Loading...
HomeMy WebLinkAboutR-434605�� , — — / :.•' : MATHLINE = $EE SHEET C102 . I SEE SHEET C001 FOR CITY OF RENTON — I 68 8 2- C �5� / / 5� t D t ° �o D.• . . '.. \ .. -.INSTALL-CB "" t 00 ., '' • .. 41 I I LO CON�, �� ... 'D PROTECTION (TYP)'' : .LO ESC STANDARD PLAN NOTES \5 / / / I : '" I I I M , .. :' ':.. .. • SF_-E DETAIL' - - EXCAVAT�O, F R FcJTURED TEN ION SYSTEM / I ". ' .. • -e .v , I ALLAUT2I4ONUNDE /\. ,,�GF .. -°. GA> .: . • ` �. II " :' �+�y. V , • . :: c: , CD SHEET C102 FOR TESC N PONSTRUCTIO47�Y` O IAT 0 10 20 40 CONSTRUCTION SEQUENCE NOTES INLET R01N6):NOLD PARKING RIM'458.61'STk LO -PRO�ECT EXISTING LocAT U CONCRETE TO REMAIN \ i •JE4:VCESSCALE 1 =20� 2 G - I ► I .'w 464 I �2 RTM'454,71' .I I I I h � i / / / ,sue / • •.•• G��' i I • . ��.• . ' .. • - - .. '. •�ti o jl I — �— NEW PARKING STRIP GRASS / INTERCEPTOR SWALE / I I gl it I LOCATIO LEGEND l / EDGE WITH ROCK CHECK DAMS OFF �F� •'� -' : - .. .. . •. :. .. ~ " v riON AT 50' O.C. SPACING / / I / �( >e; PROPERTY LINE N 7933'06" E - 46.81' / / ro.k •. ••' � SEE DETAILS : -- : - -' •• •. "•• / INST i` �T / 6 5 / ti SALVAGEAND'REMOVEEX' ,ga•. I Q CF TEMP CONSTRUCTION FENCING % � 1:1 MAX CUT SLOPE e e / AROUI� E IM�TEF� OF I off, "",- c110 c11 .•: •••: :. •' ''.'PULL UP BARS TO BE�,- / FI�LD,(TYP) ° ► ' REI-NSTALLED AFTER : I i( I - - T - - INLET PROTECTION IP / / SE TAIL /� PUMP CONSTRU TION STORMWATER TO ;.. •'.•• I I / / /tT rF i\ SEDIMENT SETTLE ENT TANKS. PUMP LINE :. COMPLETION OF GROUND ( SP BU r / /�1 9 �/ - :::.. ".°: a. 'SOUR�E.WELL FIELD•:: I I - QO VEG TREE PROTECTION / / / c11 / - -� \ PROTECT EXISTING TO BETAKEN OFF LINE AND REMOVED ONCE �CONC�• I I III- SYNTHETIC TURF DUGOUT : '�' •: :' I Rs2i DETENTION VAULT IS INSTALLED AND READY o• .° X. _ .Q59.. • .... FF SILT FENCE I / / / / AND SURROUNDING TO USE AS TEMPORARY TESC MEASURE • " �.•.' I I II O FENCE TO REMAIN mo O I / / FF�f FF naa vo c D IS INTERCEPTOR SWALE ��F c�� 9zn _ •:.. PROTECT SAWCUT LINE SYNTHETIC C TURF .'• �59a6 1 '.UTILITY EA I � �� ( / � :• .. � •- D: - - - .5 DUGOUT TO REMAIN p�� REG NO; 20060303000926- REMOVE CURBING 0 0 0 0 0 0 0 I '� , I .. . - . cRA�$ �. •: - - �-.: � '. - Icc � REMOVE ASPHALT PAVEMENT :'FF INLE7..(ROUNO). I I FENG€�` NEE \ R!M"458.46' I a REMOVE CONCRETE PAVEMENT I I DETENTI TAAI _ " 3 \ CONTRACTOR TOUTILIZE4' .. IE :4°IP(.S). 