Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CAG-20-065 - Duvall - Certified Prime Reed Trucking
State of Washington [, artment of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Affidavit of Wages Paid Project Detail - Project Dashboard Document Received Date: Intent Id: ' Affidavit Id: 1282600 Status: Approved on 1/30/2024 1170257 2/5/2024 Company Details Name REED TRUCKING Et EXCAVATING INC Address 2207 Inter Ave. PUYALLUP,WA,98372 WA UBI no. 601915034 Contractor Registration no. REEDTEI016JW Industrial Insurance Account Id 98310400 OMWBE Certifications as of 8/18/2021 Small Business Enterprise (SBE) Email Address tbarquist@reedtrucking.com Filed By Barquist, Tiffani Prime Contractor Prime contractor name REED TRUCKING Et EXCAVATING INC Prime contractor registration no. REEDTEI016JW Prime contractor Phone Number 253-841-4837 Project Information Awarding agency: RENTON, CITY OF 1055 S GRADY WAY RENTON, WA - 98055 Awarding agency contact: Flora Lee Awarding agency contact phone number: 425-430-7303 Contract no. CAG-20-065 Project name Duvall Avenue NE Project Description This project includes but is not limited to: excavation; grading; removal of pavement; plaining pavement; paving with asphalt, curb and gutter; drainage; illumination; HAWK signal; sidewalk; walls; adjustments to utility Dollar amount of your contri $ 5,878,662.46 Bid due date 6/22/2021 Contract award date 7/21/2021 Job site address/directions: Payment Details Check Number: Transaction Id: 109804373 Project Details County where work was performed King City where work was performed Renton Prime contractor Intent form Id#for this 1170257 project Intent filed date 8/18/2021 Job start date:MM-DD-YYYY 12/22/2021 Date work completed:MM-DD-YYYY 12/22/2023 Project Completion Did your company hire any subcontractors? Yes Did your company have employees perform Yes work on this project? Did you use apprentice employees on this No project? Company Owner Information How many owner/operators performed work on 0 the project that own 30% or more of the company? No company owner added. Affidavit Subcontractor(s) Company Name UBI License# Puget Construction Srvcs Inc 603356329 PUGETCS869BW TRANSPORTATION SYSTEMS INC 602726209 TRANSSI927NO CONCRETE SERVICES INC 601334103 CONCRSIO9ONZ PnD Logging Et Tree Service 601439180 PNDLOLT867QQ LEGACY TAPPING INC 604359046 LEGACTI826R8 W. E. Coates Surveying, LLC 602746960 C a P FENCING 603210811 CPFENPF882ME INTEGRITY NETWORKS INC 602512350 INTEGNI932LH LAKERIDGE PAVING CO L L C 601592135 LAKERPC050JM VI\VVII VI I I II IV VV I I/VVI I VI\VVI\VI IVJYZ GROUND UP ROAD CONST INC 0 602790246 lA,GROUNUR929CR STRIPE RITE INC 601048084 STRIPRI121JM TOTEM ELECTRIC OF TACOMA INC 278043550 TOTEMET315BS Journeylevel Wages d , County Trade Occupation Wages Fringes # # Workers Hours King Laborers - Underground General Laborer Et 52.39 0.00 9 3041.25 Sewer Et Water Topman King Power Equipment Shovel, Excavator, 74.28 0.00 7 2769.50 Operators- Underground Backhoe, Tractors Under Sewer a Water 15 Metric Tons King Power Equipment Shovel, Excavator, 72.28 0.00 8 3052.00 Operators- Underground Backhoe, Tractors Under Sewer Et Water 15 Metric Tons King Laborers Traffic Control 50.31 0.00 4 2318.58 Supervisor King Flaggers Journey Level 44.40 0.00 9 5733.75 King Truck Drivers Dump Truck Et Trailer 64.55 0.00 6 315.70 King Truck Drivers Dump Truck 63.71 0.00 6 1144.25 King Laborers - Underground Pipe Layer 53.35 0.00 3 389.50 Sewer Et Water King Laborers Traffic Control Laborer 47.48 0.00 8 327.00 King Laborers Pipe Layer Lead 54.01 0.00 1 120.50 Apprentice Wages Public Notes o Show/Hide Existing Notes No note exists CONSENT OF DIRECTORS OF REED TRUCKING &EXCAVATING, INC. IN LIEU OF ANNUAL MEETING Pursuant to the provisions of RCW 23B.07.040,the undersigned, being the sole member of the Board of Directors of REED TRUCKING &EXCAVATING, INC.,a Washington corporation,acting by unanimous written consent to the taking of the action set forth therein. RESOLVED:That the following named elected to all the offices of the corporation for the coming year,or until their successors are elected and qualified: President: Shawn J. Reed zL year, Vice President: Dustin Wright ' Secretary: Connie L.Gordon c..T6/ 11 RESOLVED:That all actions by officers of the corporation since the last meeting of the Board of Directors are hereby ratified and confirmed. RESOLVED:That the Corporation shall continue to create a budget and forecast for the coming year and review spending and equipment paid off in 2021. The execution of the Consent,which may be accomplished in counterparts,shall constitute a written waiver of any notice required by the Washington Business Corporation Act or Corporation's Articles of Incorporation and Bylaws. DATED the 29th of March,2022. haven J.Reed Pr si ent Dustin Wright,Vice President cy26'9144 '/ 4*66-it, Connie L. Gordon,Secretary -1-1�mA IJIHIlVI liliwi IUU! I �Ayyvqnp 6 CQ6Kii IHHf11I1H1 IIHVI1IEUU H1I1I[1HU ai,l.R �' �e os gif 135 ail "11 ill n ' nMn m n i'U li U: a L t t 1 F t I I g s S a a A a a I I a A A B R F p P 8 S c e o ZZZZ ee ow ooeooeooeooeo: ee eeee-000 zzzz oee e� ax Fxx:xxxxxE x££FEEy£EiEa x£FEEEEEEFFF££q' xxEE £EEEJEEEw xEFFFxL£E£tUt xxxxxyFEi>i9 xxxxx.i; xN .§ 5-.4.4.44<.4.4s5-' ? .4.4.4.4.4.4.4.4r4.44.4.4z .4 r4 .4 5-&& 1 °5454 E 5-5.'0 °`--E af,1, 8 , + 5C e �� 111 o 0 z_000^+ z ^'zzz z wo eoo- 00000"'woZZZ. 3 Z eo . . _ . Z + ii,. a 4' Exxoxxxx.t .*,“**ffF£ie: xmFE£££F^EE£E.,:i xxFF£E£QiEE£Fpyp xEEEExF>FE �3ZII xxxxx ExNyww>= xxxxpoiLI x5 lel Lil & F - 5,54.4<<w$4' '3 ' 545454a5 4 5e '1_ r4& ^ 4QFw� 5, 1 54 5. °5.k54 E_E� 8s=.3 5§i'Ry E y B i 5 : g e + _ e a 1 1$ S w o o e o e o o -o- a o 0 0 0 o o e e o o o c o m o o _ a e e e e e e Z w o 0 0 ! z P i 1 xxxExxxxFi xEF£E£33ZF,ia x:. ££ £E'�E££EPZ xxEE£Ei iFi >EE£xF>F� Epk� xxxx4 Fx E£¢a;, xxx m4,Ls x a # 5 F`- I5g44:<<5,a=; 554&4$&a5&54§a _ 5& 5. 5- -p i P-134 s&" &`-E` &&g'-> 555:e ash _ .. I1 9 e o 0000eve.ee w,..ZZZZZ ,.000 w emeee em;ee»"a ZZZZZ � ZZ Z - Ze ea 1 wom . - _ - xxxFxxxxEL xBFEF£3£3E£ EEEEEFBEEL-L xxFi£E£�F;FEE - EEEBFpt/ FFxFi < xilf trif, 4 ...r L= .p IA- x 5-C i31'&g, &a&&5-5-5-05-W5e„ °-45-&°�53' 3€5-<a r4.4.4.4.4%m/.4.4 °-°E s<< & &<< s01 *" _ Y eeo� o - ooee ee e Zo oo-oo ee,e-- eo o Ito etleoe-o eo xxxxxxxx>> 3xE£F; Fi; :"� EEE£'� ££ L xx£ F£�££iF£zZ E£>£> ££xE>> 3E3£�£FE;EA3 xxxEE� x xx Il o-i eeo� oo�W+ --- eeee o e e- ee oeeo-»a eeo oe eee e oZZZ ..Z eo z g P A Y w N m r F .a a - -P 4 P r? p' H xxxxxxxx£>. xrE££3 EE33.� N mxF£FE4ix£ £m '�+ ..*zxFE' EE£Fii FE£ ££ EEExE s1 FFEF FFi;x33+ x..**,,i+ x c kA' §5-&5-<§&5<< $ 3" 3&1&a & aa'1 0.4 S0-' tt10.99 t&t.&&''ttl t ME ttttgkt§<<<< W.i i s t ' o 00 00 yy egg oaoo 0 oN=+ ee ge.,eee-»r, e eeeeeeee e : 0000tIe o W� = _e_ ? = z xxxxxxxxaae xx£;EE'-�EF;3x EEE xE£E£+�ixExEre' xx£ExEEr.L£FE iiE E E£F£E£EFxF >E £FEE FgFr-F3_ xxx Ex+� xt.< ' 1 AA ; &s5. .§§5-5<4a 5-5-5- 35-53a & 5-" 5-& 5455 s ?.. °5 5-5-R5-&&&& 5- Ma °-°-5-5- &§ -< s V3 3 m 6 e oee ae1 go oee e e e» e ee ZeZZe Z eeeee�eeee e e> eeeeeeee >; x„,„„"x"k. F+m,ExFEEm£xEx*m,u x ExFE:EEFFE z$ £E££E ££EExE D FEE£E££Fa"�;` . f gx P�' xz- sI 5- 5-3:§ 55145.15 33&&fl- i- 5.181 43 &&°35-35-&'4A 5-054-51$.9.09- 0 1. 55-5-5-05.5- € € §4 � �. , a <y, e ,, e 000 oe000 e oo�� 000 e 000- 000 ZN 000 e00000 o eae 4. i xx*x**xxxx"*k *&*x3* * x x P- x3 3x3 5. ' $4, 5.i ti5. „1 &5.iiii 1 xx � R P- e a 000 0000, e eer s,,, e- Zeeoe-- ZZZZZ2 oee a-- ZZZZZ oo-o + e-s>r ^' xxFxxFxxxxFP+ FFFxEE8Fx£xEE3 x ExErlEEFFE'�p+ FE£8EF FF£x*may+ ********-* i- A+- xx£' ��3 xa�z 5 i gE i 5-54 5-&5-5-E &' F �5&59-5.1/i 9. 5-5-F0-'&5k 5. $i 5.?�3 5.°.& & .4o c O o 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 0"•-+ o 0 0 0 0 e 0 0 0 O - O o 0 0 e o 0 0 '" .>4 xxxxEL1 EEExE£FF;x£x'°I :££FxEE£££££E' 7 BEEEE£E£Ex£ 3 EEEEFF1 E�=I xx£;;11 Xt.- 0 5- 5-1 _ 4.4 11544 k 14+ $ '&.4.4 .4Y.4.444 .4 f g_ o.5.5.4.4r4r4.59k 5.F 5 4 .4r4 4.4-.4" E $.c a a:1 R e 7 e o W - o e o a oee e o 0 0 i o e e e o o 0 0 0 0 ` o 0 0 o e o o e o ' c e o. e o o 0 .u a"' I xx xxixxxx24 ' 5- 5-545-5xix a '5-5-.£4 x54 55-°5&45 w 5-545-5& &4 x 304 5-5-15543`I— xx5-43Q:z " Fr g o c o_g ooe eoe e o ooy$ eez.g- -e s• oeoo.+000 m ,- .o X.*..*....*k , £EExE£E,4.ExExFF3' EE£E£ ;QJ£x ££££�FE£� ��- xiF>E>3� xi 4 i 5E 1&5- 14-55, 4 4 3&4- f4x4liM $ #< .4.ifOl.4ak- `-E ittiR :. R 71 [ oee eeeo o e NNam ;s EE£x EEEFxFx£R yp' R wyRRa p - .+ N $ .4.4 mi. i $. xR g ' 1� � aAx W6— sax x3 —i,nn �= Xzzz zzz l' mx .5.2‹ '3<x rya- �333,3333 .eg4x344z 33333 ``233x3x3<333x333 - f«'z'z'N m'zzzzzzz' e-'' z'-' rz'zzz'z' grz' z° 2r222 z°z°z° r gx 11X xx ; ^33333^333 =,Xy,x333 333333 533334333x333^ `° 33x3x33333x333 L > z z° `z°zz° zz°z°z zzz zzzzzz' zzzz zzz zzz =zz z zzzzz zzz d- " Z Z o �v'� Z ° e-C_;e.Ze.i<y� �e .py�Y$-� ° ':.x�i'Vxy �3aY �Y yx.m Y.m S o ° 5 0 i y l 5 1 1 S S b 6 5 `o o = Y6 a to`o pox 'AIm•= xx 1.7.7-3333333 - 3x3333333333 3333333›c =. 4S2xxf333x333 a ---z° a-�z °zzzzzzzz7.- z zzzzzzzzzz -zzz°z°z°zzz zzz" v.;z� z° �zz'z'z zzz 6 - wt g ° gte1111y110 gee 11 $og11$ Egmlltt t :IA t that aoe zx i. ...xx a^, �33333333 dNN3x3'33�333333 .. '3333� 3'x3 x E33xxprnx333 P. A — i o 0 o s o 0 0 o -_ o 0 0 0 o e_ o o�^," d - o —Z �Z'—z°Z'z'z z Z'z Z 'z Z Z Z Z Z Z Z X Z z X Z Z Z Z Z' Z'Z' Z' z 2 Z z Z Z.Z a 1 e $ 3.°i�$ o o .`.r o .ie.Pq o 1 1 a .fie x 2" 1 "Ill Z,'�°i'l l 1 1°i' i t Zx � 353xx ,, .3.333333 ;� x333x . 3.333 . . . 333 3x333x .33x3x33333x333 jxxxxx33xxxx g« i«ez'ez° °° °Z'°zZZZZZzZ "' " z°z°z°°°°z°°'zz'z° " -Zzz""z' zz°z° �z'z' z' ZZZZZ. ZZZ zZ e 9 az'x 14111 1XX f ��33333333' day3x3333 , 33333 :Zr0133333°33x311 ccx h� 3x3x3$333x3$3 Fx3x 333x3xx z z JJ 1'ZzZX.z'ZZz <<"+`"Z ZZZz«ZZZXZ z« XXXZZ ZX Z z-`"Z Z Z XZZ. Z X 2 "',ZZZ X' X., i 'o It -It f>>>,>1 0 1 1 1 t b Z a e t 111111110 .. > l i°o `v° c c 10 1 11 e,$-e I o $1 o o 1 I I I z r>,Y y t$ >1 3 ° zx .i3xxx DhN-�3-.3f3333 `��la"3x33333333A3 Zzzc.333^^33x33xx 4...3x3x'i.3333x333 C5 33 '33$3xx s a .4 g=-zz' «mgz'°z1zzzzz >° z zz°z'zzzzz'z' = "zzz'-'z°z° Co 1==2 z Az'z'z2 zzz° «AzzZ""ZZZ«z IT eE.a$oo �> >,>8�Y YY;ah god' " g`Y s5 a > >oo`'` cc-L'o�` >b �a.BS k $b§kb a$$ L m�'d 000 = S xx .'"- xxx 5 ;33A3333 2=�3x333,,,33 333 Z z m.alz33x ' xx t..,313x"3333x�;:„ ��33-°. 333-,x3 __ 'o=z'z E^rvrvrv=zz zzzz' `"z' z'z'z"z'z "z'z'z' S-mz'z'zz'' z'z' mz' "2 z' =z°z°z°z --- °�'==z'z'"°z'zz' Z e 2. 33 333 Ler °' > >:° >4 > >or fftVo. xe mY > >3Y >lYctIz' 14”" =xa >>1 >,> >j1-1, > >, c � 4. 23xxx if iM 14x 3 . - .z ? ; xx ^$" , “ ; ii5imL a .. « a'ZZ -=z-zzzz,9z ° d—Z zz"-“-r-1=2-'zz J'—zzzzpzzz"'Z zz2xzz " 4-2a °22z1 '' S3u z £u - "° gi` a a>,>,1 11 >>>g s .1 a d o o .m1111 1 t >1 oi' 1 .111 >y , e 4=11Y$yy.�1 i.'Y-ea �e o 0 0 0 0 0 z x 1.44xxx a553>< i' , x <' x33, 33333 4z, 333Zg333z3xx F.2. =.333333�s g33,13�33333x N^�zA s" z z'z'^ ( "'z zz`" "Pizzz'z'z d '"z'z'z'°'z''zzz°'z' «"zzz^zzzzzz-- ^zzz°° z'�z°z'z°z'z' Iva a « b t z0995 ai`> o o >> s`i—d gi° gI '1'{°iotg O �rr�1. 088 >' o`'i° z' ° 1ai'i°o-.goon 112 !e>j° >. i°3'-°390 . 9 3$ i 3 sx ahNrvNxxx "'<a`33x3ffxxxx °za3�<3<', 3x3333<' 74 VY3z3z.l.z 33xx eT^3333n.333333^x Q 3 33333x flfl_ 6 z1^'z'z z°"'" ;«rvz° rvz`"z zzzz°d Zz°ryz°ry -zzzz 1= zZ'Z'z'"'zz'z'z'z'z-. z« z-«rvzzzzz y ; ;j4721 x mm t Is o. °' m xxm . W B 3 a.°g'h3 ox d3m-xxxx 'fig<?x3<xxxxx --.4.c 3 1111 x3333x � 3333z' 3333xx .- ,4,.3333335x ts..1 Izm x � t f ,.vg "" i - ry rv« Z ry m rv«ry z Z"Z 2222 «ZZZ X X X X X Z X Z X X Z X Z Z z Z'" Z Z Z Z Z.—Z 3 ? o `c'a', r ,x T#xxxxx <.,,,, xxxxx ha333^x3333x 333 3333 33xx 333333333333x <3�33 33333x x 3a r e . a d o = o 0 0,"_ ' 0 0 o d n o 0 0 0 __rvZZ^' `"ZZZ`" ZZZZ ZXX XXXZ Zz XXZZZZZXZzXZZ X'"ZZ`"ZZZZZ C 8 O O O O O a r a 8 1 I t e w m m W m a m 3 3 3 3 3 _ 3 3 c ^ I i pai E H 2_ IE . iig I i .y 1 5..4 3 o o a 2 ..i ail''i l' n>y , E c .0 c'v: n m S' l 9 t i o c rig o. : y . t i.i y tf 5 g B1611111 !, 8o c 7F'v meal uF y= $ �' ca , 4,!gL S � eo a`e �= 8dao i 2z F- F=u u� � 8m uc 8 � hu u� 8 9c', F-u u°O� � � 'zG � a� �o 'zu. 1.11h�$ au t giili _a _c3F=o.iu _cat=a2ut=m>c7 . . .,taut=t=w>O`�.;r= _a344,J t`m C�.�'AFtio _z�34...o F=t-wozi-tot _z34F-F-wo.o.su 11 x W . «3x3x33$ x333 a ^ 4 " OD- zo4"' -A2 z 2ZZZ zzz' 3 x ` th3 x r pax^x1x1 � xa z 113 3 333$333333yExx x i4' °' " °° a, °- -- ' 4f. zz ZZZ ZzZZ i z "zzzzz F22 z zzzz ZZZ _ g .Y�1 JI �i�e x 4 Jt Y s u x +i Jt y y1 Y x 1113xx 17 , 3,333�'•3333 a yc?x333333333 3333,300' 0007 - F33x3x3333x333 -N N r o `r- o d o 0 0- o 0 0 o N o e o 0 0 ^.- o 0 0 �n o 0 0 0"+ 0- o 0 0 0 0 0 0 : z Z zzz zzzz zzz' zzzzzz° o zzzz' zzz zzz E z'Z Z zzzzz zzz z a x Z i s " � � ? �4 -s�aas��y� o ssa� as E $ s�� x � `o ` ��a�ffi �a�as gx gf5� 3xx 13T3�33333333 LF0 x3333333333 ; , , 33333333x3334 014 x3x/3333x333 ' '._'"'"'mz s-^'Z zzzzzzzz °;-<zo zzzozozozozozoz'zo rzZzzzzZZ zzz"' a`, =z^g' z d"Zozzz zzz " 0 . E. xYx Feel �e1ry y g 1y Ng y 3xx 411 ET-'3^33333333 d� 3x3330333333 d 33333 , , 3x3 „ x E33x3x 3333x333 « ,}--m o '-= ° o 0 0 _ 0 2224222222 d_ 0 0 0 0 o d- o ry 422 o N o 0 0 0 0 0 -Z Z ZzZzZZZzo z g zZZZZ -Z Zo'� zZ z zzzz ZzZ zx ,f3 3xx , �3_33333, ,`y„,„›,33, ,x333 xg46 0`°..w.,33x _„33x3x333x333 ' F. r e a o 3�m 4, 0 4, 0 o ,7,°°n o o r o e. o o o .4,4,, o v e x H o o 0 0 0 0 coo m g Z Z - Z zZZ,ZoZZ zZZm z zzz -zzz Z zzz 6' zZ Z Z ZZZZ zzz - E 2 at 4:14 � ass °`'`111111 m� 15110111a g 11aaas 1 a.$� 1 1�ss 'gill _zx -.222fxx E '33333333 <'c,3x333 3$333 EZ 3333-.3x, x ..3x3x3333x3�3 If • «.6 r..b o 0 0 0 0 0 o - o o r o 0 0 0 0 >r- o 0 0 o d -_„� =AA. o 0 0°. o 0 o N o .z'- Z° ZzzzZzzZ ,<-^� Z Zzzx Zxzxx zzzzz zz z Z- z Z Z"'ZZZ Z Z E 111 azx a;f3fxxx ''Fff3 33333 <'N3x33333333,A3 zzo$33,433x33xX �w3x3x43333x$33 EA a a 4 „=- o- Z0- -- 4 1 h A 0 0 0 0 0 c Itr= o v o 0 o i=_ 0 0 r o 0 0 0 0 0 o d g z - �'+ '�'+Z Z�ZZZ zo Z zzZZZZZZ Z zZZ- ZZ ZZ Z Z ZzzZ ZZZ a =; rrWsyIt 'll Egss II 141011 hall 11 sl ....yTy $a111 $$$ 'sr, — g - .1.. 2.P. xxx f4NN $3 3333 g<N3x333N33N333 E4433334 33x?3xx 1;333xw3333x_^_ t'`S d- o o &1 0 ." o 0 0 0' o m o 0 o e 4 e - _ Z0 0 0 ' �, zz e- ^z°z°^zzzz d= z zxz zz "zzz =-zzzz Zz mz zz� zzzz '= W a 6 O O h n _ �° 01 J.' I x w_33xxx Ff3f333f3f3f <<3x33v ,6 <3<33 z'?33z33 3$ z$xx 2.i!, ,t m dq,J x K ,6 o 0 o ev r r ,;, o o ,�m o o n o o d - o o a° o 0 0 0 ZZZ -'12m2ZZ^Z'A"ZcA" -z ZZ 'Z ZZ -ZZ-ZZ ZZ Z zZ zzzz al .J k Z'e °fie r>,� YY r=� 3gk `y gbbffig ^o >h55oy`dc5`�` > 'a0r�'`5e.g858`e .g$ aF 3x g7ANxxx .0mv x$$x22<x ag3x33�,< 33333 z'333z3 '333z$xx 733a33333n.4 < xxx xxx17xx ' c 9h" z' dOz' ZzJd'r z' ZZ -ZZZZZ° -- Zzz0mz0'zZZ Z 9«�^z°ZZ ZZZZZZ° ° " - ^ 9a a e Z9955 �`es6`` ,1, g1'` gb 1111 . 4z 1o1 10.11% Z00 1.gj 1111`1g I ar r g e$ x 7NNNxxx «33xfxxxx00„P «', $<3x333<' :4x�3z3z_z3333xx -e^$333.r33 u-. < - <7$7xx$xxx3 gEF 1 a eAAvi, l„ "-z--2-Z° zzzz' Z« ^P'Z`" °°z°Z°zz° E!`-9zzZz"'zzx°zzz°' z«-z- z z y a 11 1 ` a. mm a h a.t -3 u & • s5 L h 63-3g,,`,` gc ,,,,, 1--Sobb >m11111 E . g1- y$YSo od9 p o` Y Yy >y a gEs wr x a xxxx < <x3 , xxxxx 7rr<33<3x3$$3x s e3333z' • 33333xx _3333�.333333^xd«33x $3xE3 fr ` - -_L' $ i°TW- Arr . ,in P "'�'"z°Z Z° ZZ.L2 &-^'ZZZZAZZZ°ZZ t"-ZZZZ Zz°z•z°zzm rgiZ zz -Z 3 'd 6 5gil in. g �Yy1 xm �a .� xm Mx 7 xxxxx g<a 3<xxxxx a<r<333^x333x 333 3$33g33xx _333333333333x <3<3xx33333 x , ' dm "''z- '"z°zz'" zzzz° -zzz'-z°zz°z' z°z' ^z°zzz°z°z°z°z°zzzz°z° °6z�z° ZZZZZ z° .. 0 0 0 0 0 0 0 i m m m m m m m I x I d I 3 3 I 3 • 3 3 ail cy _ ay ° V S 7 uM 1.1 1 k u II.s p5y 5q y c 2 : g 2 o m •- > °F ._ c 2- o p' °� a pp 2 j o m 1011 > y F. t . 00 3 c• = `o o a JI Ji a o y y S i. o -�N p ' ' 8'� '' 2 6 1 .� 4 5 O N 1 N G. y Y 2 y u Ti s� 3i '�' - N Qi 2 �y v E �F 1E �F B vice ,., 2 2 'g o cc max' ° fi z 3 `3 �:4Z A F-u Pu yAc! Puy >.9 F-u"JuX am u F-u, uiyaa12 u Fy-u ,G -y' aa� o�,dupp . u(5a.� acR.4' $$ 1 ua a m S O' 3 g z S 6 `vac°y 1" a E 0 m !S 8 1"4 4 a m m b .N tl ui� u d m m b .y ffi 0 t, F d a m a g .x 6 _aC _.3t-€a'u _.3t-agut-u>io`.,11 _a31-aZultita5 F. _a3�ZuFFwo F- _a3a.i0ut=f=mo`.J=a0Z _a3a't=t=m0,:i05 tits of Renton Contract No,(A(-20-065 - Duvall Avenue NE Ccrtilicd Puvrolls Pro ress Payment No 1(December) Week Ending On: 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec II-Dec I8-Dec 25-Dec Reed Trucking X X X X X X X X X X X X X X Progress Payment No 2(January) Progress Payment No 3(February) Progress Payment No 4(March) I Week Ending On: 1-Jan 8-Jan 15-Jan 22Jan 29Jon 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mae 26-Mar 2-Apr Reed Trucking 4-Jan I8-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar 14-Mar 22-Mar 25-Mar 4-Apr 8-Apr W.E.Coates X IB-Jan 28-Jan No Work No Work No Work No Work I-Mar No Work 14-Mae 24-Mar 24-Mar No Work II-Apr Totem Electric X X 28-Jan 28-Jan No Work No Work I-Mar I-Mar 4-Mar 18-Mar IS-Mar 25-Mar 4-Apr 8-Apr PnD Logging X X X X X X X I-Mar No Work No Work No Work No Work No Work No Work Puget Construction X X X X X X X X X X X X 25-Apr 25-Apr Concrete Services X X X X X X X X X X X X X 25-Apr Progress Payment No 5(April) Progress Payment No 6(May) Progress Payment No 7(June) I Week Ending On: 9-Apr 16-Apr 23-Apr 30-Apr 7-May 14-May 21-May 28-May 4-Jun II-Jun 18-Jun 25-Jun 2-Jul Reed Trucking 18-Apr 22-Apr 28-Apr 4-May 16-May 20-May 27-May 6-Jun 7-Jun _ 16-Jun 23-Jun 1-Jul 8-Jul W.E.Coates 14-Apr 22-Apr No Work 6-May No Work 24-May 3I-May 3-Jun 8-Jun No Work No Work No Work 8-Jul Totem Electric 25-Apr 27-Apr No Work No Work 13-May 20-May 24-May 6-Jun 6-Jun 16-Jun 6-Jul 6-Jul 7-Jul PnD Logging No Work X X X No Work 13-Jun No Work No Work No Work_ No Work No Work No Work No Work Puget Construction No Work No Work No Work No Work No Work No Work 6-Jun No Work 6-Jun No Work No Work No Work No Work Concrete Services 25-Apr 25-Apr 3-May No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Transportation Systems X X 3-May 5-May 27-May 31-May 27-May No Work No Work No Work No Work I-Jul 22-Jul Evergreen Sawcutting X X X 9-May No Work No Work No Work No Work No Work No Work No Work No Work No Work Ground Up X - X X 4-May 20-May No Work No Work No Work No Work No Work No Work No Work No Work Legacy Tapping X X X 29-Apr No Work No Work No Work No Work No Work No Work No Work No Work No Work Lakeridge Paving X X X X 24-May No Work No Work No Work No Work No Work No Work No Work No Work Progress Payment No 8(July) Progress Payment No 9(August) Progress Payment No 10(September) I Week Ending On: 9-Jul 16-Jul 23-Jul 30-Jul 6-Aug 13-Aug 20-Aug 27-Aug 3-Sep 10-Sep 17-Sep 24-Sep 1-Oct Reed Trucking 14-Jul 22-Jul 29-Jul 5-Aug I2-Aug 2-Sep 2-Sep 2-Sep 8-Sep 15-Sep 4-Oct 28-Sep 6-Oct W.E.Coates 15-Jul 22-Jul No Work No Work No Work No Work No Work No Work 7-Sep No Work No Work 4-Oct 17-Oct Totem Electric 2-Aug 2-Aug 2-Aug Z X X X X X X X X X X Par)Logging No Work No Work 2-Aug No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Puget Construction No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work 17-Oct Concrete Services No Work 2-Aug 2-Aug 2-Sep 2-Sep No Work No Work No Work No Work No Work No Work No Work 10-Oct Transportation Systems 22-Jul No Work - No Work 5-Aug 7-Sep 7-Sep No Work No Work 8-Sep 4-Oct No Work 4-Oct 2-Nov Transportation Systems(Electrical) X X X 22-Dec 22-Dec No Work No Work 22-Dec 22-Dec No Work No Work No Work 22-Dec Evergreen Sawcutting No Work No Work No Work No Work 12-Aug No Work No Work No Work No Work No Work No Work No Work No Work Ground Up No Work No Work No Work No Work No Work 2-Sep No Work No Work 9-Sep No Work No Work No Work No Work Legacy Tapping No Work No Work No Work No Work 5-Aug No Work No Work No Work No Work No Work No Work No Work No Work Lakeridge Paving No Work No Work No Work No Work No Work No Work 7-Sep No Work No Work No Work No Work No Work No Work Tyee Concrete X X 4-Aug No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Progress Payment No 11(October) Progress Payment No 12(November) Progress Payment No 13 I Week Ending On: 8-Oct 15-Oct - 22-Oct 29-Oct 5-Nov 12-Nov , 19-Nov 26-Nov 3-Dec 10-Dec 17-Dec 24-Dec Reed Trucking 13-Oct 24-Oct 27-Oct 2-Nov 18-Nov 18-Nov 23-Nov I-Dec 7-Dec 15-Dee 22-Dec 4-Jan W.E.Coates No Work No Work 31-Oct No Work No Work No Work 1-Dec Nu Work IS-Dec No Work No Work No Work PnD Logging No Work No Work No Work No Work No Work_ No Work No Work No Work No Work No Work No Work No Work Puget Construction No Work No Work 2-Nov No Work 18-Nov No Work No Work No Work No Work No Work No Work No Work Concrete Services 17-Oct No Work No Work 8-Nov No Work No Work No Work No Work No Work No Work No Work No Work Transportation Systems(Concrete) No Work 2-Nov 2-Nov No Work No Work 4-Jan 17-Jan No Work 4-Jan No Work No Work 5-Jan Transportation Systems(Electrical) No Work 22-Dec 11-Jan 4-Jan 4-Jun 4-Jan 4-Jan 4-Jan 4-Jan 4-Jan No Work No Work Evergreen Sawcutting No Work No Work 8-Nov No Work No Work No Work No Work No Work 7-Dec 15-Dec No Work No Work Ground Up No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Legacy Tapping 10-Oct No Work No Work No Work X X X X X X X Lakeridge Paving No Work No Work No Work 8-Nov No Work No Work No Work No Work No Work X Tyee Concrete No Work No Work No Work No Work No Work No Work No Work I-Dec No Work 15-Dec No Work No Work Stripe Rite X X X X X X X 5-Dec No Work 22-Dec No Work No Work Green City X X X X X X X X X X 5-Jan 