HomeMy WebLinkAboutC25000758_Permit IssuedDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Construction Permit: C25000758
IVR Number: 25000758
Permit Information
Permit Name: Hazen Modernization Early Clear & Grade
Address/Location:02/17/2025Application Date:1023059278Parcel Number: 1101 HOQUIAM AVE NE
Permit Type:04/04/2025Issue Date:Engineering
Permit Work Class:04/04/2026Expiration Date:Construction
Inspector: Pat DeCaro 425-207-6013 Plan Reviewer: Michael Sippo 425-430-7298
Description: Early Clear & Grade Permit for Hazen Highschool Modernization: Frontage Improvements, synthetic fields, entry
vestibule, seismic upgrades and geothermal heating system. See Civil Permit C24005771
Contacts
Name Address PhoneTypeBilling
MICHAEL CATO
RENTON SCHOOL DISTRICT #403
7812 South 124th Street
Seattle, WA 98178-4830
ApplicantX
Alexandra Forin
Integrus Architecture
117 S Main Street Suite 100, Suite
100
Seattle, WA 98104
Applicant
JAMES PHILLIPS
FORMA CONSTRUCTION
500 Columbia St NW, 201
Olympia, WA 98501-4447
B: (360) 754-5788Contractor
Business License Number: 137Construction Contractor: FORMACC878OR
ALAN JACOBSON
JACOBSON CONSULTING
815 1st Ave #288
Seattle, WA 98104
B: (206) 426-2600
C: (206) 399-6233
Engineer
Renton School District Renton School
District
7812 S 124th St
Seattle, WA 98178
B: (425) 204-4479OwnerX
MICHAEL CATO
RENTON SCHOOL DISTRICT #403
7812 South 124th Street
Seattle, WA 98178-4830
OwnerX
MICHAEL CATO
RENTON SCHOOL DISTRICT #403
7812 South 124th Street
Seattle, WA 98178-4830
Project
Manager
X
MICHAEL CATO
RENTON SCHOOL DISTRICT #403
7812 South 124th Street
Seattle, WA 98178-4830
Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton codes and ordinances.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit C25000758
Engineering
1 Engineering Condition (DOE Approval/NPDES)
PROJECT SHALL HAVE NPDES COVERAGE IN PLACE PRIOR TO EARLY CLEAR & GRADE ACTIVITIES
OR, ALTERNATIVELY, PROVIDE WRITTEN CONFIRMATION FROM DOE ALLOWING FOR ALTERNATIVE
MEASURES TO BE IN PLACE PRIOR TO COVERAGE SUCH AS LIMITING WORK TO LESS THAN 1 ACRE
OR OBTAINING A SEWER DISCHARGE PERMIT UNDER THE KING COUNTY INDUSTRIAL WASTE
PROGRAM. UNDER NO CIRCUMSTANCE SHALL CONSTRUCTION OCCUR PRIOR TO NPDES COVERAGE
OR WRITTEN CONFIRMATION FROM DOE THAT THE ACTIVITIES CAN BE PERFORMED.
Page 1 of 1