57.26' _ STORM AT�q — C11 MAX VERTICAL CUT AT BOTTOM OF EXCAVATION I BOTTOM OF EXCAIVATION �� C� Q ` I I - I II EXISTING 10" WATER MAIN TO BE PROTECTED AT ALL TIMES. y�:; BTV-454'66' ELEVAT I I PROTECTION SHALL INCLUDE, BUT NOT LIMITED TO, I I I RD CONSTRUCTION FENCING NOTE: I I I �9 q.. r" I ® - I PROHIBITION OF HEAVY MACHINERY AND DRILLING s INSTALL CONSTRUCTION FENCING AROUND I I I EQUIPMENT ON TOP OF MAIN OR WITHIN EASEMENT. , LIMITS OF WORK TO PROTECT STAFF AND =DGE I _ - OF I �a�` VIBRATIONAL TESTING MAY BE REQUIRED FOR ANY DRILLING o / PSe� n5 ITf STUDENTS AND SECURE JOBSITE. CONTRACTOR �- — IGRASS I OR PILING OCCURRING NEAR THE MAIN. ADDITIONALLY, ANY I - --� PUMP CONSTRUCTION STORMWATER I MACHINERY CROSSING THE WATER MAIN IN UNPAVED AREAS o / I I I M0) SHALL ERECT FENCE AROUND JOBSITE AND I I = - TO SEDIMENT SETTLEMENT TANKS. WILL BE REQUIRED SHEETING OR SIM[LAIR (MECHANISM TO ADJUST AS CONSTRUCTION CONDITIONS CHANGE I 4 _ PUMP LINE TO BE TAKEN OFF LINE ENSURE THAT THE MAIN IS NOT SUBJECT TO DAMAGE LOADS.Q / I I I I CB C) OR AS PHASING ALLOWS. CONTRACTOR CAN \ \ \\ \ / ` AND REMOVED ONCE DETENTION I \ II I I IE 4"CF UTILIZE EXISTING PERIMETER FENCING AS \ \I� VAULT IS INSTALLED AND READY\TO I I SECURITY FENCING AND THEN SUPPLEMENT ON \ � \ \ I I� USE AS TEMPORARY TESC MEASU�2E (4) 18,900 GALLON CAPACITY TEMf�ORARY � = . -� �_ I i I I I � II / SEDIMENT SETTLEMENT TANKS ( BAKER TANK OR R 'SS" Z1 THE WEST SIDE OF THE SITE AS NEEDED. ANY \ \ — \ �,�' EQUAL). CONTRACTOR SHALL PROVIDE ALL PUMPS 9 I I EXISTING CHAINLINK FENCING THE CONTRACTOR \ \ I � REQUIRED TO MANAGE CONSTRUCTION • i--� I- -__---_ Q \ I PARCEL No..10 -927 I / STORMWATER AND DISCHARGE AT T E SITE. ��� I ELECTS TO UTILIZE DURING CONSTRUCTION SHALL I. :I.. \ OWNER: FACILITIES & OPE NS C I / J I Haag / SETTLEMENT TANKS TO BE TAKEN OFF LI E AND M 8"DI WP) J APPLY (IE ZIPTIES OR OTHER MEANS) HIGH / I =� . �/ APPROXIMATE LIMITS 0 / �� REMOVED ONCE DETENTION VAULT IS INSTALLED I VISIBILITY MATERIAL OR SIMILAR METHOD TO BE / / j IP PROPOSED DETENTION SYSTEM \ AND READY TO USE AS TEMPORARY TESC MgASURE / a CONTRACTOR TO HAVE THE OPTION TO \ ---_ / EXCAVATION FOR BASEBALL FIELD. EXISTING CITY OF II'D APPLIED TO FENCING TO DELINEAT AS / >r'` UTILIZE PROPOSED DETENTION SYSTEM FOR / / I SEE SHEET C203 I RENTON WATER.- _ CONSTRUCTION ZONE (TYP). ANY SECTIONS OF /• .'