5-Jan Progress Payment No 14(January) Progress Payment No 15(February) Progress Payment No 16(March) I Week Ending On: 31-Dec 7-Jan 14-Jan 21Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb 4-Mar I1-Mar 18-Mar 25-Mar I-Apr Reed Trucking No Work 11-Jan 20-Jan 26-Jan 1-Feb 8-Feb 15-Feb 22-Feb X No Work X No Work X X W.E.Coates No Work No Work No Work 31-Jan I-Feb No Work No Work No Work No Work No Work 20-Mar X X X PnD Logging No Work No Work No Work No Work No Work ® X X X X X X X X Puget Construction No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work X X X Concrete Services No Work No Work No Work No Work X X X X X X X X X Transportation Systems(Concrete) No Work 3-Feb 3-Feb 3-Feb 8-Feb 15-Feb 28-Feb No Work No Work 20-Mar 20-Mar X X X Transportation Systems(Electrical) No Work No Work No Work No Work No Work No Work No Work 28-Feb No Work No Work No Work No Work X X Evergreen Sawcutting No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work X X X Ground Up No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work X X Tyee Concrete No Work No Work No Work No Work (I- X X X X X X X X X Stripe Rite No Work No Work No Work No Work 30-Jan 15-Feb No Work No Work No Work No Work No Work X X X Green City No Work 23-Jan 27-Jan 3-Feb 3-Feb 13-Feb No Work 28-Feb No Work No Work No Work X X X Integrity Networks X X X 15-Feb 15-Feb 15-Feb No Work No Work No Work No Work No Work X X X _Week Contractor/Subcontractor is on the job site,payroll required••(r121 indicates payroll number•• Reviewed Daily Reports through-2/13,223 ©Subcontractor was not on-site this week."No Work Performed"payroll required. Revised 3/23/23 Date certified payroll was recieved Corrections to payroll required Apprenticeship dot's required -Payroll Resubmittal ®Received"No Work Performed"payroll MEMO"Final"payroll City of Renton Contract No.CAG-20-065 - Duvall Avenue NE ertin� etl Payr�ly Pro ress Payment No 1(December) I Week Ending On: 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec Reed Trucking X X X X 'X X X X X X X X X X Progress Payment No 2(January) Progress Payment No 3(February) Progress Payment No 4(March) Week Ending_On: 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr Reed Trucking 4-Jan 18-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar 14-Mar 22-Mar 25-Mar 4-Apr 8-Apr W.E.Coates X 18-Jan 28-Jan No Work No Work No Work No Work 1-Mar No Work 14-Mar 24-Mar 24-Mar No Work 11-Apr Totem Electric X X 28-Jan 28-Jan No Work No Work 1-Mar 1-Mar 4-Mar 18-Mar 18-Mar 25-Mar 4-Apr 8-Apr PnD Logging X X X X X X X 1-Mar No Work No Work No Work No Work No Work No Work Puget Construction X X X X X X X X X X X X 25-Apr 25-Apr Concrete Services X X X X X _ X X X X X _ X X X 25-Apr Progress Payment No 5(A ril) Progress Payment No 6(May) Progress Payment No 7(June) 1 Week Ending_On: 9-Apr 16-Apr 23-Apr 30-Apr 7-May 14-May 21-May 28-May 4-Jun 11-Jun 18-Jun 25-Jun 2-Jul Reed Trucking 18-Apr 22-Apr 28-Apr 4-May 16-May 20-May 27-May 6-Jun 7-Jun 16-Jun 23-Jun 1-Jul 8-Jul W.E.Coates 14-Apr 22-Apr No Work 6-May No Work 24-May 31-May 3-Jun 8-Jun No Work No Work No Work 8-Jul Totem Electric 25-Apr 27-Apr No Work No Work 13-May 20-May 24-May 6-Jun 6-Jun I6-Jun 6-Jul 6-Jul 7-Jul PnD Logging No Work X X _ X No Work 13-Jun No Work No Work No Work No Work No Work No Work No Work Puget Construction No Work No Work No Work No Work No Work No Work 6-Jun No Work 6-Jun No Work No Work No Work No Work Concrete Services 25-Apr 25-Apr 3-May No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Transportation Systems X X _ 3-May 5-May 27-May 31-May 27-May No Work No Work No Work No Work 1-Jul 22-Jul Evergreen Sawcutting X X X 9-May No Work No Work No Work No Work No Work No Work No Work No Work No Work Ground Up X X X 4-May 20-May No Work No Work_ No Work No Work No Work No Work No Work No Work Legacy Tapping X X X 29-Apr No Work No Work No Work No Work No Work No Work No Work No Work No Work Lakeridge Paving X X X X 24-May No Work No Work No Work No Work No Work No Work No Work No Work Progress Payment No 8(Ju y) Progress Payment No 9(August) Progress Payment No 10(September) I Week Ending On: 9-Jul 16-Jul 23-Jul 30-Jul 6-Aug 13-Aug 20-Aug_ 27-Aug 3-Sep 10-Sep 17-Sep 24-Sep 1-Oct Reed Trucking • 14-Jul 22-Jul 29-Jul 5-Aug 12-Aug 2-Sep 2-Sep _ 2-Sep 8-Sep 15-Sep 4-Oct 28-Sep 6-Oct W.E.Coates 15-Jul 22-Jul No Work Work No Work No Work No Work No Work 7-Sep No Work No Work 4-Oct 17-Oct No Totem Electric 2-Aug 2-Aug 2-Aug i- X X X X X X x x X x PnD Logging No Work No Work 2-Aug No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Construction No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work 17-Oct :te Services No Work - 2-Aug 2-Aug 2-Sep 2-Sep No Work No Work No Work No Work No Work No Work No Work 10-Oct Transportation Systems 22-Jul No Work No Work 5-Aug 7-Sep 7-Sep No Work No Work 8-Sep 4-Oct No Work 4-Oct 2-Nov Transportation Systems(Electrical) X X X 22-Dec 22-Dec No Work No Work 22-Dec 22-Dec No Work No Work No Work 22-Dec _ Evergreen Sawcutting No Work No Work No Work No Work 12-Aug No Work No Work No Work No Work No Work No Work No Work No Work Ground Up _No Work No Work No Work No Work No Work 2-Sep No Work No Work 9-Sep No Work No Work No Work No Work Legacy Tapping No Work No Work No Work No Work 5-Aug No Work No Work No Work No Work No Work No Work No Work No Work Lakeridge Paving No Work No Work No Work No Work No Work No Work 7-Sep No Work No Work No Work No Work No Work No Work Tyee Concrete X X 4-Aug No Work No Work No Work No Work No Work No Work _ No Work No Work No Work No Work Progress Payment No 11(October) Progress Payment No 12(November Progress Payment No 13 Week Ending On: 8-Oct 15-Oct 22-Oct 29-Oct 5-Nov 12-Nov 19-Nov 26-Nov 3-Dec 10-Dec 17-Dec 24-Dec Reed Trucking 13-Oct 24-Oct 27-Oct 2-Nov 18-Nov 18-Nov 23-Nov 1-Dec 7-Dec 15-Dec 22-Dec 4-Jan W.E.Coates No Work No Work 31-Oct No Work No Work No Work 1-Dec No Work I5-Dec No Work No Work No Work PnD Logging No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Puget Construction No Work No Work 2-Nov No Work 18-Nov No Work No Work No Work No Work No Work No Work No Work Concrete Services 17-Oct No Work No Work 8-Nov No Work No Work No Work No Work No Work No Work No Work No Work Transportation Systems(Concrete) No Work 2-Nov 2-Nov No Work No Work 4-Jan 17-Jan No Work 4-Jan No Work No Work 5-Jan Transportation Systems(Electrical) No Work 22-Dec 11-Jan 4-Jan 4-Jan 4-Jan 4-Jan 4-Jan 4-Jan 4-Jan No Work No Work Evergreen Sawcutting No Work No Work 8-Nov No Work No Work No Work No Work No Work 7-Dec 15-Dec No Work No Work Ground Up No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Legacy Tapping 10-Oct No Work No Work No Work No WA" X X X X X X X Lakeridge Paving No Work No Work No Work 8-Nov 22-Nov 18-Nov'' No Work No Work No Work No Work No Work X Tyee Concrete No Work No Work No Work No Work No Work No Work No Work 1-Dec No Work 15-Dec No Work No Work Rite X X X X X X X 5-Dec No Work 22-Dec No Work No Work _ City X X X X X X X X X X 5-Jan 5-Jan Progress Payment No 14(January) Progress Payment No 15(February) Progress Payment No 16(March) Week Ending On: 31-Dec 7-Jan 14-Jan _ 21-Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb 4-Mar - 11-Mar 18-Mar 25-Mar 1-Apr Reed Trucking No Work 11-Jan 20-Jan 26-Jan 1-Feb 8-Feb 15-Feb 22-Feb W.E.Coates No Work _No Work No Work 31-Jan 1-Feb X X X PnD Logging No Work No Work No Work No Work No Work Nalp Work X X Pu et Construction No Work No Work No Work No Work No Work No Work X X Concrete Services No Work No Work No Work No Work X X X X X X X X X Transportation Systems(Concrete) No Work 3-Feb 3-Feb 3-Feb 8-Feb 15-Feb X Transportation Systems(Electrical) No Work No Work No Work No Work No Work No Work X X Evergreen Sawcutting No Work No Work No Work No Work No Work No Work No Work X Ground Up No Work No Work No Work No Work No Work No Work X X Tyee Concrete No Work No Work No Work No Work No Work X X X X X X X X X Stripe Rite No Work No Work No Work No Work 30-Jan 15-Feb X X Green City No Work 23-Jan 27-Jan 3-Feb 3-Feb _ _ X Integrity Networks X X X 15-Feb 15-Feb 15-Feb No Work X Week Contractor/Subcontractor is on the job site,payroll required. ••(#12)indicates payroll number" Reviewed Daily Reports through-2/13/23 X Subcontractor was not on-site this week. "No Work Performed"payroll required. Revised 2/22/23 15-Feb Date certified payroll was recieved Corrections to payroll required Apprenticeship dot's required Payroll Resubmittal No Work Received"No Work Performed"payroll >!r "Final"payroll City of Renton Contract No.CAG-20-065 - Duvall Avenue NE Certified Payrolls Pr ress Payment No 1(December) Week Ending On: 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec Reed Trucking X X X X X X X X X X X X X X _ Progress Payment No 2(January) Progress Payment No 3(February) Progress Payment No 4(March) I Week Ending On: 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr Reed Trucking 4-Jan 18-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar 14-Mar 22-Mar 25-Mar 4-Apr 8-Apr W.E.Coates X 18-Jan 28-Jan No Work No Work No Work No Work 1-Mar No Work 14-Mar 24-Mar 24-Mar No Work 11-Apr Totem Electric X X 28-Jan 28-Jan No Work No Work I-Mar 1-Mar 4-Mar 18-Mar 18-Mar 25-Mar 4-Apr 8-Apr PnD Logging X X X X X _ X X 1-Mar No Work No Work No Work No Work No Work No Work Puget Construction X X X X X X X X X X X X 25-Apr 25-Apr Concrete Services X X X X X X X X X X X X X 25-Apr Pro ress Payment No 5(April) Progress Payment No 6(May) Progress Payment No 7(June) Week Ending On: 9-Apr 116-Apr 23-Apr 30-Apr 7-May 14-May 21-May 28-May 4-Jun 11-Jun 18-Jun 25-Jun 2-Jul Reed Trucking 18-Apr 22-Apr 28-Apr 4-May 16-May 20-May 27-May 6-Jun 7-Jun 16-Jun 23-Jun 1-Jul 8-Jul W.E.Coates 14-Apr 22-Apr No Work 6-May No Work 24-May 31-May 3-Jun 8-Jun No Work No Work No Work 8-Jul Totem Electric 25-Apr 27-Apr No Work No Work 13-May 20-May 24-May 6-Jun 6-Jun 16-Jun 6-Jul 6-Jul 7-Jul r'nD Logging Otiffaidig X X X No Work 13-Jun No Work No Work No Work No Work No Work No Work No Work 'uget Construction No Work No Work No Work No Work No Work No Work 6-Jun No Work 6-Jun No Work No Work No Work No Work :oncrete Services 25-Apr 25-Apr 3-May No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Transportation Systems X X 3-May 5-May 27-May 31-May 27-May No Work No Work No Work No Work 1-Jul 22-Jul Evergreen Sawcutting X X X 9-May No Work No Work No Work No Work No Work No Work No Work No Work No Work Ground Up X X X 4-May 20-May No Work No Work No Work No Work No Work No Work No Work No Work Legacy Tapping X X X 29-Apr No Work No Work No Work No Work No Work No Work No Work No Work No Work Lakeridge Paving X X X X 24-May No Work No Work No Work No Work No Work No Work No Work No Work Progress Payment No 8(J ) Progress Payment No 9(August) Progress Payment No 10(September) I Week Ending On: 9-Jul 16-Jul 23-Jul 30-Jul 6-Aug 13-Aug 20-Aug 27-Aug 3-Sep 10-Sep 17-Sep 24-Sep 1-Oct Reed Trucking 14-Jul 22-Jul 29-Jul 5-Aug 12-Aug 2-Sep 2-Sep 2-Sep 8-Sep 15-Sep 4-Oct 28-Sep W.E.Coates 15-Jul 22-Jul No Work No Work No Work No Work No Work No Work 7-Sep No Work No Work 4-Oct X Totem Electric 2-Aug 2-Aug X X X X X X X X X N PnD Logging No Work No Work 2-Aug No Work No Work No Work No Work No Work No Work No Work No Work No Work X Puget Construction No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work X Concrete Services No Work 2-Aug 2-Aug 2-Sep 2-Sep No Work No Work No Work No Work No Work No Work X Transportation Systems 22-Jul No Work No Work 5-Aug 7-Sep 7-Sep No Work No Work 8-Sep 4-Oct No Work 4-Oct Evergreen Sawcutting No Work No Work No Work No Work 12-Aug No Work No Work No Work No Work No Work No Work No Work X Ground Up No Work No Work No Work No Work No Work 2-Sep No Work No Work 9-Sep No Work No Work X X Legacy Tapping No Work No Work No Work No Work 5-Aug No Work No Work No Work No Work No Work No Work X X Lakeridge Paving No Work No Work No Work No Work No Work No Work 7-Sep No Work No Work No Work No Work No Work X Tyee Concrete X X 4-Aug No Work No Work No Work No Work No Work No Work No Work No Work X X Progress Payment No 8(July) Progress Payment No 9(August) Progress Payment No 10(September) Week Ending On: 8-Oct 15-Oct 22-Oct 29-Oct 5-Nov 12-Nov 19-Nov 26-Nov 3-Dec 10-Dec 17-Dec 24-Dec 31-Dec eed Trucking W.E.Coates X PnD Logging X Puget Construction X Concrete Services Transportation Systems X _ Evergreen Sawcutting X Ground Up X Legacy Tapping X Lakeridge Paving X Tyee Concrete X Week Contractor/Subcontractor is on the job site,payroll required. **(412)indicates payroll number'* X Subcontractor was not on-site this week. "No Work Performed"payroll required. 15-Feb Date certified payroll was recieved Corrections to payroll required Apprenticeship dot's required Payroll Resubmittal ®Received"No Work Performed"payroll MIME"Final"payroll Reviewed Daily Reports through-10/3/22 Revised 10/4/22 City of Renton Contract No.CAG-20-065 - Duvall Avenue NE Certified Payrolls Pro ress Payment No 1(December) Week Ending On: 25-Sep 2-Oct _ 9-Oct _ 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec Reed Trucking X X X X X X X X X X X X X X Progress Payment No 2(January) Progress Payment No 3(February) Progress Payment No 4(March) Week Ending On: 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr Reed Trucking 4-Jan 18-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar 14-Mar 22-Mar 25-Mar 4-Apr 8-Apr W.E.Coates X 18-Jan 28-Jan No Work No Work No Work No Work 1-Mar No Work 14-Mar 24-Mar 24-Mar No Work 11-Apr Totem Electric X X 28-Jan 28-Jan No Work No Work 1-Mar 1-Mar 4-Mar 18-Mar 18-Mar 25-Mar 4-Apr 8-Apr PnD Logging X X X X X X X 1-Mar No Work No Work No Work No Work No Work No Work Puget Construction X X X X X X X X X X X X 25-Apr 25-Apr Concrete Services X X N X X X X X X X X X X 25-Apr Progress Payment No 5(April) Progress Payment No 6(May) Progress Payment No 7(June) I Week Ending On: 9-Apr _ 16-Apr 23-Apr 30-Apr 7-May 14-May 21-May 28-May 4-Jun 11-Jun 18-Jun 25-Jun 2-Jul Reed Trucking 18-Apr 22-Apr 28-Apr 4-May 16-May 20-May 27-May 6-Jun 7-Jun 16-Jun 23-Jun 1-Jul 8-Jul W.E.Coates 14-Apr 22-Apr No Work 6-May No Work 24-May , 31-May 3-Jun 8-Jun No Work No Work No Work 8-Jul Totem Electric 25-Apr 27-Apr No Work No Work 13-May 20-May ; 24-May 6-Jun 6-Jun 16-Jun 6-Jul 6-Jul 7-Jul nD Logging Ng Work X X X No Work 13-Jun No Work No Work No Work No Work No Work No Work No Work Puget Construction No Work No Work No Work No Work No Work No Work 6-Jun No Work 6-Jun No Work No Work No Work No Work Concrete Services 25-Apr 25-Apr 3-May No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Transportation Systems X X 3-May 5-May 27-May 31-May 27-May No Work No Work No Work No Work 1-Jul 22-Jul Evergreen Sawcutting X X X 9-May No Work No Work No Work No Work No Work No Work No Work No Work No Work Ground Up X X X 4-May 20-May No Work No Work No Work No Work No Work No Work No Work No Work Legacy Tapping X X X 29-Apr No Work No Work No Work No Work No Work No Work No Work No Work No Work Lakeridge Paving X X X X 24-May No Work No Work No Work No Work No Work No Work No Work No Work Progress Payment No 8(July) Progress Payment No 9(August) Progress Payment No 10(September) Week Ending On: 9-Jul 16-Jul 23-Jul 30-Jul 6-Aug 13-Aug 20-Aug 27-Aug 3-Sep 10-Sep 17-Sep 24-Sep 1-Oct Reed Trucking 14-Jul 22-Jul 29-Jul 5-Aug 12-Aug 2-Sep 2-Sep 2-Sep W.E.Coates 15-Jul 22-Jul No Work No Work No Work No Work No Work X X Totem Electric 2-Aug 2-Aug s-Aug X X X X X X X X X X PnD Logging No Work No Work 2-Aug No Work No Work No Work No Work No Work X Puget Construction No Work No Work No Work No Work No Work No Work No Work No Work X Concrete Services No Work 2-Aug 2-Aug 2-Sep 2-Sep No Work No Work No Work X Transportation Systems 22-Jul No Work No Work 5-Aug 7-Sep 7-Sep No Work No Work Evergreen Sawcutting No Work No Work No Work No Work _ 12-Aug No Work No Work No Work No Work Ground Up No Work No Work _ No Work No Work No Work 2-Sep No Work X egacy Tapping ___ No Work No Work No Work No Work , 5-Aug No Work_ No Work No Work No Work akeridge Paving No Work No Work No Work No Work , No Work No Work 7-Sep No Work No Work Tyee Concrete X X 4-Aug No Work , No Work No Work No Work No Work X Week Contractor/Subcontractor is on the job site,payroll required. **(#12)indicates payroll number** X Subcontractor was not on-site this week. "No Work Performed"payroll required. 15-Feb Date certified payroll was recieved Corrections to payroll required Apprenticeship doe's required -Payroll Resubmittal MOM Received"No Work Performed"payroll "Final"payroll Reviewed Daily Reports through-9/2/22 Revised 9/7/22 City of Renton Contract No.CAG-20-065 - Duvall Avenue NE Certified Payrolls Pro ress Payment No 1(December) Week Ending On: 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec Reed Trucking X X X X X X X X X X X X X X Progress Payment No 2(January) Progress Payment No 3(February) Progress Payment No 4(March) Week Ending On: 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr Reed Trucking 4-Jan 18-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar 14-Mar 22-Mar 25-Mar 4-Apr 8-Apr W.E.Coates X 18-Jan 28-Jan No Work No Work No Work No Work 1-Mar No Work 14-Mar 24-Mar 24-Mar No Work 11-Apr Totem Electric X X 28-Jan 28-Jan No Work No Work 1-Mar 1-Mar 4-Mar 18-Mar 18-Mar 25-Mar 4-Apr 8-Apr PnD Logging X X X X X X X 1-Mar No Work No Work No Work No Work No Work No Work Puget Construction X X X X X X X X X X X X 25-Apr 25-Apr Concrete Services X X X X X X _ X X X _ X X X X 25-Apr Progress Payment No 5(April) Progress Payment No 6(May) Progress Payment No 7(June) Week Ending On: 9-Apr 16-Apr 23-Apr 30-Apr 7-May 14-May 21-May 28-May 4-Jun 11-Jun 18-Jun 25-Jun 2-Jul Reed Trucking 18-Apr 22-Apr 28-Apr 4-May 16-May 20-May 27-May 6-Jun 7-Jun 16-Jun 23-Jun 1-Jul 8-Jul W.E.Coates 14-Apr 22-Apr No Work 6-May No Work 24-May 31-May 3-Jun 8-Jun No Work No Work No Work 8-Jul fotem Electric 25-A r 27-Apr No Work No Work 13-May 20-May 24-May 6-Jun 6-Jun 16-Jun 6-Jul 6-Jul 7-Jul ?nD Logging X X X No Work 13-Jun No Work No Work No Work No Work No Work No Work No Work Puget Construction No Work No Work No Work No Work No Work No Work 6-Jun No Work 6-Jun No Work No Work No Work No Work Concrete Services 25-Apr 25-Apr 3-May No Work No Work No Work No Work No Work No Work No Work No Work No Work No Work Transportation Systems X X 3-May 5-May 27-May 31-May 27-May No Work No Work No Work No Work 1-Jul 22-Jul Evergreen Sawcutting X X X 9-May No Work No Work No Work No Work No Work No Work No Work No Work No Work Ground Up X X X 4-May 20-May No Work No Work No Work No Work No Work No Work No Work No Work Legacy Tapping X X X 29-Apr No Work No Work No Work No Work No Work No Work No Work No Work No Work Lakeridge Paving X X X X 24-May No Work No Work No Work No Work No Work No Work No Work No Work Progress Payment No 8(July) Progress Payment No 9(August) Progress Payment No 10(September) Week Ending On: 9-Jul 16-Jul 23-Jul 30-Jul 6-Aug 13-Aug 20-Aug 27-Aug 3-Sep 10-Sep 17-Sep 24-Sep 1-Oct Reed Trucking 14-Jul 22-Jul 29-Jul 5-Aug 12-Aug W.E.Coates 15-Jul 22-Jul No Work No Work No Work No Work X Totem Electric 2-Aug 2-Aug 2-Aug X X X X X X X X X X PnD Logging No Work No Work 2-Aug No Work No Work No Work X Puget Construction No Work No Work No Work No Work No Work X X Concrete Services No Work 2-Aug 2-Aug 4-Aug X X Transportation Systems 22-Jul No Work No Work 5-Aug X Evergreen Sawcutting No Work No Work No Work No Work 12-Aug X X Ground Up No Work No Work No Work No Work No Work X .egacy Tapping No Work No Work No Work No Work 5-Aug X X akeridge Paving No Work No Work No Work No Work X X Tyee Concrete X X 4-Aug No Work X X X Week Contractor/Subcontractor is on the job site,payroll required. **(#12)indicates payroll number** X Subcontractor was not on-site this week. "No Work Performed"payroll required. 