Loading...
HomeMy WebLinkAboutR-39191313J a z Ld w NOTE: z O mew EXISTING UTILITY LOCATIONS SHOWN HEREON ARE w w APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S O 0 w Lu z RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND 1 23.5 R/W 23.5' R/W ��J HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND cn cn � O o LIJ UTILIITES PRIOR TO COMMENCING CONSTRUCTION. NO 13.5' 10' 10' 13.5' cwn I- w REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES O 0 8' LANDSCAPE STRIP O ,,,� ARE SHOWN HEREON. THE ENGINEER ASSUMES NO co F_2% EX. ELEVATIONS o , z RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES O Lij:.: 2% 2% 2% (TYPICAL) � 43.0 - :'.•.•' ..w NOT SHOWN IN THEIR PROPER LOCATION. C4 REMOVE EXISTING ASPHALT PAVING CALL BEFORE YOU DIG: 811 O 5' SIDEWALK PER EXISTING 5' 10.8 TO EDGE OF EX. CONC. PANEL C.O.R. STD. PLAN 102 4" MIN. CLASS "B" ASPHALTIC CONCRETE SIDEWALK -- VARIES ROAD PAVEMENT- 2-2" LIFTS REQUIRED 1 2% _ i NOTE: FINAL EXTENT OF TRENCH RESTORATION WITHIN EXISTING 8' LANDSCAPE STRIP 6"MIN. CRUSHED SURFACING TOP COURSE �`L� 2% i PUBLIC RIGHT-OF-WAY SHALL BE DETERMINED BY THE CITY .... VERTICAL CURB & GUTTER CRUSHED SURFACING BASE COURSE TO BE a CONSTRUCTION INSPECTOR IN THE FIELD. RESTORATION MAY PER C.O.R. STD PLAN 101 DETERMINED BY FIELD CONDITIONS BY �^ �°� A 'hl-A .. d. 0 5' REQUIRE HALF TO FULL STREET OVERLAY DEPENDING ON THE `L h5 SIDEWALK PER 0 6 MIN. CLASS B ASPHALTIC CONCRETE FINAL SAW CUT LOCATION. ALL RESTORATION SHALL BE IN Q GEOTECHNICAL ENGINEER. ° C.O.R. STD. PLAN 102 � � PAVEMENT- 3-2" LIFTS REQUIRED ACCORDANCE WITH THE CITY'S TRENCH RESTORATION AND J NE 3rd STREET ROAD SECTION EXTEND SIDEWALK LANDSCAPE STRIP 00 6"MIN. CRUSHED SURFACING TOP COURSE STREET OVERLAY REQUIREMENTS PER CITY ORDINANCE #5131 n TO EDGE OF PROPERTY CRUSHED SURFACING BASE COURSE TO BE VERTICAL CURB & GUTTER � � DETERMINED BY FIELD CONDITIONS BY ® EX. EDGE OF PAVEMENT SCALE: 1 "=10' PER C.O.R. STD PLAN 101 z Li ' ' NEW VERTICAL � N.T. z z GEOTECHNICAL ENGINEER. T z CURB AND GUTTER <0 p LOT # CENTERLINE DRIVEWAY NE 4th STREET SECTION I-_ STATION- ,1 .48% 6 ROOF DRAIN COLLECTION SYSTEM �, z PER CITY DETAIL DWG. 225.00 5 N.T.S. , SIDEWALK 526.05 630<D �° W (TYPICAL) 6 WHERE SHOWN � NEW 5 �s9 ,�� v CC) rr ON AS-BUILTS d12 0 �� ~ 07 CB 13 TYPE 1 .0 , 0 OSTA. 43+39.72 33.0' RT. INT'X O W/SOLID LOCKING LID co co O � BEGIN VERT. CURB & GUTTER STA. 45+07.90, NE 4th ST. ^� O RIM=514.48 Q� STA. 22+03.53, TRACT B �' RELOCATE EX. POLE O IE=512.08, 6" ^ '� O� I INT'X AT EX. CB `ti IE=511.88, 12" N �O \ I ,> STA. 40+00.00, NE 4th ST. O IE=517.30, 12 STA. 43+49.17 33.5 RT. MAINTAIN 5' SEPERATION Q r STA. 21 +90.02 BEGIN 5' SIDEWALK AT EX. BETWEEN NEW STORM AND oll SEE SHEET 12 y y I END OF ROAD SECTION SIDEWALK NEW WATER MAIN Q � • • NEW WATER MAIN ti CB 12 TYPE 1 07 I - OE ----------------- -- J �,ti�" J ° J a FD 3." BRASS SURFACE PIS " °: , ° ° ° a 4 M GRATE=513.52 pow d e ° /e °.. ° °. ° ti r IE-510.62, 12" I I \ - 43+0 �,� d . j d° • a #sga�7 ' '.. a n°. D SHED HIT ' 44400' e• 04l" a .e ° °.. a•' °° .