply with the Agreement. The City may withhold payment for work that does not meet the requirements of this Agreement. C. Effect of Payment. Payment for any part of the Work shall not constitute a waiver by the City of any remedies it may have against the Consultant for failure of the Consultant to perform the Work or for any breach of this Agreement by the Consultant. D. Non-Appropriation of Funds. If sufficient funds are not appropriated or allocated for payment under this Agreement for any future fiscal period, the City shall not be obligated to make payments for Work or amounts incurred after the end of the current fiscal period, and this Agreement will terminate upon the completion of all remaining Work for which funds are allocated. No penalty or expense shall accrue to the City in the event this provision applies. 5. Termination: A. The City reserves the right to terminate this Agreement at any time, with or w ithout cause by giving ten (10) calendar days’ notice to the Consultant in writing. In the event of such termination or suspension, all finished or unfinished docume nts, data, studies, worksheets, models and reports, or other material prepared by the Consultant pursuant to this Agreement shall be submitted to the City, if any are required as part of the Work. B. In the event this Agreement is terminated by the City, the Consultant shall be entitled to payment for all hours worked to the effective date of termination, less all payments previously made. If the Agreement is terminated by the City after partial performance of Work for which the agreed compensation is a fixed fee, the City shall pay the Consultant an equitable share of the fixed fee. This provision shall not prevent the City from seeking any legal remedies it may have for the violation or nonperformance of any of the provisions of this Agreement and such charg es due to the City shall be deducted from the final payment due the Consultant. No payment shall be made by the City for any expenses incurred or work done following the effective date of termination unless authorized in advance in writing by the City. 6. Warranties And Right To Use Work Product: Consultant represents and warrants that Consultant will perform all Work identified in this Agreement in a professional and workmanlike manner and in accordance with all reasonable and professional standards AGENDA ITEM #2. a) PAGE 3 OF 20 and laws. Compliance with professional standards includes, as applicable, performing the Work in compliance with applicable City standards or guidelines (e.g. design criteria and Standard Plans for Road, Bridge and Municipal Construction). Professional engineers shall certify engineering plans, specifications, plats, and reports, as applicable, pursuant to RCW 18.43.070. Consultant further represents and warrants that all final work product created for and delivered to the City pursuant to this Agreement shall be the original work of the Consultant and free from any intellectual property encumbrance which would restrict the City from using the work product. Consultant grants to the City a non- exclusive, perpetual right and license to use, reproduce, distribute, adapt, modify, and display all final work product produced pursuant to this Agreement. The City’s or other’s adaptation, modification or use of the final work products other than for the purposes of this Agreement shall be without liability to the Consultant. The provisions of this section shall survive the expiration or termination of this Agreement. 7. Record Maintenance: The Consultant shall maintain accounts and records, which properly reflect all direct and indirect costs expended and Work provided in the performance of this Agreement and retain such records for as long as may be required by applicable Washington State records retention laws, but in any event no less than six years after the termination of this Agreement. The Consultant agrees to provide access to and copies of any records related to this Agreement as required by the City to audit expenditures and charges and/or to comply with the Washington State Public Records Act (Chapter 42.56 RCW). The provisions of this section shall survive the expiration or termination of this Agreement. 8. Public Records Compliance: To the full extent the City determines necessary to comply with the Washington State Public Records Act, Consultant shall make a due diligent search of all records in its possession or control relating to this Agreement and the Work, including, but not limited to, e-mail, correspondence, notes, saved telephone messages, recordings, photos, or drawings and provide them to the City for production. In the event Consultant believes said records need to be protected from disclosure, it may, at Consultant’s own expense, seek judicial protection. Consultant shall indemnify, defend, and hold harmless the City for all costs, including attorneys’ fees, attendant to any claim or litigation related to a Public Records Act request for which Consultant has responsive records and for which Consultant has withheld records or information contained therein, or not provided them to the City in a timely manner. Consultant shall produce for distribution any and all records responsive to the Public Records Act request in a timely manner, unless those records are protected by court order. The provisions of this section shall survive the expiration or termination of this Agreement. 