Loading...
HomeMy WebLinkAboutP_Site_Plan_250317_v1HORIZONTAL DATUM VERTICAL DATUM COVER HOR:1"=XXX' VERT: 1"=XXX'OAKESDALE AVE SOUTHWEST STORM SYSTEM PROJECT 1-800-424-5555 or 811 FEB 2025 SWP-27-4030 DATE UNDERGROUND SERVICE Call 48 Hours Before You Dig 6 PACE, PMX CJ CJ JF CJ, JF 90% REVIEW SUBMITTAL XX-XX-20XX VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 PRELIMINARY NOT FOR CONSTRUCTION DATE APPRBYREVISION DESCRIPTIONNO. APPROVED FOR CONSTRUCTION BY:DATE: Public Works Department CITY OF RENTON C100 1 VICINITY MAP NOT TO SCALE OAKESDALE AVENUE SOUTHWEST STORM SYSTEM PROJECT N PROJECT LOCATION SW LA N G S T O N R D R A I N I E R A V E S SW SUNSET BLVD SW GRADY WA Y OAKES D A L E A V E S W Sheet List Table Sheet Number Sheet Title C100 COVER C101 NOTES C200 SITE PREPERATION PLAN C300 IMPROVEMENTS PLAN C301 STORM SYSTEM PROFILES C302 CURB RAMP DETAILS PROJECT SITE SCALE: 1" = 40'N CITY OF RENTON KING COUNTY OAK E S D A L E A V E S W OAKE S D A L E A V E S W SW 3R D P L S R 9 0 0 / S W S U N S E T B L V D NOTES HOR:1"=XXX' VERT: 1"=XXX'OAKESDALE AVE SOUTHWEST STORM SYSTEM PROJECT 1-800-424-5555 or 811 FEB 2025 SWP-27-4030 DATE UNDERGROUND SERVICE Call 48 Hours Before You Dig 6 PACE, PMX CJ CJ JF CJ, JF 90% REVIEW SUBMITTAL XX-XX-20XX VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 PRELIMINARY NOT FOR CONSTRUCTION DATE APPRBYREVISION DESCRIPTIONNO. APPROVED FOR CONSTRUCTION BY:DATE: Public Works Department CITY OF RENTON C101 2 GENERAL ESC NOTES THE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN OUTLINED HEREIN IS CONCEPTUAL. THE CONTRACTOR IS REQUIRED TO SUBMIT A FINAL TEMPORARY WATER POLLUTION AND EROSION CONTROL PLAN IN ACCORDANCE WITH SPECIAL PROVISIONS SECTION 1-07.15. 2.THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/ESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED. 3.THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED. 4.THE ESC FACILITIES SHOWN ON THESE PLANS OR SPECIFIED HEREIN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.). 5.THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/ESC SUPERVISOR AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESC FACILITIES DURING THE WET SEASON (OCT. 1 TO APRIL 30) AND OF MONTHLY REVIEWS DURING THE DRY SEASON (MAY 1 TO SEPT. 30). 6.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 7.ANY AREA NEEDING ESC MEASURES NOT REQUIRING IMMEDIATE ATTENTION SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS. 8.THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN FORTY-EIGHT (48) HOURS FOLLOWING A STORM EVENT. 