Loading...
HomeMy WebLinkAboutChange Order - 39Docusign Envelope ID: 3D68DB46-0E06-4685-945A-78C2E144D115 Contract Title: Change Order No. 39 Rainier Ave S Corridor Improvements -Phase 4 Contractor: Pivetta Brothers Construction, Inc. Contract No.: CAG-22-163 Federal Aid No.: STPUL-1615(005) 181 Ordered by Engineer 181 Force Account □Proposed by the Contractor (VECP)□Bid Item□Unilateral □Bid Item Price Adjustment□Lump Sum Affects DBE Work: 181 No □Yes If yes, must receive concurrence from Local Programs Original Contract: Current Contract: Estimated Net Change This Order: New Contract: ep red By: Reviewed By: Reviewed By: ·{11fi4<Ju��City of Ren Prolect Manager Reviewed By: City Attorney 39 prior to execution. Date 4/1/2025 Date 4/2/2025 Date Date Amount Working Days $28,284,172.90 500 $35,682,833.85 654 $7,707.00 0 $35,690,540.85 654 Design Manager) Consent By: Surety (Greater than 25% cost and/or 20% time increase) Endorsed By: --.. --Russell OWen 5o..� Contractor Date 4/10/2025 Date E xecuted ByG 0 �"'""""' Martin Pastucha4;1a;202s aaanffcgaa44gc City of Renton Public Works Date Administrator/ Mayor Change Order No. Contract Title: Rainier Ave S. Corridor Improvements -Phase 4 Contract No. CAG-22-163 Page 1 of 6 I 10: 52 AM PDT CAG-22-163, CO #39-25 Approved by Cheryl Beyer via email 4/11/2025 Docusign Envelope ID: 3D68D846-0E06-4685-945A-78C2E144D115 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: The Contractor shall construct concrete dead-man blocks in conformance with the attached City of Renton Standard Plan 330.4 Concrete Deadman Block. Proposal Schedule of Prices: ADD the following to Schedule B: 39-845 -Reinforcing Steel in Concrete Dead-man Blocks, 1 EST@ $7,000.00 = $7,000.00 Specification and/or Special Provision: None. Description: None. Materials: ADD the following section to SP 7-09.2: Reinforcing Steel 9-07 Measurement: ADD the following to 7-09.4: "Reinforcing Steel in Concrete Dead-man Blocks," will be measured by force account for all labor and materials necessary to construct the reinforcing steel in conformance with the attached City of Renton Standard Plan 330.4 Concrete Dead man Block. Payment: ADD the following to 7-09.5: "Reinforcing Steel in Concrete Dead-man Blocks," by force account. Plans: None. Reason for Change: The Contract documents did not include details for constructing dead-man blocks. Upon the Contractor's request, the City provided construction details that included reinforcing steel. The inclusion of reinforcing steel is an extra cost, as the Contract did not specify these details and the Contractor could not have anticipated them at the time of bidding. Change Order No. Contract Title: Contract No. 39 Rainier Ave S. Corridor Improvements -Phase 4 CAG-22-163 Page 2 of 6 Docusign Envelope ID: 3D68D846-0E06-4685-945A-78C2E144D115 Reinforcing Steel in Dead-man Blocks -Field Directive #16 PERTEET FIELD DIRECTIVE 801 2nd Avenue, Suite 302, Seattle, WA 98104 I P 206.436.0515 Project Name Federal Aid # Contract No. Date Rainier Ave S Corridor Improvements Phase 4 (S 3rd ST to NW 3rd PL) STPUL-1615(005) CAG-22-163 5/16/2023 Field Directive Description Field Directive No. Concrete Deadman Block Sizing 016 Contractor Pivetta Brothers Construction The following is documentation of on oral order given by the Engineer per WSDOT Specification 1-04.4. Please see the attached detail titled "Concrete Deodmon Block" to use when sizing Cone Dead-Mon Blocks as specified by the Water Pion on Sheets 121 - 130. This work will be paid using Bid Item No. B16 -Concrete for Thrust Blocking and Dead-Man Anchor Block. Project Engineer (or Representative) Date Mott Buselli 5/16/2023 Change Order #39, Page 5 of 6