9. Independent Contractor Relationship: A. The Consultant is retained by the City only for the purposes and to the extent set forth in this Agreement. The nature of the relationship between the Consultant and the City during the period of the Work shall be that of an independent contractor, not AGENDA ITEM #2. a) PAGE 4 OF 20 employee. The Consultant, not the City, shall have the power to control and direct the details, manner or means of Work. Specifically, but not by means of limitation, the Consultant shall have no obligation to work any particular hours or particular schedule, unless otherwise indicated in the Scope of Work or where scheduling of attendance or performance is mutually arranged due to the nature of the Work. Consultant shall retain the right to designate the means of performing the Work covered by this agreement, and the Consultant shall be entitled to employ other workers at such compensation and such other conditions as it may deem proper, provided, however, that any contract so made by the Consultant is to be paid by it alone, and that employing such workers, i t is acting individually and not as an agent for the City. B. The City shall not be responsible for withholding or otherwise deducting federal income tax or Social Security or contributing to the State Industrial Insurance Program, or otherwise assuming the duties of an employer with respect to Consultant or any employee of the Consultant. C. If the Consultant is a sole proprietorship or if this Agreement is with an individual, the Consultant agrees to notify the City and complete any required form if the Consultant retired under a State of Washington retirement system and agrees to indemnify any losses the City may sustain through the Consultant’s failure to do so. 10. Hold Harmless: The Consultant agrees to release, indemnify, defend, and hold harmless the City, elected officials, employees, officers, representatives, and volunteers from any and all claims, demands, actions, suits, causes of action, arbitrations, mediations, proceedings, judgments, awards, injuries, damages, liabilities, taxes, losses, fines, fees, penalties, expenses, attorney’s or attorneys’ fees, costs, and/or litigation expenses to or by any and all persons or entities, arising from, resulting from, or related to the negligent acts, errors or omissions of the Consultant in its performance of this Agreement or a breach of this Agreement by Consultant, except for that portion of the claims caused by the City’s sole negligence. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, (Validity of agreement to indemnify against liability for negligence relative to construction, alteration, improvement, etc., of structure or improvement attached to real estate…) then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees and volunteers, Consultant’s liability shall be only to the extent of Consultant’s negligence. It is further specifically and expressly understood that the indemnification provided in this Agreement constitute Consultant’s waiver of immunity under the Industrial Insurance Act, RCW Title 51, solely for the purposes of this indemnification. The Part ies AGENDA ITEM #2. a) PAGE 5 OF 20 have mutually negotiated and agreed to this waiver. The provisions of this section shall survive the expiration or termination of this Agreement. 11. Gifts and Conflicts: The City’s Code of Ethics and Washington State law prohibit City employees from soliciting, accepting, or receiving any gift, gratuity or favor from any person, firm or corporation involved in a contract or transaction. To ensure compliance with the City’s Code of Ethics and state law, the Consultant shall not give a gift of any kind to City employees or officials. Consultant also confirms that Consultant does not have a business interest or a close family relationship with any City officer or employee who was, is, or will be involved in selecting the Consultant, negotiating or administeri ng this Agreement, or evaluating the Consultant’s performance of the Work. 12. City of Renton Business License: Unless exempted by the Renton Municipal Code, Consultant shall obtain a City of Renton Business License prior to performing any Work and maintain the business license in good standing throughout the term of this agreement with the City. Information regarding acquiring a city business license can be found at: https://www.rentonwa.gov/Tax Information regarding State business licensing requirements can be found at: https://dor.wa.gov/doing-business/register-my-business 13. Insurance: Consultant shall secure and maintain: A. Commercial general liability insurance in the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this Agreement. B. In the event that Work delivered pursuant to this Agreement either directly or indirectly involve or require Professional Services, Professional Liability, Errors and Omissions coverage shall be provided with minimum limits of $1,000,000 per occurrence. "Professional Services", for the purpose of this section, shall mean any Work provided by a licensed professional or Work that requires a professional standard of care. C. Workers’ compensation coverage, as required by the Industrial Insurance laws of the State of Washington, shall also be secured. D. Commercial Automobile Liability for owned, leased, hired or non-owned, leased, hired or non-owned, with minimum limits of $1,000,000 per occurrence combined single limit, if there will be any use of Consultant’s vehicles on the City’s Premises by or on behalf of the City, beyond normal commutes. AGENDA ITEM #2. a) PAGE 6 OF 20 E. Consultant shall name the City as an Additional Insured on its commercial general liability policy on a non-contributory primary basis. The City’s insurance policies shall not be a source for payment of any Consultant liability, nor shall the maintenance of any insurance required by this Agreement be construed to limit the liability of Consultant to the coverage provided by such insurance or otherwise limit the City’s recourse to any remedy available at law or in equity. F. Subject to the City’s review and acceptance, a certificate of insurance showing the proper endorsements, shall be delivered to the City before performing the Work. G. Consultant shall provide the City with written notice of any policy cancellation, within two (2) business days of their receipt of such notice. 14. Delays: Consultant is not responsible for delays caused by factors beyond the Consultant’s reasonable control. When such delays beyond the Consultant’s reasonable control occur, the City agrees the Consultant is not responsible for damage s, nor shall the Consultant be deemed to be in default of the Agreement. 