9.AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM. 10.WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF 2 TO 3 INCHES. 11.NO STOCKPILING/STAGING WILL BE CONDUCTED WITHIN THE RIGHT OF WAY OR CITY OWNED SITE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ITS OWN STOCKPILE/STAGING AREAS. 12.PUBLIC STREETS SHALL BE CLEANED ONCE PER DAY OR AS DIRECTED BY THE CITY. FLUSHING OF STREETS WITH WATER WILL NOT BE ALLOWED. 13.IN ACCORDANCE WITH THE DEPARTMENT OF ECOLOGY REQUIREMENTS, WASTEWATER FROM CEMENT CONCRETE MASONRY, OR ASPHALT CONCRETE CUTTING, OR POURING OPERATIONS SHALL NOT BE DISCHARGED INTO STORM DRAINAGE SYSTEMS OR SURFACE WATERS. IMPERVIOUS SURFACES CONTAMINATED WITH SEDIMENT FROM GRIT AND CUTTING, PLANING OR PULVERIZING OPERATIONS SHALL BE VACUUM-CLEANED TO PREVENT CONTAMINANTS FROM ENTERING THE STORM DRAINAGE SYSTEM OR SURFACE WATERS. 14.CATCH BASIN INSERTS SHALL BE PLACED AT ALL CATCH BASINS ALONG PIPE ALIGNMENT. SEE DETAIL X, THIS SHEET. 15.INSTALL SILT FENCING AROUND ENTIRE STAGING/STOCKPILE AREAS PER COR STANDARD PLAN 214. 16.TEMPORARY SEDIMENTATION TANK MAY BE REQUIRED IN CONTRACTOR STAGING AREA IF THE SILT FENCING IS NOT ADEQUATE. 17.KEEP PUBLIC AND PRIVATE ROADWAYS/PARKING LOTS, SIDEWALKS, AND TRAILS FREE OF DEBRIS AND SEDIMENT. 18.CONSTRUCT TEMPORARY STORMWATER BYPASSES AS NEEDED DURING CONSTRUCTION TO DIVERT STORMWATER AROUND TRENCHING AND PIPE INSTALLATION ACTIVITIES AND MAINTAIN DRAINAGE OF UPSTREAM STORMWATER. CONTRACTOR IS RESPONSIBLE FOR DESIGN OF STORM DRAIN BYPASS PLAN. UNLESS OTHERWISE NOTED, BYPASSES ARE TO BE DESIGNED TO HANDLE THE VOLUME AND PEAK FLOWS OF THE 2-YEAR STORM EVENT AT A MINIMUM. SUBMIT AS PART OF WATER CONTROL PLAN. STORM DRAIN BYPASS PLAN SHALL ALSO ADDRESS THE DOWNSTREAM SYSTEM AND PREVENTION OF STORMWATER ENTERING THE WORK AREA BY BACKING UP FROM DOWNSTREAM. 19.ALL DEWATERING WATER AND RUNOFF WITHIN CONSTRUCTION AREAS SHALL BE TREATED VIA SEDIMENTATION, FILTRATION THROUGH VEGETATION IN APPROVED AREAS, OR PORTABLE FILTRATION SYSTEMS (UTILIZING TANKS AND FILTERS), AS NEEDED, PRIOR TO DISCHARGE TO DOWNSTREAM SYSTEM IN ORDER TO MEET ALL APPLICABLE LOCAL, STATE AND FEDERAL WATER QUALITY REGULATIONS. CONTRACTOR MAY ALSO DISCHARGE TO THE SANITARY SEWER SYSTEM AFTER OBTAINING APPLICABLE PERMITS AND MEETING PRETREATMENT REQUIREMENTS. GENERAL STORMWATER NOTES 1.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND FEDERAL LAWS. SEE THE "STANDARD DETAILS" SECTION OF THE PROJECT SPECIFICATIONS FOR REFERENCED CITY OF RENTON (COR) STANDARD DETAILS AND ANY REFERENCED WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) STANDARD DETAILS. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON STANDARDS AND THE CONTRACT SPECIAL PROVISIONS. 2.ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE CITY ENGINEER OR DESIGNATED REPRESENTATIVE. 3.PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL MEET WITH THE CITY ENGINEER FOR A PRE-CONSTRUCTION CONFERENCE. 4.A COPY OF THESE APPROVED PLANS AND PROJECT SPECIFICATIONS MUST BE ON THE SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 5.LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE. LOCATIONS ARE BASED ON A COMBINATION OF ONE OR MORE OF THE FOLLOWING: OBSERVATION OF SURFACE FEATURES, GEOGRAPHIC INFORMATION SYSTEM DATA, PAINT MARKS APPLIED BY AN UNDERGROUND UTILITY LOCATING SERVICE, CCTV, AND RECORD SCHEMATIC DRAWINGS. UTILITIES SHOWN IN THESE DRAWINGS ARE FOR THE PURPOSES OF ASSISTING THE CONTRACTOR WITH LOCATING UTILITIES. THE CITY OF RENTON ASSUMES NO LIABILITY FOR THE ACCURACY OF THE RECORD INFORMATION. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES WITHIN PROPOSED EXCAVATION LIMITS. CONTACT UNDERGROUND UTILITY LOCATE SERVICE (1-800-424-5555) A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION TO OBTAIN ON-SITE UTILITY LOCATIONS. CONTRACTOR SHALL POTHOLE UNDERGROUND GAS, WATER, SERVICE CONNECTIONS, AND OTHER UNDERGROUND UTILITIES WHERE POTENTIAL FOR CONFLICTS EXIST, WHERE DIRECTED BY THESE PLANS, OR WHERE DIRECTED BY ENGINEER. POTHOLING SHOULD BE DONE AT LEAST TEN (10) WORKING DAYS IN ADVANCE OF WORK IN THE AREA. PRECAUTIONS AND REMEDIAL MEASURES SHALL BE TAKEN AS REQUIRED TO PROTECT PERSONS AND PROPERTY AND TO AVOID DISRUPTION OF SERVICE. UNLESS OTHERWISE NOTED, PROTECT ALL UTILITIES FROM DAMAGE WHICH SHALL INCLUDE PROVIDING TEMPORARY SUPPORT SYSTEMS AND SHORING AROUND UTILITIES DURING EXCAVATION. IF AN EXISTING PRIVATE UTILITY CONFLICTS WITH PROPOSED IMPROVEMENTS, COORDINATE THE RELOCATION OF THE PRIVATE UTILITY WITH THE UTILITY OWNER UNLESS NOTED OTHERWISE OR DIRECTED BY ENGINEER. 7.THE CONTRACTOR SHALL COMPLY WITH ALL PERMITS AND ALL OTHER REQUIREMENTS BY THE CITY OF RENTON. SEE APPROVED PERMITS AND PERMIT REQUIREMENTS IN THE PROJECT SPECIFICATIONS. 6.EXISTING WATER LINE BENDS AND BLOCKING ARE NOT SHOWN. 7.STORM SEWER LENGTHS ARE MEASURED BETWEEN CENTERS OF MANHOLES AND CATCH BASINS UNLESS OTHERWISE NOTED. 8.EXCEPT AS OTHERWISE NOTED, CATCH BASIN AND MANHOLE RIM ELEVATIONS GIVEN ARE APPROXIMATE. FINAL ELEVATIONS SHALL MATCH FINAL GRADE. 