Loading...
HomeMy WebLinkAboutR-408005NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M. NE 4 TH STREET 0107 i l i e f; a)I E z 5 5 R/W DISCOUNT TIRES I DISCOUNT TIRES ASSOCIA TED PARCEL 162305-9128 162305-9052 N: 180788.71 DESIGNER DRAWN BY CHECKED BY AJ AJ ST E Q NO. I REVISION COMMENTS I BY I REVIEW DATE M a s i 1 1 1 1 0 106 I I I i U-HAUL RENTALS AUTO REPAIR SHOP i 162305-9058 162305-9112 T8 a MATCHLINE SEE SHEET C102 A❑ R/W CHEVRON EXTRA MILE/ MCDONALDS 162305-9111 N: 180780.03 E: 1308712.98 15+00 16+00 14+00 L2 - - + CITY OF RENTON PUBLIC WORKS 1055 SOUTH GRADY WAY, 5TH FLOOR- RENTON, WA 98057 MONROE AVE NE INFILTRATION FACILITY CITY PROJECT SWP-27-4080 Otak in 11241 Willows Road NE, Suite 200 Redmond, WA 98052 425.822.4446 www.otak.com SURVEY NOTES 1. HORIZONTAL DATUM: WASHINGTON COORDINATE SYSTEM NORTH ZONE (NAD 83/2011). PROJECT CONTROL WAS ESTABLISHED - - - - BY HOLDING WASHINGTON STATE REFERENCE NETWORK (WSRN) STATIONS OYLR, SMAI & SAMM. 2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM (NAVD) OF 1988, ESTABLISHED BY HOLDING WSRN STATION OLYR HEIGHT = 25.006. 3. HORIZONTAL CONTROL WAS ESTABLISHED BY A COMBINATION OF FIELD TRAVERSE AND RTK GPS WITH AN ACCURACY THAT MEETS OR EXCEEDS WAC 332-130-090. VERTICAL CONTROL WAS ESTABLISHED BY TRIGNOMETRIC LEVELS. 4. FIELD WORK WAS PERFORMED FROM FEBRUARY TO APRIL OF 2021 AND REFLECTS THE GENERAL CONDITIONS ON THE GROUND AT THAT TIME. 0 I w 11. !073 .04 087 2.31 Ll IW o v O I o o IZ N W � W I� END ALIGNMENT STA 16+80.34 N 180754.47 E 1308784.31 SURVEY CONTROL POINT# NORTHING EASTING ELEVAT/ON DESCRIPTION 100 179737.48 1308737.35 345.63 TACK WITH 0TAK WASHER 101 180102.11 1308707.97 347.54 TACK WITH 0TAK WASHER 102 180359.83 1308712.79 347.46 TACK WITH 0TAK WASHER 103 180656.73 1308718.27 342.79 TACK WITH 0TAK WASHER 104 180893.31 1308767.25 340.44 TACK WITH 0TAK WASHER 105 181080.11 1308713.66 341.52 TACK WITH 0TAK WASHER 106 181077.19 1308398.17 33772 112" IRON ROD WITH RPC STAMPED "OTAK CONTROL " 107 181073. 70 1308086. 93 332.86 112" IRON ROD WITH RPC STAMPED "OTAK CONTROL " 108 180823. 64 1308025. 64 335.16 112" IRON ROD WITH RPC STAMPED "OTAK CONTROL " 109 180252.52 1308017.47 333.79 PKNAIL WITH WASHER STAMPED "0TAKCON TROL " 110 180174. 84 1308185. 59 328.37 112" IRON ROD WITH RPC STAMPED 'OTAK CONTROL " 111 180585. 74 1308349. 30 327.. 00 112" IRON ROD WITH RPC STAMPED 'OTAK CONTROL " 115 180374. 40 1308118.27 329.37 112" IRON ROD WITH RPC STAMPED 'OTAK CONTROL " MAINTENANCE ACCESS ROAD ALIGNMENT NUMBER BEGIN STATION LENGTH RADIUS BEARING DELTA L1 8+00.00 493.20' N34007'05"E C1 12+93.20 57.14' 60.00' N61°23'55"E 54°33'40" L2 13+50.34 330.00' N88°40'45"E DESIGN REVISIONS MADE DURING CONSTRUCTION HAVE BEEN INCORPORATED INTO THESE "AS -BUILT" DRAWINGS, BUT ARE NOT HIGHLIGHTED/ CLOUDED FOR CLARITY. THESE "AS -BUILT" PLANS REFLECT DESIGN INFORMATION, INCLUDING PLAN REVISIONS MADE DURING CONSTRUCTION, WITH "AS -BUILT" INFORMATION PROVIDED BY THE CONTRACTOR. OTAK HAS NOT REVIEWED THE INFORMATION SUPPLIED BY THE CONTRACTOR FOR ACCURACY AND HAS NOT SURVEYED TO VERIFY THE "AS -BUILT" CONDITIONS SHOWN. CHARLES DEWEY, P.E 3/14/2025 r� T 40 0 40 80 HORZ SCALE IN FEET CALL BEFORE YOU DIG 1-800-424-5555 OTAK 33201.A PROJECT NUMBER SURVEY CONTROL PLAN ci 01 DRAWING NO. R-408005 SHEET: 5 of 36 © 2023 OTAK, INC.