HomeMy WebLinkAboutChange Order - 22Docusign Envelope ID: 6AC6E5A 1-30E0-4F9A-95A0-E8BE7585335B 0 Change Order No.22 Contract Title: Park Avenue North Extension Contractor: Olson Brothers Excavating, Inc. Contract No.: CAG-22-265 Federal Aid No.: NA 181 Ordered by Engineer Force Account Proposed by the Contractor (VECP)181 Bid Item Unilateral Bid Item Price Adjustment 181 Lump Sum Affects DBE Work: No Yes If yes, must receive concurrence from Local Programs prior to execution. Original Contract: Current Contract: Estimated Net Change This Order: New Contract: Prepared By: / 71 , fl..,.,,n ,A _Date: 2025.04.04 wv--11 :35:42-07'00" Resident Engineer Reviewed By: Engineer of Record Reviewed By: Date 2025.04.03 13:15:23-07'00' Date Hebe C. Bernardo:'"'.5:I'."""J!=="-zon.tMm,i,,,IHl1'01r City of Renton Project Manager Reviewed By: City Attorney Change Order No. Contract Title: Contract No. 22 PARK AVE N CAG-22-265 Date Date Amount Working Days 3,636,341.81 100 4,116,283.40 213.5 10,032.29) 17 4,106,251.11 230.5 of Renton Transportation Design Manager) Consent By: Surety (Greater than 25% cost and/or 20% time increase) Endorsed By: Contractor Executed By'"'"" Martin Pastucha 888131 FD9884490 City of Renton Public Works Administrator/ Mayor Date Date Date 4/18/2025 I 10:59 AM Date Page 1 of 4 CAG-22-265,CO #22-25 Approved by Cheryl Beyer via email 4/2/2025 Docusign Envelope ID: 6AC6E5A1-30E0-4F9A-95A0-E8BE7585335B THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Description: This Change Order covers the cost of the signal pole adaptor assembly, which was purchased directly by the City from Everett Engineering and provided to the contractor for realigning the signal pole arms. This adjustment compensates the City for the manufacturing cost of the adaptor plate. Proposal Schedule of Prices: The new bid item A79-3 "Adaptor Plate" shall be measured by Lump Sum. Specification and/or Special Provision: Description: Measurement: The ne w Bid Item A79-3 "Adaptor Plate" shall be paid as a lump and shall cover the complete credit cost of providing all labor, materials, tools, equipment required for Everett Engineering to complete the adaptor plate fabrication work. Payment: The new Bid Item A79-3 "Adaptor Plate" shall be paid as a lump. Materials: NA Plans: NA REASON FOR CHANGE: Signal pole 4's base and signal arm were installed incorrectly, causing a direct conflict with the railroad gate arm. The city determined the bolt alignment, and pole base installation to be nonconforming work and required the Contractor to correct it in accordance with SSl-05.7. However, the City accepted the corrected installation after the contractor installed a city-obtained adaptor plate and agreed to a corresponding price adjustment to reimburse the City for the cost of the adaptor plate assembly. Change Order No. Contract Title: Contract No. 22 PARK AVE N CAG-22-265 Page 2 of4 Docusign Envelope ID: 6AC6E5A1-30E0-4F9A-95A0-E8BE7585335B EQUITABLE ADJUSTMENT: This Change Order does/does not include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached. Estimated Cost: ($10,032.29) Extended Overhead: $ 0 Force Account Time related $ 0 damages per 1-09.6, 6.d.: Total: $ ($10,032.29) EXTENSION OF TIME: The Time for Completion is extended 17 Working Days. AFFECTS DBE WORK: Explain how this Change Order affects DBE work. NA. Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. To be attached to Change Order: D 1-Field Directive/Request for Information Response D 2-Estimated Change Order Cost D 3-Plans D 4-Change Order Quotation D 5-Project Labor List D 6-Force Account Equipment Rate Request (DOT Form 422-010 EF) 181 7-Equitable AdjustmentDetermination D 8-Additional Working Days Calculation Change Order No. Contract Title: Contract No. 22 PARK AVE N CAG-22-265 Page 3 of 4 Docusign Envelope ID: 6AC6E5A 1-30E0-4F9A-95A0-E8BE7585335B EVERETT ENGINEERING. INC BILL TO EverettEngineering, Inc. P.O. Box 12100 Everett, WA 98206-2100 Phone:425-259-3117 Fax: 425-258-1288 CITY OF RENTON P.O. NO. DESCRIPTION FABRJCATE I EA BASE ADAPTORBASSED OFF PREVIOUS DISCUSSION AND CUSTOMER SUPPLIED ORA WINGS. SALES TAX (SHIP TO: EVERETT RTA-3105) Pay invoice TERMS COD RATE Total Use account 317.122190.015.595.30.63.001 9.90% Invoice DATE INVOICE# 9/30/2024 35779 DUE DATE 9/30/2024 AMOUNT 9,128.56 903.73 10,032.29