Loading...
HomeMy WebLinkAboutEx 08_Advisory Notes.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 6 LUA24-000364 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Alex Morganroth, 425-430-7219, amorganroth@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and /or your U.S. Fish and Wildlife Service permit. Development Engineering: (Contact: Michael Sippo, 425-430-7298, msippo@rentonwa.gov) 1. See attached Memo dated March 27, 2025 Renton Fire Department: (Contact: Corey Thomas, 425-276-9582, cthomas@rentonrfa.org) 1. The fire flow requirement for a single family home is 1,000 gpm minimum for dwellings up to 3,600 square feet (including garage and basements). If the dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be required. One existing fire hydrant is adequate to meet minimum requirements. A certificate from the Soos Creek Water Department will be required to assure the demand can be met. 2. Fire impact fees are applicable at the rate of $829.77 per new residential unit. A credit is given for the demolition of the one existing house. This fee is paid at time of building permit issuance. 3. Fire department apparatus access roadways are adequate as provided by the existing public streets. ADVISORY NOTES TO APPLICANT Page 2 of 6 LUA22-000276 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: July 1, 2024 TO: Alex Morganroth, Principal Planner FROM: Yong Qi, Development Engineer SUBJECT: Tran Short Plat 16654 113th Ave SE LUA22-000276 I have reviewed the application for the Tran Short Plat project located at 16654 113th Ave SE, parcel No: 0088000930, and have the following comments: EXISTING CONDITIONS: WATER & SEWER: The proposed project is within Soos Creek Water and Sewer District. STORM DRAINAGE: There is an existing 12-inch concrete stormwater pipe and associated catch basins along the west side of 113th Ave SE (no record), which discharges to the existing conveyance system on south side of SE 168th Street. STREETS: This project fronts 113th Ave SE along the west property line and SE 168th Street along the south property line. The project site takes access from 113th Ave Se with one existing driveway. WATER COMMENTS: 1. Water service is provided by Soos Creek Water and Sewer District. 2. Applicant shall obtain a water availability certificate from the District and provide it with the civil construction permit submittal. 3. Review of the water plans will be conducted by Soos Creek Water and Sewer District and the Renton Regional Fire Authority. 4. Water Plans approved by Cedar River Water and Sewer District shall be routed to the City for final review prior to permit issuance. ADVISORY NOTES TO APPLICANT Page 3 of 6 LUA22-000276 SEWER COMMENTS: 1. Sewer service is provided by Soos Creek Water and Sewer District. 2. Applicant shall obtain a sewer availability certificate from the District and provide it with the civil construction permit submittal. 3. Review of the sewer plans will be conducted by Soos Creek Water and Sewer District. 4. Sewer Plans approved by Cedar River Water and Sewer District shall be routed to the City for final review prior to permit issuance. STORM DRAINAGE COMMENTS: 1. Drainage plans and a drainage report complying with the adopted 2022 Renton Surface Water Design Manual is required. Refer to Figure 1.1.2.A – Flow Chart of the 2022 Renton Surface Water Design Manual (RSWDM) to determine what type of drainage review is required for this site. Based on the City’s flow control map, this site falls within City’s Flow Control Duration Standard area (Matching Forested Conditions). The project site is located in the Soos Creek Drainage Basin. a. A preliminary TIR prepared by Tebaldi Engineering, LLC., dated April 8th, 2024, was submitted by the Applicant with the Land Use Application, which was prepared following the 2021 King County Surface Water Design Manual. The drainage TIR shall be revised to be in compliance with the current 2022 RSWDM. b. Core Requirement #2, off-site analysis: An off-site and downstream analysis was performed by Casey Lowe with the Migizi group in 2022, which is included on Section 3.0 of the TIR. The downstream drainage paths were field inspected for existing drainage problems and the analysis concluded there are no potential problems found, and it is not anticipated that the additional flow from the subject property will create any flooding or erosion risks. c. Core Requirement #3, per the TIR, a vault of approximately 15,500 cubic feet was proposed to meet the flow control requirement, which was modeled with WWHM2012 to meet the Leve 2 flow control standards, which shall be revised to meet City's flow control duration standard (matching forested condition) per Section 1.2.3 of 2022 RSWDM. 2. Conveyance, Core Requirement #4: All new conveyance systems constructed as part of the project must be sized to RSWDM standards for the total tributary area (onsite and offsite) that the storm systems serve. a. The preliminary TIR depicts the new conveyance systems have been designed to convey the 100-year design storm pipe systems, but no calculation is provided. The calculation and analysis of the new conveyance system shall be provided and will be reviewed during the civil construction permit review process. 3. Construction Stormwater Pollution Prevention, Core Requirement #5: The preliminary civil plan and drainage assessment include an ESC and CSWPP plan. a. A preliminary CSWPP is provided in Section 8.0 of the TIR. A final CSWPP and ESC plan in compliance of 2022 RSWDM instead of 2021 KCSWDM shall be included within the TIR and utility plans submitted as a portion of the civil construction permit application. 4. Water Quality, RSWDM Core Requirement #8: If the new plus replaced pollution generating impervious (PGIS) surface exceeds 5,000 SF, the applicant will be required to provide enhanced basic water quality treatment. a. The preliminary TIR indicates that the total PGIS is less than 5,000 SF and water quality treatment is not required. Staff has reviewed the preliminary analysis and determined it is acceptable. 5. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the new runoff created by this development to the maximum extend feasible. On-site BMPs shall be evaluated as described in Section C.1.3 of the 2022 RSWDM. A preliminary drainage plan, including the application of on-site BMPs, shall be included with the land use application, as appliable to the project. The final drainage plan and drainage report must be submitted with the utility construction permit. a. The preliminary TIR depicts that soil amendment BMP will be used for pervious surfaces. However, perforated pipe connection is not evaluated and shall be provided for all proposed connection of roof ADVISORY NOTES TO APPLICANT Page 4 of 6 LUA22-000276 downspouts per Section 1.2.9.2.2 of RSWDM. The on-site BMPs feasibility analysis will be further reviewed during the civil construction permit application. 6. A geotechnical report for the site is required and shall be submitted with the land use application. Information concerning the soils, geology, drainage patterns, vegetation present, water table and soil permeability, with recommendations of appropriate on-site BMP options with typical designs for the site from the geotechnical engineer, shall be submitted with the application. The geotechnical report should include an on-site infiltration test to clearly show if the site is suitable or unsuitable for infiltration. a. A geotechnical report prepared by Migizi Group, Inc., dated January 24, 2019 (revised March 31, 2020), was submitted by the Applicant with the Land Use Application. b. The geotechnical report indicates the site is underlain by relatively impermeable, glacial till soils, infiltration is not recommended for this site, however, permeable surfacing can be used in the upper soil. The groundwater seepage was encountered at the top of the impermeable layer of glacial till deposits approximately 2 feet and 3 feet below existing grades. 7. The 2024 Surface water system development fee (SDC) is $2,300.00 per new single-family lot. This is payable prior to issuance of the construction permit and are not vested to the rates at land-use approval. This fee is subject to change based on the calendar year the construction permit is issued. TRANSPORTATION/STREET COMMENTS: 1. The proposed project fronts 113th Ave SE to the west with existing right of way (ROW) width of approximately 60 feet with an existing paved width of approximately 23 feet. To meet the City’s complete street standards for a residential access street, per RMC 4-6-060, a minimum ROW width of 53 feet is required. Per RMC 4-6-060 half of street improvements as taken from the road centerline shall be required and include a 26-foot paved road (13 feet each side), a 0.5-foot curb, an 8-foot planting strip, and a 5-foot sidewalk. No dedication will be required pending field survey. a. The submitted preliminary civil plan depicts the street improvements along 113th Ave SE as taken from the road centerline is a 13 feet paved road, a 0.5-foot curb, an 8-foot planting strip, and a 5-foot sidewalk. Therefore, the planting strip shall be revised to be 11.5-foot wide, and the sidewalk shall be located against the west property line of the project site. 2. The proposed project fronts SE 168th Street to the south with existing ROW width of approximately 60 feet with an existing paved width of approximately 43 feet. To meet the City’s complete street standards for Collector Arterial Street, the minimum ROW width required on a 2-lane collector street is 83 feet with 30 feet wide travel width, 8 feet wide paved parking width on both sides, 0.5 feet wide curbs, 8 feet wide landscaped planter, 8 feet wide sidewalks, and 2 feet clearance at back of sidewalks. a. The submitted preliminary civil plan depicts the street improvements along SE 168th Street following the requirement above, Staff has reviewed the conceptual layout and determined it is acceptable. 3. Refer to City code 4-4-080 regarding driveway regulations: • Maximum driveway slope is 15%. Driveways which exceed 8% shall provide slotted drains at the lower end with positive drainage discharge to restrict runoff from entering the garage. • The maximum width of a single loaded garage driveway is 9-feet and the maximum width of a double loaded garage driveway is 16-feet. If a garage is not present, the maximum driveway width is 16-feet. • Driveways shall not be closer than 5-feet to any property line. 4. Undergrounding of all existing and proposed utilities is required on all frontages per RMC 4-6-090. 5. ADA access ramps shall be installed at all street crossings. Ramps shall be shown at each intersection. Ramps shall be oriented to provide direct pedestrian crossings. a. The submitted preliminary civil plan depicts the installation of an ADA curb ramp only on northeast corner at intersection of 113th Ave SE and SE 168th St. However, per RCW 35.68.075 (3), the curb ramp at the other end of the crosswalk shall meet ADA requirements as well, therefore, the information (dimensions, slopes, and elevations) of existing curb ramp at the northwest corner of the intersection shall be provided, and needs to be upgraded to meet ADA standards if it does not meet ADA standards, and a new matched ADVISORY NOTES TO APPLICANT Page 5 of 6 LUA22-000276 curb ramp meeting ADA standards at the southeast corner of the intersection shall be installed. Blow -up details including the dimensions, slopes, and elevations of these curb ramps shall be added on the civil plans and will be reviewed as a portion of the civil construction permit. 6. Paving and trench restoration shall comply with the City’s Trench Restoration and Overlay Requirements. 7. Per RMC 4-4-060, at the intersection of two classes of streets, the radius for the higher-class street shall be used. a. The radius of the intersection between 113th Ave SE (residential access street) and SE 168th St (collector arterial street) shall be 35 feet minimum. 8. The development is subject to transportation impact fees. Fees will be charged based on the rate at the time of construction permit issuance and are not vested to the rates at land-use approval. a. For a single-family home, the transportation impact fee is $11,485,67 based on the City’s 2024 fee schedule. b. Final transportation impact fees will be paid based on the current impact fee rate at the time of building permit issuance. GENERAL COMMENTS: 1. The fees listed are for 2024. The fees that are current at the time of the respective permit issuance will be levied. Please see the City of Renton website for the current fee schedule. ADVISORY NOTES TO APPLICANT Page 6 of 6 LUA22-000276