Mike,
Attached is the email confirmation from DOE that if there is no discharge to surface waters, that an NPDES Permit is not triggered or required.
Will continue to work with DOE to obtain the NPDES permit, and will keep you posted on its progress.
Alan Jacobson PE, PRINCIPAL
JACOBSON CONSULTING ENGINEERS
O: 206.426.2600 C: 206.399.6233
JACOBSON <https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fjacobsonengineers.com%2F&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a
05e1675%7C0%7C0%7C638790479639173027%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=jppfJejgYNi2FcremM0wMi40rQ
pimFWsKXdbvS3jlZY%3D&reserved=0> ENGINEERS <https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fjacobsonengineers.com%2F&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd70
8e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639192490%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7
C&sdata=I%2FQTp3GvZsgiOUmdzoOuey5pxNu50t9y23OCXXqqTcw%3D&reserved=0> .COM <https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fjacobsonengineers.com%2F&data=05%7C02%7CMSippo%40Rentonwa.g
ov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639206730%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpb
CIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=LE0mTrvW1NgPndfb%2BHxh%2F%2FgFVL%2BikF7Jo7e9t4UgNZ8%3D&reserved=0>
________________________________
From: Sascha Eastman <sascha@jacobsonengineers.com>
Sent: Monday, March 31, 2025 12:52 PM
To: Michael Sippo <MSippo@Rentonwa.gov>; Alexandra Forin <AForin@integrusarch.com>
Cc: Alan Jacobson <alan@jacobsonengineers.com>; jessef@formacc.com <jessef@formacc.com>; Charlie Blankenship <CharlieB@formacc.com>; Jeff Luedeman <jluedeman@integrusarch.com>; Mike
Cato (michael.cato@rentonschools.us) <michael.cato@rentonschools.us>; matthew.feldmeyer@rentonschools.us <matthew.feldmeyer@rentonschools.us>; Alex Morganroth <AMorganroth@Rentonwa.gov>
Subject: RE: C25000758 Hazen HS Early Clear and Grade
Michael,
Thanks for meeting with Alan and I earlier this afternoon. Please see our response below in BLUE for item 7 NPDES Permit to summarize what was discussed.
Alexandra and Forma,
Related to Item 9, could Forma please provide some dates and times next week for a precon with the City.
Thank you,
Sascha Eastman, PE, Senior Project Manager
JACOBSON CONSULTING ENGINEERS
O: 206.426.2600 C: 206.293.9134
JACOBSONENGINEERS.COM <https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fjacobsonengineers.com%2F&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C710141410611
48858e98cc96a05e1675%7C0%7C0%7C638790479639220289%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=PdxWfhGlKJD2O
8pBAggjRWzL41KZxzysdjDU8TZnjj8%3D&reserved=0>
From: Michael Sippo <MSippo@Rentonwa.gov>
Sent: Sunday, March 30, 2025 11:53 AM
To: Alexandra Forin <AForin@integrusarch.com>
Cc: Sascha Eastman <sascha@jacobsonengineers.com>; Alan Jacobson <alan@jacobsonengineers.com>; jessef@formacc.com; Charlie Blankenship <CharlieB@formacc.com>; Jeff Luedeman <jluedeman@integrusarch.co
m>; Mike Cato (michael.cato@rentonschools.us) <michael.cato@rentonschools.us>; matthew.feldmeyer@rentonschools.us; Alex Morganroth <AMorganroth@Rentonwa.gov>
Subject: RE: C25000758 Hazen HS Early Clear and Grade
Hello Alexandra,
Please see the update below for the Hazen Early Clear & Grade permit precon items.
1. Issuance of Civil Construction Permit – Ongoing. Plans and TIR routed for final signatures. I will send you a copy once they are signed. All items below must be complete prior to
full issuance and notice to proceed for the permit.
2. Payment of all fees associated with Civil Construction Permit: Paid.
3. Permit bond: Received.
4. Authorization of special billing: Received.
5. Business licenses for the contractor and subs: Resolved. Note, a list of subs and confirmation of business licenses will be required at the precon meeting.