15. Successors and Assigns: Neither the City nor the Consultant shall assign, transfer or encumber any rights, duties or interests accruing from this Agreement without the written consent of the other. 16. Notices: Any notice required under this Agreement will be in writing, addressed to the appropriate party at the address which appears below (as modified in writing from time to time by such party), and given personally, by registered or certified mail, return recei pt requested, by facsimile or by nationally recognized overnight courier service. Time period for notices shall be deemed to have commenced upon the date of receipt, EXCEPT facsimile delivery will be deemed to have commenced on the first business day following transmission. Email and telephone may be used for purposes of administering the Agreement, but should not be used to give any formal notice required by the Agreement. CITY OF RENTON Ethan Belen 1055 South Grady Way Renton, WA 98057 Phone: (425) 430-7221 Ebelen@rentonwa.gov GRAY & OSBORNE, INC. Tani Stafford 1130 Rainer Avenue South Seattle, WA 98144 Phone: (206) 284-0860 tstafford@g-o.com Fax: (206) 283-3206 AGENDA ITEM #2. a) PAGE 7 OF 20 17. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational qualification, the Consultant agrees as follows: A. Consultant, and Consultant’s agents, employees, representatives, and volunteers with regard to the Work performed or to be performed under this Agreement, shall not discriminate on the basis of race, color, sex, religion, nationality, creed, marital status, sexual orientation or preference, age (except minimum age and retirement provisions), honorably discharged veteran or military status, or the presence of any sensory, mental or physical handicap, unless based upon a bona fide occupational qualification in relationship to hiring and employment, in employment or application for employment, the administration of the delivery of Work or any other benefits under this Agreement, or procurement of materials or supplies. B. The Consultant will take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, national origin, sex, age, sexual orientation, physical, sensory or mental handicaps, or marital status. Such action shall include, but not be limited to the following employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training. C. If the Consultant fails to comply with any of this Agreement’s non -discrimination provisions, the City shall have the right, at its option, to cancel the Agreement in whole or in part. D. The Consultant is responsible to be aware of and in compliance with all federal, state and local laws and regulations that may affect the satisfactory completion of the project, which includes but is not limited to fair labor laws , worker's compensation, and Title VI of the Federal Civil Rights Act of 1964, and will comply with City of Renton Council Resolution Number 4085. 18. Miscellaneous: The parties hereby acknowledge: A. The City is not responsible to train or provide training for Consultant. B. Consultant will not be reimbursed for j ob related expenses except to the extent specifically agreed within the attached exhibits . C. Consultant shall furnish all tools and/or materials necessary to perform the Work except to the extent specifically agreed within the attached exhibits. D. In the event special training, licensing, or certification is required for Consultant to provide Work he/she will acquire or maintain such at his/her own expense and, if Consultant employs, sub-contracts, or otherwise assigns the responsibility to perform AGENDA ITEM #2. a) PAGE 8 OF 20 the Work, said employee/sub-contractor/assignee will acquire and or maintain such training, licensing, or certification. E. This is a non-exclusive agreement and Consultant is free to provide his/her Work to other entities, so long as there is no interruption or interference with the provision of Work called for in this Agreement. F. Consultant is responsible for his/her own insurance, including, but not limited to health insurance. G. Consultant is responsible for his/her own Worker’s Compensation coverage as well as that for any persons employed by the Consultant. 19. Other Provisions: A. Approval Authority. Each individual executing this Agreement on behalf of the City and Consultant represents and warrants that such individuals are duly authorized to execute and deliver this Agreement on behalf of the City or Consultant. B. General Administration and Management. The City’s project manager is Ethan Belen. In providing Work, Consultant shall coordinate with the City’s contract manager or his/her designee. C. Amendment and Modification. This Agreement may be amended only by an instrument in writing, duly executed by both Parties. D. Conflicts. In the event of any inconsistencies between Consultant proposals and this Agreement, the terms of this Agreement shall prevail. Any exhibits/attachments to this Agreement are incorporated by reference only to the extent of the purpose for which they are referenced within this Agreement. To the extent a Consultant prepared exhibit conflicts with the terms in the body of this Agreement or contains terms that are extraneous to the purpose for which it is referenced, the terms in the body of this Agreement shall prevail and the extraneous terms shall not be incorporated herein. E. Governing Law. This Agreement shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington and the City of Renton. Consultant and all of the Consultant’s employees shall perform the Work in accordance with all applicable federal, state, county and city laws, codes and ordinances. F. Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared by the joint efforts of the Parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution. AGENDA ITEM #2. a) PAGE 9 OF 20 G. Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or interpret this Agreement or any of its terms or covenants shall be brought in the King County Superior Court for the State of Washington at the Maleng Regional Justice Center in Kent, King County, Washington, or its replacement or s uccessor. Consultant hereby expressly consents to the personal and exclusive jurisdiction and venue of such court even if Consultant is a foreign corporation not registered with the State of Washington. H. Severability. A court of competent jurisdiction’s determination that any provision or part of this Agreement is illegal or unenforceable shall not cancel or invalidate the remainder of this Agreement, which shall remain in full force and effect. I. Sole and Entire Agreement. This Agreement contains the entire agreement of the Parties and any representations or understandings, whether oral or written, not incorporated are excluded. J. Time is of the Essence. Time is of the essence of this Agreement and each and all of its provisions in which performance is a factor. Adherence to completion dates set forth in the description of the Work is essential to the Consultant’s performance of this Agreement. K. Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be construed to give any rights or benefits in the Agreement to anyone other than the Parties, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the Parties and no one else. L. Binding Effect. The Parties each bind themselves, their partners, successors, assigns, and legal representatives to the other party to this Agreement, and to the partners, successors, assigns, and legal representatives of such other party with respect to all covenants of the Agreement. M. Waivers. All waivers shall be in writing and signed by the waiving party. Either party’s failure to enforce any provision of this Agreement shall not be a waiver and shall not prevent either the City or Consultant from enforcing that provision or any other provision of this Agreement in the future. Waiver of breach of any provision of this Agreement shall not be deemed to be a waiver of any prior or subsequent breach unless it is expressly waived in writing. N. Counterparts. The Parties may execute this Agreement in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. AGENDA ITEM #2. a) PAGE 10 OF 20 IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON By:_____________________________ GRAY & OSBORNE, INC. By:____________________________ Armando Pavone Mayor Michael B. Johnson, P.E. President _____________________________ Date _____________________________ Date Attest _____________________________ Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Cheryl Beyer Senior Assistant City Attorney Contract Template Updated 5/21/2021 2/20/25 AGENDA ITEM #2. a) PAGE 11 OF 20 EXHIBIT A Renton School and Pedestrian Crossings 2 Scope of Services Introduction The City of Renton (the “City”) has identified the need for improved pedestrian crossings by installing rectangular rapid flashing beacons (RRFBs ) at the following three Renton school crossings within the City’s Right-Of-Way (ROW). This Scope of Work defines the work tasks to be performed by Gray & Osborne, Inc. team (the “Consultant”) in support of the purpose and goals of the City’s project (the “Project”). • Union Avenue NE at NE 8th Street (north side of intersection); • SE 165th Street and 116th Avenue SE; • Hoquiam Avenue NE at NE 5th Street (south side of intersection). The Project generally includes: • RRFBs with accessible push buttons; • Signage; • Pavement markings; • Sidewalk widening/bulbouts; • ADA/curb ramps improvements; • Drainage improvement; • Visibility improvements; • Street lighting, if needed. Assumptions and Responsibilities The following assumptions have been made in developing this Scope of Work and Budget. Additional detail specific to individual tasks is included in the task descriptions. 1. Funding is provided by the City of Renton and will follow City of Renton standards for permitting and approval. State of Washington, FHWA, or other funding sources are not included. Addition of outside funding sources may modify permitting and/or approval requirements, which may result in an amendment to this scope of work. 2. The level of effort is specified in the Scope of Work and the budgeted labor and expenses are indicated in Exhibit B. The budget may be transferred between discipline tasks at the discretion of the City Project Manager, provided the total contracted amount is not exceeded. The Consultant will have the flexibility to manage budget within a given discipline on a subtask level. Services not included in this Scope of Work are specifically excluded from the scope of the Consultant’s services. 3. The Consultant shall complete its work and services within its control to meet the agreed upon schedule. The consultant shall provide to the City Project Manager monthly updates to the project schedule that identify tasks and deliverables that require time AGENDA ITEM #2. a) PAGE 12 OF 20 extensions due to reasonable and/or unforeseen circumstances. The City shall not unreasonably withhold written acceptance of the time extensions. 4. The project will include submittals at 30 percent, 90 percent, and 100 percent design. Drafting standards will follow Renton Survey and Drafting s tandards and Renton Standard Details. For each submittal, the Consultant will conduct a comment resolution meeting with the City Project Manager. The following submittal will include responses to comments that will also include all subconsultant responses with incorporation of the comments into the plans. 5. Both Solar-powered and AC-powered RRFBs will be considered for this Project; RRFB products selected should meet Renton’s material standards and maintenance requirements. 