From:Nichole D. Perry
To:Jennifer Cisneros
Subject:FW: City of Renton LUA Acceptance: Oakesdale Ave SW Stormwater System Project, LUA25-000099, ECF
Date:Monday, April 28, 2025 11:54:23 AM
Attachments:Outlook-ev2umoo0.png
Outlook-2kwdvjin.png
Outlook-1mxzsccc.png
Outlook-5mkx5n4e.png
CONSTRUCTION INFORMATION REQUEST PDF.pdf
CONSTRUCTION INFORMATION REQUEST.docx
Metro comments.
NICHOLE PERRY, Associate Planner
City of Renton // Community and Economic Development
Virtual Permit Center // Online Applications and Inspections
office 425-430-7286
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From: Markwell, Thi <tmarkwell@kingcounty.gov>
Sent: Friday, April 25, 2025 2:44 PM
To: Nichole D. Perry <NPerry@rentonwa.gov>
Subject: Fw: City of Renton LUA Acceptance: Oakesdale Ave SW Stormwater System Project, LUA25-
000099, ECF
Good afternoon,
King County Metro received the notice identified in the subject line and forwarded it for internal
review. The Construction Coordination team responded with:
To All Contractors and Agencies performing construction work in Metro Transit Bus Stops
and Roadways:
Contractors or Agencies doing work that impact transit routes or bus stops, must reach
out to this office directly by sending an email to construction.coord@kingcounty.gov, with
the following information:
Construction Request Form (Attached)
All Approved TCPs and permits, (Required)
Please send all pertinent TCPs for this work along with a completed copy of the
attached construction request form.
Notification Guidelines:
Please note that King County Metro requires all contractors and agencies to follow
notification guidelines.
Visit KC Metro System Impacts web site for more details at: Transit System Impacts -
King County, Washington
Your project is not approved until you are notified by the KC Metro Construction
Impacts office.
We will contact you if we require additional information or T-39 No Parking Signs.
The contractor is responsible for providing permitted no-park signage for the
placement of temporary bus stop placement or for the safe movement of coaches
on a planned reroute. No-Parks must be placed 72 hours prior to the start of work
to be enforceable.
Once we receive all required information, your request will be reviewed and final
written approval will be sent via email.
Once approval is received, the contractor may contact the permitting agency as
necessary.
KCM Construction Coordinators will arrange for the coordination of all bus stops
closures and the placement of temporary bus stops if necessary.
More notification lead time will be needed when impacting a KC Metro Layover and
access to Comfort Stations. Station.comfort@kingcounty.gov 206-477-9959
TCPs need to accurately dipict your traffic control and work site set up. This
includes noting the location of impacted bus stops.
Precon, Construction and Site Meetings:
· KCM Construction Coordinators are available to attend meetings.
Please send all meeting invites to construction.coord@kingcounty.gov
Site meetings can be coordinated with Construction Coordinators and Metro
Service Quality Field Supervisors.
Bus Stop Construction and Long-Term Bus Stop Impacts:
If the contractor needs to remove/reinstall bus stop equipment/structures, such as
zone flags, bus stop shelters, benches, and KC garbage cans, our Transit Route
Facilities group will work with you to coordinate this work.They can be reached at:
RFDOTTransitRouteFacilities@kingcounty.gov
If the contractor needs to find information on bus stop specifications, please contact
our Bus Stop Projects group at: busstopprojects@kingcounty.gov
NOTE: All work that will require the construction, removal or installation of bus stop
amenities requires 30 business days notification lead time.
Timely notification allows us to plan, mitigate, and most importantly, notify our
riders and operators of your work.
Single Bus Stop Closures: 5 business days (Not including holidays)
Projects that require multiple bus stop closures: 10 business days (Not
including holidays)
Street Closures that impact transit: 10 business days (Not including holidays)
Long-term Bus Stop moves that require the closure and relocation of a
layover or access to Metro facilities: 30 business days (Not including
holidays)
See our website for details.
Please download, complete, and return the attached Bus Stop/Route Impact Request
form. If your project has multiple phases, please complete one form for each phase.
Be sure to include all approved TCPs and permits for this impact with your request form.
Please be sure to reach out to the permitting agency (if applicable) for prior approval of
your project.
We appreciate you working with us so we can help you safely complete your project.
Thank you.
====
If you have any questions or concerns, please reach out.
Thanks!