6. Insurance certificates: In process and is in review with the Risk Management department.
7. Proof of NPDES coverage: I will be meeting tomorrow with Alan to discuss. The permit has been conditioned to provide either the NPDES coverage or written confirmation from DOE that
other measures are acceptable. As discussed with Mike Sippo today 3/31/25, until the NPDES permit is obtained, Construction Runoff will be captured in on-site tanks and trucked off-site
to an approved disposal location. No discharge to the surface water storm system will occur until the NPDES permit has been approved. We understand that this will also be a permit
condition of this Early Grading Permit.
8. Any State/DNR approvals that may be needed prior to drilling of geothermal wells: Noted.
9. Pre-construction meeting: A preconstruction meeting will need to be held prior to the contractor mobilizing. Cannot schedule until the NPDES requirements are resolved. We will
need about a week notice to schedule. One physical copy of the engineering plans will need to be provided to the City inspector at the pre-construction meeting.
MICHAEL S. SIPPO, Civil Engineer III
City of Renton // Development Engineering
Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.rentonwa.gov%2Fcity_hall%2Fcommunity_and_economic_development%2Fpermit_services&data=05%7C02%7CMSippo%40Re
ntonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639232843%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOI
joiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=h6bq23ZcwjoGpmN1krKJwkKHuj%2BfMcxJYLQlGPrfFcU%3D&reserved=0> // Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?ur
l=https%3A%2F%2Fpermitting.rentonwa.gov%2F%23%2Fhome&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639245678%7CUnknown%
7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=WNcoFtgA6DftSMIAIulgs%2FnNY3QMK7gO7vbzbMe75Uo%3D&reserved=0>
office 425-430-7298
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From: Alexandra Forin <AForin@integrusarch.com <mailto:AForin@integrusarch.com> >
Sent: Monday, March 17, 2025 10:17 AM
To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> >
Cc: Sascha Eastman <sascha@jacobsonengineers.com <mailto:sascha@jacobsonengineers.com> >; Alan Jacobson <alan@jacobsonengineers.com <mailto:alan@jacobsonengineers.com> >; jessef@formacc.com
<mailto:jessef@formacc.com> ; Charlie Blankenship <CharlieB@formacc.com <mailto:CharlieB@formacc.com> >; Jeff Luedeman <jluedeman@integrusarch.com <mailto:jluedeman@integrusarch.com>
>; Mike Cato (michael.cato@rentonschools.us <mailto:michael.cato@rentonschools.us> ) <michael.cato@rentonschools.us <mailto:michael.cato@rentonschools.us> >; matthew.feldmeyer@rentonschools.us
<mailto:matthew.feldmeyer@rentonschools.us> ; Alex Morganroth <AMorganroth@Rentonwa.gov <mailto:AMorganroth@Rentonwa.gov> >
Subject: RE: C25000758 Hazen HS Early Clear and Grade
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Hi Mike,
Thank you for sending over this list of items to complete for this permit. There have been a few emails flying around so I’ll condense responses here.
1. Our team will complete the final drawing changes shortly and have requested an FTP link for re-upload
2. Per Mike Cato, payment of invoices anticipated end of day today.
3. PASA has been provided by Mike Cato
4. Mike Cato will be the person responsible for authorizing / payment for special billing. Is there a form that needs to be completed?
5. Resolved
6. FORMA to update insurance as needed and forward COI
7. Per Sascha Eastman, NPDES is in process; will follow up with status update later this week
8. Project does not include geothermal wells (applicable term is “ground source wells”). DNR requirements do not pertain to ground source well drilling per RCW 78.60.030(b) “‘Geothermal
resources’ does not include heat energy used in ground source heat exchange system for ground source heat pumps.” Drilling contractor to follow state DOE requirements for well drilling.
9. April 2 is acceptable for a preconstruction meeting.
Please let me know if you have any follow up comments.