6. Assume drainage design is required at all locations and/or bulbout locations. Stormwater improvements will be required to meet the current City of Renton Surface Water Design Manual (SWDM), where applicable. Technical Information Report (TIR) will be prepared for all three crossings in one document assuming the impacted area for each site is less than 2,000 square feet. 7. This scope of work and associated budget assumes no design deviations will be necessary as part of this contract. ADA code guidelines that cannot be met due to site conditions will be identified on the plans with “Maximum Extent Feasible” notes provided on the plan sheets. 8. No landscape plans will be prepared, adjacent areas will be restored with hydroseed lawn. 9. The Consultant will develop traffic control plans for all three crossings. 10. The Consultant will prepare a compiled project manual. 11. The Consultant will support the City during Bid and Ad of the project. City of Renton Responsibilities 1. For those task items to be performed by other City of Renton agencies and stakeholders, the City Project Manager will coordinate and secure the required agreements. 2. The City Project Manager will provide background data and information as available and as requested by the Consultant 3. The City will maintain the lead role on the project, coordinating with private and governmental agencies with the assistance of the Consultant. 4. The City will have a separate professional consultant agreement to lead the NEPA/SEPA Environmental (if necessary) documentations and permitting for this proje ct. The Consultant will provide exhibits to the City for the documentation and/or permitting. 5. The City will order up to six (6) title reports for any properties that may require parcel maps. 6. Possibility of private right-of-way entry may be needed and but activities associated with the construction of the project are to remain within the public right -of-way. AGENDA ITEM #2. a) PAGE 13 OF 20 7. The City will compile all comments from reviewers and provide comments to the Consultant on one marked up set of the submittal documents and/or one compiled set of written comments on a comment response form (format provided by the Consultant). The Consultant will compile/update all review comments and responses to comments, including subconsultant responses, on a list form (spreadsheet format). 8. The Consultant will produce the project manual, with assistance as required by the City. The Consultant will compile standard specifications and special provisions specific to civil, landscape, and signal design, as needed. The City will provide up contract documents templates. 9. The City will provide City departments for review as needed in support of the design and/or construction of the project. 10. The City will coordinate with franchise utilities as needed to review plans. City of Renton-Furnished Services, Information, and Items The City of Renton will make available or direct the Consultant to the following project resources as needed to complete the construction documents: • Plans and project schedules for improvement in the study area; • Pedestrian and bicycle count and crash information from the study area; • Renton Municipal Code; • City of Renton Standard Plans; • City of Renton Surface Water Design Manual (SWDM); • City of Renton signal, illumination, and signage guidelines ; • GIS information for the study area; • Access to existing record drawing information of the study area as available ; • Securing location for public meetings; • Securing location for comment review meetings ; • Arborist information about existing trees ; • Any available geotechnical information to support design; • Recent City of Renton project bid tabs, as available; • The existing luminaire design data (IES files) for the AGi32 modeling ; • The City standard for lighting conditions at the crosswalks. AGENDA ITEM #2. a) PAGE 14 OF 20 Task 1: Project Management and Coordination Task 1.1: Meetings The CONSULTANT will attend and facilitate a kickoff meeting with the CITY Project Manager and any necessary CITY staff. The following summarizes the number and type of general coordination meetings that are assumed for the project. The consultant will prepare the meeting agenda one day prior to the meeting and will document the meeting minutes. Meetings: • Project kick-off, and site visits (one meeting via zoom/teams, two site visits). • Periodic coordination meetings (assume five via zoom/teams, in person if needed). Task 1.2: Invoicing Monthly progress reports and invoices (up to eight) will be provided, either by email or by hardcopy. Each report will include task accomplishments, status of deliverables, items needed by the City and/or others, and expected upcoming activities. Deliverables (Notice to Proceed (NTP) and Ongoing to 1 year following NTP): • Monthly Progress Report and billings submitted via e-mail in PDF format. • Meeting notes from each meetings, submitted via e-mail in PDF format. Task 2: RRFB Preliminary Design Task 2.1: Topographic Survey and Base Mapping The Consultant will provide survey services to create a base map as necessary to complete design. Survey services will include the following information. Three crosswalk locations: • Union Avenue NE at NE 8th Street (North side of intersection). • SE 165th Street and 116th Avenue SE. • Hoquiam Avenue NE and NE 5th Street (South side of intersection). Consultant will locate surface and underground features within 50 feet of each crosswalk location (in each direction). Consultant will locate curb, striping and signage from 50 feet to 200 feet. Survey will extend behind sidewalk 5 feet at each location and will stay within the public right-of-way abutting non-properties. Surface and underground features will include existing vegetation, pavement markings, curb (islands and sidewalk), tactile warning strips, sign locations, edge of pavement, castings, all other traffic features (such as flexposts/pylons), utility/signal poles, overhead signs and related suspension systems, traffic/signal cabinets, and underground utilities. Other surface features that are unique to each site but not listed here will also be surveyed and included in the base map. Consultant will identify approximate right-of-way extents based on GIS