HomeMy WebLinkAbout041425 Admin Report
Mayor’s Office
Memorandum
DATE: April 10, 2025
TO: James Alberson, Jr., Council President
Members of the Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• Please stop by to chat with Chief Administrative Officer Ed VanValey at the next
What’s Brewing, Wednesday, April 16 at the Berliner Pub, 221 Main Avenue South,
from 5:30-6:30 p.m. All ages are welcome. Check out the Facebook event for
more details.
• Save the date – Saturday, April 26 at 9 a.m! Join us at Highlands Park and
Neighborhood Center (800 Edmonds Avenue NE) as we celebrate Arbor Earth Day
with a volunteer day at the park. Dive into a fun day outdoors and help make a
difference in our community. For more information and to register for this event
visit www.rentonwa.gov/volunteer.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open.
Monday, April 14, 7:00am-4:00pm. Lane closure on east bound NE 3rd St from
Monterey Dr NE to Jefferson Ave NE for asphalt repairs by City Street Maintenance.
Flaggers will be used for traffic control as needed. Question may be directed to
Public Works Maintenance Shop, 425-430-7400.
Tuesday, April 15 through Wednesday, April 16. Lane closure on westbound NE
3rd St from Jefferson Ave NE to I-405 for asphalt repairs by City Street
Maintenance. Flaggers will be used for traffic control as needed. Question may be
directed to Public Works Maintenance Shop, 425-430-7400.
Thursday, April 17, 7:00am-4:00pm. Lane closure on eastbound NE 4th St from
Jefferson Ave NE to Monroe Ave NE for asphalt repairs by City Street Maintenance.
Flaggers will be used for traffic control as needed. Question may be directed to
Public Works Maintenance Shop, 425-430-7400.
Monday, April 14 through Friday, April 18, 8:00am-3:00pm. Intermittent lane
James Alberson, Jr., Council President
Members of the Renton City Council
Page 2 of 2
April 10, 2025
closure on S 7th St between Shattuck Ave S and Talbot Rd S for construction work.
Traffic control plans were issued for all work and will be followed. Questions may
be directed to City Transportation, 425-430-7423.
Monday, April 14 through Friday, April 18, 8:00am-3:00pm. Intermittent lane
closure on SW 43rd St between Talbot Rd S and SR 167 on ramp for utility
installation. Traffic control plans were issued for all work and will be followed.
Uniform police officers will be on site. Questions may be directed to Casey Grant,
206-532-4380.
Monday, April 14 through Friday, April 18, 8:00am-3:00pm. Burnett Ave S will be
closed to thru traffic from S 2nd St to Tobin Ave S. Approved traffic control plans
were issued and will be followed, including a detour with flaggers on onsite to
assist local traffic. Questions may be directed to Rob Blackburn, 206-379-1489.
Monday, April 14 through Friday, April 18, 8:00am-3:00pm. Intermittent lane
closure on Rainier Ave N between S 3rd St and NW 3rd Pl for construction work.
Approved traffic control plans were issued for all work and will be followed.
Questions may be directed to Joe Nerlfi, 425-757-9657.
Monday, April 14 through Friday, April 18, 8:00am-3:00pm. Intermittent lane
closure on NE Sunset Blvd between Edmonds Ave NE and Kirkland Ave NE for
construction work. Approved traffic control plans were issued for all work and will
be followed. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, April 14 through Friday, April 18, 8:00am-3:00pm. Shifting lane
closures both east and west on NE Sunset Blvd between Redmond Pl NE to Union
Ave NE for utility installation and frontage improvements. Approved traffic control
plans were issued for all work and will be followed. Questions may be directed to
Brad Stocco, 425-282-2373.
Monday, April 14 through Friday, April 18, 8:00am-3:00pm. Intermittent lane
closures on Williams Ave S and S Tobin St for construction work. Approved traffic
control plans were issued for all work and will be followed. Questions may be
directed to Rob Blackburn, 206-379-1489.
On-going Street Closure January 21 through May 22, 2025 (City of Renton
Resolution No. 4545). FULL STREET CLOSURE on Houser Way N between Lake
Washington Blvd N and Lowe’s Business Access Road in support of WSDOT I-405
Renton to Bellevue Widening and Express Toll Lane project. Approved traffic
control plans were issued for all work and will be followed. Questions may be
directed to Justin Johnson, 425-902-7102.