Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_250414_v1Construction Mitigation Description Proposed Construction Dates: Anticipated Summer 2025, ~July 2025 to ~September 2025. Hours and Days of Operation: Monday – Friday form 7:00 am to 5:00 pm (unless authorized by the City of Renton). Proposed Hauling/Transportation Routes: Hauling routes may vary depending on location of work, but expected to use Puget Dr SE or SE 168th St. Truck hauling will be limited to arterial streets unless otherwise approved by the City of Renton. Measures to be Implemented: Please see detailed Construction SWPPP in the Drainage Report. Any Special Hours Proposed: None. Preliminary Traffic Control Plan: Traffic Control Plan will adhere to City, State, and MUTCD Standards and will be maintained throughout the project. The traffic control plan will be approved by City prior to beginning construction activities. Traffic control will be provided by flaggers for one lane two-way operations during construction. Pedestrian detours and/or handlers will be provided during construction.