HomeMy WebLinkAboutChange Order - 1Docusign Envelope ID: 0BD54307-E753-489F-A099-F73E696D4AC7 Change Order No. 1 Contract Title: Sewer Damage Restoration ·ontractor: SERVPRO Central Seattle r,)>ntract No. : CAG-24-315 --------------------------Feder a I Aid No. D Ordered by Engineer D Proposed by the Contractor (VECP) 181 Unilateral Original Contract: Current Contract: Estimated Net Change This Order: New Contract: Prepared/Issued By: fJJ/b )Jct-:2 lr/ct/V;uS City of Renton Project Manager Date City Attorney Change Order No. Contract Title: Contract No. Date 1 SERVPRO 24-315 Amount Working Days 43,015.43 Start by 12/27/2024 43,015.43 End by 12/31/2024 25,529.92 105 68,545.35 End By 4/15/2025 Executed By: DocuSigned by: Martin Pastuch a 4/14/202 s I 4: 26 PM Poi City of Renton Public Works Administrator/ Mayor Date Page 1 ofZ CAG-24-315, CO #1-25 Approved by Cheryl Beyer via email 3/26/2025 Docusign Envelope ID: 0BD54307-E753-489F-A099-F73E696D4AC7 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Adding Attachment B to scope. Reason for Change: In order to match the existing carpet a special order needed to be made with a longer than normal lead time. We also had to purchase a minimum of 100 yards of carpet. Will likely only need 75yards. This attachment also covers some final touch up items like drywall, carpentry and painting. Materials: See attached price breakdown for the materials and labor. Plans: NA Equitable Adjustment: NA Extension of Time: The Time for Completion is extended 105 Working Days. Sections 1-04.4 and 1-04.S of the 2018 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order D Plans D Field Directive 181 Change Order Quotation 181 Estimated Change Order Cost 181 Project Labor List D Force Account Equipment Rate Request (DOT Form 422-010 EF) D Equitable Adjustment Determination Change Order No. Contract Title: Contract No. 1 SERVPRO 24-315 Page 2 of 2 Docusign Envelope ID: 0BD54307-E753-4B9F-A099-F73E696D4AC7 ◄➔4Jffll+► Servpro of Central Seattle, Servpro of Bellevue West, Northeast Seattle, & Kent Fn&Wore,-Oea""f)&�------------------------------------------- 8320 South 208th Street Suite H-101 Kent, WA 98032 Seattle: 206-282-9500 Fax: 253-277-7615 State Contr. Reg.# SERVPCS911LE EIN#87-0742562 Franchise #9573, 11539, 9746, 9233, & 10225 info@servprocentralseattle.com Client: Renton Municipal Airport 243 W Perimeter Rd Renton, WA 98057 Home: (425) 430-7471 Property: Operator: LANCE Estimator: Position: Company: Business: Type of Estimate: Date Entered: Lance Wong Project Director Servpro Central Seattle 8320 S. 208th St. Kent, WA 98032 Sewage 7/16/2024 Price List: WASE8X_JUN24 Labor Efficiency: Restoration/Service/Remodel Estimate: 2407-380804PHASE2 Please note this is a change order phase 2. Business: E-mail: Date Assigned: Any questions regarding this change order / phase 2 can be directed to the estimator listed above. Thank you for your business! (425)339-5959 lance. w@servprocentralseattle.com Docusign Envelope ID: 0BD54307-E753-489F-A099-F73E696D4AC7 ◄1difl;i•► Se rvpro of Central Seattle, Servpro of Bellevue West, Northeast Seattle, & Kent Fire & Wener. Cleanup & Ruromlior,"' 8320 South 208th Street Suite H-101 Kent, WA 98032 Seattle: 206-282-9500 Fax: 253-277-7615 State Contr. Reg.