HomeMy WebLinkAboutMFP25001502.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP25001502
IVR Number: 25001502
Permit Information
Permit Name: Comcast Cable Franchise Permit - JB0001876368 Alley
Address/Location:03/26/2025Application Date:7231501845Parcel Number: 214 WILLIAMS AVE S
Permit Type:04/21/2025Issue Date:Franchise
Permit Work Class:04/21/2026Expiration Date:Minor Utility
Job Number: JB0001876368Franchise Type:Cable
Description: JB0001876368 Comcast proposes to dig and intercept Comcast conduit and overset new vault, pull new Fiber
through existing conduit and upgrade additional vault with manhole.
Contacts
Name Address PhoneTypeBilling
Permitting Department
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
ApplicantX
Permitting Department
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contact
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Contact
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Emergency
Contact
MICROMANAGER 1 LLC 214 WILLIAMS AVE S
RENTON , WA 98057
Owner
Amy Boldenow
Comcast - Billing
1701 John F Kennedy BLVD John F.
Kennedy Blvd
Philadelphia, PA 19103
B: (425) 918-1140Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP25001502
Scott Warlick 5/1/2025
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 2/25/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 2/25/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4. Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
MFP25001502
8:00amMondayFriday
Scott Warlick CED 5/1/2025
Page 2 of 6 | Published: 2/25/2025
This Page Intentionally Left Blank
Page 3 of 6 | Published: 2/25/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
• Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
• Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
• Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
• Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
• Applicant must comply with all conditions of the application.
• The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
• No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
• Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
• Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
• Applicant must have the approved TCP prior to commencing the work.
• Approved TCP must be at the work site during work hours.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
• At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
• When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
• Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 | Published: 2/25/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
• Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
• Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
• Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
• Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
• Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430-
7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal)
affecting the vehicle detection.
• Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
• Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
• Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
• Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
• Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
• If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
• Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
• All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
• Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
five (5) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 | Published: 2/25/2025
• Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
• Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
• Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
• Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
• For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
• Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
• Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
• Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
• Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
• Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8) for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
• City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 | Published: 2/25/2025
• Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
• Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
• The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
• If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
• TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
• Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
• TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
• TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
NO
SCALE
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
TRAFFIC CONTROL NOTES:
1. The designed traffic controls contained within this TCP will not be implemented until approved by the public
authority having jurisdiction
2. The contractor is advised that all lane closures shall be kept to a minimum. Local jurisdictions will approve
only those lane and roadway closures determined to be necessary for the contractor to accomplish a specific
task. No lane or roadway closures will be permitted without prior approvals.
3. The contractor shall keep all traffic lanes and shoulders clear of equipment and materials during non-working
hours. Equipment and materials shall not be stored on the streets. The contractor's employees and agents
shall not park private vehicles along the roadway or median.
4. All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal
manual on uniform traffic control devices (m.u.t.c.d).
5. Cities and various municipalities may have also adopted specialized guidelines for traffic control within their
jurisdiction. It is the responsibility of the on-site traffic control personnel to verify if any special conditions exist.
6. Traffic control equipment shall maintain a minimum 15' clearance from railroad tracks.
7. Recessed steel plates shall be placed over open trench during non-work hours. W8-24 signs shall be placed
as advanced warning to vehicles.
8. Will coordinate with any businesses that will be affected by construction
9. Access to driveways must be maintained at all times.
10. No park signs to be placed 72 hours prior to construction.
11. Signs within roadway will be protected by channelization devices
12. All traffic control devices used for night work must be retroreflective
PEDESTRIAN & BICYCLE NOTES:
1. Bike lane traffic must be maintained with a minimum of 2' clearance throughout work area.
2. Pedestrian traffic must be maintained with a minimum of 4' clearance within crosswalk.
3. Pedestrian traffic must be maintained with a minimum of 4' clearance within sidewalk.
4. Flagger/spotter to direct and assist pedestrians around work area unless otherwise noted.
5. All work will stop while pedestrians are escorted through work zones
ADDITIONAL NOTES:
1. Contact property owner(s) 72 hours prior to start of work to alert owner(s) to possible driveway closures and
alternate access when applicable.