15-Feb Date certified payroll was recieved Corrections to payroll required Apprenticeship dot's required ®Payroll Resubmittal IIIMEZIM Received"No Work Performed"payroll "Final"payroll Reviewed Daily Reports through-8/16/22 Revised 8/17/22 City of Renton Contract No.CAG-20-065 - Duvall Avenue NE Certified Payrolls Pro ress Payment No 1(December) Week Ending On: 25-Sep 2-Oct _ 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov _ 27-Nov 4-Dec 11-Dec _ 18-Dec _ 25-Dec Reed Trucking X X X X X X X X X X X X X X Progress Payment No 2(January) Pro ress Payment No 3(February) Progress Payment No 4(March) Week Ending On: 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr Reed Trucking 4-Jan 18-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar 14-Mar 22-Mar 25-Mar 4-Apr 8-Apr W.E.Coates X 18-Jan 28-Jan No Work _No Work No Work No Work 1-Mar No Work 14-Mar 24-Mar 24-Mar No Work 11-Apr Totem Electric X X 28-Jan 28-Jan No Work No Work 1-Mar 1-Mar 4-Mar 18-Mar 18-Mar 25-Mar 4-Apr 8-Apr PnD Logging X X X X X X X 1-Mar No Work No Work No Work No Work No Work No Work Puget Construction X X X X X X X X X X X X 25-Apr 25-Apr Concrete Services X X _ X X X X X X X X X X X 25-Apr Progress Payment No 5(April) Progress Payment No 6(May) Progress Payment No 7(June) Week Ending On: 9-Apr 16-Apr 23-Apr 30-Apr 7-May 14-May 21-May 28-May 4-Jun 11-Jun 18-Jun 25-Jun 2-Jul Reed Trucking 18-Apr 22-Apr 28-Apr 4-May 16-May 20-May 27-May 6-Jun 7-Jun 16-Jun 23-Jun 1-Jul W.E.Coates 14-Apr 22-Apr No Work 6-May No Work 24-May 31-May 3-Jun 8-Jun No Work No Work X Potem Electric 25-Apr 27-Apr No Work No Work 13-May 20-May 24-May 6-Jun 6-Jun 16-Jun r'nD Logging No Work X X X No Work 13-Jun No Work No Work No Work X X X X Puget Construction No Work No Work No Work No Work No Work No Work 6-Jun No Work 6-Jun No Work No Work No Work X Concrete Services 25-Apr 25-Apr 3-May No Work No Work No Work No Work No Work No Work No Work No Work No Work X Transportation Systems X X 3-May 5-May 27-May 31-May 27-May No Work No Work No Work No Work 1-Jul Evergreen Sawcutting X X X 9-May No Work No Work No Work No Work No Work No Work No Work No Work X Ground Up X X X 4-May 20-May No Work No Work No Work No Work No Work No Work No Work X Legacy Tapping X X X 29-Apr No Work No Work No Work No Work No Work No Work No Work X X Lakeridge Paving X X X X 24-May No Work No Work No Work No Work No Work No Work X X Week Contractor/Subcontractor is on the job site,payroll required. "(#12)indicates payroll number" X Subcontractor was not on-site this week. "No Work Performed"payroll required. 15-Feb Date certified payroll was recieved Corrections to payroll required Apprenticeship doe's required -Payroll Resubmittal MEM Received"No Work Performed"payroll "Final"payroll Reviewed Daily Reports through-7/1/22 Revised 7/5/22 City of Renton Contract No.CAG-20-065 - Duvall Avenue NE _ Certified Payrolls Pro ress Payment No 1(December) Week Ending On: 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec Reed Tricking X X X X X X X X X X X X X X Progress Payment No 2(January) Progress Payment No 3(February) Progress Payment No 4(March) I Week Ending On: 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr Reed Trucking 4-Jan 18-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar 14-Mar 22-Mar 25-Mar 4-Apr 8-Apr W.E.Coates X I8-Jan 28-Jan No Work No Work No Work No Work 1-Mar No Work I4-Mar 24-Mar 24-Mar No Work 1 I-Apr Totem Electric X X 28-Jan 28-Jan No Work No Work 1-Mar 1-Mar 4-Mar 18-Mar 18-Mar 25-Mar 4-Apr 8-Apr PnD Logging X X X X X X X 1-Mar No Work No Work No Work No Work No Work No Work Puget Construction X X X X X X X X X X X X 25-Apr 25-Apr Concrete Services X X X X X X X X X X X X X 25-Apr Progress Payment No 5(April) Progress Payment No 6(May) Progress Payment No 7(June) Week Ending On: 9-Apr I6-Apr 23-Apr 30-Apr 7-May T, 14-May 21-May 28-May 4-Jun _ 11-Jun 18-Jun 25-Jun 2-Jul Reed Trucking 18-Apr 22-Apr 28-Apr 4-May 16-May 20-May 27-May 6-Jun 7-Jun W.E.Coates 14-Apr 22-Apr No Work 6-May No Work 24-May 31-May 3-Jun 8-Jun X X 3 Electric 25-Apr 27-Apr No Work No Work 13-May 20-May 24-May 6-Jun 6-Jun .ogging No Work X X X No Work 13-Jun No Work _ No Work No Work X X Puget Construction No Work No Work No Work No Work No Work No Work 6-Jun No Work 6-Jun X X Concrete Services 25-Apr 25-Apr 3-May No Work No Work No Work No Work No Work No Work X X Transportation Systems X X 3-May 5-May 27-May 3I-May 27-May No Work No Work X X Evergreen Sawcutting X X X 9-May No Work No Work No Work No Work No Work X X Ground Up X X X 4-May 20-May No Work No Work _ No Work No Work X X Legacy Tapping X X X 29-Apr No Work No Work No Work No Work No Work X X Lakeridge Paving X X X X 24-May No Work No Work No Work No Work X X Week Contractor/Subcontractor is on the job site,payroll required. 4°(#12)indicates payroll number** X Subcontractor was not on-site this week. "No Work Performed"payroll required. 15-Feb Date certified payroll was rccieved Corrections to payroll required I. Apprenticeship doe's required -Payroll Resubmittal No Work Received"No Work Performed"payroll Iliffril"Final"payroll Reviewed Daily Reports through-6/13/22 Revised 6/14/22 City of Renton Contract No.CAG-20-065 - Duvall Avenue NE Certified Payrolls Pro ress Payment No 1(December) Week Ending On: 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec _ 18-Dec 25-Dec Reed Trucking X _ X X X X X X X X X X X X X Progress Payment No 2(January) Pro.ress Payment No 3(February) Progress Payment No 4(March) Week Ending On: 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr Reed Trucking _ 4-Jan 18-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar 14-Mar 22-Mar 25-Mar 4-Apr 8-Apr W.E.Coates X I8-Jan 28-Jan No Work No Work No Work No Work 1-Mar No Work I4-Mar 24-Mar 24-Mar No Work I I-Apr Totem Electric X _ X 28-Jan 28-Jan No Work No Work 1-Mar 1-Mar 4-Mar 18-Mar 18-Mar 25-Mar 4-Apr 8-Apr PnD Logging X X X X X X X 1-Mar No Work No Work No Work No Work No Work No Work Puget Construction X - X X X X X X X X X X X 25-Apr 25-Apr Concrete Services X X X X X X X X X X X X X 25-Apr Progress Payment No 5(April) Progress Payment No 6(May) Progress l'nyment No 7(June) Week Ending On: 9-Apr 16-Apr 23-Apr 30-Apr 7-May 14-May 21-May 28-May 4-Jun 11-Jun I8-Jun 25-Jun 2-Jul Reed Trucking 18-Apr 22-Apr 28-Apr 4-May 16-May W.E.Coates 14-Apr 22-Apr No Work 6-May No Work X t Electric 25-Apr 27-Apr No Work No Work 13-May jogging No Work . X X X X X X X X X X X Puget Construction No Work No Work No Work X No Work X Concrete Services 25-Apr 25-Apr 3-May No Work X X Transportation Systems X X 3-May 5-May Evergreen Sawcutting X X X 9-May No Work X Ground Up X X X 4-May X Legacy Tapping X X X 29-Apr X X Lakeridge Paving X X X X X Week Contractor/Subcontractor is on the job site,payroll required. **(#12)indicates payroll number** X Subcontractor was not on-site this week. "No Work Performed"payroll required. 15-Feb Date certified payroll was rccicved Corrections to payroll required L. Apprenticeship doe's required -Payroll Resubmittal ®Received"No Work Performed"payroll "I;Mal"payroll Reviewed Daily Reports through-5/13/22 Revised 5/17/22 City of Renton Contract No.CAG-20-065 - Duvall Avenue NE Certified Payrolls Pro ress Payment No 1 (December) Week Ending On: 25-Sep 2-Oct 9-Oct 16-Oct _ 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec Reed Tntcking X X X X X X X X _ X X X X X X Progress Payment No 2(January) Progress Payment No 3(February) Progress Payment No 4(March) Week Ending On: 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr Reed Trucking 4-Jan 18-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar 14-Mar 22-Mar 25-Mar 4-Apr 8-Apr W.E.Coates X 18-Jan 28-Jan No Work No Work No Work No Work 1-Mar No Work I4-Mar 24-Mar 24-Mar No Work I I-Apr Totem Electric X X 28-Jan 28-Jan No Work No Work 1-Mar 1-Mar 4-Mar 18-Mar I8-Mar 25-Mar 4-Apr 8-Apr PnD Logging X X X X X X X I-Mar No Work No Work No Work No Work No Work No Work Puget Construction X X X X X X X X X X X X X Concrete Services X X X X X X X X X X X X X Progress Payment Nu 5(April) Progress Payment No 6(May) Progress Payment No 7(June) Week Ending On: 9-Apr I6-Apr 23-Apr 30-Apr 7-May 14-May 21-May 28-May 4-Jun 11-Jun 18-Jun 25-Jun 2-Jul Reed Trucking W.E.Coates 14-Apr X r Electric .ogging No Work X X X X X X X X X X X X Puget Construction X X Concrete Services Potelco X Week Contractor/Subcontractor is on the job site,payroll required. **(#12)indicates payroll number** X Subcontractor was not on-site this week. "No Work Performed"payroll required. 15-Feb Date certified payroll was recicved Corrections to payroll required 01 Apprenticeship doe's required WA Dept of L&I Payroll. Submit Certifying Statement with Fed language(wh347 page 2). Payroll Rcsubmittal No Work Received"No Work Performed"payroll 15-Feb '"Final"payroll Reviewed Daily Reports through-4/15/22 Revised 4/18/22 City of Renton Contract No.CAG-20-065 - Duvall Avenue NE Certified Payrolls Pro ress Payment No 1(December) Week Ending On: 25-Sep _ 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec Reed Trucking X X X X X X X X X X X X X X Progress Payment No 2(January) Pro ress Payment No 3(February) Progress Payment No 4(March) Week Ending On: 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr Reed Trucking 4-Jan 18-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar 14-Mar W.E.Coates X 18-Jan 28-Jan No Work No Work _ No Work No Work 1-Mar No Work 14-Mar X X Totem Electric X X 28-Jan 28-Jan No Work No Work 1-Mar 1-Mar 4-Mar 18-Mar 18-Mar PnD Logging X X X X X X X 1-Mar No Work No Work No Work X Week Contractor/Subcontractor is on the job site,payroll required. ""(#12)indicates payroll number" iiiiii X Subcontractor was not on-site this week. "No Work Performed"payroll required. 15-Feb Date certified payroll was recieved Collections to payroll required Apprenticeship does required Payroll Resubmittal y v v v No Work Received"No Work Performed"payroll 15-Feb "Final"payroll Reviewed Daily Reports through-3/17/22 Revised 3/18/22 City of Renton Contract No.CAG-20-065 - Duvall Avenue NE Certified Payrolls Progress Pa ment No 1(December Week Ending On: 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec Reed Trucking X X X X X X X X X X X X X PP No 1 Progress Payment No 2(January) Progress Payment No 3(February) Week Ending On: 25-Dec 1-Jan 8-Jan 15-Jan 22-Jan _ 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar Reed Trucking 4-Jan 4-Jan 18-Jan 25-Jan 28-Jan 4-Feb 10-Feb 1-Mar 1-Mar 4-Mar W.E.Coates X X 18-Jan 28-Jan No Work No Work No Work No Work 1-Mar No Work X Totem Electric X X X 28-Jan 28-Jan No Work No Work 1-Mar 1-Mar 4-Mar PnD Logging X X X _ X X X X X 1-Mar X X Hoil Week Contractor/Subcontractor is on the job site,payroll required. *"(#12)indicates payroll number** Subcontractor was not on-site this week. "No Work Performed"payroll required Date certified payroll was recieved Corrections to payroll required Apprenticeship doc's requiredPayroll Resubmittal k Received"No Work Performed"payroll "Final"payroll Reviewed Daily Reports through-3/3/22 Revised 3/5/22 City of Renton Contract No.CAG-20-065 - Duvall Avenue NE Certified Payrolls Pay Est No 1(December) Week Ending On: 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov - 27-Nov 4-Dec 11-Dec 1/3-Dec Reed Trucking X X X X X X X X X X X X X Pay Est No 2(January) Pay Est No 3(February) Pay Est No 4(March) Week Ending On: 25-Dec 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar Reed Trucking 4-Jan 4-Jan 18-Jan W.E.Coates X X 18-Jan X Totem Electric X X X X Week Contractor/Subcontractor is on the job site,payroll required. **(#12)indicates payroll member""" X Subcontractor was not on-site this week. "No Work Performed'payroll required 15-Feb Date certified payroll was recieved Corrections to payroll required Apprenticeship dot's required WA Dept of L&I Payroll. Submit Certifying Statement with Fed language(wh347 page 2). Payroll Resubmittal No Work Received"No Work Performed"payroll 15-Feb "Final"payroll Reviewed Daily Reports through-1/18/22 Revised 1/19/22 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 Po Box 44540, Olympia, WA 98504-4540 Statement of Intent to Pay Prevailing Wage Project Detail - Project Dashboard Document Received Intent ID: Affidavit ID: Status: Approved On Date: 8/18/2021 1170257 8/24/2021 Company Details Company Name: REED TRUCKING Et EXCAVATING INC Address: 2207 Inter Ave. PUYALLUP, WA, 98372 Contractor Registration No. REEDTEI016JW WA UBI Number 601915034 Phone Number 253-841-4837 Industrial Insurance Account ID 98310400 OMWBE Certifications as of 8/18/2021 Small Business Enterprise (SBE) Email Address tbarquist®reedtrucking.corn Filed By Tiffani Barquist Prime Contractor Company Name REED TRUCKING Et EXCAVATING INC Contractor Registration No. REEDTEI016JW WA UBI Number 601915034 Phone Number 253-841-4837 Project Information Awarding Agency RENTON, CITY OF 1055 S GRADY WAY RENTON, WA - 98055 Awarding Agency Contact Flora Lee Awarding Agency Contact Phone Number 425-430-7303 - Contract Number CAG-20-065 Project Name Duvall Avenue NE Project Description This project includes but is not limited to: excavation; grading; removal of pavement; plaining pavement; paving with asphalt, curb and gutter; drainage; illumination; HAWK signal; sidewalk; walls; adjustments to utility frames, grates, and covers; property restoration; and other work. Contract Amount $5,218,171.95 Contract Type Description Bid-Build (Traditional) Bid due date 6/22/2021 Award Date 7/21/2021 Project Site Address or Directions Payment Details Check Number: Transaction Id: 108230690 Intent Details Expected project start date: (MM/DD/YYYY) 9/20/2021 In what county (or counties) will the work be King performed? In what city (or nearest city) will the work be Renton performed? What is the estimated contract amount? OR is $5,218,171.95 this a time and materials estimate? Does your company intend to hire ANY Yes subcontractors? Will your company have employees perform Yes work on this project? Do you intend to use any apprentices? No (Apprentices are considered employees.) How many owner/operators performing work on 1 the project own 30% or more of the company? First Name Last Name Trade Shawn Reed Truck Drivers a - k� V Journey Level Wages County Trade Occupation Wage Fringe # Workers King Power Equipment Operators- Shovel, Excavator,Backhoe, $72.28 $0.00 3 Underground Sewer a Water Tractors Under 15 Metric Tons. . King Laborers Traffic Control Supervisor $50.31 $0.00 1 King Laborers Grade Checker a Transit $54.01 $0.00 . . 2 Person King Laborers - Underground Sewer Pipe Layer $53.35 $0.00 3 a Water - King Laborers - Underground Sewer General Laborer a Topman $52.39 $0.00 2 a Water King Truck Drivers Dump Truck $63.71 $0.00 3 King Truck Drivers Dump Truck a.Trailer $64.55 $0.00 -.3 King Flaggers Journey Level $44.40 $0.00 3 Public Notes o Show/Hide.Existing Notes . No note exists Certified Payroll Report Department of Labor and e.:..71: ,�Tf: . Project Name County Project or Contract# IndustriesPrime Contractor Z r Duvall Avenue NE King CAG-20-065 Prevailing Wage Program �:;;;;;, ;: r l Subcontractor ❑ PO Box 44540 "',:rle ov Project Address Olympia WA 98504-4540 y` 'Nes a Final Week of (360)902-5335 Payroll E Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 8/19/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date 1 Deductions Work Classification Name & o o Sun Mon Tue Wed Thu Fri Sat Total a) Gross Amount and And a E 8/13 8/14 8/15 8/16 8/17 8/18 8/19 Total Rate Earned/Gross Hourly Net Wages co E Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address y Benefits" Tax ce o o Hours Worked Each Day 0 1. Laborers-Underground J Medicare:$33.66, Sewer&Water RG 0.00 0.00 0.00 0.00 3.00 0.00 0.00 3.00 $52. 9 $157.17 NiPaid Family Jesse Johnson `� Medical Leave: General Laborer&Topman 819 Louise Wise $157.17/ (King) Ave NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $2 321.17 $0.00/hr $406.00 $143.92 $47.14 $1,690.45 Orting,WA-98360 $104.7 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 $0.00 2. Power Equipment RG 0.00 0.00 0.00 0.00 3.00 0.00 0.00 3.00 $74.28 $222.84 Medicare:$45.01, Operators-Underground Paid Family Sewer&Water $111.4 Medical Leave: Shovel,Excavator,Backhoe, Christopher Rustan OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $222 84/ $61.09, Tractors Under 15 Metric Tons 29522 94th St SE $3,432.52 $0.00/hr $594.00 $192.45 Garnishment: $2,014.94 (King) Moroe,WA-98272 $196.60,Health: DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168"5 $0.00 $328.43 I F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 8/29/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 8/13/2023 8/19/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jesse Johnson Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 2.Christopher Rustan Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • w The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions,other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. -%,5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and _;'raining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes Punch list items MB 8/29/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and fµ��ArF Project Name County Project or Contract# �,:~» :7L,, Prime Contractor Industries ••~ t. =r Duvall Avenue NE King CAG-20-065 Prevailing Wage Program I-':;'_, . :� ) Subcontractor ❑ PO Box 44540 �' .t.�, Project Address y� hFy Final Week of Olympia WA 98504-4540 (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 8/12/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name c9 ~O o Sun Mon Tue Wed Thu Fri Sat Total a= Gross Amount and And a) E 8/6 8/7 8/8 8/9 8/10 8/11 8/12 Total Rate Earned/Gross Hourly Net Wages Eco Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address O o Hours Worked Each Day Benefits" 0 No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 8/29/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 8/6/2023 8/12/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F L — No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ._ 1t:i)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and raining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes On suspension MB 8/29/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and F,STA=F Project Name County Project or Contract# ?.:_ .,•'' Prime Contractor 0 Industries =•t' 4. Duvall Avenue NE King CAG-20-065 Prevailing Wage Program g"= ;;;' Subcontractor ❑ PO Box 44540 °',�y�,I a�y,. Project Address Olympia WA 98504-4540 "Bs Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone FOr the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 8/5/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name E5 ~ " Sun Mon Tue Wed Thu Fri Sat Total CL O aGross Amount and And a E 7/30 7/31 8/1 8/2 8/3 8/4 8/5 Total Rate Earned/Gross Hourly Net Wages ru E � Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address o o Hours Worked Each Day y Benefits" Tax O 1. Power Equipment Medicare:$58.75, Operators-Underground RG 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 $74.28 $742.80 Paid Family Joseph Frantom Sewer&Water Medical Leave: 2760 SW Youwood $111 4 Shovel,Excavator,Backhoe, Way OT 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 2 $55.71 $798.51/ $0.00/hr $831.00 $251.21 $77.66,388.8Health: $2,833.19 Tractors Under 15 Metric Tons Port Orchard,WA- $4,440.64 $388.83 (King) 98367 $148.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 2. Laborers-Underground J Medicare:$38.48, Sewer&Water RG 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 $52.39 $523.90 Paid Family Jesse Johnson Ni Medical Leave: General Laborer&Topman 819 Louise Wise $523.90/ (King) Ave NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $2,654.08 $0.00/hr $486.00 $164.56 $53.69 $1,911.35 Orting,WA-98360 $104.7 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 $0.00 3. Laborers-Underground Medicare:$13.43, RG 0.00 0.00 0.00 9.00 0.00 0.00 0.00 9.00 $52.39 $471.51 Sewer&Water Douglas Neal Paid Family General Laborer&Topman 20302 77th Street $471.51 / Medical Leave: (King) Ct.E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $925.91 $0.00/hr $39.00 $57.41 $19.36 $796.71 Bonney Lake,WA- 98391 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$04.7 $0.00 4. Power Equipment Medicare:$55.79, RG 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 $74.28 $742.80 Operators-Underground Paid Sick Leave: Sewer&Water $74.29, Christopher Rustan $111.4 Shovel,Excavator,Backhoe, 29522 94th St SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $742.80/ $0.00/hr $792.00 $238.55 Garnishment: $2,490.41 Tractors Under 15 Metric Tons Moroe,WA-98272 $4,232.69 $196.60,Health: $385.05 (King) $148.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment RG 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 $72.28 $722.80 Medicare:$42.64, Operators-Underground Paid Family Sewer&Water Jason Sniezak Medical Leave: Shovel,Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $108.4 $0.00 g 2 $722.80/ $0.00/hr $349.00 $182.32 $59.47,Health: $2,307.21 Tractors Under 15 Metric Tons Village Ln SE $3,265.29 $324.65 (King) Yelm,WA-98597 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 8/16/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 7/30/2023 8/5/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Joseph Frantom Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) _ q 2.Jesse Johnson Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 3.Douglas Neal Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Christopher Rustan Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 5.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. �'F5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ,iraining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 8/17/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ST,TF Project Name County Project or Contract# Industries y Prime Contractor EJ Prevailing Wage Program fiiii. 't'.ili= Duvall Avenue NE King CAG-20-065 .,i =. _, Subcontractor ❑ PO Box 44540 ".?;, `y. Project Address Olympia WA 98504-4540 '=�y^ Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 7/29/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name o ° Sun Mon Tue Wed Thu Fri Sat Total m Gross Amount and And E 7/23 7/24 7/25 7/26 7/27 7/28 7/29 Total Rate Earned/Gross Hourly Net Wages f Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address > ID Benefits" Tax o O o Hours Worked Each Day 0 No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 8/1/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 7/23/2023 7/29/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F ) No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions,other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and aaining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes On Suspension MB 8/2/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and �f.sl+TE Project Name County Project or Contract# .:iff •*qt.?". Prime Contractor Z Industries ;:'•'vl Duvall Avenue NE King CAG-20-065 PrevailingWage Program ,fill - •'r= 9 9 >. i.2. ::!, Subcontractor ❑ PO Box 44540 °';,-� y Project Address Olympia WA 98504-4540 y` 1&89 ac Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 7/22/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c� p o Sun Mon Tue Wed Thu Fri Sat Total cL a) Gross Amount and And a> E 7/16 7/17 7/18 7/19 7/20 7/21 7/22 Total Rate Earned/Gross Hourly Net Wages E Hours of Pay Pa roll "Usual FICA Withholding Other m a' y Benefits" Tax Soc Sec#of Employee Address ce O o Hours Worked Each Day a 1. Laborers 1 $1,672. Medicare:$28.05, RG 0.00 0.00 8.50 9.00 8.00 7.75 0.00 33.25 $50.31 1 ,/ Paid Family Traffic Control Supervisor Jesse Williams (King) 245 S 78th St $1,672.81 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $277.00 $119.97 $41.83 $1,468.21 $1,935.06 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�0.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 7/26/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 7/16/2023 7/22/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally ' permissible, have been made by any person either directly or indirectly from the full wages earned. 5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and graining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator -Tiffani Barquist MB 7/27/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and I.S.T. A. Project Name County Project or Contract# ' _ _:..-, Prime Contractor Industries 4�: _ 4 o_,::. s.y Duvall Avenue NE King CAG-20-065 Prevailing Wage Program <'° 'f'y Subcontractor El PO Box 44540 y�Jr v Project Address Olympia WA 98504-4540 �89 Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 7/1/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name c9 ~o o Sun Mon Tue Wed Thu Fri Sat Total ce m Gross Amount and And a� E 6/25 6/26 6/27 6/28 6/29 6/30 7/1 Total 1 Rate Earned/Gross Hourly Net Wages z r 0 Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address IX O o Hours Worked Each Day Benefits" Tax a No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 7/11/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 6/25/2023 7/1/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification I Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly l (E) Approved I (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ?5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ( _raining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes On Suspension MB 7/11/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and *E. +rf Project Name County Project or Contract# _ •_ - Prime Contractor Industries ,t. Duvall Avenue NE King CAG-20-065 Prevailing Wage Program =11:: ;gill i.r Subcontractor ❑ PO Box 44540 '.y cv' Project Address Olympia WA 98504-4540 -B� Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone FOr the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 6/24/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions r Work Classification Name c7 n o Sun Mon Tue Wed Thu Fri Sat Total ce O m Gross Amount and And E 6/18 6/19 6/20 6/21 6/22 6/23 6/24 Total Rate Earned/Gross Hourly Net Wages E Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address O o ce Hours Worked Each Day Tax Benefits" a • 1. Laborers `1 J Medicare:$13.68, RG 0.00 0.00 0.00 8.50 6.50 3.75 0.00 18.75 $50.31 $943.31 Paid Family Traffic Control Supervisor Jesse Williams �/ (King) 245 S 78th St $943.31/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $943.31 $0.00/hr $77.00 $58.49 $14.98 $779.16 98408 $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 6/29/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 6/18/2023 6/24/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. •"5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ("raining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 6/30/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and �� .,.F Project Name County Project or Contract# ty-t:",- Prime Contractor El Industries -:Ea ,; :y Duvall Avenue NE King CAG-20-065 Y Prevailing Wage Program {1 ;� Subcontractor ❑ PO Box 44540 t Project Address Olympia WA 98504-4540 Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 6/17/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name ( ~ o Sun Mon Tue Wed Thu Fri Sat Total a, Gross Amount and And a) E 6/11 6/12 6/13 6/14 6/15 6/16 6/17 Total Rate Earned/Gross Hourly Net Wages E Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address m a) - y Benefits" Tax o_ O o' Hours Worked Each Day 0 No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 6/23/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 6/11/2023 6/17/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side a The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (g'-4,iy apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and 1, ing Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes Suspension MB 6/23/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ,,,rt Project Name Count �t. •i_ •', Prime Contractor El Y Project or Contract# Industries :64- j Prevailing Wage Program =` , ,. = Duvall Avenue NE King CAG-20-065 Pr Box 44540 :;.'11z' �'�1' Subcontractor ❑ Project Address Olympia WA 98504-4540 yf�J. ^""' Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone FOr the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 6/10/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date - — Deductions Work Classification Name ~O o Sun Mon Tue Wed Thu Fri Sat Gross Amount Total and And `. a� E 6/4 6/5 6/6 6/7 6/8 6/9 6/10 Total Rate Hourly E Earned/Gross Soc Sec#of Employee Address rn Hours of Pay Payroll "Usual FICA Withholding Other Net Wages w o o Hours Worked Each Day Benefits" Tax 0 No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on R` Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 6/15/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 6/4/2023 6/10/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (g) 4.ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ling Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes Suspension MB 6/15/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and F,5T.,TF, Project Name County Project or Contract# Industries ""ii s Prime Contractor XI Prevailing Wage Program -.--. ,;a Duvall Avenue NE King CAG-20-065 ill: ,•••r. Subcontractor ❑ PO Box 44540 ",-, : Project Address Olympia WA 98504-4540 Hz "F4' Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 6/3/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions H Work Classification Name 6 ~O o Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And ` a) E 5/28 5/29 5/30 5/31 6/1 6/2 6/3 Total Rate Hourly 21 E i= Hours of Pay Earned/Gross "Usual FICA Withholding Other Net Wages Soc Sec#of Employee Address o o Hours Worked Each Day Payroll Benefits" Tax 0 No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 6/9/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 5/28/2023 6/3/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (s)_Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ling Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes Suspension MB 6/12/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side r • Certified Payroll Report Department of Labor and �t, T4�= Project Name County Project or Contract# : � Prime Contractor ►� Industries 44;r _ s_ Prevailing Wage Program �ii::. s'= Duvall Avenue NE King CAG 20 065 �;w i Subcontractor ❑ PO Box 44540 '?'•�. Project Address Olympia WA 98504-4540 e� `""", Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 5/27/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions IL- Work Classification Name (-3 ~O 2- Sun Mon Tue Wed Thu Fri Sat Total S a)E 5/21 5/22 5/23 5/24 5/25 5/26 5/27 Total Rate Gross Amount Hourly and And LBa) a) Earned/Gross "Usual FICA Net Wages r Hours of Pay Payroll "Ul Withholding Other Soc Sec#of Employee Address cc O o Hours Worked Each Day Benefits" Tax a No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 6/9/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 5/21/2023 5/27/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (NI Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ung Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes Suspension MB 6/12/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ArF. Project Name County Project or Contract# ,.; � , • e:"°* Prime Contractor ►5 Industries I , Duvall Avenue NE King CAG-20-065 Prevailing Wage Program <El3 , �• Subcontractor ❑ PO Box 44540 ''":� Project Address Olympia WA 98504-4540 tn1.19 Final Week of (360) 902-5335 Payroll El Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 5/20/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name & ~O •• Sun Mon Tue Wed Thu Fri Sat Total a) Gross Amount and And a) E 5/14 5/15 5/16 5/17 5/18 5/19 5/20 Total Rate Earned/Gross Hourly Net Wages m E Hours of Pay "Usual FICA Withholding Other co Payroll Benefits" Tax Soc Sec#of Employee Address o o Hours Worked Each Day 0 1. Flaggers RG 0.00 5.00 4.50 0.00 0.00 0.00 0.00 9.50 $44.40 $421.80 Medicare:$20.91, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $469.28/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,442.10 $0.00/hr $168.00 $89.41 $23.82 $1,139.96 Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers RG 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Medicare:$20.91, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $469.28/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1,442.10 $0.00/hr $168.00 $89.41 $23.82 $1,139.96 Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 .,. .-aggers J J Medicare:$3.54, RG 0.00 5.50 0.00 0.00 0.00 0.00 0.00 5.50 $44.40 $244.20 Paid Family Level Diago Hunter (King) 7620 S.Alaska $244.20/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $244.20 $0.00/hr $0.00 $15.14 $4.20 $221.32 _= 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$5.86, RG 0.00 1.50 0.00 0.00 0.00 0.00 0.00 1.50 $47.48 $71.22 Paid Family Control Laborer Joseph Tountas (King) 20407 30th Ave NE $404.22/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $404.22 $0.00/hr $14.00 $25.06 $6.90 $352.40 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 5. Flaggers Joseph Tountas Medicare:$5.86, 20407 30th Ave NE RG 0.00 7.50 0.00 0.00 0.00 0.00 0.00 7.50 $44.40 $333.00 $404.22/ $0.00/hr $14.00 $25.06 Paid Family $352.40 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Journey Level Shoreline,WA- $404.22 Medical Leave: (King) 98155 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $6.90 * - - ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 6. Laborers Medicare:$30.23, RG 0.00 10.00 7.50 0.00 0.00 0.00 0.00 17.50 $50.31 $880.43 Paid Family Traffic Control Supervisor Jesse Williams (King) 245 S 78th St $993.63/ Medical Leave: Tacoma,WA- OT 0.00 1.50 0.00 0.00 0.00 0.00 0.00 1.50 $75.47 $113.21 $2 084.64 $0.00/hr $310.00 $129.25 $31.85 $1,583.31 * ** 98408 $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 ' F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 5/26/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 5/14/2023 5/20/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Laborers ffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Diego Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) __Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (MM A.ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ding Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 5/30/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side f Certified Payroll Report Department of Labor and Proje.Iipict Name County Project or Contract# Industries =� :: ;:r.;: Duvall Avenue NE King CAG-20-065 Prevailing Wage Program =4fiu; f�a°r Subcontractor ❑ PO Box 44540 4," Project Project Address Olympia WA 98504-4540 `""`' Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 5/13/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name & ~O Sun Mon Tue Wed Thu Fri Sat Total a, Gross Amount and And a, E 5/7 5/8 5/9 5/10 5/11 5/12 5/13 Total Rate Earned/Gross Hourly Net Wages `i E i Hours of Pay "Usual FICA Withholding Other Soc Sec#of Employee Address c f a Payroll Benefits" Tax cf O o Hours Worked Each Day 0 1. Laborers Medicare:$6.62, RG 0.00 3.00 0.00 0.00 0.00 0.00 0.00 3.00 $47.48 $142.44 Paid Family Traffic Control Laborer Steve Cooper (King) 7610 So Park Ave. $497.64/ Medical Leave: _ Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $497.64 $0.00/hr $9.00 $28.29 $8.46, Health: $403.80 98408 $41.47 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 2. Flaggers Medicare:$6.62, RG 0.00 8.00 0.00 0.00 0.00 0.00 0.00 8.00 $44.40 $355.20 Journey Level Steve Cooper Paid Family (King) 7610 So Park Ave. $497.64/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $497.64 $0.00/hr $9.00 $28.29 $8.46, Health: $403.80 98408 $41.47 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Truck Drivers Medicare:$49.01, RG 0.00 2.25 0.00 0.00 0.00 0.00 0.00 2.25 $63.71 $143.35 Paid Family Dump Truck Ryan Eubanks (Pierce) 13633 Olympic De. $167.24/ Medical Leave: SE OT 0.00 0.25 0.00 0.00 0.00 0.00 0.00 0.25 $95.57 $23.89 $3,380.31 $0.00/hr $464.00 $209.58 $45.11 $2,612.61 Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 4. Power Equipment Medicare:$61.64, RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $74.28 $742.80 Operators-Underground Paid Family Sewer&Water Travis Haney Medical Leave: Shovel,Excavator,Backhoe, ****169th Ave E OT 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 $1 21 4 $55.71 $798.51 / $50.56 Tractors Under 15 Metric Tons Lake Tapps,WA- $4,250.87 $0.00/hr $789.00 $263.55 $3,086.12 (King) 98391 $148.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers-Underground Medicare:$22.37, RG 0.00 10.00 8.50 0.00 0.00 0.00 0.00 18.50 $53.35 $986.98 Sewer&Water Paid Family Somnang Hean Medical Leave: Pipe Layer Pacific Hwy S $986.98/ (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $80.03 $0.00 $1,543.18 $0.00/hr $191.00 $95.67 $23.40 $1,210.74 98188 $106.7 * DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 6. Laborers RG 0.00 10.00 8.50 0.00 0.00 0.00 0.00 18.50 $54.01 $999 19 Medicare:$19.68, Pipe Layer Leadaid Family y Shaun McNally SiJ (King) 15010 113th Ave E $999.19/ Medical Leave: Puyallup,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $81.02 $0.00 $1 572.29 $0.00/hr $236.00 $84.14 $23.58, Health: $993.71 - - 98374 $215.18 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $128.0 $0.00 7. Laborers $1,509.3 Medicare:$37.02, RG 0.00 10.00 10.00 0.00 0.00 10.00 0.00 30.00 $50.31 Traffic Control Supervisor Jesse Williams 0 Paid Family (King) 245 S 78th St $1,660.24 Medical Leave: Tacoma,WA- OT 0.00 1.00 1.00 0.00 0.00 0.00 0.00 2.00 $75.47 $150.94 / $0.00/hr $422.00 $158.28 $38.40 $1,897.28 " " *' 98408 $2,552.98 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 20 6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side k Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 5/19/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: nivall Avenue NE 5/7/2023 5/13/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Steve Cooper Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) I 2.Steve Cooper F1',9gers rney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) _ 3.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 5.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer [ring) 6.Shaun McNally Laborers Pipe Layer Lead $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Y .-_, The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the'actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ony apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ;ling Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 5/30/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and t,;T.�TA, Project Name County Project or Contract# �.,' "'E;; i Prime Contractor IndustriesWage Program =iii::. Duvall Avenue NE King CAG-20-065 Prevailing 9 g ,n.., Subcontractor ❑ PO Box 44540 ' ....47' y° Project Address Olympia WA 98504-4540 y` '"es'''S' Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 5/6/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name c9 0 o Sun Mon Tue Wed Thu Fri Sat Total O O a, Gross Amount and And a) E 4/30 5/1 5/2 5/3 5/4 5/5 5/6 Total Rate Earned/Gross Hourly Net Wages j E Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address a,'i a) a y Benefits" Tax o: O o Hours Worked Each Day 0 1. Laborers $1,962�0 Medicare:$37.29, RG 0.00 10.00 10.00 10.00 9.00 0.00 0.00 39.00 $50.31 g 4 Paid Family Traffic Control Supervisor Steve Cooper (King) 7610 So Park Ave. $2,188.50 Medical Leave: Tacoma,WA- OT 0.00 1.00 1.00 1.00 0.00 0.00 0.00 3.00 $75.47 $226.41 / $0.00/hr $305.00 $159.46 $41.37, Health: $2,028.86 * ** o8 $2,760.48 $188.50 984DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 2'6 $0.00 2. Power Equipment RG 0.00 6.00 10.00 0.00 0.00 0.00 0.00 16.00 $74.28 $1,188.4 Medicare:$63.12, Operators-Underground 8 Paid Family Sewer&Water Travis Haney $111.4 $1,299.90 Medical Leave: Shovel, Excavator,Backhoe, ****169th Ave E OT 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 2 $111.42 / $0.00/hr $821.00 $2gg_gg $51.64 $3,147.30 Trarrors Under 15 Metric Tons Lake Tapps,WA- $4,352.95 98391 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $148.56 $0.00 3. Laborers-Underground RG 0.00 0.00 10.00 10.00 0.00 0.00 0.00 20.00 $53.35 $1,067.0 Medicare:$38.57, Sewer&Water 0 Paid Family Somnang Hean Pipe Layer *****Pacific Hwy S $1,107.02 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $80.03 $40.02 / $0.00/hr $448.00 $164.92 $38.76 $1,969.79 98188 $2,660.04 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 '7 $0.00 0 4. Laborers-Underground RG 0.00 0.00 10.00 10.00 0.00 0.00 0.00 20.00 $52.39 $1,047.8 Medicare:$43.23, Sewer&Water Adrian Juarez- 0 Paid Family General Laborer&Topman Flores $1,087.10 Medical Leave: (King) 15502 79th Ave E OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $78.59 $39.30 / $0.00/hr $564.00 $184.84 $42.14 $2,147.15 Puyallup,WA- $2,981.36 * _ _ ** 98375 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $104.7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers RG 0.00 0.00 10.00 10.00 0.00 0.00 0.00 20.00 $54.01 $1,080.2 Medicare:$35.22, Pipe Layer Lead Shaun McNally 0 Paid Family (King) 15010 113th Ave E $1,161.22 Medical Leave: Puyallup,WA- OT 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $81.02 $81.02 / $0.00/hr $482.00 $150.61 $39.71, Health: $1,721.64 $2,780.26 $351.08 98374 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 08'0 $0.00 6. Flaggers Medicare:$24.02, RG 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $44.40 $44.40 Joseph Tountas JourneyLevel Paid Family (King) 20407 30th Ave NE $139.36/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,657.10 $0.00/hr $216.00 $102.75 $26.98 $1,287.35 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 7. Laborers Medicare:$24.02, RG 0.00 0.00 2.00 0.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Traffic Control Laborer Joseph Tountas Paid Family (King) 20407 30th Ave NE $139.36/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1,657.10 $0.00/hr $216.00 $102.75 $26.98 $1,287.35 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 8. Laborers Medicare:$30.66, RG 0.00 0.00 8.00 0.00 0.00 0.00 0.00 8.00 $50.31 $402.48 Traffic Control Supervisor Jesse Williams Paid Family (King) 245 S 78th St $477.95/ Medical Leave: -. Tacoma,WA- OT 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $75.47 $75.47 $2114.45 $0.00/hr $317.00 $131.10 $32.03 $1,603.66 98408 $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side ti , Affirmation Department of Labor and Industries Prevailing Wage Program • PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 5/12/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ^,`31I Avenue NE 4/30/2023 5/6/2023 (V "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Steve Cooper Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Travis Haney ier Equipment Operators- { 'lerground Sewer&Water anovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 3.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Adrian Juarez-Flores Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Shaun McNally Laborers Pipe Layer Lead $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 6.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Jesse Williams Laborers ffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ''-",ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ling Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 5/30/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and . TArf Project Name County Project or Contract# Industries = •.dn `•„`y Prime Contractor Prevailing Wage Program =isi. .:i _ Duvall Avenue NE King CAG-20-065 ;ii, ••_.1 Subcontractor ❑ PO Box 44540 'yyf�'�,, Project Address Olympia WA 98504-4540 '° Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 4/29/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions ~ Work Classification Name a 8 9- Sun Mon Tue Wed Thu Fri SaC Total a) Gross Amount and And o E 4/23 4/24 4/25 4/26 4/27 4/28 4/29 Total Rate Earned/Gross Hourly Net Wages E m Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address o > ,o Benefits" ce O o Hours Worked Each Day 0 No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 5/5/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 4/23/2023 4/29/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification I Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. rm Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and 'ling Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes On Suspension MB 5/8/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ���tSTATF�� Project Name County Project or Contract# Industries 4 f Prime Contractor ►z� Prevailing Wage Program -. ;, s Duvall Avenue NE King CAG-20-065 1illii. ...:. Subcontractor ❑ PO Box 44540 ,:y. p, •y' Project Address Olympia WA 98504-4540 ` `�8" Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone FOr the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 4/22/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c9 ~O o Sun Mon Tue Wed Thu Fri Sat Total E Gross Amount 4/16 4/17 4/18 4/19 4/20 4/21 4/22 Total Rate Hourly and And E Earned/Gross Net Wages - Hours of Pay "Usual FICA Withholding Other Soc Sec#of Employee Address O o Hours Worked Each Day Payroll Benefits" Tax 0 1. Flaggers RG 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.00 $44.40 $222.00 Medicare:$23.05, Journey Level Steve Cooper Paid Family (King) 7610 So Park Ave. $601.84/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1 713.91 $0.00/hr $138.00 $98.55 $26.67,Health: $1,303.23 ** 98408 $124.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers Medicare:$23.05, RG 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.00 $47.48 $237.40 Traffic Control Laborer Steve Cooper Paid Family (King) 7610 So Park Ave. $601.84/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 $71.22 $142.44 $1 713.91 $0.00/hr $138.00 $98.55 $26.67, Health: $1,303.23 - 98408 $124.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 'borers-Underground RG 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 $52.39 $523.90 Medicare:$42.58, Sewer&Water Paid Family General Laborer&Topman Eric Ellis $563.20/ Medical Leave: (King) 705 Celery Ave OT 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 $78.59 $39.30 $2 949.66 $0.00/hr $514.00 $182.06 $44.11, Health: $2,153.60 Algona,WA-98001 $13.31 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184.7 $0.00 4. Power Equipment RG 0.00 10.00 10.00 10.00 0.00 0.00 0.00 30.00 $74.28 $2,228.4 Medicare:$65.72, Operators-Underground 0 Paid Family Sewer&Water Travis Haney Medical Leave: Shovel, Excavator, Backhoe, "*" 169th Ave E OT 0.00 0.50 1.00 0.50 0.00 0.00 0.00 2.00 $1 21'4 $222.84 $2,451.24 $52.96 $0.00/hr $879.00 $280.97 $3,253.19 Tractors Under 15 Metric Tons Lake Tapps,WA- (King) 98391 $4,531.84 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 fi5 . $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers-Underground $1,600.5 Medicare:$44.18, Sewer&Water RG 0.00 10.00 10.00 10.00 0.00 0.00 0.00 30.00 $53.35 0 Paid Family Somnang Hean Pipe Layer "Pacific Hwy S $1,600.50 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $80.03 $0.00 / $0.00/hr $540.00 $188.89 $43.04 $2,230.39 98188 $3,046.50 "" DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $10066.7 $0. 0 6. Laborers RG 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 $54.01 $54 10 Medicare:$25.18, JPipe Layer Lead Shaun McNally Paid Family (King) 15010 113th Ave E $540.10/ Medical Leave: Puyallup,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $81.02 $0.00 $1 737.10 $0.00/hr $320.00 $107.70 $25.29 $1,258.93 98374 $108.0 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 7. Laborers $1,006.2 Medicare:$32.47, RG 0.00 0.00 10.00 10.00 0.00 0.00 0.00 20.00 $50.31 Traffic Control Supervisor Jesse Williams 0 Paid Family (King) 245 S 78th St $1,176.01 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.25 2.00 0.00 0.00 0.00 2.25 $75.47 $169.81 / $0.00/hr $347.00 $138.86 $34.17 $1,687.24 98408 $2,239.74 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $12.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 4/27/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 4/16/2023 4/22/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Steve Cooper Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Steve Cooper Laborers fic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Eric Ellis • Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 5.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer (King) 6.Shaun McNally Laborers Pipe Layer Lead $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and `;ing Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 5/1/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and t,�?ATf Project Name County Project or Contract# � sg i_.;:- Prime Contractor ® j Industries 4k J, t1_4- Prevailing Wage Program � , "4e;m' Duvall Avenue NE King CAG-20-065 PO Box 44540 ''_' 0,-:- Subcontractor ❑ °' Project Address Olympia WA 98504-4540 y,, """,v Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 4/15/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions 1---- Work Classification Name O~ 1;-1 Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And a> E 4/9 4/10 4/11 4/12 4/13 4/14 4/15 Total Rate Hourly Net Wages Hours of PayEarned/Gross r a) Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address m a Benefits" Tax cc O o Hours Worked Each Day 0 1. Laborers Ni 1 Medicare:$35.41, Traffic Control Supervisor RG 0.00 0.00 0.00 0.00 10.00 2.00 0.00 12.00 $50.31 $603.72 Steve Cooper / j Paid Family (King) 7610 So Park Ave. J $1,207.48 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 1.00 7.00 0.00 8.00 $75.47 $603.76 / $0.00/hr $276.00 $151.43 $39.04, Health: $1,940.50 98408 $100.6 $2,619.57 $177.19 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 2. Flaggers RG 0.00 0.00 0.00 0.00 10.00 7.50 0.00 17.50 $44.40 $777.00 Medicare:$25.23, Journey Level Joseph Tountas Paid Family y 20407 30th Ave NE $777.00/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $0.00/hr $234.00 $107.87 $29.10 $1,343.60 98155 $1,739.80 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 J. Laborers RG 0.00 0.00 7.00 7.00 0.00 0.00 0.00 14.00 $50.31 $704.34 Medicare:$37.90, Traffic Control Supervisor Jesse Williams Paid Family y 245 S 78th St OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $704.34/ Medical Leave: rt Tacoma,WA- $2,613.62 $0.00/hr $436.00 $162.04 $38.48 $1,939.20 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�0.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 4/20/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 4/9/2023 4/15/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Steve Cooper Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Joseph Tountas Flaggers Jrney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (p-°,ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ling Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 4/20/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and t s,'.ArE Project Name CountyProject or Contract# � ::_•••i=f;i,y Prime Contractor ® Industries � t • 'El, Duvall Avenue NE King CAG-20-065 Prevailing Wage Program =€Hfi, ;:_ 4 Subcontractor ❑ PO Box 44540 'y'"_ v Project Address Olympia WA 98504-4540 f�� """1 Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 4/8/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 - Day and Date I Deductions i= Work Classification Name c9 5 o Sun Mon Tue Wed Thu Fri Sat Total a) Gross Amount and And a� E 4/2 4/3 4/4 4/5 4/6 4/7 4/8 Total Rate Hourly E i= Hours of Pay Earned/Gross "Usual FICA Withholding Other Net Wages Soc Sec#of Employee Address f o Hours Worked Each Day Payroll Benefits" Tax a No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 4/12/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ^wall Avenue NE 4/2/2023 4/8/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and T' ing Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes On Suspension MB 4/12/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and .c, srAreo, Prime Contractor El Project Name County Project or Contract# Industries 4:;';'i t Duvall Avenue NE King CAG-20-065 Prevailing Wage Program '': Subcontractor ❑ PO Box 44540 �•i•, ' Project Address Olympia WA 98504-4540 y`4'NPe a, Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone FOr the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 4/1/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c7 ~O o Sun Mon Tue Wed Thu Fri Sat Total m Gross Amount and And a� E 3/26 3/27 3/28 3/29 3/30 3/31 4/1 Total Rate Earned/Gross Hourly Net Wages E Hours of Pay "Usual FICA Withholding Other z r m Payroll Benefits" Tax Soc Sec#of Employee Address CD O o Hours Worked Each Day a 1. Laborers Medicare:$17.76, Yolanda BarryRG 0.00 0.00 2.00 0.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Control Laborer (King) 6906 52nd Street Ct $383.56/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1 225.11 $0.00/hr $121.00 $75.96 $20.29 $990.10 _ _ •• Puyallup,WA- _ 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 2. Flaggers Medicare:$17.76, RG 0.00 0.00 6.50 0.00 0.00 0.00 0.00 6.50 $44.40 $288.60 Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $383.56/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1 225.11 $0.00/hr $121.00 $75.96 $20.29 $990.10 _ _ •- Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers Medicare:$20.14, RG 0.00 0.00 8.00 0.00 0.00 0.00 0.00 8.00 $44.40 $355.20 Journey Level Steve Cooper Paid Family (King) 7610 So Park Ave. $450.16/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,506.24 $0.00/hr $114.00 $86.14 $24.46, Health: $1,144.63 98408 $116.87 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$20.14, RG 0.00 0.00 2.00 0.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Control Laborer Steve Cooper (King) 7610 So Park Ave. $450.16/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1,506.24 $0.00/hr $114.00 $86.14 $24.46, Health: $1,144.63 98408 $116.87 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $76 $0.Q0 5. Power Equipment Travis Haney RG 0.00 0.00 6.00 0.00 0.00 0.00 0.00 6.00 $72.28 $433.68 Medicare:$45.72, Operators-Underground 169th Ave E $433.68/ $0.00/hr $506.00 $195.50 Paid Family $2,366.35 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Sewer&Water Lake Tapps,WA- $108.4 $3,153.18 Medical Leave: Shovel, Excavator, Backhoe, 98391 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $39.61 Tractors Under 15 Metric Tons (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 $0.00 6. Laborers Medicare:$8.36, RG 0.00 0.00 2.00 0.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Control Laborer Joseph Tountas (King) 20407 30th Ave NE $383.56/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $576.12 $0.00/hr $33.00 $35.72 $9.68 $489.36 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 7. Flaggers RG 0.00 0.00 6.50 0.00 0.00 0.00 0.00 6.50 $44.40 $288.60 Medicare:$8.36, Journey Level Joseph Tountas Paid Family (King) 20407 30th Ave NE $383.56/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $576.12 $0.00/hr $33.00 $35.72 $9.68 $489.36 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 • 8. Laborers Medicare:$38.64, RG 0.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00 $50.31 $503.10 Paid Family Traffic Control Supervisor Jesse Williams (King) 245 S 78th St $578.57/ Medical Leave: Tacoma,WA- OT 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $75.47 $75.47 $2 665.14 $0.00/hr $449.00 $165.24 $39.04 $1,973.22 98408 $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 4/6/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: . Project Name: For the week starting: For the week ending: ^.^'all Avenue NE 3/26/2023 4/1/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry c'a'3gers 'rney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Steve Cooper Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Steve Cooper Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons ng) 6.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Jesse Williams )orers affic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side p X• y The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. _ (5)-°ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ling Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Amended Reason Changed Travis'hours to Tuesday instead of Monday. • MB 4/6/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and . -.iv', Project Name County Project or Contract# Industries ^�. - ..,, Prime Contractor =,2=:b- "=y Duvall Avenue NE King CAG-20-065 Prevailing Wage Program fr hi ,i•3 Subcontractor ❑ PO Box 44540 "�:::air y_ Project Address Olympia WA 98504-4540 y` ""y�� Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 3/25/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name cc ~o o Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And a� E 3/19 3/20 3/21 3/22 3/23 3/24 3/25 Total Rate Hourly E Earned/Gross "UsualWithholdingNet Wages a) Payroll of Pay Payroll FICA Other Soc Sec#of Employee Address ce O o Hours Worked Each Day Benefits" Tax 0 No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 3/29/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: "—all Avenue NE 3/19/2023 3/25/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (51_Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and .1 ding Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes On Suspension M B 3/30/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and STATE Project Name County Project or Contract# ,tti==i „_,,,. Prime Contractor El Industries 4 lii:l PrevailingWage Program = N€:. Duvall Avenue NE King CAG-20-065 9 g ;�N .•-• Subcontractor ❑ PO Box 44540 '• 2' oy Project Address Olympia WA 98504-4540 y` `""s a Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 3/11/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions i= Work Classification Name c7 ~O o Sun Mon Tue Wed Thu Fri Sat Total m Gross Amount and And a) E 3/5 3/6 3/7 3/8 3/9 3/10 3/11 Total Rate Earned/Gross Hourly Net Wages `m E i= Hours of Pay "Usual FICA Withholding Other • r Payroll Benefits" Tax Soc Sec#of Employee Address • O o Hours Worked Each Day 0 No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 3/15/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 3/5/2023 3/11/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. - (3)The payments'of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit ofsuch employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or-will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ( �ony apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington-State Apprenticeship and 'i ling Council. -- Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title - Signature Tiffani Barquist Contract Administrator Tiffani Barquist Notes On suspension MB 3/27/23 F700-065-000 certified payroll report 05-09 - Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and STATE Project Name County Project or Contract# Industries 4,t;; °, Prime Contractor y Duvall Avenue NE King CAG-20-065 Prevailing Wage Program ;ii: __lif :,..I �j' v 7 Subcontractor ❑ PO Box 44540 ` Project Address Olympia WA 98504-4540 y� `"A9 r� Final Week of (360) 902-5335 Payroll E Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 2/25/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c9 ~O o Sun Mon Tue Wed Thu Fri Sat Total a� Gross Amount and And m E 2/19 2/20 2/21 2/22 2/23 2/24 2/25 Total Rate Earned/Gross Hourly Net Wages E i Hours of Pay "Usual FICA Withholding Other Soc Sec#of Employee Address d Payroll Benefits" Tax o O o' Hours Worked Each Day 0 No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 2/28/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ni wall Avenue NE 2/19/2023 2/25/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (f)4iy apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ing Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 3/27/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and �, TATE_ Project Name County Project or Contract# �� ii ' "=.•`y Prime Contractor XI IndustriesWage Program Duvall Avenue NE King CAG-20-065 Prevailing 9 9 -' .ii'ix Subcontractor ❑ PO Box 44540 ., oYn Project Address Olympia WA 98504-4540 y`1889 Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 2/18/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions H Work Classification Name c9 o o Sun Mon Tue Wed Thu Fri Sat Total ce a> Gross Amount and And e E 2/12 2/13 2/14 2/15 2/16 2/17 2/18 Total Rate Earned/Gross Hourly Net Wages E Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address m > - Benefits" Tax O o Hours Worked Each Day 0 1. Flaggers RG 0.00 8.00 0.00 6.50 0.00 0.00 0.00 14.50 $44.40 $643.80 Medicare:$10.02, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $691 28/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $691 28 $0.00/hr $47.00 $42.85 $11.86 $579.55 Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers RG 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Medicare:$10.02, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $691 28/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $691 28 $0.00/hr $47.00 $42.85 $11.86 $579.55 _ _ •• Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 3. Laborers Medicare:$10.05, Traffic Control Laborer RG 0.00 2.00 0.00 0.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Steve Cooper Medical Leave: (King) 7610 So Park Ave. $738.76/ Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $738 76 $0.00/hr $33.00 $42.97 $12.65,Health: $594.38 98408 $45.71 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Flaggers RG 0.00 8.00 0.00 0.00 6.50 0.00 0.00 14.50 $44.40 $643.80 Medicare:$10.05, Journey Level Steve Cooper Paid Family Medical Leave: (King) 7610 So Park Ave. OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $738.76/ $0.00/hr $33.00 $42.97 $12.65,Health: $594.38 Tacoma,WA- $738.76 98408 $45.71 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 5. Truck Drivers Eric Ellis RG 0.00 1.25 0.00 2.00 0.00 0.00 0.00 3.25 $63.71 $207.06 Medicare:$27.65, 705 Celery Ave $1,153.25 $0.00/hr $271.00 $118.24 Paid Family $1,457.04 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Dump Truck Algona,WA-98001 / Medical Leave: (King) OT 0.00 2.50 0.00 0.00 0.00 0.00 0.00 2.50 $95.57 $238.93 $1,917.98 $33.17,Health: $127.4 $10.88 a!le*_**_*.** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 6. Laborers-Underground RG 0.00 5.25 0.00 4.50 2.25 0.00 0.00 12.00 $52.39 $628.68 Medicare:$27.65, Sewer&Water Paid Family General Laborer&Topman Eric Ellis $1,153.25 Medical Leave: (King) 705 Celery Ave OT 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $78.59 $78.59 / $0.00/hr $271.00 $118.24 $33.17,Health: $1,457.04 Algona,WA-98001 $1,917.98 $10.88 * *` DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184.7 $0.00 7. Power Equipment RG 0.00 10.00 0.00 10.00 0.00 0.00 0.00 20.00 $74.28 $1,485.6 Medicare:$48.43, Operators-Underground 0 Paid Family Sewer&Water Chance Erdmann Medical Leave: 2331 Greenfield ST $111.4 $1,819.86 / Shovel,Excavator,Backhoe, SE OT 0.00 1.50 0.00 1.50 0.00 0.00 0.00 3.00 2 $334.26 $55.29 Tractors Under 15 Metric Tons $0.00/hr $492.00 $207.06 $2,536.85 (King) Olympia,WA- $3,339.63 * ** 98501 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168 5 $0.00 8. Truck Drivers RG 0.00 7.00 0.00 8.00 0.00 0.00 0.00 15.00 $63.71 $955.65 Medicare:$25.32, Dump Truck Ryan Eubanks Paid Family (Pierce) 13633 Olympic De. $955.65/ Medical Leave: le ** SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $174619 $0.00/hr $147.00 $108.26 $28.00 $1,437.61 Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 9. Power Equipment RG 0.00 10.00 0.00 10.00 0.00 0.00 0.00 20.00 $72.28 $1,445.6 Medicare:$43.36, Operators-Underground 0 Paid Family Sewer&Water Travis Haney Medical Leave: $108.4 $2,402.24 $37.40 Shovel,Excavator,Backhoe, **`*169th Ave E OT 0.00 1.50 0.00 1.50 0.00 0.00 0.00 3.00 2 $325.26 Tractors Under 15 Metric Tons Lake Tapps,WA- / $0.00/hr $467.00 $185.40 $2,257.08 (King) 98391 $2,990.24 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164 5 $0.00 10. Power Equipment Medicare:$43.36, Operators-Underground RG 0.00 0.00 0.00 0.00 8.50 0.00 0.00 8.50 $74.28 $631.38 Paid Family Sewer&Water Travis Haney Medical Leave: Shovel,Excavator,Backhoe, ****169th Ave E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 2 1'4 $0.00 $2,402.24 $37.40 Tractors Under 15 Metric Tons Lake Tapps,WA- / $0.00/hr $467.00 $185.40 $2,257.08 (King) 98391 $2,990.24 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi.5 $0.00 11. Laborers-Underground $1,493.1 Medicare:$28.56, Sewer&Water RG 0.00 10.00 0.00 10.00 8.50 0.00 0.00 28.50 $52.39 2 Paid Family Somnang Hean General Laborer&Topman ** Pacific Hwy S $1,532.41 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 $78.59 $39.30 / $0.00/hr $284.00 $122.10 $30.19 $1,504.53 98188 $1,969.38 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $104.7 $0.00 12. Laborers Jesse Williams RG 0.00 8.50 0.00 10.00 9.50 0.00 0.00 28.00 $5 3 $1 40 6 Medicare:$22.07, 1 Traffic Control Supervisor 245 S 78th St / 8 $1,5 1.89 Paid Family (King) Tacoma,WA- J J / $0.00/hr $186.00 $94.36 Medical Leave: $1,195.67 98408 OT 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.50 $75.47 $113.21 $1 521 89 $23.79 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side ***-**_**** $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 2/22/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 2/12/2023 2/18/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A)"Hourly (B) Hourly (C) Hourly (D)Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Steve Cooper Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Steve Cooper Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) ' 6.Eric Ellis Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Chance Erdmann Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 8.