Thi Markwell (She/Her)
Transit Environmental Planner II
Transit Real Estate and Environmental (TREE)
P 206-263-2659
tmarkwell@kingcounty.gov
From: Chung, Lawrence <lachung@kingcounty.gov>
Sent: Thursday, April 24, 2025 4:48 PM
To: Markwell, Thi <tmarkwell@kingcounty.gov>
Subject: OAP: City of Renton LUA Acceptance: Oakesdale Ave SW Stormwater System Project, LUA25-
000099, ECF
From: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Sent: Thursday, April 24, 2025 4:05 PM
To: ktsang@muckleshoot.nsn.us; Laura Murphy <Laura.murphy@muckleshoot.nsn.us>;
sepacenter@dnr.wa.gov; Planning@TukwilaWA.gov; Mark Hofman <markh@newcastlewa.gov>;
sepa@pscleanair.org; Ishimaru, Jim <Jim.Ishimaru@kingcounty.gov>; McColloch, Duffy
<McCollD@wsdot.wa.gov>; NSchildmeyer <NSchildmeyer@kentwa.gov>; Madura, Jalaine
<Jalaine.Madura@seattle.gov>; Fischer, Katherine <katherine.fischer@kingcounty.gov>;
SEPA@dahp.wa.gov; R4Splanning@dfw.wa.gov; NWS.Compliance@usace.army.mil;
culturalpreservation@duwamishtribe.org; KCWTD Other Agency Planning
<KCWTD_otheragencyplanning@kingcounty.gov>; sandy.leek@pse.com; ktsang@muckleshoot.nsn.us;
Chung, Lawrence <lachung@kingcounty.gov>
Cc: Nichole D. Perry <NPerry@rentonwa.gov>; Muang Saelee <MSaelee@rentonwa.gov>
Subject: City of Renton LUA Acceptance: Oakesdale Ave SW Stormwater System Project, LUA25-000099,
ECF
[EXTERNAL Email Notice! ] External communication is important to us. Be cautious of phishing attempts. Do not click or
open suspicious links or attachments.
Hello,
Please see linked documents below for City of Renton LUA acceptance for the following project:
Oakesdale Ave SW Stormwater System Project
LUA25-000099, ECF
Please see related documents linked below:
Notice of Application
Site Plan
Environmental Checklist
As the project progresses, more information will be available by request and through our online
Public Notice of Land Use Applications Map.
Regards,
JENNY CISNEROS, Planning Technician
City of Renton // Community and Economic Development
Virtual Permit Center // Online Applications and Inspections
office 425-430-6583
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
CONSTRUCTION INFORMATION REQUEST
Bus Stops/Route Impact
Date Submitted:
Minimum notification:
•5 full business days required to
close/move bus stops.
•10 full business days required to reroute
buses for road closures.
•Changes to work scope or rescheduling your project is
subject to the same notifications listed here.
•You must receive written notice from this office to proceed
with your project.
Email this form to construction.coord@kingcounty.gov. All requests must include approved TCPs and Permits. If you
have questions, please call (206)477-1140.
If your work is to be in or around Trolley Bus Right of Way or Trolley Wire Overhead:
Contact Trolley Impacts Coordinators at trolley.impacts@kingcounty.gov (206)477-1150.
New Request ☐ Revised Request ☐
Description of work:
APPROVED Traffic Control & APPROVED Permits TCP’s are required for all construction requests.:
Approved TCP: ☐ Yes ☐ No Approved TCP Submitted: ☐ Yes ☐ No
Date(s) of work:
Start Work Date: End Work Date: Start Work Time:
☐AM ☐ PM
End Work Time:
☐AM ☐ PM
Type of closure:
☐Daily ☐ Nightly ☐ Continuous (24 Hr/Day)
If Continuous (24 hr/Day) Are you working on:
☐Weekdays ☐ Weekends ☐ Both
Work weather dependent:
☐Yes ☐ No
If yes: Contingency Date: 2nd Contingency Date:
Location (include nearest cross streets and/or intersecting streets):
Street/Road/Address work to be done on: Direction:
☐North ☐ East ☐ South ☐ West
Cross Street(s): Lane shifts with Flaggers/UPO?
☐Yes ☐ No
Full Road Closure:
☐Yes ☐ No
Partial Road Closure:
☐Yes ☐ No
Bus Stop Closure:
☐Yes ☐ No
If yes, provide bus stop number (Bus stop numbers can be found on OneBusAway:
Contact Information:
Project Lead: Project Lead Company:
Project Lead Phone: Project Lead Email:
Onsite contacts (Contacts must be onsite and available during work hours.):
Primary Contact: Primary Phone: Secondary Contact: Secondary Phone: