Conditions for Permit B21002641
Building
1 All construction, demolition and land clearing waste must be recycled at a King County licensed or approved
facility, or taken to Regional Disposal Facilities.
2 Instructions for Issued permits:
1. Print full~sized plan sheets in color for field inspector, plans must have text at 1/8" or larger for inspector, print
conditions of approval and attach them to the approved set of plans for the inspector.
2. Hard copies of permit, approved plans, site plans, and conditions must remain on the job site for the inspector.
Inspections will not take place if printed plans are not on site.
3 Water and sewer permits are required to be approved prior to the final inspection for the building.
4 TREE PROTECTION MEASURES FOR ALL TREES IN THE CONSTRUCTION AREA OF A DEVELOPMENT
SITE. THESE MEASURES INCLUDE: 1. 6 foot high chain link fences around the trees out to and including the
drip line of the tree. 2. All the area within the fenced area needs a minimum of 3" of bark mulch. 3. Warning signs
must also be included on the fence. 4. Construction activity, parking, and storage of materials and equipment is
not allowed within the drip line (and therefore fenced) area of any tree. 5. The only new impervious surfaces
allowed within the drip line of existing trees are those shown on approved building or construction plans, which
typically should be limited to the new buildings, new driveways, new parking lots, new streets and new sidewalks.
5 All new residential utility installations (electric, cable, phone, Etc.) shall be installed underground.
6 Erosion control shall be in place and inspection approved prior to disturbance of soil on site.
7 Authorized hours of construction/activity: 7:00 a.m. - 8:00 p.m. Monday Through Friday; 9:00 a.m. - 8:00 p.m.
Saturday; No work allowed on Sunday. Per Ordinance 4703, 2-2-1998
8 Ground Electrode System (either 1 or 2 are approved methods): 1. An electrode of at least 20 ft long bare copper,
sized in accordance with NEC. 2. An electrode of 20 ft long #4 rebar (not less than 1/2 inch in diameter) and
sized per NEC; either one shall be encased by at least 2 inches of concrete, located within and near the bottom
of a concrete footing that is in direct contact with the Earth, and shall be installed in all new residential and
commercial construction.
9 Provide structural calculation at the job site for verification by the Building Inspector.
Engineering
10 Single-family driveways exceeding eight percent (8%) slope shall provide slotted drains at the lower end with
positive drainage discharge to restrict run-off from entering the garage/residence or crossing any public sidewalk.
Driveways shall not exceed fifteen percent (15%) without an approved variance from the CED Administrator.
Fire
11 SPRINKLER SYSTEM IS REQUIRED. PLANS SHALL BE STAMPED BY A STATE CERTIFIED SPRINKLER
CONTRACTOR. PLANS TO BE SUBMITTED TO RENTON FIRE PREVENTION BUREAU FOR REVIEW AND
PERMITTING(425)430-7024. A PLUMBING PERMIT FOR A BACKFLOW PREVENTION DEVICE IS ALSO
REQUIRED PRIOR TO ISSUANCE OF SPRINKLER PERMIT.
Page 1 of 2
Water
12 This site’s water provider is King County Water District 90. Applicant shall contact King County Water District 90
for a water availability certificate and for any permitting requirements to accommodate the new residential fire
sprinkler system.