# SERVPCS911LE EIN#87-0742562 Franchise #9573, 11539, 9746, 9233, & 10225 info@servprocentralseattle.com 2407-380804PHASE2 General Items DESCRIPTION QTY REMOVE REPLACE 1. Glue down carpet 1.00 EA 0.00 208.00 Additional ordered flooring to leave for attic stock. Totals: General Items Level 2 Entry/Hallway 406.95 SF Walls TAX O&P 25.70 41.60 25.70 41.60 139.76 SF Ceiling 139.76 SF Floor TOTAL 275.30 275.30 Height: 7' 6" 546.71 SF Walls & Ceiling 15.53 SY Flooring 54.26 LF Floor Perimeter 54.26 LF Ceil. Perimeter Missing Wall 5'4" X7'6" Opens into HALLWAY_3 Missing Wall 5' 1 1/8" X 7' 6" Opens into Exterior DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL SITE PROTECTION 2.Floor protection -heavy paper and 139.76 SF 0.00 0.54 9.32 15.10 99.89 tape Will not reuse floor protection. Current protection will be removed, carpel tiles will be laid back down, and new floor protection will be installed until the full repairs are complete. 3. Mask and prep for paint -plastic,paper, tape (per LF) INSULATION 4.Batt insulation -6" -Rl9 -unfacedbatt DRYWALL 5.1/2" -drywall per LF -up to 2' tall6.Texture drywall -light hand texture7.Drywall Installer/ Finisher -perhour 75.00 LF 6.00 SF 3.00 LF 9.00 SF 4.00 HR Not all work to be done at one time and multiple trips will be needed. PAINT 8.Seal/prime (1 coat) then paint (2coats) the surface area 2407-380804PHASE2 188.00 SF 0.00 0.00 0.00 0.00 0.00 0.00 1.68 1.93 14.47 l.39132.32 1.64 15.58 1.43 5.36 1.55 65.42 38.1 I 25.20 2.32 8.68 2.50 105.86 61.66 3/20/2025 166.78 15.33 57.45 16.56 700.56 408.09 Page:2 Docusign Envelope ID: 0BD54307-E753-489F-A099-F73E696D4AC7 11111�1411·1·' .. Servpro of Central Seattle, Servpro of Bellevue West, Northeast Seattle, & Kent Fire & 'Watl!r - Cleanup & Restorotion"' 8320 South 208th Street Suite H-101 Kent, WA 98032 Seattle: 206-282-9500 Fax: 253-277-7615 State Contr. Reg.# SERVPCS911LE EIN#87-0742562 Franchise #9573, 11539, 9746, 9233, & 10225 info@servprocentralseattle.com CONTINUED -Entry/Hallway DESCRIPTION QTY REMOVE REPLACE 9.Paint baseboard -two coats 54.26 LF I 0. Stain & finish casing 17.00 LF 11.Caulking -acrylic 3.00 LF 0.00 2.98 FLOORING 12.Floor prep (scrape rubber back 5.00 SF 0.00 1.62 residue) 13.Glue down carpet-heavy traffic 5.00 SF 0.00 9.22 Patching with stock or used carpet. 14.Carpet Installer -per hour 1.00 HR 0.00 98.21 CARPENTER 15.Install Baseboard - 3 1/4"3.00 LF 0.00 3.07 Install only 16.Install Casing - 3 1/4"7.00 LF 0.00 1.60 Install only CLEANING 17.Final cleaning -construction -139.76 SF 0.00 1.16 Residential Totals: Entry/Hallway Hallway 2 Missing Wall 2407-380804PHASE2 304.83 SF Walls 422.18 SF Walls & Ceiling 13.04 SY Flooring 40.64 LF Ceil. Perimeter 5' 4" X 7' 6" TAX O&P I.IO 1.78 1.00 1.62 5.70 9.22 12.14 19.64 1.14 1.84 1.38 2.24 20.04 32.42 179.27 290.08 117.36 SF Ceiling 117 .36 SF Floor TOTAL OPEN OPEN 11.82 10.72 61.02 129.99 12.19 14.82 214.58 1,919.80 Height: 7' 6" 40.64 LF Floor Perimeter Opens into ENTRY_HALLWA 3/20/2025 Page:3 Docusign Envelope ID: OBD54307-E753-489F-A099-F73E696D4AC7 ◄1 Hf4-i•► Servpro of Central Seattle, Servpro of Bellevue West, Northeast Seattle, & Kent fire & Water. Cleor,up & Reslorolion'" 8320 South 208th Street Suite H-101 Kent, WA 98032 Seattle: 206-282-9500 Fax: 253-277-7615 State Contr. Reg.# SERVPCS911LE EIN#87-0742562 Franchise #9573, 11539, 9746, 9233, & 10225 info@servprocentralseattle.com CONTINUED -Hallway 2 Subroom: Hallway (1) 200.57 SF Walls 49.08 SF Ceiling 49.08 SF Floor Height: 7' 6" 249.65 SF Walls & Ceiling 5.45 SY Flooring 26.74 LF Floor Perimeter 26.74 LF Ceil. Perimeter Missing Wall 5' 2 7/8" X 7' 6" Subroom: Hallway (2) Missing Wall DESCRIPTION SITE PROTECTION 18.Floor protection -heavy paper andtape 215.57 SF Walls 258.41 SF Walls & Ceiling 4. 