ROW records. Property deeds will not be acquired during this project. AGENDA ITEM #2. a) PAGE 15 OF 20 Consultant will perform potholing to verify design for foundation locations at all three crossings for up to eight potholes of which six are in sidewalks/shoulders and two are in roadways. For all eight locations, this scope of work assumes potholes will be backfilled with native material (if dry and in the case that the native material is wet then crushed surfacing top course will be used) but only temporary surface replacement with cold mix is expected due to the fact that construction of new sidewalks/roads surfaces will restore the surface to new condition. If permanent surface replacement is required (pothole performed outside of future construction limits), this could be added to the scope and budget by way of contract amendment. Assumptions: • Consultant will calculate right of way through research and using the title reports obtained by the City as part of the project. No parcel maps will be created during this phase. If parcel maps are needed, they will be scoped during a later phase. Survey right of way lines will show on plans. • The City will provide GIS utilities files and all utility records where ava ilable for the project site at least one week prior to start of field work. • Trees with trunk diameters of 4 inches and above will be surveyed. Trees will be labeled with trunk and dripline diameter and the species will only be classified as coniferous or deciduous unless directed otherwise. All trees will show on Plans. • Manholes over 25 feet deep or full of debris/water will not be as -built as they require confined space entry to access the manhole in order to accurately measure the depth. • Assume drainage design is required at all crossings and the new drainage improvement will be tied into the existing drainage system. Pipe tracing are not included within this scope. If this service is needed, additional scope and budget can be added with an amendment at a later date. • The Consultant’s surveyor will call One Call (811) and pick-up utilities that are marked. The Consultant’s surveyor expects very little to be marked and will supplement the previously located utilities by One Call with a private locator to make sure all utilities are located. • Base maps will be provided in the Civil3D 2020 using APWA CAD standards and layering. No hard copies will be provided, PDF format will be provided. Title block and title data will be provided for PDF survey sheets by Gray & Osborne, Inc. • Base maps will be provided in NAD83(2011) North Zone horizontal Datum and NAVD88 vertical Datums Deliverables (NTP to 2.5 Monts Post-NTP): • Two AutoCAD 2020 Civil3D digital drawings; one drawing will contain a flattened 2D basemap and the second drawing will contain the 3D DTM surface. • Topographical survey sheets will be provided in PDF format. • Point data in .csv file format, point number, northing, easting, elevation, description. • Project site photos (.jpeg). AGENDA ITEM #2. a) PAGE 16 OF 20 Task 2.2: 30 Percent Design The Consultant will conduct field visits with Renton to inventory the existing sidewalk, curb ramp and landscaped area conditions, lighting condition at the crosswalk, identify potential AC power sources, and discuss design concepts. The Consultant and Renton will conduct a 1-hour workshop to develop the design concept and confirm where solar powered RRFB is desired an d where AC powered RRFB is desired. The design concept will be prepared and submitted in a draft 30 percent submittal package. Existing lighting condition will be analyzed using AGi32 for each of the three crosswalk areas to evaluate if the existing lighting meets the City’s requirements. The Consultant will prepare standard 1"=20' scaled drawings for each school crossing with line drawings to show all features with an aerial background layer on the plans. The crosswalk drawings will show information including approach and crossing channelization, signage, paving repair, utilities, landscape, signals, bulb-out for sidewalk widening, and ADA improvements, as required. The signal design drawings will show RRFB equipment locations, conduits, power source if AC powered RRFB, conduit path, and handhole locations. Anticipated sheets for the 30 percent submittal include: Site Preparation and Demolition Plans and Details, including TESC 4 Cover, Vicinity Map, General Notes 2 Paving Plans, Sections, and Details (1"=10") 4 Stormwater and Utility Plans 2 Crosswalk Plans (Channelization and Signage) 4 Signal Plans (New RRFB installation layout) 3 The Consultant will submit final 30 percent design package after incorporating and addressing Renton’s review comments to the draft 30 percent submittal. Deliverables (2 Months Post-NTP to 3 months Post NTP): • Draft 30 percent design plans (electronic PDF of half-size drawings). • Final 30 percent design plans (electronic PDF of half-size drawings). • Comments responses that show all 30 percent review comments have been addressed/incorporated to final 30 percent design plans. • Draft 30 percent cost estimate. Task 2.3: Puget Sound Energy Coordination The Consultant will coordinate with Puget Sound Energy to identify AC power source at each crossing as service point for RRFBs and confirm service connection design. AGENDA ITEM #2. a) PAGE 17 OF 20 Task 3: RRFB Final Design Upon receiving approval from Renton on the final 30 percent design submittal, the Consultant will prepare a 90 percent design package, and 100 percent/Bid documents. The Consultant will prepare standard 1"=20' scaled drawings for each school crossing. The crosswalk drawings will show information including approach a nd crossing channelization, signage, paving repair, utilities, landscape, signals, bulbout for sidewalk widening, and ADA improvements, as required. Aerial image will be included in the civil site and signal layout sheets as a background layer to show existing conditions. The right -of-way will be marked in the civil site and