Loading...
HomeMy WebLinkAboutR-3935081313 120 11D IDO SD 70 Of65 1 f0O F-c ZNA 3 f 00 1 REVISED DRIVEWAYS SSMH 2 do SELECT SERVICES LMT 1412118 2 ADJUST LOTS 6-6 LMT 5122118 3 UPDA TED CURB RAMP PER CITY COMMEN IS LMT 6115118 4 WATER UPDATES PER FIELD COND177ONS SDC 7110118 5 REVISIONS TO EAST END OF ALLEY (SW 3RD CT) CHW 8110118 NO. I REVISION BY I DATE I APPR 4 f 00 UNDERGROUND UTILITY NOTE UNDERGROUND UTILITIES ARE SHOWN IN THE APPROXIMATE LOCATION THERE 1S NO GUARANTEE THAT ALL UTILITY LINES ARE SHOWN, OR THAT THE LOCATION, SIZE AND MATERIAL 1S ACCURATE. THE CONTRACTOR SHALL UNCOVER ALL INDICATED PIPING WHERE CROSSING, INTERFERENCES, OR CONNECTIONS OCCUR PRIOR TO TRENCHING OR EXCAVATION FOR ANY PIPE OR STRUCTURES, TO DETERMINE ACTUAL LOCATIONS, SIZE AND MATERIAL THE CONTRACTOR SHALL MAKE THE APPROPRIATE PROVISION FOR PROTECTION OF SAID FACILITIES THE CONTRACTOR SHALL NOTIFY DNE C&L AT B-1-1 (WASHINGTONBII.COM) AND ARRANGE FOR FIELD LOCA T7ON OF EXISTING FA CIL1 TIES BEFORE CONSTRUCTION MCTCH EVENS, PLS NAVD ISM oESICNm: AS NOTED WRIZ°MA` W 1983/1991 SHAWN COOPER DMWN: SHAWN COOPER ONE INCH DATUM C1ECICED AT FAIL SCALE BREIT K. PUDMS, PE IF Nor GCE WH APPROVED: SCALE ACCORDINGLY BRETT K. PUDISM PE 9/IS/zw CITY OF REN TON Planning/Building/Public Works Dept. 5f0D 1.313 12D IID 1DD SD 70 5+75 R-393508 APPROVED FOR CONSTRUCTION SUBJECT TO ERRORS AND OMISSIONS BY: DATE: BY: DATE: BY: DATE: BY: DATE: LANGSTON ALLEY PROJECT ROAD AND UTILITY IMPROVEMENTS ROAD AND STORM DRAINAGE PROFILE AS -BUILT 9/18/20 RP-01 T, S 27 Rl- a a CV CY] a a a r Q J CV r a a a r rr n C 2020 THE BLUELINE GROUP