Thank you,
Alexandra Forin, AIA
Architect, Associate
AForin@integrusarch.com <mailto:AForin@integrusarch.com>
O 206.628.3137
A COLLABORATION OF YGH & INTEGRUS ARCHITECTURE
integrusarch.com <https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.integrusarch.com%2F&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e
98cc96a05e1675%7C0%7C0%7C638790479639258007%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=0L8CqQB8tz%2BMHKynd
qfoWBirlwtsYESJT%2FP8qRdAnuQ%3D&reserved=0>
<https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FIntegrusArchitecture%2F&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148
858e98cc96a05e1675%7C0%7C0%7C638790479639270275%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=3CMWWv3rA%2BbZ0
g%2FJFjKKnI7x%2BL37diZnnQrzp06ry8U%3D&reserved=0> <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fintegrusarchitecture%2F%3Fhl%3Den&data=05%7C02%7CMSippo%40Ren
tonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639282293%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIj
oiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=rot00bH%2FYCcQ2WTPrFgp%2Fxrsh0bzsNAZlE%2FawN5taaM%3D&reserved=0> <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fc
ompany%2Fintegrus-architecture%2F&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639294758%7CUnknown%7CTWFpbGZsb3d8eyJFb
XB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=xzP6w6n3iFZCZV3FiM%2BB2vSUuS8NN2ENYuc6vPO18Bc%3D&reserved=0>
From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> >
Sent: Sunday, March 16, 2025 9:01 AM
To: Alexandra Forin <AForin@integrusarch.com <mailto:AForin@integrusarch.com> >
Cc: Sascha Eastman <sascha@jacobsonengineers.com <mailto:sascha@jacobsonengineers.com> >; Alan Jacobson <alan@jacobsonengineers.com <mailto:alan@jacobsonengineers.com> >; jessef@formacc.com
<mailto:jessef@formacc.com> ; Charlie Blankenship <CharlieB@formacc.com <mailto:CharlieB@formacc.com> >; Jeff Luedeman <jluedeman@integrusarch.com <mailto:jluedeman@integrusarch.com>
>; Mike Cato (michael.cato@rentonschools.us <mailto:michael.cato@rentonschools.us> ) <michael.cato@rentonschools.us <mailto:michael.cato@rentonschools.us> >; matthew.feldmeyer@rentonschools.us
<mailto:matthew.feldmeyer@rentonschools.us> ; Alex Morganroth <AMorganroth@Rentonwa.gov <mailto:AMorganroth@Rentonwa.gov> >
Subject: RE: C25000758 Hazen HS Early Clear and Grade
Good morning Alexandra,
Thank you for sending over. Below is a list of the items that will be needed prior to issuing the civil construction permit for the Hazen HS Modernization Early Clear & Grade. Each
item is noted where we are at in the process and any questions or additional information is needed.
1. Issuance of Civil Construction Permit – Ongoing. I sent final plans for very minor updates to be revised. Once I receive back will have the plans signed and returned to the team.
All items below must be complete prior to full issuance and notice to proceed for the permit.
2. Payment of all fees associated with Civil Construction Permit: Please find the remaining review and inspection invoice at: https://permitting.rentonwa.gov/#/invoice/6afa2dd6-ea19-427c-8adb-685bce
ef561e/true <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa.gov%2F%23%2Finvoice%2F6afa2dd6-ea19-427c-8adb-685bceef561e%2Ftrue&data=05%7C02%7CMSippo%40Rentonwa.g
ov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639306823%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpb
CIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=Eh5WAfWxKUq8IqzsNx9JpKGVflcmCpiVJG4O33GNPgE%3D&reserved=0> The invoice for the 2025 wet weather construction fee can be found here: https://permitting.rentonw
a.gov/#/invoice/066382a5-636f-4fc5-b131-b26fc76216dc/true <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa.gov%2F%23%2Finvoice%2F066382a5-636f-4fc5-b131-b26fc762
16dc%2Ftrue&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639318810%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlY
iOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=G1uCBlN8e6nZGvPl1MzlEN80AUyLonbcn94z4TW0EoE%3D&reserved=0> fee.
3. Permit bond: Project is public in nature, so it does not require bonding. Provide Public Agency Agreement for Performance or similar instrument. The email chain below indicates that
it is in progress.
4. Authorization of special billing: Please provide. This is who will be authorizing potential specialized billings such as overtime or weekend inspection etc.
5. Business licenses for the contractor and subs: Noted below that the contractor is Forma.
6. Insurance certificates: In process and I will run through our Risk Management department. Note, insurance certificate expires July 2025 so will need to be updated.
