Misc_Project_Schedule_250414_v1
ID Task Mode Task Name Duration Start Finish Predecessors % Complete 1 Project Management 392 days Thu 12/14/23Fri 6/13/25 55% 2 Preliminary Engineering 37 days Thu 12/14/23Fri 2/2/24 100% 3 Notice to Proceed 1 day Thu 12/14/23Thu 12/14/23 100% 4 Surveying 19 days Tue 1/9/24 Fri 2/2/24 3 100% 5 Design 378 days Wed 1/3/24 Fri 6/13/25 52% 6 Conceptual Design 23 days Wed 1/3/24 Fri 2/2/24 100% 7 Site Exploration 1 day Tue 1/9/24 Tue 1/9/24 3 100% 8 Alternatives Design Figures 13 days Wed 1/3/24 Fri 1/19/24 100% 9 Alternative Design Cost Estimates 8 days Wed 1/10/24Fri 1/19/24 8FF 100% 10 City Review Conceptual Design 10 days Mon 1/22/24Fri 2/2/24 8 100% 11 60% Design 42 days Mon 10/21/24Tue 12/17/24 100% 12 Plan Sheets 27 days Mon 10/21/24Tue 11/26/2410 100% 13 Specifications 7 days Mon 11/18/24Tue 11/26/2412FF 100% 14 Cost Estimate 17 days Mon 11/4/24Tue 11/26/2412FF 100% 15 Final Drainage Report 17 days Mon 11/4/24Tue 11/26/2412FF 100% 16 City Review 60% Design 15 days Wed 11/27/24Tue 12/17/2412 100% 17 SEPA Check List 40 days Mon 1/13/25Fri 3/7/25 55% 18 Draft 20 days Mon 1/13/25Fri 2/7/25 12FF 100% 19 City Review Draft 10 days Mon 2/10/25Fri 2/21/25 18 20% 20 Final Check List 10 days Mon 2/24/25Fri 3/7/25 19 0% 21 100% Design 50 days Mon 1/13/25Fri 3/21/25 35% 22 Plan Sheets 40 days Mon 1/13/25Fri 3/7/25 16 50% 23 Project Manual 5 days Mon 3/3/25 Fri 3/7/25 22FF 0% 24 Cost Estimate 2 days Thu 3/6/25 Fri 3/7/25 22FF 0% 25 City Review 100% Design 10 days Mon 3/10/25Fri 3/21/25 22 0% 26 Geotechnical 8 wks Mon 2/24/25Fri 4/18/25 0% 27 Bid Documents 20 days Mon 4/7/25 Fri 5/2/25 0% 28 Bid Document PS&E 20 days Mon 4/7/25 Fri 5/2/25 26FS-2 wks 0% 29 City Preapare Advertisement 3 wks Mon 5/5/25 Fri 5/23/25 28 0% 30 Advertise for Bid 15 days Mon 5/26/25Fri 6/13/25 29 0% Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Qtr 4, 2023 Qtr 1, 2024 Qtr 2, 2024 Qtr 3, 2024 Qtr 4, 2024 Qtr 1, 2025 Qtr 2, 2025 Qtr 3, 2025 Renton 116th Ave SE Sidewalk Project Schedule January 11, 2024February 12, 2025