Loading...
HomeMy WebLinkAboutContract Agreement aAMENDMENT NO. 2 TO AGREEMENT FOR ENGINEERING SERVICES FOR CEDAR AVE SIDEWALK PROJECT CAG-19-335 THIS AMENDMENT, dated for reference purposes only asMarch 27, 2025, is by and between the Gray & Osborne, Inc. a Washington corporation. The City and the Consultant are referred to collectively in this Amendment lly executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-19-335, dated November 17, 2022, to provide necessary services for the Cedar Ave Sidewalk project (referred Whereas, the Parties wish to amend the Agreement to change the compensation in order to complete the engineering services for Cedar Ave Sidewalk Project. NOW THEREFORE, It is mutually agreed upon that CAG-19-335 is amended as follows: 1.Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-2, which is attached and incorporated herein. 2.Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $15,755.00 from $65,540.52 to $81,295.52, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit B-2, which is attached and incorporated herein. 3. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. CAG-19-335, Adden #2-25 PAGE 2 OF 2 IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Martin Pastucha Public Works Administrator Michael B. Johnson President _____________________________ Date _____________________________ Date Attest N/A _____________________________ Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Shane Maloney City Attorney Contract Template Updated 06/17/2021 3/27/25 Approved by Cheryl Beyer via email 3/27/2025 EXHIBIT A-2 Additional Engineering Services Scope of Work Page 1 EXHIBIT A-2 SCOPE OF WORK CITY OF RENTON CEDAR AVENUE SIDEWALK PROJECT CAG 19-335 This Amendment No. 2 includes additional engineering services as specifically detailed below. The expiration date of this agreement is December 31, 2027, no change from the original agreement. Additional Engineering Services 12. Provide additional design support during the bid phase to address bidder inquiries and plan revisions desired by the City. 13. Provide Engineering support services as requested by the City during the construction phase in the amount of 15 working days at 4 hours per day, plus 4 hours of drafting work. This work may include submittal review, assistance with change orders, weekly meetings, progress payments and/or site visits. This does not include field inspection. 14. Prepare Record Drawings based on plan revisions issued during the construction phase and contractor red-lines. This work does not include field survey.