° a°• .'`d.. e d •d• I ° d 4 INTX' STA. 20+00.00 I I - -- INTX' STA. 21 +95.02 U��oT��uw a a e- ° - d o .. d e A L ° ° ° �L' e e ° ° ° 4 �-�'- 1 ° ° . a � ALE Y '. A °. w -STA. 1 +20.50 - ®® @ BOUNDARY z nn, _ ° SDLIP°WHITE 4 ° ° - 07 EX. CB c6 RIM=o.79.° Q d ° ° p - NE '4th . ��ET a ° °. e d e e .. ° d. .. ° ° 4' .° ° w - - 21 +00 I GRATE=520.68 5�s. ®.. 4.° . d< INSTALL SURVEY MONUMENT�� -I - - - w d ° °{DASHED• WINTE d. ° to. EDGE OF EX. ASPHALT = PER CITY STANDARDS "B NE 3rd STREET IE=517.03, 12 (E) z IE=516.83, 12 7 _ I' I'MS°�1/@ CUT SINE �h�° .. ��� a ° STA. 21 +92.0 LCF' ��-1..�C°E., :.:.::. • :,'.,;..'. _ ��• C I INSTALL TYPE III Q BARRICADE, SEE SHEET 21 - - - - - - - - - - - - - - - - - - - - - - --- -----------r--------- V I -- 68LF., 12" LCPE @ S=2.68% �7 VALVE BOX W/2° a �ti 77.9T SEE SHEET 12 � I p IF TOBLOWOFF xSLo' °� I 'f:? �1 ti�� I PAVED ASPHALT TRANSITION .. SEE ENLARGEMENT ABOVE O CB 22 TYPE 1 IE=515.48 6' VERTIC y f GRATE 523.95 UP I BOARDFE E R W DEDICATION LINE t. IE-520.62, 12" 0 CB 11, TYPE 1 0 1• 'W SEE SHEET 14 , GRATE-513.54 STA. 46+72.14 33.0 RT. IE=510.34, 12 W CONTRACTOR TO POT -HOLE STA. 45+08.57 33' LT. END 5' SIDEWALK ELEVATION AT CENTERLINE IE=510.32, 12 (N) ELEVATION TGRADECENTERLIN AND AS -BUILT 6" HYDRANT CENSTD. PLAN #ER 20' DRI SWAY APPROACH RELOCATE EX. OF PROPOSED GRADE TYP. LEG; PROVIDE ENGINEER WITH WATER METER INFORMATION PRIOR TO INSTALLATION OF STORM SYSTEM ALONG NE 4TH ST. STA. 46+77.14 33.0' RT. -t Co Co N N � Co o END VERT. CURB/GUTTER 0o O r- O _t N _t co O - - `n c° - - TOP BACK OF CURB ELEVATION AT CENTERLINE 0 0 L`� 0 0 0 'n A 24LF., 12" LCPE@S=5.25% (PRIVATE) � ELEVATIONS TYPICAL OF EXISTING GRADE TYP. O RELOCATE EXISTING STREET LIGHT w N O AS SHOWN ON SHEET 21 z o NE 4th STREET PROFILE ............... :............... ...... ........ ...... ........ ...... ........ ............... ............... ............... ..... Ln .................... OB 19LF., 12" LCPE@S=1.58% 07 VERTICAL CURVE + m Co m In O I- N r- N Co r- L=60.0' OC 54LF., 12" LCPE@S=2.02% 07 N r N r N I� cfl o rn O o WIN N N I-i � Ln 6 In 6 N N N N N N N N N N N N p Q Oft� R = 2 5.0 0' «O Ln Ln Ln Ln Ln Ln Ln Ln v7 Ln Ln 520 + + N - _ 520=39.27' 530 w 530 - A=90°00'00" ,"� N ,� PC=0+85.50, 13.00' RT. NE: 4th STREET + - Q d TBC=513.73 cf)_ - I DELTA/2 o NI IIcf) II II CENTERLINE > � Q w - w +3•$9% :II O TBC=513.85 , PROPOSED TO OF NE 4th STREET 0 15 30 60 w o � - > PT=20+38.00, 10.00 RT. -i cn w w w 1 ...... CURB PROFILE ........ . . ............... ............... ...... TBC=513.99 ............................... ............... ... -2.00� I C I OE R=25.00' L=39.27, i inch = 30 feet 0=90°00 00 � - CONSTRUCTION RECORD DRAWING 510 - - _ - - - - 510 PC=1 +55.50, 13.00' RT. 520 - fl THIS CONSTRUCTION RECORD DRAWINb21g A COPY OF A CAD FILE PREPARED .........:...............-.---...... ....-.-... TB A 515.03 _.................................................... ............. ....................... .................... ................................................ E EL 2 BY OFFE ENGINE LC AND HAS BEEN EDITED - - - - ENGINEERS, PL C LJ y� _ _ DELTA/2 TBC 514.43 I :I 7 99LF 12" LCPE@S=1 90% INVERT AND RIM ELEVATIONS OF THE STORM, SANITA SDX �KD _ PT-20+38.00, 10.00' LT. 1 VERIFIED INVERT AND RIM ELEVATIONS WERE PROVIDED BY PACIFIC COAST SURVEYS, INC., 10� TBC=513.99 - ON DECEMBER 10, 2018. THE ON -SITE PRIVATE STORM DRAINAGE AND PUBLIC/PRIVATE LJ NE 3rd STREET WATER AND SEWER SYSTEMS WERE INSTALLED IN ACCORDANCE WITH THE APPROVED .............................................................................................. F INSTALL 16' DRIVEWAY APPROACHCB#22, -TYPE PLANS AND THE DOCUMENTED FIELD REVISIONS AND FUNCTION AS INTENDED. CB 12 : TYPE 1 PER CITY DETAIL #104.3 GRATE 3.951: 7 CB f 1 TYPE 1 IE=520.62, 12" R-391913 GRATE�513.52 � IE=51062, 12 GRATE=513.54 EX. CB RECORD DRAW N G S IE=510.34, 12" W GRATE=520.:68 IE=510.32, 12"�N:� IE-517.03 12 E 500 510 - , . „�) IN COMPLIANCE WITH CITY OF RENTON STANDARDS .............................................................................................................................................................. ............... ..IE=516:83;..1.2...W)................................................................ ..................... ..... . HORIZONTAL SCALE: 1 "=30' HORIZONTAL: SCALE: 1 "=:30' VERTICAL SCALE: 1 "-5' VERTICAL SCALE: 1 "=5' 20+00 21 +00 22+00 : AS -BUILT 12-12-2018 44+00 45+00 46+00 OFFE ENGINEERS 13932 SOUTHEAST 159TH PLACE RENTON, WASHINGTON 98058 PHONE: 425-260-3412 CONTACT: DARRELL OFFE, P.E. 7 L of 'WAsy��;�, 6 5 4 2 ° 27460O.STO0 o�FSS ��\ �� 12/12/2018 1 NO. AS -BUILT REVISED ROCKERY TO SAVE TREE REVISED VAULT PER CITY COMMENTS REVISED PER CITY COMMENTS REVISED PER CITY COMMENTS REVISED PER CITY COMMENTS REVISED PER CITY COMMENTS REVISION DLO 12/2018 DLO 9/2018 a J DLO 6/2018 SURVEYED: TERRANE SURVEYING SCALE: VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATUM CITY OF VR R E N TO N VZOOF Planning/Building/Public Works Dept. RENTON 14 PLAT KENDALL HOMES, INC. ROAD/PAVING/STORM DRAINAGE PLAN & PROFILE 6201 NE 4th STREET DATE: 12/12/2018 O Z Lu (]� DLO 2/2018 DESIGNED: D.L. OFFE, P.E. DLO 1/2018 P FIE�: DLO 9/2017 DRAWN: D.L. OFFE, P.E. ONE INCH DRAWING NO: DLO 2/2017 CHECKED: AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY BY DATE APPR APPROVED: SHEET: 1 3 28 OF: CJ