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 9.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 12.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions,other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. - ,(5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 2/22/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and �,,TA,•F. Project Name County Project or Contract# Industries :"4. Prime Contractor ZI ,t'•� 'ii t Duvall Avenue NE King CAG-20-065 Prevailing Wage Program �i '° ::;' Subcontractor ❑ PO Box 44540 J,;y.,4,0 a�y, Project Address Olympia WA 98504-4540 ` 1e8" Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 2/11/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name c9 ~O o Sun Mon Tue Wed Thu Fri Sat Total m Gross Amount and And a) E 2/5 2/6 2/7 2/8 2/9 2/10 2/11 Total Rate Earned/Gross Hourly Net Wages E i= Hours of Pay "Usual FICA Withholding Other rn f a) Payroll Benefits" Tax Soc Sec#of Employee Address ct O �33 Hours Worked Each Day 1 a 1. Flaggers RG 0.00 0.00 2.00 7.50 7.50 0.00 0.00 17.00 $44.40 $754.80 Medicare:$16.46, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,134.64 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $101.00 $70.35 $19.26 $927.57 Puyallup,WA- __ $1,134.64 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers Medicare:$16.46, RG 0.00 0.00 6.00 1.00 1.00 0.00 0.00 8.00 $47.48 $379.84 Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,134.64 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $101.00 $70.35 $19.26 $927.57 Puyallup,WA- $1,134.64 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 s. rlaggers RG 0.00 5.00 0.00 0.00 0.00 0.00 0.00 5.00 $44.40 $222.00 Medicare:$4.60, Journey Level Virginia Basher Paid Family (King) 6936 E I st. $316.96/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $316.96 $0.00/hr $22.00 $19.65 $5.39 $265.32 * ** 98404 ' DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$4.60, RG 0.00 2.00 0.00 0.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $316.96/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $316.96 $0.00/hr $22.00 $19.65 $5.39 $265.32 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 • 5. Laborers Steve Cooper RG 0.00 1.00 6.00 1.00 0.00 0.00 0.00 8.00 $47.48 $379.84 Medicare:$18.76, 7610 So Park Ave. $1,378.84 $0.00/hr $103.00 $80.50 Paid Family $1,068.64 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Traffic Control Laborer Tacoma,WA- / Medical Leave: (King) 98408 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1,378.84 $23.45, Health: $84.49 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 6. Flaggers Medicare:$18.76, RG 0.00 3.00 2.00 7.50 10.00 0.00 0.00 22.50 $44.40 $999.00 Paid Family Level Steve Cooper (King) 7610 So Park Ave. $1,378.84 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $103.00 $80.50 $23.45,Health: $1,068.64 98408 - $1,378.84 $84.49 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 7. Truck Drivers RG 0.00 0.00 0.00 0.00 4.50 0.00 0.00 4.50 $63.71 $286.70 Medicare:$22.41, Dump Truck Paid Family (King) Eric Ellis $993.96/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $1,554.03 $0.00/hr $191.00 $95.83 $26.25, Health: $1,210.04 Algona,WA-98001 $8.50 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127.4 $0.00 _aborers-Underground Medicare:$22.41, Sewer&Water RG 0.00 0.00 0.00 1.00 4.50 8.00 0.00 13.50 $52.39 $707.27 Paid Family General Laborer&Topman Eric Ellis $993.96/ Medical Leave: (King) 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $1,554.03 $0.00/hr $191.00 $95.83 $26.25, Health: $1,210.04 Algona,WA-98001 $8.50 "' `,,"`* DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $10J$4.7 $0.00 9. Power Equipment RG 0.00 0.00 0.00 0.00 9.00 0.00 0.00 9.00 $74.28 $668.52 Medicare:$48.32, Operators-Underground Paid Family Chance Erdmann Sewer&Water J Medical Leave: 2331 Greenfield ST $111.4 Shovel, Excavator, Backhoe, SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $668.52/ $41.16 Tractors Under 15 Metric Tons $3,332.81 $0.00/hr $490.00 $206.64 $2,546.69 Olympia,WA- (King) 98501 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168.5 $0.00 10. Truck Drivers RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $63.71 $0.00 Medicare:$27.57, Dump Truck Ryan Eubanks Paid Family (Pierce) 13633 Olympic De. $262.82/ Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 2.75 0.00 2.75 $95.57 $262.82 $1 901.67 $0.00/hr $166.00 $117.91 $34.36 $1,555.83 Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 11. Power Equipment RG 0.00 0.00 0.00 0.00 9.00 5.50 0.00 14.50 $72.28 $1,048.0 Medicare:$51.02, Operators-Underground 6 Paid Family Sewer&Water Travis Haney Medical Leave: $108.4 $1,644.37 $43.50 Shovel, Excavator,Backhoe, "" 169th Ave E OT 0.00 0.00 0.00 0.00 0.00 5.50 0.00 5.50 2 $596.31 / Tractors Under 15 Metric Tons Lake Tapps,WA- $0.00/hr $594.00 $218.15 $2,611.95 (King) 98391 $3,518.62 $1645 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 . $0.00 12. Laborers-Underground $1,755.0 Medicare:$25.44, RG 0.00 8.50 8.00 7.50 9.50 0.00 0.00 33.50 $52.39 Sewer&Water 7 Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $1,755.07 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $237.00 $108.81 $27.17 $1,356.65 98188 $1,755.07 " DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4.7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 13. Power Equipment RG 0.00 9.00 8.50 9.00 10.00 0.00 0.00 36.50 $74.28 $2,711.2 Medicare:$40.12, Operators-Underground2 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 $12 1 4 $55.71 $2,766.93 $34.83, Tractors Under 15 Metric Tons Gig Harbor,WA- / $0.00/hr $453.00 $171.55 Garnishment: $1,616.02 (King) 98335 $2,766.93 $451.41 $1685 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 . $0.00 14. Laborers RG 0.00 8.00 8.25 8.00 10.00 0.00 0.00 34.25 $50.31 $1,723.1 Medicare:$24.98, Traffic Control Supervisor Jesse Williams _ _ 2 Paid Family (King) 245 S 78th St $1,723.12 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $230.00 $106.83 $27.36 $1,333.95 ***_**_**** 98408 $1,723.12 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 _` 1 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 2/15/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 2/5/2023 2/11/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Laborers iffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Steve Cooper Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 b.Steve Cooper Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Eric Ellis , Laborers-Underground Sewer& biter neral Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Chance Erdmann Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 11.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons -,ng) 12.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons 14.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Vining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 2/17/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and �,STArF Project Name County Project or Contract# ?..!V••:°.t: Prime Contractor Industries 8.ill` y Duvall Avenue NE King CAG-20-065 PrevailingWage Program - •••''_ 9 9 ;,i Subcontractor ❑ PO Box 44540 "�' oy Project Address Olympia WA 98504-4540 9� lb89 Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 2/4/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions i= Work Classification Name c9 ~O o Sun Mon Tue Wed Thu Fri Sat Total and And Gross Amount a� E 1/291/30 1/31 2/1 2/2 2/3 2/4 Total Rate Hourly Earned/Gross Net Wages m f m Hours of Pay Payroll "Usual FICA Withholding Other g Soc Sec#of Employee Address O o Hours Worked Each Day Benefits" Tax 0 1. Flaggers RG 0.00 9.00 0.00 8.50 8.50 0.00 0.00 26.00 $44.40 $1,154.4 Medicare:$16.74, Journey Level Virginia Basher 0 Paid Family (King) 6936 E 1st. $1,154.40 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $142.00 $71.57 $19.87 $904.22 ** 98404 $1,154.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers RG 0.00 9.00 5.50 8.50 8.50 0.00 0.00 31.50 $50.31 $1,584.7 Medicare:$26.55, Traffic Control Supervisor Steve Cooper 7 Paid Family (King) 7610 So Park Ave. $1,939.97 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $167.00 $113.49 $31.29,Health: $1,492.22 98408 $1,939.97 $109.42 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120"6 $0.00 3. Flaggers Medicare:$26.55, RG 0.00 0.00 0.00 0.00 0.00 8.00 0.00 8.00 $44.40 $355.20 Journey Level Steve Cooper Paid Family (King) 7610 So Park Ave. $1,939.97 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $167.00 $113.49 $31.29, Health: $1,492.22 ** 98408 $1,939.97 $109.42 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Power Equipment RG 0.00 0.00 0.00 0.00 0.00 3.00 0.00 3.00 $74.28 $222.84 Medicare:$45.11, Operators-Underground Paid Family Chance Erdmann Sewer&Water Medical Leave: 2331 Greenfield ST $111.4 Shovel,Excavator,Backhoe, SE OT 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 2 $111.42 $334.26/ $38.86 Tractors Under 15 Metric Tons Olympia,WA- .$3,111.11 $0.00/hr $441.00 $192.88 $2,393.26 (King) 4e 98501 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168'5 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment Medicare:$47.26, RG 0.00 0.00 0.00 0.00 0.00 5.00 0.00 5.00 $72.28 $361.40 Operators-Underground J J Paid Family Sewer&Water Travis Haney $108 4 Medical Leave: Shovel, Excavator,Backhoe, **** 169th Ave E OT 0.00 0.00 0.00 0.00 0.00 3.00 0.00 3.00 2 'f $325.26 $686.66/ $0.00/hr $532.00 $202.07 $40.74 $2,437.09 Tractors Under 15 Metric Tons Lake Tapps,WA- V $3,259.16 (King) 98391 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 6. Laborers-Underground RG 0.00 9.00 10.00 8.00 8.00 0.00 0.00 35.00 $52.39 $1,833.6 Medicare:$26.59, Sewer&Water 5 Paid Family Somnang Hean $1,833.65 Medical Leave: General Laborer&Topman ***Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $255.00 $113.69 $28.38 $1,409.99 98188 $1,833.65 * " DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4.7 $0.00 7. Power Equipment RG 0.00 9.00 10.00 8.00 8.00 5.00 0.00 40.00 $74.28 $2,971.2 Medicare:$49.61, Operators-Underground 0 Paid Family Fier&Water Nathan McAllister $111.4 $3,361.17 Medical Leave: we', Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 3.50 0.00 3.50 2 $389.97 / $0.00/hr $610.00 $212.11 $42.43, $2,055.61 Tractors Under 15 Metric Tons Gig Harbor,WA- Garnishment: (King) 98335 $148.5 $3,421.17 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 8. Power Equipment RG 0.00 0.00 0.00 0.00 0.00 3.25 0.00 3.25 $72.28 $234.91 Medicare:$37.03, Operators-Underground Paid Family Sewer&Water Jason Sniezak Medical Leave: Shovel, Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 0.75 0.00 0.75 $1 2.4 $81.32 $316.23/ $0.00/hr $264.00 $158.36 $38.08,Health: $2,056.73 Tractors Under 15 Metric Tons Village Ln SE $3,000.82 $446.62 (King) Yelm,WA-98597 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 9. Flaggers $1,776.0 Medicare:$27.68, RG 0.00 9.00 8.00 8.50 8.50 6.00 0.00 40.00 $44.40 0 Paid Family Journey Level Joseph Tountas (King) 20407 30th Ave NE $1,909.20 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 $66.60 $133.20 / $0.00/hr $271.00 $118.37 $32.36 $1,459.79 98155 $1,909.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 Laborers Medicare:$5.84, RG 0.00 0.00 0.00 0.00 0.00 8.00 0.00 8.00 $50.31 $402.48 iffic Control Supervisor Paid Family P Jesse Williams (King) 245 S 78th St $402.48/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $402.48 $0.00/hr $14.00 $24.95 $6.40 $351.29 98408 $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 2/8/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: "wall Avenue NE 1/29/2023 2/4/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F • 1.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Steve Cooper ' borers faffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) . 3.Steve Cooper Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 1 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Chance Erdmann Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 5.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 6.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 8.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 9.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 10.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 _ (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. !F` Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 2/8/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse.Side Certified Payroll Report Department of Labor and ���-.;'^ F�,� Prime Contractor ® Project Name County Project or Contract# Industries . .=i=� iii.. =dI1: y Duvall Avenue NE King CAG-20-065 Prevailing Wage Program Aii:. :_' __ ,,.,,;,_: ",;,.;. Subcontractor ❑ PO Box 44540 ,,p,.Jr ��v" Project Address Olympia WA 98504-4540 '` L Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 1/28/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions IL- Work Classification Name c 0 o Sun Mon Tue Wed Thu Fri Sat Gross Amount Total and And a> E 1/22 1/23 1/24 1/25 1/26 1/27 1/28 Total Rate Earned/Gross Hourly Net Wages E Hours of Pay "Usual FICA Withholding Other 5 f a> Payroll Benefits" Tax Soc Sec#of Employee Address O o Hours Worked Each Day 0 1. Flaggers Medicare:$2.30, RG 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.50 $44.40 $111.00 Journey Level Virginia Basher Paid Family (King) 6936 E I st. $158.48/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $158.48 $0.00/hr $6.00 $9.83 $3.27 $137.08 *it ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers Medicare:$2.30, RG 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $158.48/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $158.48 $0.00/hr $6.00 $9.83 $3.27 $137.08 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94 996 $0.00 3.3. Truck Drivers RG 0.00 0.00 0.00 0.00 0.00 2.50 0.00 2.50 $63.71 $159.28 Medicare:$19.56, Dump Truck Ryan Eubanks J Paid Family (Pierce) 13633 Olympic De. $159.28/ Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $1 349 28 $0.00/hr $99.00 $83.65 $26.32 $1,120.75 * ** Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 4. Laborers-Underground RG 0.00 8.50 10.00 4.50 0.00 0.00 0.00 23.00 $52.39 $1,204.9 Medicare:$19.69, Sewer&Water Somnang Hean 7 Paid Family General Laborer&Topman *****Pacific Hwy S $1,204.97 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $150.00 $84.19 $23.84 $1,080.25 98188 $1,357.97 ` ** "** $147 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ . $0.00 5. Power Equipment Nathan McAllister RG 0.00 9.00 10.00 5.00 0.00 0.00 0.00 24.00 $74.28 $1,782.7 Medicare:$36.58, Operators-Underground 3201 36th St NW 2 $1,782.72 $0.00/hr $395.00 $156.41 Paid Family $1,447.12 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Sewer&Water Gig Harbor,WA- $111.4 / Medical Leave: Shovel,Excavator,Backhoe, 98335 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $2 522 72 $36.20, Tractors Under 15 Metric Tons Garnishment: $451.41 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi 5 $0.00 6. Flaggers RG 0.00 7.00 8.00 2.50 0.00 8.50 0.00 26.00 $44.40 $1,154.4 Medicare:$18.11, Journey Level Joseph Tountas 0 Paid Family (King) 20407 30th Ave NE $1,249.36 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $126.00 $77.47 $21.45 $1,006.33 98155 $1,249.36 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 7. Laborers Medicare:$18.11, RG 0.00 1.00 0.00 1.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Traffic Control Laborer Joseph Tountas (King) 20407 30th Ave NE $1,249.36 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $126.00 $77.47 $21.45 $1,006.33 �� 98155 $1,249.36 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 8. Laborers RG 0.00 8.00 8.00 8.00 0.00 8.50 0.00 32.50 $50.31 $1,635.0 Medicare:$23.71, Traffic Control Supervisore 8 Paid Family P 245 S 78tha t $1,635.08 Medical Leave: (King) 245 S 78th St Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $211.00 $101.38 $25.96 $1,273.03 $1,635.08 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 2/1/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: vall Avenue NE 1/22/2023 1/28/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" ! Program (A+B+C+D+E+F 1.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Virginia Basher `borers affic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 5.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 6.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Jesse Williams _borers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. zany apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and lining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 2/1/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and i.STATF. Project Name County Project or Contract# .•+.:. ,!� :Q Prime Contractor ►1 Industries w:=.aa =�=4 Prevailing Wage Program --_�:. x Duvall Avenue NE King CAG-20-065 �,::::. , ',',5,-" Subcontractor ❑ PO Box 44540 „ ;.:�r Project Address Olympia WA 98504-4540 y` '""y'k" Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone FOr the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 1/21/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c9 O~ o Sun Mon Tue Wed Thu Fri Sat Total ct a) Gross Amount and And a) E 1/15 1/16 1/17 1/18 1/19 1/20 1/21 Total Rate Earned/Gross Hourly Net Wages j E Hours of Pay "Usual FICA Withholding Other Soc Sec#of Employee Address a-i GU .o Payroll Benefits" Tax o: O o Hours Worked Each Day 0 1. Laborers Medicare:$4.59, Yolanda BarryRG 0.00 0.00 2.00 0.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Traffic Control Laborer _ (King) 6906 52nd Street Ct $316.96/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $316.96 $0.00/hr $5.00 $19.65 $5.38 $282.34 * _ _ ** Puyallup,WA- _- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 2. Flaggers RG 0.00 0.00 0.00 4.00 1.00 0.00 0.00 5.00 $44.40 $222.00 Medicare:$4.59, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $316.96/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $316.96 $0.00/hr $5.00 $19.65 $5.38 $282.34 * _ _ ** Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Laborers $1,710.5 Medicare:$23.44, RG 0.00 0.00 9.50 8.00 8.50 8.00 0.00 34.00 $50.31 4 Paid Family Control Supervisor Steve Cooper - (King) 7610 So Park Ave. $1,710.54 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $141.00 $100.21 $27.16,Health: $1,324.55 * ** 98408 $1,710.54 $94.18 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120'6 $0.00 4. Laborers-Underground RG 0.00 0.00 6.25 6.00 0.00 0.00 0.00 12.25 $52.39 $641.78 Medicare:$18.13, Sewer&Water Paid Family General Laborer&Topman Eric Ellis - $641.78/ Medical Leave: (King) 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $1,258.66 $0.00/hr $126.00 $77.51 $24.53, Health: $1,003.99 Algona,WA-98001 $8.50 ** ** **** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 8 04'7 $0.00 5. Laborers-Underground Somnang Hean $1,938.4 Medicare:$28.68, Sewer&Water *****Pacific Hwy S RG 0.00 0.00 10.00 9.50 9.50 8.00 0.00 37.00 $52.39 3 $1,977.73 $0.00/hr $286.00 $122.62 Paid Family $1,509.94 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side General Laborer&Topman Des Moines,WA- / Medical Leave: (King) 98188 OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $78.59 $39.30 $1 977 73 $30.49 - - '• DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4.7 $0.00 6. Power Equipment RG 0.00 0.00 10.00 9.50 10.00 8.50 0.00 38.00 $74.28 $2,822.6 Medicare:$42.54, Operators-Underground 4 Paid Family Sewer&Water Nathan McAllister Medical Leave: $2,934.06 $111 Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.50 0.00 0.50 0.00 0.00 1.00 2 4 $111.42 $36.80, Tractors Under 15 Metric Tons Gig Harbor,WA- / $0.00/hr $493.00 $181.91 Garnishment: $1,728.40 (King) 98335 $2,934.06 $451.41 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi.5 $0.00 7. Flaggers*** J $1,110 0 ) Medicare:$16.10, RG 0.00 0.00 9.50 0.00 7.00 8.50 0.00 25.00 $44.40 V Journey Level Joseph Tountas 0 Paid Family (King) 20407 30th Ave NE $1,110.00 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $97.00 $68.82 $19.11 $908.97 ** 98155 $1,110.00 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 1/26/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ' vall Avenue NE 1/15/2023 1/21/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry -ggers ,'Jrney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Steve Cooper Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Eric Ellis Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 5.