9.USE CDF FOR BEDDING AND BACKFILLING AROUND EXISTING OR NEW UTILITIES WHERE STANDARD METHODS DO NOT PERMIT COMPACTION REQUIREMENTS TO BE MET, AS SHOWN ON THE DWGS, OR AS DIRECTED BY ENGINEER. 10.SITE CONSTRUCTION LIMITS (PRESERVATION LINES) COINCIDE WITH CITY RIGHT-OF-WAY UNLESS SHOWN OTHERWISE. 11.FOR CLARITY OF DRAWINGS, OVERHEAD POWER AND TELECOM ARE NOT SHOWN ON THE DRAWINGS. CONTRACTOR IS ADVISED THAT THERE ARE OVERHEAD POWER AND TELECOM THROUGHOUT PROJECT AREA, INCLUDING DIRECTLY OVER PROPOSED PIPE IMPROVEMENTS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM THE WORK IN A SAFE MANNER AND IN ACCORDANCE WITH ANY REQUIREMENTS SET FORTH BY THE UTILITY OWNER AND APPLICABLE LAWS AND REGULATIONS. 12.NO STAGING AREA IS PROVIDED TO THE CONTRACTOR. ALL STAGING AREAS SHALL BE ON A CONTRACTOR SECURED AREA. ALL TESC REQUIREMENTS APPLY TO THE CONTRACTOR'S OBTAINED STAGING AREA. 13.WHERE NEW STORM IS DESIGNED PARALLEL TO AND AT AN ELEVATION HIGHER THAN ADJACENT SEWER MAIN, THERE IS A POTENTIAL FOR CONFLICT WITH ASSOCIATED SIDE SEWER SERVICES. THE PLANS IDENTIFY CERTAIN SIDE SEWERS FOR SITE SPECIFIC UTILITY POTHOLING. CONTRACTOR SHALL POTHOLE THESE SIDE SEWERS AND PROVIDE DEPTH TO THE ENGINEER 10 DAYS IN ADVANCE OF CONSTRUCTION IN THIS AREA. IF NO CONFLICT, CONTRACTOR SHALL PROTECT AND SUPPORT SIDE SEWER. ANY DAMAGE TO SIDE SEWER WILL BE AT CONTRACTOR'S EXPENSE. IF CONFLICT EXISTS, ENGINEER MAY ELECT TO CHANGE GRADE OF STORM TO AVOID CONFLICT AT NO ADDITIONAL COST TO THE CITY, OR RELOCATE SIDE SEWER SERVICE IN ACCORDANCE WITH THE "RELOCATE SIDE SEWER" BID ITEM, AND DETAIL X ON SHEET X. IF SEWER IS NOT POTHOLED AND IS IN CONFLICT, RELOCATE PER DETAIL X ON SHEET X. 14.CONTRACTOR SHALL COORDINATE WITH CITY OF RENTON WATER UTILITY ABOUT ANY RELOCATION OR MODIFICATION TO SERVICE LINES. TEMPORARY WATER SERVICE RELOCATION INCLUDES SERVICE LINE AND CONNECTION FITTINGS AND SHALL BE INCIDENTAL TO OTHER PAYMENT ITEMS. 15.THE NEW STORM CROSSES EXISTING UNDERGROUND GAS MAINS AND GAS SERVICES IN MULTIPLE LOCATIONS. IF NOT PREVIOUSLY POTHOLED BY PSE, CONTRACTOR SHALL POTHOLE GAS A MINIMUM OF 10 DAYS IN ADVANCE OF PERFORMING WORK IN THE AREA AND PROVIDE RESULTS TO ENGINEER. IF EXISTING GAS MAIN IS IN CONFLICT WITH NEW STORM, CITY WILL PROVIDE NEW PROFILE GRADES FOR THE STORM PIPING. ADJUSTMENT OF THE STORM ALIGNMENT SHALL BE AT NO ADDITIONAL COST TO THE CITY. IF EXISTING GAS MAIN (OR SERVICE) IS IN CONFLICT WITH NEW STORM AND STORM PROFILE CANNOT BE ADJUSTED, CONTRACTOR SHALL COORDINATE WITH PSE FOR GAS RELOCATION (CONTACT PSE GAS REPRESENTATIVE CHANG PAK AT 253-395-6988). ALL COST FOR COORDINATION WITH PSE FOR GAS SERVICE RELOCATION SHALL BE PAID FOR BY “RESOLUTION OF UTILITY CONFLICTS”. 