2. Contractor shall coordinate work hours with local school bell schedule. no traffic control equipment shall be
placed until after school is in session when applicable.
3. Notify fire station 72 hours prior to start of work. access for emergency vehicles shall be maintained at all
times when applicable.
4. Contact transit authority 72 hours prior to start of work for temporary relocation of bus stop when applicable.FLAGGERSPOTTERLEGEND
Work Vehicle Truck Mounted Attenuator Work Area
Flagger Spotter Traffic Safety Cone/Drum
WT WT
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
Silas Schroeder
(P): (253) 709-3302
(E): sschroeder@teamcannon.com
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 3/25/2025
COVER SHEET
SS AM KB
001 003
MFP25001502
207
214
222
221
217WILLIAMS AVE SROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPEOPEOPDWS/WS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPEOPEOPALLEYSPOTTERXROAD
WORK
AHEAD
W20-1
ACCESS TO DRIVEWAYS MUST BE
MAINTAINED AT ALL TIMES.
CONTACT PROPERTY OWNER(S) 72
HOURS PRIOR TO START OF WORK.
WT
PARKINGNO
FROM
TO
NAME OF FIRM 000-0000
PHONE (CONTACT #)
TOW-AWAY AREA
T-39
XROAD
WORK
AHEAD
W20-1 NO
SCALE
N
S
EW
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
Silas Schroeder
(P): (253) 709-3302
(E): sschroeder@teamcannon.com
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 3/25/2025
COVER SHEET
SS AM KB
002 003
MFP25001502
800
824
808
810
818814 822 826
237
227
225
229
231
223ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPDWS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPWILLIAMS AVE SALLEYSPOTTER
PARKINGNO
FROM
TO
NAME OF FIRM 000-0000PHONE (CONTACT #)
TOW-AWAY AREA
T-39
ACCESS TO DRIVEWAYS MUST BE
MAINTAINED AT ALL TIMES.
CONTACT PROPERTY OWNER(S) 72
HOURS PRIOR TO START OF WORK.WTNO
SCALE
N
S
EW
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
Silas Schroeder
(P): (253) 709-3302
(E): sschroeder@teamcannon.com
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 3/25/2025
COVER SHEET
SS AM KB
003 003
MFP25001502
WORK AREA
410 Valley Ave NW
Puyallup, WA 98371
COMCAST CABLE COMMUNICATION LLC
CLIENT
CONTACT: Casey Brown
PHONE: (425) 263-5345
EMAIL: Casey_Brown2@cable.comcast.com
VICINITY MAP
406 Porter Way
Milton, WA 98354
CANNON COMPANIES
CONTACT: Silas Schroeder
PHONE: (253) 709-3302
EMAIL: sschroeder@teamcannon.com
PLANT MAINTENANCE
1 -COVER SHEET
2 -GENERAL NOTES
3 -LEGEND
4 -DETAILS
5-6 -CONSTRUCTION PLAN
7-8 -RESTORATION PLAN
NO
SCALE
SCOPE OF WORK
DIG AND INTERCEPT EXISTING COMCAST CONDUITS TO OVERSET
NEW VAULT.
TRENCH (1) NEW 4" CONDUIT FROM EXISTING VAULT TO OVERSET
VAULT.
PULL NEW FIBER THROUGH NEW CONDUIT (PROPOSED NIGHT
WORK).
RELOCATE SPLICE CASE FROM EXISTING VAULT TO NEW VAULT
(PROPOSED NIGHT WORK).
WRECKOUT FIBER IN EXISTING CONDUITS.
UPGRADE EXISTING VAULT WITH MANHOLE LID.