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ng) 6.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 7.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. !g>Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and `ping Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist L MB 1/30/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ��,STAN. _ Project Name County Project or Contract# Industries Prime Contractor ►� .ini X Duvall Avenue NE King CAG-20-065 Prevailing Wage ProgramViiii " . Subcontractor ❑ PO Box 44540 .. ik e9y9 Project Address Olympia WA 98504-4540 '` '8ea Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 1/14/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name c7 ~O o Sun Mon Tue Wed Thu Fri Sat Total m Gross Amount and And a) E 1/8 1/9 1/10 1/11 1/12 1/13 1/14 Total Rate Earned/Gross Hourly Net Wages r Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address CD o ce o Hours Worked Each Day Benefits" Tax 0 1. Flaggers RG 0.00 7.25 7.00 0.00 7.00 0.00 0.00 21.25 $44.40 $943.50 Medicare:$14.37, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $990 98/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $990.98 $0.00/hr $83.00 $61.44 $18.09 $814.08 * lc 1r-*** Puyallup,WA- . 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers RG 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 $47.48 $47.48 Medicare:$14.37, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $990.98/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $990.98 $0.00/hr $83.00 $61.44 $18.09 $814.08 Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 3. Flaggers $1,265.4 Medicare:$17.85, RG 0.00 8.00 5.50 8.00 7.00 0.00 0.00 28.50 $44.40 Paid Family Level Steve Cooper 0 (King) 7610 So Park Ave. '$1,312.88 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $95.00 $76.33 $23.33, Health: $1,018.65 * ** 98408 1$1,312.88 $81.72 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$17.85, RG 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 $47.48 $47.48 Paid Family Traffic Control Laborer Steve Cooper (King) 7610 So Park Ave. '$1,312.88 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $95.00 $76.33 $23.33, Health: $1,018.65 * ** 98408 $1,312.88 $81.72 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 5. Laborers-Underground Somnang Hean $1,283.5I, Medicare:$18.61, Sewer&Water *****Pacific Hwy S RG 0.00 8.50 8.00 8.00 0.00 0.00 0.00 24.50 $52.39 6 '$1,283.56 $0.00/hr $134.00 $79.58 Paid Family $1,020.91 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side General Laborer&Topman Des Moines,WA- / Medical Leave: (King) 98188 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $1,283.56 $30.46 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$�4.7 $0.00 6. Power Equipment RG 0.00 8.50 8.00 8.50 0.00 0.00 0.00 25.00 $74.28 $1,857.0 Medicare:$26.93, Operators-Underground 0� / Paid Family Sewer&Water Nathan McAllister V Medical Leave: Shovel, Excavator,Backhoe, 3201 36th St NW $111.4 $1, .85700 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $25.48, Tractors Under 15 Metric Tons Gig Harbor,WA- / $0.00/hr $242.00 $115.14 Garnishment: $918.98 (King) 98335 $1,857.00 $528.47 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi'5 $0.00 7. Flaggers Medicare:$5.15, RG 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 $44.40 $355.20 Paid Family Journey Level Joseph Tountas (King) 20407 30th Ave NE $355.20/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $355.20 $0.00/hr $9.00 $22.02 $8.16 $310.87 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 8. Laborers RG 0.00 8.00 8.00 8.00 8.25 7.75 0.00 40.00 $50.31 $2,012.4 Medicare:$30.00, Traffic Control Supervisor Jesse Williams 0 Paid Family (King) 245 S 78th St $2,069.00 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.75 0.00 0.75 $75.47 $56.60 / $0.00/hr $306.00 $128.28 $43.19 $1,561.53 98408 $2,069.00 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of,Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 1/20/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the-week starting: For the week ending: ^uvall Avenue NE 1/8/2023 1/14/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers - Journey Level $0.00 $0.00 $0.00 $0.00( $0.00 $0.00 (King) 2.Yolanda Barry )aborers traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Steve Cooper Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Steve Cooper Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Somnang Hean _ Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (ing) - 6:Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 7.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Jesse Williams ,aborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the,applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. 19 Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and .ining Council. Falsification of any of the above statements is,a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 1/20/23 F700-065-000'certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ,Ari. Project Name County Project or Contract# Industries " '•,^,\t�'""1•:'" Prime Contractor IZI . -i `a r Duvall Avenue NE King CAG-20-065 Prevailing Wage Program <, 11 i;' •1!! Subcontractor ❑ PO Box 44540 ,y Project Address Olympia WA 98504-4540 �` '""" Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone FOr the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 1/7/2023 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions F= Work Classification Name c9 ~O 9- Sun Mon Tue Wed Thu Fri Sat Total au Gross Amount and And a, E 1/1 1/2 1/3 1/4 1/5 1/6 1/7 Total Rate Earned/Gross Hourly Net Wages j E I- Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address m f y Benefits" Tax O 'o Hours Worked Each Day a 1. Laborers Medicare:$20.37, RG 0.00 0.00 0.00 0.00 2.00 0.00 0.00 2.00 $47.48 $94.96 Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,404.76 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $160.00 $87.10 $23.06 $1,114.23 * _ _ ** Puyallup,WA- $1,404.76 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 2. Flaggers RG 0.00 0.00 8.00 8.00 6.00 7.50 0.00 29.50 $44.40 $1,309.8 Medicare:$20.37, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,404.76 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $160.00 $87.10 $23.06 $1,114.23 * _ _ *- Puyallup,WA- $1,404.76 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers RG 0.00 0.00 7.50 0.00 0.00 7.50 0.00 15.00 $44.40 $666.00 Medicare:$11.03, Journey Level Virginia Basher Paid Family (King) 6936 E I st. $760.96/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $760.96 $0.00/hr $75.00 $47.18 $12.46 $615.29 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$11.03, RG 0.00 0.00 2.00 0.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $760.96/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $760.96 $0.00/hr $75.00 $47.18 $12.46 $615.29 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 5. Laborers Steve Cooper RG 0.00 0.00 0.00 0.00 2.00 0.00 0.00 2.00 $47.48 $94.96 Medicare:$13.67, 7610 So Park Ave. $1,005.16 $0.00/hr $61.00 $58.46 Paid Family $793.22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Traffic Control Laborer Tacoma,WA- / Medical Leave: (King) 98408 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1,005.16 $16.48,Health: - $62.33 - - " DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 6. Flaggers RG 0.00 0.00 0.00 8.00 6.00 6.50 0.00 20.50 $44.40 $910.20 Medicare:$13.67, Journey Level Steve Cooper Paid Family (King) 7610 So Park Ave. $1,005.16 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $61.00 $58.46 $16.48,Health: $793.22 98408 $1,005.16 $62.33 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 7. Laborers-Underground RG 0.00 0.00 9.50 9.00 8.00 8.50 0.00 35.00 $52.39 $1,833.6 Medicare:$26.59, Sewer&Water Somnang Hean 5 Paid Family General Laborer&Topman Pacific Hwy S $1,833.65 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $255.00 $113.69 $17.80 $1,420.57 98188 $1,833.65 ` - - " DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184.7 $0.00 8. Power Equipment RG 0.00 0.00 9.50 9.50 8.00 9.00 0.00 36.00 $74.28 $2,674.0 Medicare:$38.77, Operators-Underground 8 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $2,674.08 / $31.77, Tractors Under 15 Metric Tons Gig Harbor,WA- $0.00/hr $431.00 $165.79 Garnishment: $1,555.34 $111.4 98335 $2,674.08 (Kin g) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $148.5 $0.00 $451.41 9. Flaggers RG 0.00 0.00 8.00 0.00 0.00 0.00 0.00 8.00 $44.40 $355.20 Medicare:$5.15, Journey Level Talonika Summers Paid Family (King) 2315 West Ridge $355.20/ Medical Leave: Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $355.20 $0.00/hr $21.00 $22.02 $5.85 $301.18 • _ _ ** University Place, WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88 80 $0.00 10. Flaggers N `► Medicare:$5.15, RG 0.00 0.00 8.00 0.00 0.00 0.00 0.00 8.00 $44.40 $355.20 Journey Level Joseph Tountas J Paid Family (King) 20407 30th Ave NE $355.20/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $355.20 $0.00/hr $9.00 $22.02 $4.07 $314.96 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Laborers RG 0.00 0.00 10.00 9.50 8.00 8.00 0.00 35.50 $50.31 $1,786.0 Medicare:$26.44, Traffic Control Supervisor Jesse Williams 1 Paid Family (King) 245 S 78th St $1,823.74 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $75.47 $37.74 / $0.00/hr $252.00 $113.07 $18.31 $1,413.93 98408 $1,823.75 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation • Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 1/11/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 1/1/2023 1/7/2023 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) • 2.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Steve Cooper Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 6.Steve Cooper Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 8.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 9.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 41 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions,other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 1/12/23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and t ,aT, Project Name County Project or Contract# Industries ^ ``•"'3• Prime Contractor ::: ' 4 Duvall Avenue NE King CAG-20-065 Prevailing Wage Program <!.Illi ,.iiii Subcontractor ❑ PO Box 44540 .,:,: • .„Y Project Address Olympia WA 98504-4540 '°" Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 12/31/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions F o Sun Mon Tue Wed Thu Fri Sat Work Classification Name C9 Total ix O N 12/2 12/2 12/2 12/2 12/2 12/3 12/3 Gross Amount Total Rate Hourly Earned/Gross Net Wages and And j E 5 6 7 8 9 0 1 Hours of Pay Payroll "Usual FICA Withholding Other g Soc Sec#of Employee Address -- a) a y Benefits" Tax o: O o Hours Worked Each Day No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 1/4/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 12/25/2022 12/31/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F No Employees performed work on this project during this reporting period. F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions,other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ;(5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 1/4/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and t,n1A7'7 Project Name County Project or Contract# Industries !' • '1 -, Prime Contractor ii '14. •:i;:I - .-:.::r Duvall Avenue NE King CAG-20-065 Prevailing Wage Program <+33li,' i:fh Subcontractor ❑ PO Box 44540 ''.y ' w Project Address Olympia WA 98504-4540 , '"""' Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 12/24/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions - a Sun Mon Tue Wed Thu Fri Sat Work Classification Name 9 Total Cf o co 12/1 12/1 12/2 12/2 12/2 12/2 12/2 Gross Amount �, E Total Rate Hourly and And Earned/Gross Net Wages j E 8 9 0 1 2 3 4 Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address •- > Benefits" Tax W 0 o Hours Worked Each Day 1. Laborers Medicare:$5.84, Yolanda BarryRG 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Paid Family Control Laborer J (King) 6906 52nd Street Ct $402.68/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $0.00/hr $15.00 $24.97 $5.35 $351.52 • ** Puyallup,WA- _ - $402.68 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 2. Flaggers RG 0.00 6.00 2.00 0.00 0.00 0.00 0.00 8.00 $44.40 $355.20 Medicare:$5.84, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $402.68/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $402.68 $0.00/hr $15.00 $24.97 $5.35 $351.52 Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers RG 0.00 7.00 0.00 0.00 0.00 0.00 0.00 7.00 $44.40 $310.80 Medicare:$4.51, JourneyLevel Paid Family Jeana Hansen Medical Leave: (King) Ave CT E#B $310.80/ Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $310.80 $0.00/hr $23.00 $19.27 $2.98 $261.04 * ** 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers-Underground RG 0.00 7.00 6.00 0.00 0.00 0.00 0.00 13.00 $52.39 $681.07 Medicare:$9.87, Sewer$Water Paid Family Somnang Hean Medical Leave: General Laborer&Topman Pacific Hwy S $681.07/ (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $681 07 $0.00/hr $48.00 $42.23 $5.53 $575.44 98188 $104.7 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment RG 0.00 7.00 6.00 0.00 0.00 0.00 0.00 13.00 $74.28 $965.64 Medicare:$14.01, Operators-Underground Paid Family Sewer&Water Nathan McAllister - $111.4 Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $965.64/ $5.51, Tractors Under 15 Metric Tons Gig Harbor,WA- $965.64 $0.00/hr $72.00 $0.00 Garnishment: $422.71 (King) 98335 $148.5 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ' 6. Flaggers RG 0.00 7.00 0.00 0.000.00 0.00 0.00 7.00 $44.40 $310.80 Medicare:$4.51, Journey Level Talonika Summers Paid Family (King) 2315 West Ridge $310.80/ Medical Leave: Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $310.80 $0.00/hr $20.00 $19.27 $4.15 $262.87 * _ _ *• University Place, WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 7. Flaggers Medicare:$5.79, RG 0.00 7.00 2.00 0.00 0.00 0.00 0.00 9.00 $44.40 $399.60 Journey Level Joseph Tountas Paid Family (King) 20407 30th Ave NE $399.60/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $399.60 $0.00/hr $15.00 $24.78 $3.84 $350.19 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 8. Laborers RG 0.00 7.50 5.50 0.00 0.00 0.00 0.00 13.00 $50.31 $654.03 Medicare:$9.49, Traffic Control Supervisor Jesse Williams Paid Family (King) 245 S 78th St $654.03/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $654.03 $0.00/hr $45.00 $40.55 $5.53 $553.46 98408 $100.6 DT 0.00 0.00I0.00 0.00 0.00 0.0010.00 0.00 1 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 • Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 1/4/2023 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 12/18/2022 12/24/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Flaggers 1, Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 5.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 6.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 1/4/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and aI.sTn`'F.o� Project Name County Project or Contract# .... Prime Contractor El Industries 1..., ": Duvall Avenue NE King CAG-20-065 PrevailingWage Program 4'•`:` : iax 9 9 Subcontractor ❑ PO Box 44540 -.1 ''� ' °r Project Address Olympia WA 98504-4540 y` 'ndy ,6YFinal Week of (360) 902-5335 Payroll E Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 12/17/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date I Deductions Work Classification Name c7 I- o Sun Mon Tue Wed Thu Fri Sat Total ce 2 cv 12/1 12/1 12/1 12/1 12/1 12/1 12/1 Gross Amount a, E Total Rate Hourly and And `m E i- 1 2 3 4 5 6 7 Hours of Pay Earned/Gross "Usual FICA Withholding Other Net Wages Soc Sec#of Employee Address m > a3 Payroll Benefits" Tax cc O 8 Hours Worked Each Day 0 1. Flaggers RG 0.00 3.00 7.00 4.50 0.00 0.00 0.00 14.50 $44.40 $643.80 Medicare:$14.50, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $999 90/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $999 90 $0.00/hr $86.00 $61.99 $13.12 $824.29 * _ _ ** Puyallup,WA- . 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 • 2. Laborers RG 0.00 4.00 1.50 2.00 0.00 0.00 0.00 7.50 $47.48 $356.10 Medicare:$14.50, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $999 90/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $999 90 $0.00/hr $86.00 $61.99 $13.12 $824.29 • ** Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 3. Laborers Medicare:$14.50, RG 0.00 4.00 1.50 2.00 0.00 0.00 0.00 7.50 $47.48 $356.10 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $999.90/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $999.90 $0.00/hr $117.00 $61.99 $13.13 $793.28 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Flaggers 'Medicare:$14.50, RG 0.00 3.00 7.00 4.50 0.00 0.00 0.00 14.50 $44.40 $643.80 Paid Family Level Virginia Basher (King) 6936 E I st. $999.90/ l Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $999 90 $0.00/hr $117.00 $61.99 $13.13 $793.28 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers RG 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 $63.71 $31.86 Medicare:$3.06, Dump Truck Scott Echternkamp Paid Family (King) 10900 Kuhlman Rd $31.86/ Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $210.89 $0.00/hr $13.00 $13.08 $2.19 $179.56 * _ _ ** Olympia,WA- 98513 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127.4 $0.00 6. Laborers RG 0.00 2.00 1.50 0.00 0.00 0.00 0.00 3.50 $47.48 $166.18 Medicare:$14.96, Traffic Control Laborer Jeana Hansen Paid Family (King) Ave CT E#B $1,031.98 Medical Leave: Tacoma,WA- • ****** OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $124.00 $63.98 $9.80 $819.24 98446 $1,031.98 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 7. Flaggers RG 0.00 6.00 7.00 6.50 0.00 0.00 0.00 19.50 $44.40 $865.80 Medicare:$14.96, JourneyLevel Paid Family Jeana Hansen (King) Ave CT E#B $1,031.98 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $124.00 $63.98 $9.80 $819.24 * - - ** 98446 $1,031.98 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 8. Laborers-Underground RG 0.00 8.50 6.00 8.00 8.00 0.00 0.00 30.50 $52.39 $1,597.9 Medicare:$23.17, Sewer&Water Somnang Hean 0 Paid Family General Laborer&Topman *****Pacific Hwy S $1,597.90 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $212.00 $99.07 $13.00 $1,250.66 98188 $1,597.90 _ _ ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.7 $0.00 9. Power Equipment RG 0.00 8.50 8.00 8.50 8.00 0.00 0.00 33.00 $74.28 $2,451.2 Medicare:$49.27, Operators-Underground 4 Paid Family Sewer&Water Nathan McAllister Medical Leave: $111.4 $2,451.24 $19.41, Shovel, Excavator, Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 / $0.00/hr $617.00 $0.00 $2,261.22 Tractors Under 15 Metric Tons Gig Harbor,WA- $3,398.31 Garnishment: (King) 98335 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168.5 $0.00 $451.41 * **** 10. Power Equipment RG 0.00 8.00 8.00 8.00 0.00 0.00 0.00 24.00 $72.28 $1,734.7 Medicare:$35.38, Operators-Underground 2 Paid Family ewer&Water Edward Torres $108.4 $1,734.72 Medical Leave: vel, Excavator, Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $23.60 ia�tors Under 15 Metric Tons Rd. / $0.00/hr $313.00 $151.25 $1,916.22 (King) Talent,OR-97540 $2,439.45 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 $0.00 11. Laborers RG 0.00 0.00 1.50 1.00 0.00 0.00 0.00 2.50 $47.48 $118.70 Medicare:$19.43, Traffic Control Laborer Joseph Tountas Paid Family (King) 20407 30th Ave NE $1,339.70 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $156.00 $83.06 $12.78 $1,068.43 98155 $1,339.70 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 12. Flaggers Joseph Tountas RG 0.00 8.00 7.00 6.00 6.50 0.00 0.00 27.50 $44.40 $1,221.0 Medicare:$19.43, Journey Level 20407 30th Ave NE 0 $1,339.70 Paid Family (King) Shoreline,WA- / $0.00/hr $156.00 $83.06 Medical Leave: $1,068.43 98155 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,339.70 $12.78 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side ..R .. DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88,80 $0.00 13. Laborers " $1 685f 3 Medicare:$24.44, 8 RG 0.00 .00 9.00 8.50 8.00 0.00 0.00 33.50 $50.31 9 V J Paid Family Traffic Control Supervisor Jesse Williams (King) 245 S St $1,685.39 Medical Leave: Tacoma,78th StA OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $232.00 $104.49 $14.28 $1,310.18 ********* 98408 $1,685.