76 SY Flooring28.74 LF Ceil. Perimeter3' 4 7/8" X 7' 6" QTY REMOVE REPLACE 209.33 SF 0.50 0.00 Opens into HALLWAY_3 42.84 SF Ceiling 42.84 SF Floor Height: 7' 6" 28.74 LF Floor Perimeter Opens into HALLWAY_3 TAX O&P TOTAL 12.94 20.94 138.55 Current floor protection will be removed and carpet installed. Then new floor protection will be laid down until repairs are complete. INSULATION 19.Batt insulation -6" -RI 9 -unfaced 144.00 SF 0.00 1.93 34.36 55.58 367.86 battDRYWALL 20.1/2" -drywall per LF -up to 2' tall 58.00 LF 0.00 14.47 103.73 167.86 1,110.85 21.Texture drywall -light hand 174.00 SF 0.00 1.39 29.89 48.38 320.13 texture22.Drywall Installer/ Finisher -per 11.00 HR 0.00 132.32 179.90 291.10 1,926.52 hourNot all work to be done at one time and multiple trips will be needed. PAINT 23.Mask and prep for paint -plastic,96.13 LF 0.00 1.68 19.96 32.30 213.76 paper, tape (per LF)24.Seal the surface area w/PV A 200.00 SF 0.00 0.72 17.80 28.80 190.60 primer -one coat25.Seal/prime (1 coat) then paint (I 720.96 SF 0.00 1.19 106.04 171.58 1,135.56 coat) the walls2407-380804PHASE2 3/20/2025 Page: 4 Docusign Envelope ID: 0BD54307-E753-489F-A099-F73E696D4AC7 11111�1-lhl,11,-Servpro of Central Seattle, Servpro of Bellevue West, Northeast Seattle, & Kent Fire & Water• Cleanup & Reslomtion'" 8320 South 208th Street Suite H-101 Kent, WA 98032 Seattle: 206-282-9500 Fax: 253-277-7615 State Contr. Reg.# SERVPCS9 l lLE EIN#87-0742562 Franchise #9573, 11539, 9746, 9233, & 10225 info@servprocentralseattle.com CONTINUED -Hallway 2 DESCRIPTION QTY REMOVE REPLACE 26.Caulking -acrylic 3.00 LF 0.00 2.98 27.Paint baseboard -two coats 96.13 LF 28.Stain & finish door/window trim &6.00 EA jamb (per side)FLOORING 29.Floor prep (scrape rubber back 209.33 SF 0.00 1.62 residue) 30.Glue down carpet -heavy traffic 209.33 SF 0.00 9.22 3 1. Carpet Installer - per hour 8.00 HR 0.00 98.21 CARPENTER 32.Install Baseboard - 3 1/4"3.00 LF 0.00 3.07 Install only 33.Install Casing - 3 1/4"7.00 LF 0.00 1.60 Install only CLEANING 34.Final cleaning -construction -209.33 SF 0.00 1.16 Residential Totals: Hallway 2 Lounge DESCRIPTION SITE PROTECTION 35.Floor protection -heavy paper andtape INSULATION 36.Batt insulation -6" -Rl9 -unfacedbatt DRYWALL 37.1/2" -drywall per LF -up to 2' tall2407-380804PHASE2 583.79 SF Walls 926.63 SF Walls & Ceiling 38.09 SY Flooring 77.84 LF Ceil. Perimeter QTY REMOVE REPLACE 75.00 SF 0.00 0.54 20.00 SF 0.00 1.93 20.00 LF 0.00 14.47 TAX O&P I.IO 1.78 41.92 67.82 238.55 386.00 97.12 157.14 1.14 1.84 1.38 2.24 30.01 48.56 915.84 1,481.92 342.84 SF Ceiling 342.84 SF Floor TOTAL 11.82 OPEN OPEN 448.85 2,554.57 1,039.94 12.19 14.82 321.39 9,807.41 Height: 7' 6" 77 .84 LF Floor Perimeter TAX 5.00 4.78 35.77 O&P 8.10 7.72 57.88 3/20/2025 TOTAL 53.60 SI.IO 383.05 Page: 5 Docusign Envelope ID: 0BD54307-E753-489F-A099-F73E696D4AC7 t111�!!!lil 111, Servpro of Central Seattle, Servpro of Bellevue West, Northeast Seattle, & Kent Fire & Watar • Cleanup & Restoralion .. 8320 South 208th Street Suite H-101 Kent, WA 98032 Seattle: 206-282-9500 Fax: 253-277-7615 State Contr. Reg.