7. Proof of NPDES coverage: Please provide.
8. Any State/DNR approvals that may be needed prior to drilling of geothermal wells: If wells are proposed to start drilling prior to full civil issuance. See - https://www.oria.wa.gov/site/alias__
oria/mid__12357/403/handbook-entry?ItemID=156#:~:text=Drilling%2C%20redrilling%20or%20deepening%20of,drilling%20or%20redrilling%22%20RCW%2078.60 <https://gcc02.safelinks.protection.outlook.com/?url=h
ttps%3A%2F%2Fwww.oria.wa.gov%2Fsite%2Falias__oria%2Fmid__12357%2F403%2Fhandbook-entry%3FItemID%3D156%23%3A~%3Atext%3DDrilling%252C%2520redrilling%2520or%2520deepening%2520of%2Cdrilling%2520or%2520red
rilling%2522%2520RCW%252078.60&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639329966%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0
eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=WToAx%2B%2BnICpWaHI3R6%2BA0guv0%2FOuZWGaSLMcrofnWGc%3D&reserved=0> . Are there
any other approvals needed?
9. Pre-construction meeting: A preconstruction meeting will need to be held prior to the contractor mobilizing. Wednesday April 2nd is the preferred date if construction is beginning
April 7th but if a different day is needed let me know and may be able to work it out. One physical copy of the engineering plans will need to be provided to the City inspector at
the pre-construction meeting.
Please let me know if you have any questions. Thank you,
MICHAEL S. SIPPO, Civil Engineer III
City of Renton // Development Engineering
Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.rentonwa.gov%2Fcity_hall%2Fcommunity_and_economic_development%2Fpermit_services&data=05%7C02%7CMSippo%40Re
ntonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639341268%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOI
joiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=HSczdL2TlVfB6SLBcVb2vXmwg8V35lvgMYmrh75%2Fvis%3D&reserved=0> // Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?ur
l=https%3A%2F%2Fpermitting.rentonwa.gov%2F%23%2Fhome&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639352229%7CUnknown%
7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=WfmTtzNPGVzLDtgdEK3hSKQ2nnIkkLTouR17R8DgFmU%3D&reserved=0>
office 425-430-7298
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From: Alexandra Forin <AForin@integrusarch.com <mailto:AForin@integrusarch.com> >
Sent: Monday, March 10, 2025 3:19 PM
To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> >
Cc: Sascha Eastman <sascha@jacobsonengineers.com <mailto:sascha@jacobsonengineers.com> >; Alan Jacobson <alan@jacobsonengineers.com <mailto:alan@jacobsonengineers.com> >; jessef@formacc.com
<mailto:jessef@formacc.com> ; Charlie Blankenship <CharlieB@formacc.com <mailto:CharlieB@formacc.com> >; Jeff Luedeman <jluedeman@integrusarch.com <mailto:jluedeman@integrusarch.com>
>
Subject: C25000758 Hazen HS Early Clear and Grade
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Hi Mike,
Providing the contractor’s information for the Early Clear & Grade permit issuance.
* FORMA Contractor’s License # FORMACC878OR
* FORMA City of Renton Business License #137
The PASA should be ready to send over later this week and we will follow up about the preconstruction meeting.
Thank you
Alexandra Forin, AIA
Architect, Associate
AForin@integrusarch.com <mailto:AForin@integrusarch.com>
O 206.628.3137
A COLLABORATION OF YGH & INTEGRUS ARCHITECTURE
integrusarch.com <https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.integrusarch.com%2F&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e
98cc96a05e1675%7C0%7C0%7C638790479639368637%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=47aFgDtvcfvb%2B%2BE
9gPBZJUI3fpVoyHVO6Tlr9%2FI4e3A%3D&reserved=0>
<https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FIntegrusArchitecture%2F&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148
858e98cc96a05e1675%7C0%7C0%7C638790479639381007%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=hkCWTcOHF8poCa4
6JvJ6ztp0%2BYCCXC1GToSzJfxLW8g%3D&reserved=0> <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fintegrusarchitecture%2F%3Fhl%3Den&data=05%7C02%7CMSippo%40Rentonw
a.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639392334%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTW
FpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=klAqPuqGdwLCyottc1ZfCmDE9VUBBxpzzsG0r7304to%3D&reserved=0> <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fi
ntegrus-architecture%2F&data=05%7C02%7CMSippo%40Rentonwa.gov%7C81d51a1210da4c6549a208dd708e8326%7C71014141061148858e98cc96a05e1675%7C0%7C0%7C638790479639403209%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGk
iOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=BqWD3Yw0bNhOC0SNyKFZbxeIyQOszn42IvJkkD2U6Xk%3D&reserved=0>