HomeMy WebLinkAboutEX_12_C_Transportation_Concurrency_250311DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: March 11, 202 TO: Jill Ding, Senior Planner FROM: Nathan Janders, Development Engineering Manager SUBJECT: Traffic Concurrency Test – Chipotle Redevelopment (APN 3223059065) LUA25-000052 The applicant is requesting an Administrative Conditional Use Permit (CUP) and a Street Standards Waiver for a new restaurant with a drive-through window. The project site totals 157,868 square feet (3.62 acres) in area and is zoned Commercial Arterial (CA) and is located within Urban Design District D. The project site is currently developed with an existing 3,193 square foot building that was previously a Bank of America and 28 stall surface parking lot. The applicant proposes to remodel the existing building for a restaurant use with an accessory drive- through window. No expansions to the existing building footprint are proposed. The proposal includes the removal of the existing sloped roof and the replacement with a new flat roof with parapets. No change in access is proposed. The proposed development would generate an increase of approximately 101 weekday daily trips. During the weekday AM peak hour, the project would generate a decrease of 18 weekday AM peak hour (11 in, 7 out). During the weekday PM peak hour, the project would generate a decrease of approximately 4 net new trips (1 in, 3 out). The proposed project passes the City of Renton Traffic Concurrency Test per RMC 4-6-070.D as follows: Traffic Concurrency Test Criteria Pass Implementation of citywide Transportation Plan Yes Within allowed growth levels Yes Project subject to transportation mitigation or impact fees Yes Site specific street improvements to be completed by project Yes Traffic Concurrency Test Passes EXHIBIT 12 Docusign Envelope ID: 6C7B5EC9-9F44-42FF-92F2-89C3C67F8FD0 Transportation Concurrency Test – Chipotle Renton Development Page 2 of 3 March 11, 2025 Evaluation of Test Criteria Implementation of citywide Transportation Plan: The City’s investment in completion of the forecast traffic improvements is 100% of the scheduled expenditure through 2025. Within allowed growth levels: The citywide traffic concurrency trip capacity for concurrency with the city adopted model for 2025 is 1,398 trips, which provides sufficient capacity to accommodate approximately 4 less trips from this project. A resulting 1,402 trips are remaining. Project subject to transportation mitigation or impact fees: The project will be subject to transportation impact fees at time of building permit for the project. Site specific street improvements to be completed by project: The project will be required to complete frontage street improvements prior to issuance of a certificate of occupancy. Any additional off-site improvements identified through land use approval will also be completed prior to issuance of a certificate of occupancy. Background Information on Traffic Concurrency Test for Renton The City of Renton Traffic Concurrency requirements for proposed development projects are covered under Renton Municipal Code (RMC) 4-6-070. The specific concurrency test requirement is covered in RMC 4-6-070.D, which is listed for reference: D. CONCURRENCY REVIEW PROCESS: 1. Test Required: A concurrency test shall be conducted by the Department for each nonexempt development activity. The concurrency test shall determine consistency with the adopted Citywide Level of Service Index and Concurrency Management System established in the Transportation Element of the Renton Comprehensive Plan, according to rules and procedures established by the Department. The Department shall issue an initial concurrency test result describing the outcome of the concurrency test. 2. Written Finding Required: Prior to approval of any nonexempt development activity permit application, a written finding of concurrency shall be made by the City as part of the development permit approval. The finding of concurrency shall be made by the decision maker with the authority to approve the accompanying development permits required for a development activity. A written finding of concurrency shall apply only to the specific land uses, densities, intensities, and development project described in the application and development permit. 3. Failure of Test: If no reconsideration is requested, or if upon reconsideration a project fails the concurrency test, the project application shall be denied by the decision maker with the authority to approve the accompanying development activity permit application. The Concurrency Management System established in the Transportation Element on page XI-65 of the Comprehensive Plan states the following: Docusign Envelope ID: 6C7B5EC9-9F44-42FF-92F2-89C3C67F8FD0 Transportation Concurrency Test – Chipotle Renton Development Page 3 of 3 March 11, 2025 Based upon the test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation Plan, payment of a Transportation Mitigation Fee, and an application of site specific mitigation, development will have met City of Renton concurrency requirements. Docusign Envelope ID: 6C7B5EC9-9F44-42FF-92F2-89C3C67F8FD0