REVISED DRIVEWAYS SSMH 2 do SELECT SERVICES
LMT
1412118
2
ADJUST LOTS 6-6
LMT
5122118
3
UPDA TED CURB RAMP PER CITY COMMEN IS
LMT
6115118
4
WATER UPDATES PER FIELD COND177ONS
SDC
7110118
5
REVISIONS TO EAST END OF ALLEY (SW 3RD CT)
CHW
8110118
NO.
I REVISION
BY
I DATE
I APPR
4 f 00
UNDERGROUND UTILITY NOTE
UNDERGROUND UTILITIES ARE SHOWN IN THE APPROXIMATE
LOCATION THERE 1S NO GUARANTEE THAT ALL UTILITY LINES ARE
SHOWN, OR THAT THE LOCATION, SIZE AND MATERIAL 1S
ACCURATE. THE CONTRACTOR SHALL UNCOVER ALL INDICATED
PIPING WHERE CROSSING, INTERFERENCES, OR CONNECTIONS OCCUR
PRIOR TO TRENCHING OR EXCAVATION FOR ANY PIPE OR
STRUCTURES, TO DETERMINE ACTUAL LOCATIONS, SIZE AND
MATERIAL THE CONTRACTOR SHALL MAKE THE APPROPRIATE
PROVISION FOR PROTECTION OF SAID FACILITIES THE CONTRACTOR
SHALL NOTIFY DNE C&L AT B-1-1 (WASHINGTONBII.COM) AND
ARRANGE FOR FIELD LOCA T7ON OF EXISTING FA CIL1 TIES BEFORE
CONSTRUCTION
MCTCH EVENS, PLS NAVD ISM
oESICNm:
AS NOTED WRIZ°MA` W 1983/1991
SHAWN COOPER
DMWN:
SHAWN COOPER ONE INCH DATUM
C1ECICED AT FAIL SCALE
BREIT K. PUDMS, PE IF Nor GCE WH
APPROVED: SCALE ACCORDINGLY
BRETT K. PUDISM PE
9/IS/zw
CITY OF
REN TON
Planning/Building/Public Works Dept.
5f0D
1.313
12D
IID
1DD
SD
70
5+75
R-393508
APPROVED FOR CONSTRUCTION
SUBJECT TO ERRORS AND OMISSIONS
BY: DATE:
BY: DATE:
BY: DATE:
BY: DATE:
LANGSTON ALLEY PROJECT
ROAD AND UTILITY IMPROVEMENTS
ROAD AND STORM DRAINAGE PROFILE
AS -BUILT
9/18/20
RP-01
T, S 27