Loading...
HomeMy WebLinkAboutC25000758_Permit IssuedDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Construction Permit: C25000758 IVR Number: 25000758 Permit Information Permit Name: Hazen Modernization Early Clear & Grade Address/Location:02/17/2025Application Date:1023059278Parcel Number: 1101 HOQUIAM AVE NE Permit Type:04/04/2025Issue Date:Engineering Permit Work Class:04/04/2026Expiration Date:Construction Inspector: Pat DeCaro 425-207-6013 Plan Reviewer: Michael Sippo 425-430-7298 Description: Early Clear & Grade Permit for Hazen Highschool Modernization: Frontage Improvements, synthetic fields, entry vestibule, seismic upgrades and geothermal heating system. See Civil Permit C24005771 Contacts Name Address PhoneTypeBilling MICHAEL CATO RENTON SCHOOL DISTRICT #403 7812 South 124th Street Seattle, WA 98178-4830 ApplicantX Alexandra Forin Integrus Architecture 117 S Main Street Suite 100, Suite 100 Seattle, WA 98104 Applicant JAMES PHILLIPS FORMA CONSTRUCTION 500 Columbia St NW, 201 Olympia, WA 98501-4447 B: (360) 754-5788Contractor Business License Number: 137Construction Contractor: FORMACC878OR ALAN JACOBSON JACOBSON CONSULTING 815 1st Ave #288 Seattle, WA 98104 B: (206) 426-2600 C: (206) 399-6233 Engineer Renton School District Renton School District 7812 S 124th St Seattle, WA 98178 B: (425) 204-4479OwnerX MICHAEL CATO RENTON SCHOOL DISTRICT #403 7812 South 124th Street Seattle, WA 98178-4830 OwnerX MICHAEL CATO RENTON SCHOOL DISTRICT #403 7812 South 124th Street Seattle, WA 98178-4830 Project Manager X MICHAEL CATO RENTON SCHOOL DISTRICT #403 7812 South 124th Street Seattle, WA 98178-4830 Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit C25000758 Engineering 1 Engineering Condition (DOE Approval/NPDES) PROJECT SHALL HAVE NPDES COVERAGE IN PLACE PRIOR TO EARLY CLEAR & GRADE ACTIVITIES OR, ALTERNATIVELY, PROVIDE WRITTEN CONFIRMATION FROM DOE ALLOWING FOR ALTERNATIVE MEASURES TO BE IN PLACE PRIOR TO COVERAGE SUCH AS LIMITING WORK TO LESS THAN 1 ACRE OR OBTAINING A SEWER DISCHARGE PERMIT UNDER THE KING COUNTY INDUSTRIAL WASTE PROGRAM. UNDER NO CIRCUMSTANCE SHALL CONSTRUCTION OCCUR PRIOR TO NPDES COVERAGE OR WRITTEN CONFIRMATION FROM DOE THAT THE ACTIVITIES CAN BE PERFORMED. Page 1 of 1