Contract Title:
Change Order No. 39 Rainier Ave S Corridor Improvements -Phase 4
Contractor: Pivetta Brothers Construction, Inc. Contract No.: CAG-22-163 Federal Aid No.: STPUL-1615(005)
181 Ordered by Engineer 181 Force Account □Proposed by the Contractor (VECP)□Bid Item□Unilateral □Bid Item Price Adjustment□Lump Sum
Affects DBE Work: 181 No □Yes If yes, must receive concurrence from Local Programs
Original Contract: Current Contract: Estimated Net Change This Order: New Contract:
ep red By:
Reviewed By:
Reviewed By: ·{11fi4<Ju��City of Ren Prolect Manager
Reviewed By:
City Attorney
39
prior to execution.
Date
4/1/2025 Date
4/2/2025 Date
Date
Amount Working Days
$28,284,172.90 500
$35,682,833.85 654
$7,707.00 0
$35,690,540.85 654
Design Manager)
Consent By:
Surety (Greater than 25% cost and/or 20%
time increase)
Endorsed By: --.. --Russell OWen 5o..�
Contractor
Date
4/10/2025 Date
E xecuted ByG 0 �"'""""'
Martin Pastucha4;1a;202s
aaanffcgaa44gc City of Renton Public Works Date Administrator/ Mayor
Change Order No.
Contract Title: Rainier Ave S. Corridor Improvements -Phase 4
Contract No. CAG-22-163
Page 1 of 6
I 10: 52 AM PDT
CAG-22-163, CO #39-25
Approved by Cheryl Beyer via email 4/11/2025
Docusign Envelope ID: 3D68D846-0E06-4685-945A-78C2E144D115
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
The Contractor shall construct concrete dead-man blocks in conformance with the attached
City of Renton Standard Plan 330.4 Concrete Deadman Block.
Proposal Schedule of Prices:
ADD the following to Schedule B:
39-845 -Reinforcing Steel in Concrete Dead-man Blocks, 1 EST@ $7,000.00 = $7,000.00
Specification and/or Special Provision:
None.
Description:
None.
Materials:
ADD the following section to SP 7-09.2:
Reinforcing Steel 9-07
Measurement:
ADD the following to 7-09.4:
"Reinforcing Steel in Concrete Dead-man Blocks," will be measured by force account for
all labor and materials necessary to construct the reinforcing steel in conformance with
the attached City of Renton Standard Plan 330.4 Concrete Dead man Block.
Payment:
ADD the following to 7-09.5:
"Reinforcing Steel in Concrete Dead-man Blocks," by force account.
Plans:
None.
Reason for Change:
The Contract documents did not include details for constructing dead-man blocks. Upon the
Contractor's request, the City provided construction details that included reinforcing steel.
The inclusion of reinforcing steel is an extra cost, as the Contract did not specify these
details and the Contractor could not have anticipated them at the time of bidding.
Change Order No.
Contract Title:
Contract No.
39
Rainier Ave S. Corridor Improvements -Phase 4
CAG-22-163
Page 2 of 6
Docusign Envelope ID: 3D68D846-0E06-4685-945A-78C2E144D115
Reinforcing Steel in Dead-man Blocks -Field Directive #16
PERTEET
FIELD DIRECTIVE
801 2nd Avenue, Suite 302, Seattle, WA 98104 I P 206.436.0515
Project Name Federal Aid # Contract No. Date
Rainier Ave S Corridor Improvements
Phase 4 (S 3rd ST to NW 3rd PL) STPUL-1615(005) CAG-22-163 5/16/2023
Field Directive Description Field Directive No.
Concrete Deadman Block Sizing 016
Contractor
Pivetta Brothers Construction
The following is documentation of on oral order given by the Engineer per WSDOT Specification 1-04.4.
Please see the attached detail titled "Concrete Deodmon Block" to use when sizing Cone Dead-Mon Blocks as specified by the Water Pion on Sheets 121 -
130.
This work will be paid using Bid Item No. B16 -Concrete for Thrust Blocking and Dead-Man Anchor Block.
Project Engineer (or Representative) Date
Mott Buselli 5/16/2023
Change Order #39, Page 5 of 6