signal layout sheets. The Consultant will prepare an itemized quantity takeoff of bid items for each plan set and Engineer’s Estimate for the project at the 90 percent and 100 percent/Bid document design submittals. The Consultant will work with the City to use standard bid item unit costs based on historical costs in the City of Renton or similar projects in the Puget Sound region. The Consultant shall modify unit costs based on experience and judgement to reflect specific construction requirements of this contract and the general bidding environment, including recent City of Renton bid documents. Task 3.1: 90 Percent Design The Consultant will prepare plans, draft special provisions, and provide an engineer’s estimate based on the approved design approach from the 30 percent design. The Consultant will support Renton staff in preparing the draft project manual, by providing special provisions specific to civil, landscape, and signal design. Anticipated sheets for the 90 percent submittal include: Site Preparation and Demolition Plans and Details, including TESC 4 Cover, Vicinity Map, General Notes 2 Paving Plans, Sections, and Details (1"=10") 4 Stormwater and Utility Plans 2 Crosswalk Plans (Channelization and Signage [7]) 4 Signal Plans (New RRFB installation layout [3], Details [2]) 5 TCP Plans 6 Deliverables (3 months NTP to 3.5 months NTP): • 90 Percent Design Plans (electronic PDF of half-size drawings). • 90 Percent Design Engineer’s Estimate. • Draft special provisions for civil, landscape and signal design. • Curb ramp improvements MEF documentation, if required. AGENDA ITEM #2. a) PAGE 18 OF 20 • TIR documentation, if required. Meetings: • Comment resolution meeting. Task 3.2: 100 Percent/Bid Documents Upon receipt of 90 percent comments the Consultant will prepare bid-ready documents, including plans, special provisions and engineer’s estimate ready for all the stamps and signatures needed for bid advertisement. Any final additions to the project manual will be added at this time. The Consultant will perform a final Quality Assurance/Quality Control (QA/QC) review to ensure that all comments have been addressed and furnish the fina l bid package to the City, and submit QA/QC documents to the City for review/approval. Anticipated sheets for the 100 percent submittal include updates to the 90 percent complete plan set. Deliverables (3.5 months NTP to 4 months NTP): • QA/QC documentation to the City. • 100 Percent/Bid Documents Design Plans (electronic PDF). • 100 Percent/Bid Documents Special Provisions (word .doc format). • 100 Percent/Bid Documents Engineer’s Estimate. • Final 100 Percent/Bid Documents Design Plans (electronic PDF of full-size drawings). • Final 100 Percent/Bid Documents Special Provisions. • Updated comments responses that show all review comments have been addressed/incorporated. Task 4: Bid Support Services The Consultant shall provide bid support services by providing answers to questions from the potential bidders and preparing addenda if needed and conformed set for construction. Task 5: Construction Support Services (Management Reserve Fund) The Consultant will assist the City in efforts outside of those specified in the above tasks upon request on an as-needed basis. Budget from this task will not be used without prior written authorization from the City of Renton Project Manager. Additional Services The City may require additional services of the Consultant. The scope of the work for additional services will be determined based on anticipated or unanticipated project needs or other considerations at the sole discretion of the City. This work may include items identified in the current task authorization as well as other items, which may include, but are not necessarily limited to the following: • Additional Engineering services. • Other services not specifically referenced in this scope of work. AGENDA ITEM #2. a) PAGE 19 OF 20 These services will be authorized under a future contract supplement if necessary. At the time these services are required, the Consultant shall provide a detailed scope of work and an estimate of costs. The Consultant shall not proceed with the work until the City has auth orized the work and issued a notice to proceed. AGENDA ITEM #2. a) Task Description hrs hrs hrs $ hrs $ hrs $ hrs $ hrs $ hrs $ hrs $ hrs $ hrs $ hrs $ hrs $ hrs $ 1 Project Management and Coordination $0.00 22 $1,617.00 12 $627.00 $0.00 $0.00 $0.00 6 $222.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,466.00 40.0 2 RRFB Preliminary Design $0.00 32 $2,352.00 88 $4,598.00 $0.00 $0.00 $0.00 32 $1,184.00 12 $441.00 16 $992.00 8 $436.00 38 $1,377.50 18 $828.00 40 $1,680.00 40 $1,480.00 $15,368.50 324.0 3 RRFB Final Design 4 $288.00 32 $2,352.00 85 $4,441.25 4 $269.00 16 $612.00 8.5 $584.38 31 $1,147.00 $0.00 1.5 $93.00 $0.00 54 $1,957.50 27 $1,242.00 $0.00 $0.00 $12,986.13 263.0 4 Bid Support Services $0.00 12 $882.00 4 $209.00 $0.00 $0.00 $0.00 $0.00 $0.00 8 $290.00 $0.00 $0.00 $0.00 $1,381.00 24.0 4 $288.00 98 $7,203.00 189 $9,875.25 4 $269.00 16 $612.00 8.5 $584.38 69 $2,553.00 12 $441.00 17.5 $1,085.00 8 $436.00 100 $3,625.00 45 $2,070.00 40 $1,680.00 40 $1,480.00 $32,201.63 651.0 5 Construction Support Services (Management Reserve Fund)$0.00 38 $2,793.00 20 $1,045.