./ / CONSTRUCTION STORMWATER SETTLEMENT / I IAULT MUST BE CLEANED OF ALL SEDIMENT I \ EASEMENT TO BE EXISTING FENCING THAT IS NOT 6-FT HIGH SHALL i / 'LV\ PROTECTED AT HAVE TEMPORARY 6-FT HIGH CHAINLINK FENCING / / / "/ : PRIOR TO THE END OF CONSTRUCTION I 1 ALL TIMES INSTALLED NEXT TO IT. SEE DETAIL 10/C110. / ..:I• - I I I SUPPLEMENT SITE FENCING IGATION / I I I I I 1cc LID DURING CONSTRUCTION AS \ oIP 11E O EEXI(�) "& NEEDED TO SECURE IOUU SUMP AND 55 GALLON ONSTRUWORK AREASCB YPE I D� \ \\ G TA IM: 28. II I I I REE L�J TE2 .� DRUM WITH SUMP PUMP I I 'SEE CONSTRUCTION FENCING \ \ \ ,~r < IE PVC E :428.83 I I RE Y I I INSTALLE AT LOW w o I / I IF , ^, �J, .�, I I I � I I / � f ' " " I I I NOTE WITHIN SHEET i \ \ \ \ z = POINT ON ITE I I PUMP "CLEAN" STORMWATER FROM TEMP I / I N TE• I I I . I' SEE DETAI 3UMH (�AUL�LO 'SEWER") RIM-464.14' L,j. ARBORI T �SFIIALL E ON TI .:I• ` I I I SEDIMENT SETTLEMENT TANKS TO EXISTING IE 8"PE(NE):457.95' Q m ( DURING -FREE �E1�VIQ�AL �� � \ � :. C1Gi I I I CATCH BASIN. CONTRACTOR TO ENSURE ALL IE 12"PE(E):454.95' I I e DISCHARGE MEETS TURBIDITY REQUIREMENT . IE 12"CP(S)-454.65' 1 / S o / STORM P PI INSTAL, TIQN I f .. L: I I PUMP LINE TO BE TAKEN OFF LINE AND REMOV D1. I ST RMW En E I I I PROTECT EX CATCH BASIN '= I I I I I PUMP CONSTRUCTION STORMWATER TOANDI I •a.`• \ \ / I I - "DE -I ' :: Ln I ONCE DETENTION VAULT IS INSTALLED AND STORM PIPING 3MH RIM:463.9T I �••• N o I I mo' I EG SEDIMENT SETTLEMENT' TANKS UNTIL READY TO USE AS TEMPORARY TESC MEASURDURING GROUND SOURCE 8"CP(E) I ���•, ;� I r / _ I FFI �». \ I S D I I \ \ I•'":- -_ DETENTION VAULT IS INSTALLED AND READY I WELL INSTALLATION kICCP(N,S) I i,,,•t�• / I I 8'(bEC PROTECT E�X\1 l : • \ TO USE AS TEMPORARY TESC MEASURE I COC:454.75' 1 _ I ;•,. A INE Y i U DE I I II DECIDUOI� TR \ I I \ : ' . \ . 411 I114 - 1 I I gD G �u / j: \:- . MATCHLINE - SEE SHEET C104 I I 6 0 \ I / I :.I _I, `: \ REMOVE AND REPLACE I , I •,.y F I I / ) I / / I j •: : -:. .. - �\ PORTION OF EXI%TING .' FENCE AS NEEDED FOR I EXISTING 10" PRIVATE CLAY SEWER MAIN TO BE PROTECTED AT I I •�'.' I I I: /TREE R OVAL UNDER ISEPAR T C VI I I I `\ . CF I ALL TIMES. PROTECTION SHALL INCLUDE, BUT NOT LIMITED TO, I I I '� • ° COGVST UCTION PERMIT N . C 460 77 UTILITY INSTALLATION r I ° -•• f I I J' ' \ I PROHIBITION OF HEAVY MACHINERY AND DRILLING EQUIPMENT I I I » a cn • �••• " �� � � a' 15' UTILITY EASEMENT � ae 9� "' •� ~ I / 2 0"p I I I / I I I I 6N TOP OF MAIN, VIBRATIONAL TESTING MAY BE REQUIRED FOR REC. NO. UTILITY EASEMENT 1 t--r - , II AG I I IREM6v EEC C '.1 `': I \ I ANY DRILLING OR PILING OCCURRING NEAR THE MAIN. 1 )�EGICjU tRE I \ I ADDITIONALLY, ANY MACHINERY CROSSING THE WATER MAIN IN / '• � REM VE EX /" cn cs : SDMN -� I PROTECT EX TREES TO I I � I \ I UNPAVED AREAS WILL BE REQUIRED TO UTILIZE SHEETING OR.'