N
S
EW
POLE COUNT =
TRANSMISSION =
DISTRIBUTION =
POLES THAT NEED PERMIT =
POLES THAT NEED MAKE READY =
POLE INFORMATION
0
0
0
0
0
BILL OF MATERIALS *ALL FOOTAGES AND
MATERIALS ARE ESTIMATED
OVER-LASH =FT
NEW AERIAL =FT
PROOF & PULL =FT
NEW UNDERGROUND =FT
RISER =FT
TOTAL ROW FOOTAGE =FT
RIGHT OF WAY FOOTAGES*:
=FT=FT+ 20% STORAGE
MATERIAL FOOTAGES*
0
0
0
8
(0)0
8
96CT 810
SHEET INDEX
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 03/25/2025
COVER SHEET
SS AM KB
001 008
MFP25001502
RESTORATION PER CITY OF RENTON STANDARDS
NO
SCALE
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO
CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS
NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT
THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE
NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.
THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND
IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE
IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH
MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,
ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE
OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES
TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES
AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO
PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY
OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR
WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT
PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS
OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE
ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A
SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING
NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES
AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE
EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE
MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL
BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX
351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN
TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE SCHEDULE 80 PVC OR EQUIVALENT, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36"
WITH A MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,
PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP
CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL
ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE
SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL
ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD
SPECIFICATIONS OF EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT
CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN
ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED
PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED
AND WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED
PRIOR TO CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF
WASHINGTON'S WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING
UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE
REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO
POWER MAIN WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND
REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS
IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 03/25/2025
GENERAL NOTES
SS AM KB
002 008
MFP25001502
NO
SCALE
V
NEW
V
TH
NEW
TH
CAB
NEW
CAB
DH
NEW
DH
P
NEW
P
LINE TYPES
FL FL
EOP EOP
ROW ROW
S/W S/W
D/W D/W
X X
U U U U U U U U
P P
PARCEL LINE
BUILDING OUTLINE
LANE LINE
CENTERLINE / STATION LINE
FOG LINE
EDGE OF PAVEMENT (EOP)
RIGHT OF WAY (ROW)
SIDEWALK (S/W)
DRIVEWAY (D/W)
FENCE
GUARDRAIL
CROSSWALK
RAILROAD
POWER
TS TS TRAFFIC SIGNAL
F/O F/O FIBER OPTIC
T T TELECOMMUNICATION
S S SEWER MAIN
SS SS SANITARY SEWER
D D DRAIN MAIN
DD DD DRAINAGE DITCH
G G GAS
OIL OIL OIL
STM STM STEAM
W W WATER
UNK UNK UNKNOWN UTILITY
TRAFFIC CONES
STRAW WATTLES
A A EXISTING AERIAL
A A NEW AERIAL
C C EXISTING/PROOF & PULL CONDUIT
PROPOSED CONDUIT
SYMBOLS
HATCH PATTERNS
CONCRETE ASPHALT
CONCRETE PANELS
LANDSCAPELIMITS OF RESTORATION
GRAVEL
BRICK/COBBLE
ROWIP ALLEY / TRAVEL LANE WZ
ROWIP PARKING / BIKE LANE WZ
ROWIP SIDEWALK WZ
OH OH OVERHEAD UTILITIES
#VAULT
(EXIST / NEW)
SIZE MAY VARY
MANHOLE
(EXIST / NEW)
DOGHOUSE
(EXIST / NEW)
TIGERHOUSE
(EXIST / NEW)
NODE CABINET
(EXIST / NEW)
PEDESTAL
(EXIST / NEW)
R R
UTILITY POLE
(EXIST / NEW)
UTILITY RISER
(EXIST / NEW)
200'
EXISTING SPLICE CASE
NEW SPLICE CASE
NEW MAT. STORAGE
NEW COAX TAP
UTILITY POTHOLE
POLE ANCHOR
/ DOWN GUY
CB CATCH BASIN
CATCH BASIN
W/ SOCK
CW CROSSWALK SIGNAL
SL STREET LIGHT
FH
FIRE HYDRANT
M WATER METER
V UTILITY VALVE
TREE
SHRUBBERY
N
S
EW
STREET SIGN
MAP COMPASS
339'FOOTAGE NOTE
LANE DIRECTION INDICATOR
BUS STOP LOCATION
MARK-UP NOTATIONS
#
#
PHOTO LOCATOR/ORIENTATION
CALLOUT
CONSTRUCTION NOTE CALLOUT
POLE # CALLOUT
STA 0+00 DISTANCE STATION
A
#
CROSS SECTION SYMBOL
CROSS SECTION NAME
CROSS SECTION SHEET #
#WORK
LOCATION PHOTO NOTE CALLOUT
#DISTANCE DIMENSION
ADA RAMP
CB
#VAULT # CALLOUT
MH MH
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 03/25/2025
LEGEND
SS AM KB
003 008
MFP25001502
G
GGGGPPPPPPPP207
214
222
221
217WILLIAMS AVE SROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROW
ROWROWROWROWROWROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPEOPEOPDWS/WS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPEOPEOPALLEYTTTTTTVDH
V 8'
2,3
1
4
5
~~~
~~~~
1
CONSTRUCTION NOTES:
DIG AND INTERCEPT EXISTING
COMCAST CONDUITS TO OVERSET
NEW VAULT.