16.CONTRACTOR SHALL NOT ORDER PRECAST MANHOLES/CATCH BASINS UNTIL ALL POTENTIAL CONFLICTS THAT COULD AFFECT THE MANHOLES/CATCH BASINS HAVE BEEN POTHOLED TO CHECK FOR CONFLICT, AND THOSE CONFLICTS HAVE BEEN RESOLVED. 17.ALL STORM DRAINAGE PIPES SHALL HAVE WATERTIGHT JOINTS PER MANUFACTURER RECOMMENDATION. 18.EXISTING STORM DRAINAGE PIPES SHALL BE ABANDONED AND FILLED WHERE INDICATED ON THE PLANS IN ACCORDANCE WITH SECTION 2-02.3(4) OF THE SPECIAL PROVISIONS FOR PIPES AND SECTION 7-05.3(2) OF THE STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS FOR STRUCTURES. 19.CONTRACTOR SHALL REPLACE SURVEY MONUMENTS WHERE SHOWN ON DRAWINGS IN ACCORDANCE WITH SECTION 1-05.4 OF THE SPECIAL PROVISIONS AND CITY OF RENTON SURVEY STANDARDS. ANY MONUMENTS NOT SPECIFICALLY CALLED OUT AS TO BE REPLACED ON DRAWINGS SHALL BE REPLACED BY CONTRACTOR AT ITS OWN EXPENSE. 20.FOR PAVEMENT RESTORATION, CONTRACTOR IS REQUIRED TO PROVIDE A HOT MIX ASPHALT TRENCH PATCH IN ACCORDANCE WITH COR STANDARD PLAN 220.20. 21.WHERE TYPE 2 CATCH BASINS ARE INSTALLED IN ROADWAY GUTTER SECTION, THEY SHALL BE PLACED IN ACCORDANCE WITH DETAIL X ON SHEET X. 22.TEMPORARY SHORING IS REQUIRED FOR ALL STORM DRAIN WORK AND ASSOCIATED MANHOLES. MINIMUM TECHNIQUE SHALL BE USE OF TRENCH BOX. SPECIAL SHORING TECHNIQUES ARE REQUIRED WHERE WORKING IN CLOSE PROXIMITY TO UTILITIES. SEE SPECIAL PROVISIONS SECTION 7-08. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL SUBMIT TO CITY PROJECT MANAGER, A SHORING AND UTILITIES PROTECTION PLAN AS REQUIRED BY THE WORK PLAN UNDER THE MOBILIZATION BID ITEM. 81st AVE S S W S U N S E T B L V D ( S R 9 0 0 ) OAKESDALE AVE SW SW 3r d P L A C E 6 5 3 3 3 3 7 5 2 2 3 3 3 6 2 4 1 4 6 4 6 6 SITE PREPERATION PLAN C200 3 HOR:1"=XXX' VERT: 1"=XXX'OAKESDALE AVE SOUTHWEST STORM SYSTEM PROJECT 1-800-424-5555 or 811 FEB 2025 SWP-27-4030 DATE UNDERGROUND SERVICE Call 48 Hours Before You Dig 6 PACE, PMX CJ CJ JF CJ, JF 90% REVIEW SUBMITTAL XX-XX-20XX VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 PRELIMINARY NOT FOR CONSTRUCTION DATE APPRBYREVISION DESCRIPTIONNO. APPROVED FOR CONSTRUCTION BY:DATE: Public Works Department CITY OF RENTON DEMOLITION KEY NOTES ABANDON EXISTING STORM STRUCTURE. PRESERVE AND PROTECT EXISTING STORM STRUCTURE. NOTE THAT THE EXISTING STRUCTURES MAY BE BRICK AND MAY HAVE A NON-STANDARD KNOCKOUT. AVOID DAMAGE TO EXISTING KNOCKOUTS WHEN REMOVING EXISTING PIPES. PRESERVE AND PROTECT EXISTING UTILITY. PLUG EXISTING 18-INCH EXTENDING SOUTH WITH CONCRETE. ABANDON EXISTING STORM PIPE AND FILL WITH CDF PER SPECIAL PROVISION 1-09.14(2). CUT AND CAP EXISTING UTILITY. DECOMMISSION AND ABANDON EXISTING HYDRANT AND WATER VALVE. 