HomeMy WebLinkAboutCAG-20-065 - Duvall - Final Contract Voucher Certificate FINAL CONTRACT VOUCHER CERTIFICATE
Contractor
Reed Trucking & Excavating, Inc. 11616
Street Address
11616 24th Ave E
City State Zip Date
Tacoma WA 98445 January 29, 2024
City Contract Number City Project Number Federal-Aid Number(if applicable)
CAG-20-065 TED4004100 n/a
Contract Title
Duvall Ave NE
Date Work Physically Complete Final Amount
January 10, 2024 $5,878,662.46
CONTRACTOR'S CERTIFICATION
I,The undersigned,having first been duly sworn,certify that I am authorized to sign for the claimant;that in connection with the work
performed and to the best of my knowledge no loan,gratuity or gift in any form whatsoever has been extended to any employee of
the City of Renton nor have I rented or purchased any equipment or materials from any employee of the City of Renton; I further
certify that the attached final estimate is a true and correct statement showing all the monies due me from the City of Renton for
work performed and material furnished under this contract;that I have carefully examined said final estimate and understand the
same and that I release the City of Renton from any and all clairz4kictimftetpwver nature which I may have, arising out of the
performance of said contract,which are not set forth in said esti NN) Pi:a%
d t�� r I NOTgRy
Contractor Authorized Signature(Required) E •* ... a
tot: PUBLIC ka I
�(ASk-<<� t J A a \ •: ''.:t, #F
Printed Signature Name ••••• Wri•:.•l ,°c r
°#‘41sa ja W wauAS► ,�
� L
Subscribed and sworn to before me this day of ?Z.LAckz. ..( 20 ,a,
/_rvv Notary Public in and for the State of �GA.$1•11tr 5k
residing at C;t,god-.CtivU1 lJJ
CITY OF RENTON CERTIFICATION
I,certify the attached final estimate to be based upon actual easurements,and to be true and correct.
lect Mana Signature Public Wo s Dept.,Section Manager Appro d Date
CITY OF RENTON ACCEPTANCE
The C'ty of Re ton hereby accepts the completed contract,pursuant to Section 1-05.12 of the Contract Provisions.
7/4 // ,
Public Works Administrator Date of Council Accedtance
Contractor's claims,if any,must be included and the Contractor's Certification must be labeled indicating a claim is attached.