# SERVPCS911LE EIN#8 7-0742562 Franchise #9573, 11539, 9746, 9233, & 10225 info@servprocentralseattle.com CONTINUED - Lounge DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL 38.Texture drywall -light hand 60.00 SF 0.00 1.39 10.31 16.68 110.39 texture39.Drywall Installer/ Finisher -per 4.00 HR 0.00 132.32 65.42 105.86 700.56 hourNot all work to be done at one time and multiple trips will be needed. PAINT 40.Mask and prep for paint -plastic,77.84 LF 0.00 1.68 16.16 26.16 173.09 paper, tape (per LF) 41.Seal the surface area w/PV A 60.00 SF 0.00 0.72 5.34 8.64 57.18 primer -one coat42.Seal/prime (I coat) then paint (1 200.00 SF 0.00 1.19 29.41 47.60 315.01 coat) the surface area43.Caulking -acrylic 34.00 LF 0.00 2.98 12.53 20.26 134.11 44.Paint baseboard -two coats 77.84 LF 0.00 1.81 17.41 28.18 186.48 45.Paint casing -two coats 17.00 LF 0.00 1.83 3.84 6.22 41.17 FLOORING 46.Tear out non-salv. gluedn. cpt,229.70 SF 4.82 0.00 136.85 221.44 1,465.44 cut/bag 47.Floor prep (scrape rubber back 342.84 SF 0.00 1.62 68.65 111.08 735.13 residue)48.Glue down carpet -heavy traffic 342.84 SF 0.00 9.22 390.70 632.20 4,183.88 49.Carpet Installer -per hour 8.00 HR 0.00 98.21 97.12 157.14 1,039.94 CARPENTER 50.Cabinetry -lower (base) units -9.00 LF 0.00 98.88 109.99 177.98 1,177.89 Reset 51.Cabinetry -full height unit -Reset 1.50 LF 0.00 98.88 18.34 29.66 196.32 52.Cabinetry-upper (wall) units -3.00 LF 0.00 98.88 36.66 59.32 392.62 Reset53.Re-skin toe kick 13.00 LF 0.00 15.70 25.22 40.82 270.14 54.Vinyl cove -4" wrap 13.00 LF 0.00 12.53 20.14 32.58 215.61 55.Baseboard - 3 1/4"34.00 LF 0.00 6.80 28.57 46.24 306.01 56.Casing - 3 1/4"14.00 LF 0.00 5.20 9.00 14.56 96.36 57.Dishwasher -Reset 1.00 EA 0.00 276.48 34.18 55.30 365.96 58.Refrigerator -Remove & reset 1.00 EA 0.00 195.66 24.18 39.14 258.98 CLEANING 59.Final cleaning -construction -342.84 SF 0.00 1.16 49.15 79.54 526.38 Residential Totals: Lounge 1,254.72 2,030.30 13,436.40 2407-380804PHASE2 3/20/2025 Page: 6 Docusign Envelope ID: 0BD54307-E753-4B9F-A099-F73E696D4AC7 ◄1tlh► Servpro of Central Seattle, Servpro of Bellevue West, Northeast Seattle, & Kent nre & Wafer , Cl.anup & Raston.on-Total: Level 2 8320 South 208th Street Suite H-101 Kent, WA 98032 Seattle: 206-282-9500 Fax: 253-277-7615 State Contr. Reg.# SERVPCS911LE EIN#87-0742562 Franchise #9573, 11539, 9746, 9233, & 10225 info@servprocentralseattle.com Labor Minimums Applied DESCRIPTION QTY REMOVE REPLACE 60.Insulation labor minimum 1.00 EA 0.00 68.75 Totals: Labor Minimums Applied Line Item Totals: 2407-380804PHASE2 Grand Total Areas: 3,658.66 SF Walls 1,517.85 SF Ceiling 1,517.85 SF Floor 168.65 SY Flooring 0.00 SF Long Wall 0.00 SF Short Wall 1,517.85 Floor Area 1,633.83 Total Area 1,736.86 Exterior Wall Area 208.83 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Ridge Length 0.00 Total Hip Length 2407-380804PHASE2 2,349.83 3,802.30 TAX O&P 8.50 13.76 8.50 13.76 2,384.03 3,857.66 5,176.51 SF Walls and Ceiling 487.82 LF Floor Perimeter 487.82 LF Ceil. Perimeter 3,724.21 Interior Wall Area 0.00 Total Perimeter Length 3/20/2025 25,163.61 TOTAL 91.01 91.01 25,529.92 Page: 7 Docusign Envelope ID: 0BD54307-E753-489F-A099-F73E696D4AC7 ◄➔4-l!;i,► Servpro of Central Seattle, Servpro of Bellevue West, Northeast Seattle. & Kent Fire & Walflr • Oeonup & Restoration"' Line Item Total Overhead Profit Sales Tax 8320 South 208th Street Suite H-101 Kent, WA 98032 Seattle: 206-282-9500 Fax: 253-277-7615 State Contr. Reg.# SERVPCS911LE EIN#87-0742562 Franchise #9573, 11539, 9746, 9233, & 10225 info@servprocentralseattle.com Summary for Dwelling Replacement Cost Value Net Claim 2407-380804PHASE2 Lance Wong Project Director 3/20/2025 19,288.23 1,928.83 1,928.83 2,384.03 $25,529.92 $25,529.92 Page: 8