1 2 3 4 5 6 7 DEMOLITION NOTES 1.THE WORK UNDER THE CONTRACT INCLUDES ALL CLEARING NECESSARY TO COMPLETE ALL WORK ASSOCIATED WITH THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FULLY REVIEW THE SITE CONDITIONS AND TO CORRELATE THESE OBSERVATIONS WITH THE PROJECT WORK. CLEARING, GRUBBING, AND DEMOLITION WORK SHALL BE INCIDENTAL TO THE PROJECT. 2.CONTRACTOR SHALL LEGALLY DISPOSE OF ALL DEMOLISHED AND REMOVED MATERIALS FROM THE SITE UNLESS OTHERWISE NOTED. 3.SEE SHEET C101 FOR ESC NOTES. DEMOLITION, CLEARING, & TESC LEGEND SEE NOTES ON SHEET C101 UNLESS OTHERWISE NOTED BELOW. PROPERTY LINE RIGHT OF WAY LINE APPROX LIMITS OF WORK 6' HIGH TEMPORARY CHAIN LINK CONSTRUCTION/TREE PROTECTION FENCE WITH CONCRETE SHOES INLET PROTECTION, SEE COR STD. PLAN 216.30 EXISTING TREE TO REMAIN WITH APPROX. CRITICAL ROOT ZONE SAWCUT LOCATION ASPHALT PAVING TO BE REMOVED, SAWCUT EDGES AS REQ'D (NOTE: PROTECT EX PAVING THAT IS TO REMAIN) CONCRETE PAVING/SIDEWALK TO BE REMOVED, SAWCUT EDGES AS REQ'D (NOTE: PROTECT EX CONC PAVING/SIDEWALK THAT IS TO REMAIN) CURB TO BE REMOVED, SAWCUT EDGES AS REQ'D (NOTE: PROTECT EX CURB THAT IS TO REMAIN) Feet 0 40 80 81st AVE S S W S U N S E T B L V D ( S R 9 0 0 ) OAKESDALE AVE SW SW 3r d P L A C E 18" S D 18" SD 12" SD 18" S D 18" S D 18 " S D 18" S D SEE PROFILE 1, SHEET C301 SEE PROFILE 2, SHEET C301 8 HYDRANT ASSEMBLY 2 INV OUT:165.87 18" INV IN:166.37 12" N: 178403.59 E: 1294507.26 RIM:172.28 EX-CB1 4 1 4 5 5 2 1 C302 GRADING ENLARGEMENT 2 C302 GRADING ENLARGEMENT 7 6 3 INV OUT:164.32 18" INV IN:164.32 18" N: 178296.54 E: 1294544.81 RIM:172.70 CB-3 INV OUT:165.04 18" INV IN:165.04 18" N: 178358.18 E: 1294577.29 RIM:176.44 CB-1 INV OUT:156.93 18" INV IN:156.93 18" N: 178197.80 E: 1294438.09 RIM:160.88 CB-4 INV OUT:155.91 18" INV IN:155.91 18" INV IN:156.41 12" N: 178182.00 E: 1294421.01 RIM:159.16 CB-5 INV OUT:155.64 12" INV IN:155.64 18" N: 178184.40 E: 1294413.02 RIM:158.68 EX-SD3 INV OUT:164.77 18" INV IN:164.77 18" INV IN:171.79 12" N: 178332.62 E: 1294571.94 RIM:175.94 CB-2 7 7 7 IMPROVEMENTS PLAN HOR:1"=XXX' VERT: 1"=XXX'OAKESDALE AVE SOUTHWEST STORM SYSTEM PROJECT 1-800-424-5555 or 811 FEB 2025 SWP-27-4030 DATE UNDERGROUND SERVICE Call 48 Hours Before You Dig 6 PACE, PMX CJ CJ JF CJ, JF 90% REVIEW SUBMITTAL XX-XX-20XX VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 