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 16 $580.00 $0.00 $0.00 $0.00 $4,418.00 74.0 4 $288.00 136 $9,996.00 209 $10,920.25 4 $269.00 16 $612.00 8.5 $584.38 69 $2,553.00 12 $441.00 17.5 $1,085.00 8 $436.00 116 $4,205.00 45 $2,070.00 40 $1,680.00 40 $1,480.00 $36,619.63 725.0 Direct Labor without Task 5 MRF $32,201.63 Fee 0.2615 $8,420.72 Overhead 1.8844 $60,680.75 Expenses - Mileage $147.00 Subconsultants Applied Professional Services $20,132.20 Total w/o MRF $121,582.29 Task 5 MRF $13,898.59 Total w/ MRF $135,480.88 Engineer in Training Brian SchulkinRick Bond Jason Stanford Surveyor $37.00 Max Nelson Engineer in Training $36.75 Hourly Totals $36.25 $42.00$72.00 $73.50 $52.25 Hourly Subtotals Employee Rate $54.50$37.00 $46.00$62.00$68.75 Exhibit B - Prime Consultant Computations Mark Nagal Zack Liebowitz Prof Licensed Surveyor Technician SurveyorPrincipal/PM Principal/PMFunction/Title Nick DolfStacy ClearEmployee Brian Sourwine Tani Stafford Bryan Wang Phil Marshall TechnicianStructural Engineer Myron Basden Prof Licensed Surveyor Renton School and Pedestrian Crossings 2 Civil Engr Contract Hours Project Name: Budget Estimate Jenny Goetz $38.25$67.25 Contract Totals Civil Engineer (Storm) Engineer in Training (Storm) PAGE 20 OF 20 AG E N D A I T E M # 2 . a ) 36,1126019 Map Title All data, information, and maps are provided "as is" without warranty or any representation of accuracy, timeliness of completeness. The burden for determining accuracy, completeness, timeliness, merchantability and fitness for or the appropriateness for use rests solely on the user. WGS_1984_Web_Mercator_Auxiliary_Sphere Notes Legend 4093 2046 Feet40930 City and County Labels City and County Boundary Renton <all other values> Citations AGENDA ITEM #2. a) Renton School & Pedestrian Crossings No. 2 March 17, 2025 – Transportation Committee 1 AG E N D A I T E M # 2 . b ) Project Overview The Renton School & Pedestrian Crossings No.2 project will include the installation of three (3) Rectangular Rapid Flashing Beacons (RRFBs) at crosswalks. Project elements include:•ADA -compliant ramps•Sidewalk widening and bulb outs•Pavement markings and school zone signage / signage•Visibility enhancements•Drainage improvements and street lighting, where necessary This project improves pedestrian safety, travel, and access to/from schools. 2 Existing Conditions: 1 2 3 1 2 3 AG E N D A I T E M # 2 . b ) Traffic Safety – City Funds 3 •This project will be funded by City funds. The 2025Traffic Safety Program has a budget of $500,000. The 2025 Q1 budget adjustments will add $27,207.75 from 2024 carry forward. This brings the total budget for Traffic Safety Program to $527,207.75. Q1 Q2 Q3 Q4 Selection Process January - February100% Project Kick-off End Q1 – Q2 Early Spring Bid / Award Phase Q3 Summer – Q4 all Construction Q4 Fall Consultant SelectionJanuary Project Kick-off Mar Design Phase April Bid / Award Aug - Sept Construction Sept - Nov Design Phase Q2 Spring – Q3 Mid Summer Project Schedule AG E N D A I T E M # 2 . b ) Staff Recommendation 4 •Authorize the City Council and City Clerk to execute the professional services agreement with Gray & Osborne, Inc. totaling $135,481 for the Renton School & Pedestrian Crossings No. 2 Project. AG E N D A I T E M # 2 . b ) MEMO Intergovernmental Affairs DATE:March 17,2025 TO:Ryan Mclrvin,Transportation Committee Chair Members of the Transportation Committee VIA:Armondo Pavone,Mayor FROM:Eric Perry,Government Affai Manager STAFF CONTACT:Eric Perry (eperry@rentonwa.gov) SUBJECT:Eastside Transportation Partnership (ETP)Agreement Key Facts and Information Summary The Eastside Transportation Partnership (ETP)provides an Eastside forum for inter jurisdictionat cooperation to implement coordinated,prioritized transportation plans and programs through Leadership,education,and advocacy. The Eastside Transportation Partnership (ETP)was established through an Intertocal Agreement in 1987,which provided funds for a study recommending transportation improvements on the Eastside.That study as completed,recommendations were adopted, and staffing responsibility transferred in 1990 from the City of Redmond to King County. Efforts have continued to imptement the recommended projects,many of which have been completed or are currently underway. By 1995,because of increased jobs,poputation,vehicle miles traveled,declining transportation revenues,and new legislation,including the Growth Management Act (GMA) and Commute Trip Reduction Act (CTRA),the ETP determined that the 1991 recommendations needed to be updated.In 1995,the group was awarded a federal grant of Intermodal Surface Transportation Efficiency Act (ISTEA)funds.This was suppLemented by matching contributions from ETP member jurisdictions,a new Intertocal Agreement was approved,and a consultant was hired in January 1997 to complete the update.This was completed and adopted in 1998.Since then,ETP has focused on regional coordination and advocacy for ETP priorities. Should the Renton City Council approve the 2026 ETP Agreement,the King County Council will approve in the summer of 2025 and send the final agreement back to jurisdictions in the fall for signature. AGENDA ITEM #3. a) Members of the Transportation Committee Page 2 of 2 March 13,2025 Goats of the ETP: Develop and adopt a package of transportation priorities based on adopted land use plans that improve overati mobility for people,freight,and goods and address peak-hour congestion on the Eastside. •Jointly implement adopted priorities through leadership,education,and advocacy within communities,cities,and the region. •Adopt and implement a strategy for increasing transportation improvements and programs funding. Changes to the Agreement: The existing inter-jurisdictional agreement expires at the end of 2025.Attached is the existing agreement and a clean and red-line copy of the proposed ETP agreement.Changes to the agreement include the reorganization of Section 2.1,the addition of tetters of support for transportation projects (2.1.9),and the deletion of “Input”and the addition of “Recommendation”(2.1.7 and 2.2.3).Section 6 changes include reorganization,whether annuaL dues in the amount of $1 00.00 will be collected,and the addition of new due eligible items (refreshments,room rentals,and speaker fees). Council History •Approval of the Eastside Transportation Partnership Agreement 2017 •Approval of the Eastside Transportation Partnership Agreement 2021 Staff Recommendation Staff requests approval of the 2026 Eastside Transportation Partnership Agreement. cc:Members of the Renton City CounciL Ed VanVatey,Chief Administrative Officer Kristi Rowtand,Deputy Chief Administrative Officer Jason Seth,City Clerk AGENDA ITEM #3. a)