TRENCH (1) NEW 4" CONDUIT FROM
EXISTING VAULT TO OVERSET
VAULT.
PULL NEW FIBER THROUGH NEW
CONDUIT(PROPOSED NIGHT WORK).
.
RELOCATE SPLICE CASE FROM
EXISTING VAULT TO NEW VAULT
(PROPOSED NIGHT WORK).
WRECKOUT FIBER IN EXISTING
CONDUITS.
UPGRADE EXISTING VAULT WITH
MANHOLE LID.
2
3
4
5
6
0 10'20'
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
N
S
EW
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 03/25/2025
CONSTRUCTION PLAN
SS AM KB
004 008
MFP25001502
800
808
810
818814 822ROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPDWS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPS/WS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPEOPTTTTT MHWILLIAMS AVE SALLEY6
1
CONSTRUCTION NOTES:
DIG AND INTERCEPT EXISTING
COMCAST CONDUITS TO OVERSET
NEW VAULT.
TRENCH (1) NEW 4" CONDUIT FROM
EXISTING VAULT TO OVERSET
VAULT.
PULL NEW FIBER THROUGH NEW
CONDUIT(PROPOSED NIGHT WORK).
.
RELOCATE SPLICE CASE FROM
EXISTING VAULT TO NEW VAULT
(PROPOSED NIGHT WORK).
WRECKOUT FIBER IN EXISTING
CONDUITS.
UPGRADE EXISTING VAULT WITH
MANHOLE LID.
2
3
4
5
6
0 10'20'
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
N
S
EW
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 03/25/2025
CONSTRUCTION PLAN
SS AM KB
005 008
MFP25001502
214 ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROW ROW
ROWROWROWROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPEOPDWS/WS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPEOPS/WS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPEOPEOPALLEY8'
5'7'3'
3'VV
1R
WILLIAMS AVE S1
RESTORATION NOTES:
RESTORE ASPHALT CONCRETE ROADWAY
PER CITY OF RENTON'S SPECIFICATIONS.
0 10'20'
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
N
S
EW
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 03/25/2025
RESTORATION PLAN
SS AM KB
006 008
MFP25001502
800
808
222
810WILLIAMS AVE SROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPEOPDWS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPS/WS/WEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP5'
5'
MH
1RALLEY 1
RESTORATION NOTES:
RESTORE ASPHALT CONCRETE ROADWAY
PER CITY OF RENTON'S SPECIFICATIONS.
0 10'20'
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
N
S
EW
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 03/25/2025
RESTORATION PLAN
SS AM KB
007 008
MFP25001502
1 EXCAVATION AREA & NEW VAULT LOCATION
STANDING IN ALLEY @ 214 WELLS AVE S 2 EXCAVATION AREA & NEW VAULT LOCATION
STANDING IN ALLEY @ 214 WELLS AVE S
NO
SCALE
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
ALLEY VAULT REPLACEMENT
T23N R05E S17
214 WELLS AVE S RENTON, WA 98057
JB0001876368
--------
SS AM 03/25/2025
PROJECT IMAGES
SS AM KB
008 008
MFP25001502