PRELIMINARY NOT FOR CONSTRUCTION DATE APPRBYREVISION DESCRIPTIONNO. APPROVED FOR CONSTRUCTION BY:DATE: Public Works Department CITY OF RENTON C300 4 KEY NOTES CONNECT EXISTING STORM UTILITY TO NEW STRUCTURE. CONNECT NEW STORM PIPE TO EXISTING STRUCTURE. RECTANGULAR VANED GRATE PER CITY OF RENTON STANDARD PLAN 204.20. ROUND FRAME AND COVER PER CITY OF RENTON STANDARD PLAN 204.50. RECTANGULAR SOLID METAL COVER PER CITY OF RENTON STANDARD PLAN. FILL AND GROUT EXISTING CONNECTION AT 18" CMP OUTLET AT IE: 163.27 CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER CITY OF RENTON STANDARD PLAN 101. SEE SHEET C302 FOR CURB RETURN TABLE. INSTALL NEW FIRE HYDRANT ASSEMBLY PER COR STANDARD PLAN 300.10. 1 2 3 4 5 6 7 8 STORM DRAINAGE NOTES 1.UNLESS OTHERWISE NOTED, ALL STORM PIPES SHALL BE POLYPROPYLENE PER SP 9-05.24 AND SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS. 2.CONTRACTOR TO VERIFY LOCATIONS OF NEW MANHOLES WITH ENGINEER PRIOR TO CONSTRUCTION. 3.ALL NEW MANHOLE RISERS SHALL BE ADJUSTED TO FINISHED GRADE PER CITY OF RENTON STANDARD PLAN 106. 4.CEMENT CONCRETE SIDEWALKS SHALL BE REPLACED PER COR STANDARD PLAN 102: CEMENT CONCRETE SIDEWALK. 5.CEMENT CONCRETE CURB AND GUTTER SHALL BE REPLACED PER COR STANDARD PLAN 101 & 103: CEMENT CONCRETE TRAFFIC CURB AND GUTTER. 6.CONTRACTOR SHALL MAINTAIN ONE LANE OF TRAFFIC AT ALL TIMES DURING CONSTRUCTION. 7.MAINTAIN MINIMUM VERTICAL AND HORIZONTAL UTILITY SEPARATION PER CITY OF RENTON STANDARD SPECIFICATIONS. UTILITY LEGEND SEE NOTES ON SHEET C101 FOR GENERAL NOTES FOR EACH UTILITY. EXISTING TYPE 1 CATCH BASIN EXISTING TYPE 2 CATCH BASIN TYPE 1 CATCH BASIN TYPE 2 CATCH BASIN SANITARY SEWER MANHOLE PROPERTY LINE RIGHT OF WAY LINE APPROXIMATE LIMITS OF WORK STORM DRAIN PIPE WITH FLOW DIRECTION 2" GRIND AND OVERLAY PER COR STD PLAN 110.2 CEMENT CONCRETE SIDEWALK PER COR STD PLAN F007 Feet 0 40 80 140 145 150 155 160 165 170 175 180 185 140 145 150 155 160 165 170 175 180 185 10+00 10+20 10+40 10+60 10+80 11+00 11+20 11+40 11+60 11+80 12+00 12+20 12+40 12+60 12+80 13+00 13+20 13+40 13+60 13+80 14+00 17 0 . 9 9 16 9 . 3 3 16 7 . 6 6 16 6 . 1 0 16 4 . 5 8 16 2 . 8 6 16 1 . 1 9 15 9 . 6 5 15 8 . 6 2 26 LF 18" SD @ 1.00% 145 LF 18" S D @ 5 . 0 9 % CB - 1 EX - C B 1 CB - 5 23 LF 18" DI SD @ 4.37% 83 LF EXIST 18" SD @ 1.00% CB - 4 EX - S D 3 8 LF 18" DI SD @ 3.26% CB - 2 45 LF 18" SD @ 1.00% CB - 3 145 150 155 160 165 170 175 145 150 155 160 165 170 175 15 8 . 6 6 15 8 . 9 5 15 9 . 7 9 16 0 . 