— N ,I -" RIM:45�. \ REMAIN UNLESS \ I \ SIMILAR MECHANISM TO ENSURE THAT DAMAGE DOES NOT / -- f M •*s I 1 C �,� I 16'DE \ ' B"P OTHERWISE NOTED OCCUR TO THE MAIN. IE .10"ADS : 451.13' r + - - APPROXIMATE LIMITS OF.:.IE-).4 \ / �*• e , I I PROPOSED STORM PIPING "ADS V- l( EXCAVATION FROM DETENTION ,1 73 j YSTEM FOR BASEBALL FIELD. I I I I -,I 8 : , P. - INTERCEPTOR SWALE / / / `..r • ' : IS E' HEET C203 FOR DEPTH OF I I I I I {'• :Q VEG WITH ROCK CHECK DAMS I I I I 2 " I I / AT 50' O.C. SPACING 11,E 2 STORM SYSTEM. I ,.f: / ;Ass FF .:... SEE DETAILS Z. I � \ / pp ut� STER I �j \ \ \ C110 C11 / I CB TYPE 1 iAG/'2 I I t \�\' \ I \ \ ,I I4:459.90' )\ I I .:.. - \.. IE 10"ADS(W):456.60' I / 4 ICE OL/E EX 10" : • F : \ '. \. \ / \ / 6`� I I IE 10"P E): 456.55' CB TYPE 1 PROTECT EX FIELD f PROTECT EX TM' 455.20' i I JD�CIWOUS TREE — \ \ \ V I D' 'PSD I PERIMETER FENCING I \ ` \ \. :.....:. \ ' \ \ — / RIM:457.SE CONCRETE RETAINING / ADS \ SD " \.' , • \., \ \ V A �— VERT // IE 10"ADS (E). 55.41' TO REMAIN / \ \ \ \ \ V. \ \ \ ELEV. 7 \ IE 10 PE W, 4 I WALL AND FENCE - \. :...:.. \ \ .SD _ _ IN COMPLIANCE WITH CITY OF RENTON STANDARDS \ I ....\ .•.{ .. \ \ P�QTE'ET�TI�f C�8" ) BTM.454.31 I TQR10'IRURIN-G PROPOS1 \ I � I SUSD J 'ST�OKM INSTALLC�hON \ \ \ \ I DEVELOPMENT ENGINEERING ` 1 A \ \ 11 EM VE \X 6" SEESH (T�'P� \\ OPSD SD / I c 2\1 \ �� _ _ 8 DE \ \ \ S S§\ a \\ I I " : .. ,p:. . _ . •. , : . AG� / \` — — — Michael Sippo 03/30/2025 \A 14\ _ C cCV I CIDUO TREE \ 8"DEC5 / TAG, \ CD TAG/j� T,4G//21 \ 6 \ \ �q ��� �� �� �� \ I `Q ��/ / �/ Y FLAG --/ ( \ 16' EC S \ POSE .I Tr. 1 "DEC \ \ TAG /j 18 SURVEYED: SCALE: DATE: REMOVE EX6 N88`33'12"W 286.59- �-�w '� VERTICAL: NAVD 1981 HAZEN HIGH SCHOOL MODERNIZATION 03 20 2025 DECIDUOUS TREE �� ���=20> HORIZONTAL: NAD 1983/1991 I i —� W P �� JAJ CITY OF FIELDBt/K: / DESIGNED: CB TYPE I RENTON PAGE: !I RIM: 431.85' �� DRAWN: ONE INCH DJD/AJJ DRAWING NO: I IE 12"ADS(N):428.85' -- REMOVE AND REPLACE PORTION OF �, 43667 � CHECKED:DATUM I IE 12"ADS(S):428.95' EXISTING SIDEWALK AND ASPHALT AS �Ss�C�sT1 RE G� JAJ IF NOT ONE INCH Planning/Building/Public Works Dept. DEMOLITION AND TESC PLAN C 103 IE 8" PVC(E):429.35' NEEDED FOR UTILITY INSTALLATION ��NAL �� APPROVED: SCALE ACCORDINGLY SHEET: OF: BTM:427.45' N0. REVISION BY DATE APPR JAJ 5 OF 8 R-434605