HomeMy WebLinkAboutC_Redington_Public_Comment_20250412From:LFforms_noreply@rentonwa.gov
To:Party of Record
Subject:Party of Record/Public Comments Submitted
Date:Saturday, April 12, 2025 2:16:46 PM
Attachments:Land Use Public Comment Form.pdf
Add Party of Record info to Laserfiche excel spreadsheet. If comment is received save comment to
Additional Documents Folder in Laserfiche and send email to Project Planner.
Land Use Case Number: LUA25-000080
First Name: Roger
Last Name: Edington
Company (if applicable):
Email: teddi.edington@comcast.net
Phone Number: (253) 854-7308
Address:
Do you want to provide comments?: Yes
Do you want to receive project information and documents in hard copy via US mail?: No
Comment: My residence is located at 11825 SE 192nd Street, directly across the street fromthe proposed development. We have a particular issue with the Technical Information Report
compiled by Encompass, which shows the surface water management plan in Section III(Downstream Analysis). Section III, Task 4 (page 12) incorrectly identifies SE 192nd street as
SE 196th St. The map (page 11) shows runoff from the development being carried underneathSE 192nd street via a CMP culvert where it then " flows to the south trough residential
properties until the 1/4 mile downstream limit is reached." From C to D on the map. Wecurrently struggle with surface runoff from the existing culvert which frequently backs up
where it transitions from above ground to the below ground stormwater catchment system. Myproperty floods if I do not frequently maintain the ditch and keep the catchment area free of
leaves and debris. Given the current difficulty in maintaining the flow of surface water into thesystem and keeping my property and home from being flooded, it is not feasible to dump
additional runoff from this development into the existing inadequate catchment system. Onesolution would be to an install underground culvert in front of the PSE substation and connect
with the existing drainage system east of the substation.