8 6 30 LF 12" DI SD @ 5.75% 8 LF 18" DI SD @ 3.26% EX - S D 3 CB - 5 STORM SYSTEM PROFILES HOR:1"=XXX' VERT: 1"=XXX'OAKESDALE AVE SOUTHWEST STORM SYSTEM PROJECT 1-800-424-5555 or 811 FEB 2025 SWP-27-4030 DATE UNDERGROUND SERVICE Call 48 Hours Before You Dig 6 PACE, PMX CJ CJ JF CJ, JF 90% REVIEW SUBMITTAL XX-XX-20XX VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 PRELIMINARY NOT FOR CONSTRUCTION DATE APPRBYREVISION DESCRIPTIONNO. APPROVED FOR CONSTRUCTION BY:DATE: Public Works Department CITY OF RENTON C301 5 1 1"=20' HORIZONTAL, 1"=5' VERTICAL PROFILE VIEW 2 1"=20' HORIZONTAL, 1"=5' VERTICAL PROFILE VIEW SAME STRUCTURE STORM DRAINAGE NOTES 1.SEE SHEET C300 FOR DRAINAGE STRUCTURE INFORMATION. 158.45 158.37 160.40 160.34 158.66 1 1 11 1 1 1 1 1 1 1 1 1 1 161.16 4.00 3 CURB RETURN TABLE NAME C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 TYPE BEG CURB BEG LAND END LAND END CURB BEG CURB MID, R=65' END CURB PC RAMP LAND LAND MID, R=24.5' RAMP PT END CURB NORTHING 178180.5084 178180.8518 178184.2928 178189.7984 178162.4763 178172.6694 178181.8266 178366.2668 178365.5053 178362.6617 178359.9826 178354.4724 178347.0891 178344.7204 178338.5174 178327.0260 178318.6074 EASTING 1294407.6098 1294407.9719 1294411.5995 1294417.4037 1294436.4131 1294441.4601 1294448.2068 1294560.7160 1294561.8904 1294565.4871 1294567.9058 1294571.1340 1294572.9671 1294573.0597 1294572.2015 1294565.2648 1294556.4197 ELEVATION 158.34 158.36 158.58 159.14 158.99 159.62 160.28 174.92 175.12 175.67 175.92 176.01 176.27 176.40 176.28 175.23 174.27 1 176.07 176.22 176.06 176.61 176.61 1 1 1 175.16 1 2 CURB RAMP DETAILS HOR:1"=XXX' VERT: 1"=XXX'OAKESDALE AVE SOUTHWEST STORM SYSTEM PROJECT 1-800-424-5555 or 811 FEB 2025 SWP-27-4030 DATE UNDERGROUND SERVICE Call 48 Hours Before You Dig 6 PACE, PMX CJ CJ JF CJ, JF 90% REVIEW SUBMITTAL XX-XX-20XX VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 PRELIMINARY NOT FOR CONSTRUCTION DATE APPRBYREVISION DESCRIPTIONNO. APPROVED FOR CONSTRUCTION BY:DATE: Public Works Department CITY OF RENTON C302 6 KEY NOTES MATCH EXISTING GRADE. CEMENT CONCRETE PARALLEL CURB RAMP TYPE A PER WSDOT STANDARD PLAN F-40.12-03. CEMENT CONCRETE PARALLEL CURB RAMP TYPE B PER WSDOT STANDARD PLAN F-40.12-03. 1 2 3 SCALE: SOUTH CURB RAMP AND SIDEWALK REPLACEMENT 1" = 5'1 SCALE: NORTH CURB RAMP AND SIDEWALK REPLACEMENT 1" = 5'2 LEGEND SEE NOTES ON SHEET C101 UNLESS OTHERWISE NOTED BELOW. RIGHT OF WAY LINE MAJOR CONTOUR MINOR CONTOUR GRADING POINT GRADING NOTES 1.PROPOSED CONTOURS ARE APPROXIMATE. CONTRACTOR TO MATCH CONTOURS TO EXISTING GRADE ALONG PROJECT BOUNDARIES. ELEVATIONXXX.XX'