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 12/21/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 12/11/2022 12/17/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Laborers affic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Scott Echternkamp Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) o.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Somnang Hean Laborers-Underground Sewer& Hater $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ;neral Laborer&Topman (King) 9.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 'ing) 12.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ''Pny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ;ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 12/22/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ,�4,,sTA .. Project Name County Project or Contract# �.... Prime Contractor Industries 6 '•'•' 1. Duvall Avenue NE King CAG-20-065 PrevailingWage Program 6a.... `.'..`_ 9 9 Subcontractor ❑ PO Box 44540 ',`I.::::1,,6/ o'Y Project Address Olympia WA 98504-4540 y` '889 Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 12/10/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name C7 ~ ° Sun Mon Tue Wed Thu Fri Sat Total ▪ a� 12/1 Gross Amount and And E 12/4 12/5 12/6 12/7 12/8 12/9 0 Total Rate Earned/Gross Hourly Net Wages Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address m a) a y Benefits" Tax W O o Hours Worked Each Day 0 1. Laborers RG 0.00 0.00 1.25 4.00 2.00 0.00 0.00 7.25 $47.48 $344.23 Medicare:$21.57, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct- '$1,487.53 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $188.00 $92.23 $19.66 $1,166.07 ***_* **** Puyallup,WA- $1,487.53 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 2. Flaggers RG 0.00 0.00 7.00 5.25 7.00 6.50 0.00 25.75 $44.40 $1,143.3 Medicare:$21.57, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,487.53 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $188.00 $92.23 $19.66 $1,166.07 * _ _ ** Puyallup,WA- $1,487.53 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers RG 0.00 7.00 7.00 3.00 6.00 4.25 0.00 27.25 $44.40 $1,209.9 Medicare:$25.81, Journey Level Virginia Basher 0 Paid Family (King) 6936 E I st. $1,779.66 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $289.00 $110.34 $23.41 $1,331.10 * ** 98404 $1,779.66 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$25.81, RG 0.00 1.00 1.25 4.50 2.25 3.00 0.00 12.00 $47.48 $569.76 Paid Famil Traffic Control Laborer Virginia Basher - .- y (King) 6936 E I st. $1,779.66 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $289.00 $110.34 $23.41 $1,331.10 * ** 98404 $1,779.66 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers Medicare:$30.54, RG 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.25 $64.55 $145.24 Dump Truck&Trailer Scott Echternkamp Paid Family (King) 10900 Kuhlman Rd $877 90/ Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $2106.78 $0.00/hr $367.00 $130.62 $28.89 $1,549.73 if._ _ ** Olympia,WA- 98513 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11 $0.0 6. Truck Drivers RG 0.00 7.25 1.00 3.25 0.00 0.00 0.00 11.50 $63.71 $732.67 Medicare:$30.54, J Dump Truck Scott Echternkamp Paid Family (King) 10900 Kuhlman Rd $877.90/ Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $2106.78 $0.00/hr $367.00 $130.62 $28.89 $1,549.73 Olympia,WA- 98513 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127'4 $0.00 7. Flaggers $1,642.8 Medicare:$28.64, RG 0.00 7.00 8.25 10.00 7.00 4.75 0.00 37.00 $44.40 0 Paid Family Journey Level Jeana Hansen (King) Ave CT E#B $1,958.67 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.50 0.00 0.50 0.00 1.00 $66.60 $66.60 / $0.00/hr $335.00 $122.47 $18.21 $1,471.00 * '**'**** 98446 $1,975.32 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 8. Laborers Medicare:$28.64, RG 0.00 1.00 0.00 0.00 2.00 0.00 0.00 3.00 $47.48 $142.44 Paid Family Control Laborer Jeana Hansen (King) Ave CT E#B $1,958.67 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 1.50 0.00 1.50 $71.22 $106.83 / $0.00/hr $335.00 $122.47 $18.21 $1,471.00 ********* 98446 $1,975.32 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 9. Laborers-Underground $2,043.2 Medicare:$29.63, RG 0.00 9.00 10.00 10.00 10.00 0.00 0.00 39.00 $52.39 Sewer&Water 1 Paid Sick Leave: Somnang Hean $2,043.21 $16.62 General Laborer&Topman **Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $312.00 $126.68 $1,558.28 98188 $2,043.21 * ** $184 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 '7 $0.00 10. Power Equipment RG 0.00 8.50 10.00 10.00 10.00 1.50 0.00 40.00 $74.28 $2,971.2 Medicare:$43.08, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister $111.4 Medical Leave: �`-vel, Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $2,9�1.20 $0.00 $16.97, ;tors Under 15 Metric Tons Gig Harbor,WA- $0.00/hr $515.00 Garnishment: $1,944.74 9) 98335 $148.5 $2,971.20 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 11. Flaggers Medicare:$9.66, RG 0.00 0.00 0.00 0.00 8.00 7.00 0.00 15.00 $44.40 $666.00 Journey Level Talonika Summers Paid Family (King) 2315 West Ridge $666.00/ Medical Leave: Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $666.00 $0.00/hr $56.00 $41.29 $8.90 $550.15 University Place, • WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Power Equipment $2,891.2 Medicare:$41.92, RG 0.00 8.00 10.00 10.00 9.50 2.50 0.00 40.00 $72.28 Operators-Underground 0 Paid Family Edward Torres Sewer&Water $2,891.20 Medical Leave: R1d3 Wagner Creek OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 28'4 Shovel, Excavator, Backhoe, $0.00 / $0.00/hr $412.00 $179.25 $27.95 $2,230.08 Tractors Under 15 Metric Tons Talent,OR-97540 $2,891.20 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi.5 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 13. Flaggers $1,842.6 Medicare:$28.43, RG 0.00 8.00 7.00 10.00 8.50 8.00 0.00 41.50 $44.40 Paid Family Journey Level Joseph Tountas 0 $1,951.90 Medical Leave: (King) 20407 30th Ave NE Shoreline,WA- OT 0.00 0.00 0.00 0.25 0.00 0.50 0.00 0.75 $66.60 $49.95 / $0.00/hr $292.00 $121.59 $18.10 $1,501.02 ********* 98155 $1,961.14 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 14. Laborers Medicare:$28.43, RG 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25 $47.48 $59.35 Paid Family Control Laborer Joseph Tountas (King) 20407 30th Ave NE $1,951.90 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $292.00 $121.59 $18.10 $1,501.02 ***_*._**** 98155 $1,961.14 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 15. Laborers $2,012.4 Medicare:$33.28, +ric Control Supervisor RG 0.00 6.75 8.50 10.00 9.50 5.25 0.00 40.00 $50.31 0 Paid Family P 245 eS 78tha t $2,295.41 Medical Leave: 1""-��i9) 245 S 78th St Tacoma,WA- OT 0.00 0.00 0.00 1.00 2.75 0.00 0.00 3.75 $75.47 $283.01 / $0.00/hr $373.00 $142.32 $18.65 $1,728.16 • **�****** 98408 $2,295.41 , DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 00.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 12/15/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 12/4/2022 12/10/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Flaggers urney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Scott Echternkamp Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 rk.ng) 6.Scott Echternkamp Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Jeana Hansen Laborers =iffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 • (King) 9.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F7OO-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons i (King) 9) 11.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Jng) 12.Edward Torres Power Equipment Operators- Underground Sewer&Water - Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 13.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. 'F'Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and lning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 12/15/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ',STATA•o Project Name County Project or Contract# .c?::: 1s::..,' Prime Contractor Industries 4 ::, I:t.y. �:::: ,, Duvall Avenue NE King CAG-20-065 PrevailingWage Program <"" 9 9 sA,..,,. „� Subcontractor ❑ PO Box 44540 °,�H`a' a°yam Project Address Olympia WA 98504-4540 '�"y Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 12/3/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name CD p o Sun Mon Tue Wed Thu Fri Sat Total o 11/2 11/2 11/2 11/3 Gross Amount E• Earned/Gross Net Wages 12/1 12/2 12/3 Total Rate Hourly and And E 7 8 9 0 Hours of Pay "Usual FICA Withholding Other Soc Sec#of Employee Address m a' .n Payroll Benefits" Tax cC O Hours Worked Each Day 0 1. Flaggers 1RG 0.00 7.50 0.00 8.00 0.00 8.00 0.00 23.50 $44.40 $1,043.4 Medicare:$15.82, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,090.88 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $101.00 $67.63 $14.53 $891.90 * _ _ ** Puyallup,WA- $1,090.88 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers RG 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 $47.48 $47.48 Medicare:$15.82, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct - $1,090.88 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $101.00 $67.63 $14.53 $891.90 Puyallup,WA- $1,090.88 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 3. Laborers Medicare:$18.32, RG 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $361.36/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1,264.02 $0.00/hr $175.00 $78.37 $16.47 $975.86 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Flaggers Medicare:$18.32, RG 0.00 0.00 0.00 6.00 0.00 0.00 0.00 6.00 $44.40 $266.40 Paid Family Level Virginia Basher (King) 6936 E I st. $361.36/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1 264.02 $0.00/hr $175.00 $78.37 $16.47 $975.86 * -*'**** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers Medicare:$18.96, Scott EchternkampRG 0.00 0.00 0.00 0.00 0.00 4.00 0.00 4.00 $64.55 $258.20 Dump Truck&Trailer Paid Family (King) 10900 Kuhlman Rd $258.20/ Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $1,307.54 $0.00/hr $185.00 $81.07 $13.56 $1,008.95 ********* Olympia,WA- 98513 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1209'1 $0.00 6. Laborers Medicare:$17.20, Traffic Control Laborer RG 0.00 0.00 0.00 2.00 0.00 1.00 0.00 3.00 $47.48 $142.44 Paid Family Hansen (King) Ave CT E#B $1,185.84 Medical Leave: Tacoma,WA- ***.* ** OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $158.00 $73.52 $11.28 $925.84 98446 $1,185.84 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 7. Flaggers RG 0.00 7.50 2.00 6.00 0.00 8.00 0.00 23.50 $44.40 $1,043.4 Medicare:$17.20, Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $1,185.84 Medical Leave: Tacoma,WA- ********* OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $158.00 $73.52 $11.28 $925.84 98446 $1,185.84 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 8. Laborers-Underground $1,074.0 Medicare:$15.57, Sewer&Water RG 0.00 8.50 4.00 8.00 0.00 0.00 0.00 20.50 $52.39 0 Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $1,074.00 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $97.00 $66.58 $8.74 $886.11 98188 $1,074.00 * *** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.7 $0.00 9. Power Equipment RG 0.00 8.50 5.00 9.50 0.00 7.00 0.00 30.00 $74.28 $2,228.4 Medicare:$32.32, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: $111.4 $2,228.40 $12.73, Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 / $0.00/hr $337.00 $0.00 $1,394.94 Tractors Under 15 Metric Tons Gig Harbor,WA $2 228 40 Garnishment: (King) 98335 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168.5 $0.00 $451.41 *** ..**** 10. Flaggers RG 0.00 0.00 2.00 0.00 0.00 0.00 0.00 2.00 $44.40 $88.80 Medicare:$7.33, Journey Level Talonika Summers Paid Family 2315 West Medic g) Ave Ridge OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $88.80/ $0.00/hr $37.00 $31.34 $6.58 al Leave: $423.16 ********* University Place, $505.41 WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Power Equipment Ni $2,023 Medicare:$29.34, Operators-Underground RG 0.00 8.00 4.00 8.00 0.00 8.00 0.00 28.00 $72.28 4 4 / Paid Family Sewer&Water Edward Torres V Medical Leave: $108.4 $2,023.84 $19.57 Shovel,Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 / $0.00/hr $222.00 $125.48, 125.48 $1,627.45 Tractors Under 15 Metric Tons Rd. $2,023.84 (King) Talent,OR-97540 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ********* 12. Laborers Joseph Tountas RG 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 $47.48 $47.48 Medicare:$17.11, Traffic Control Laborer $1 179 68 Paid Family Kin Shoreline,0 30thAve NE $0.00/hr $120.00 $73.14 (King) WA- / Medical Leave: $958.14 98155 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1,179.68 $11.29 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 13. Flaggers $1,132.2 Medicare:$17.11, RG 0.00 7.50 2.00 8.00 0.00 8.00 0.00 25.50 $44.40 0 Paid Family Journey Level Joseph Tountas (King) 20407 30th Ave NE $1,179.68 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $120.00 $73.14 $11.29 $958.14 "'"-"'*"" Shore $1,179.68 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 14. Laborers $1,370.9 Medicare:$21.07, RG 0.00 8.00 2.25 8.00 0.00 9.00 0.00 27.25 $50.31 5 Paid Family Traffic Control Supervisor Jesse Williams (King) 245 S 78th St $1,370.95 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $181.00 $90.11 $12.47 $1,148.75 ""-.*-"""` $1,453.40 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 12/7/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 11/27/2022 12/3/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Laborers affic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Scott Echternkamp Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Somnang Hean Laborers-Underground Sewer& 1, `"'-ter :neral Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons ng) 12.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 14.Jesse Williams borers ..'affic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. '!'Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and lining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 12/7/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and 4pte==i."4:.:.(Z4 sTnre Project Name County Project or Contract# Prime ContractorIndustries Prevailin Wa e Pro ram � .=EFls Duvall Avenue NE King CAG-20-065 9 g g •=II Subcontractor ❑aHi. e PO Box 44540 °Z _�' y Project Address Olympia WA 98504-4540 H` `""�'c Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON, CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 11/26/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions o Sun Mon Tue Wed'Thu Fri Sat Work Classification Name c9 Total o tY m 11/2 11/2 11/2 11/2 11/2 11/2 11/2 Gross Amount m E Total Rate Hourly and And Earned/Gross Net Wages • E 1= 0 1 2 3 4 5 6 Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address 0 ,D y Benefits" Tax • O o Hours Worked Each Day a 1. Laborers RG 0.00 2.00 0.00 0.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Medicare:$12.00, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $827.56/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $827.56 $0.00/hr $65.00 $51.31 $11.00 $688.25 _ _ •• Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 2. Flaggers Medicare:$12.00, RG 0.00 6.00 4.00 6.50 0.00 0.00 0.00 16.50 $44.40 $732.60 Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $827.56/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $827.56 $0.00/hr $65.00 $51.31 $11.00 $688.25 Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers RG 0.00 4.00 3.00 6.50 0.00 0.00 0.00 13.50 $44.40 $599.40 Medicare:$12.83, Journey Level Virginia Basher Paid Family (King) 6936 E I st. $884.28/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $884.28 $0.00/hr $92.00 $54.82 $11.63 $713.00 " .... 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$12.83, RG 0.00 4.00 1.00 1.00 0.00 0.00 0.00 6.00 $47.48 $284.88 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $884.28/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $884.28 $0.00/hr $92.00 $54.82 $11.63 $713.00 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side NI i 5. Flaggers RG 0.00 5.00 4.00 6.50 0.00 0.00 0.00 15.50 $44.40 $688.20 / Medicare:$14.80, Journey Level Jeana Hansen `� Paid Family (King) Ave CT E#B $830.64/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,020.56 $0.00/hr $122.00 $63.28 $9.58 $810.90 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 6. Laborers RG 0.00 3.00 0.00 0.00 0.00 0.00 0.00 3.00 $47.48 $142.44 Medicare:$14.80, Traffic Control Laborer Jeana Hansen Paid Family (King) Ave CT E#B $830.64/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1 020.56 $0.00/hr $122.00 $63.28 $9.58 $810.90 ***'**...*** 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 7. Laborers-Underground RG 0.00 9.00 8.00 0.00 0.00 0.00 0.00 17.00 $52.39 $890.63 Medicare:$12.92, Sewer&Water Somnang Hean Paid Sick Leave: General Laborer&Topman *****Pacific Hwy S $890.63/ $7.24 3) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $890.63 $0.00/hr $73.00 $55.22 $742.25 98188 * ** $104.7 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 $0.00 8. Power Equipment RG 0.00 9.00 8.00 0.00 5.00 0.00 0.00 22.00 $74.28 $1,634.1 Medicare:$23.69, Operators-Underground 6 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $111.4 2 $1,634.16 $0.00 / $9.33, Tractors Under 15 Metric Tons Gig Harbor,WA- $0.00/hr $202.00 $0.00 Granishment: $947.73 (King) 98335 $1,634.16 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168'5 $0.00 9. Power Equipment RG 0.00 9.00 5.00 0.00 0.00 0.00 0.00 14.00 $72.28 $1,011.9 Medicare:$14.68, Operators-Underground 2 Paid Family Sewer&Water Edward Torres Medical Leave: $108.4 $1,011.92 Shovel, Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $g.7g Tractors Under 15 Metric Tons Rd. / $0.00/hr $84.00 $62.74 $840.71 (King) Talent,OR-97540 $1,011.92 $1645 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 10. Flaggers Medicare:$11.91, RG 0.00 8.00 4.00 6.50 0.00 0.00 0.00 18.50 $44.40 $821.40 ney Level Joseph Tountas Paid Family 9) 20407 30th Ave NE $821.40/ Medical Leave: ***** ** Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $821 40 $0.00/hr $65.00 $50.93 $7.88 $685.68 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Laborers RG 0.00 8.00 5.00 7.50 0.00 0.00 0.00 20.50 $50.31 $1,031.3 Medicare:$23.53, Traffic Control Supervisor Jesse Williams 6 Paid Family (King) 245 S 78th St $1,031.36 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $218.00 $100.60 $12.36 $1,268.05 * **.*** 98408 $1,622.54 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 12/1/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ^-.;vall Avenue NE 11/20/2022 11/26/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry cggers 'irney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher .Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 • (King) 7.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Nathan McAllister Power Equipment Operators- Iderground Sewer&Water ,ovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 9.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 , (King) � t F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ig\.,Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 12/1/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ���STArF � Project Name County Project or Contract# Industries a,,,, ,,4 Prime Contractor IZI �iTi r Duvall Avenue NE King CAG-20-065 Prevailing Wage Program s Subcontractor D PO Box 44540 `l> i3�r ,'v"r Project Address Olympia WA 98504-4540 y� '"=""� Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 11/19/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions C� ~ ~ Sun Mon Tue Wed Thu Fri Sat Work Classification Name Total o 0 11/1 11/1 11/1 11/1 11/1 11/1 11/1 Gross Amount a, E Total Rate Hourly and And EE 3 4 5 6 7 8 9 Hours of Pay Earned/Gross °Usual FICA Withholding Other Net Wages Soc Sec#of Employee Address Payroll Benefits" Tax I O o Hours Worked Each Day 0 1. Laborers Medicare:$26.28, RG 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,812.38 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $260.00 $112.37 $24.06 $1,389.67 * _ _ ** Puyallup,WA $1,812.38 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.?6 $0.00 2. Flaggers V $1 731. Medicare:$26.28, Yolanda BarryRG 0.00 8.00 7.00 8.00 8.00 8.00 0.00 39.00 $44. 0 NiPaid Family Journey Level 0 (King) 6906 52nd Street Ct $1,812.38 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.50 $66.60 $33.30 / $0.00/hr $260.00 $112.37 $24.06 $1,389.67 Puyallup,WA- $1,812.38 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers RG 0.00 6.00 7.00 0.00 0.00 1.50 0.00 14.50 $44.40 $643.80 Medicare:$35.88, JourneyLevel Paid Family Virginia Basher (King) 6936 E I st. $1,391.61 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $455.00 $153.44 $29.97 $1,800.55 * ** 98404 $2,474.84 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$35.88, RG 0.00 2.00 1.00 0.00 0.00 0.00 0.00 3.00 $47.48 $142.44 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $1,391.61 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 8.50 0.00 8.50 $71.22 $605.37 / $0.00/hr $455.00 $153.44 $29.97 $1,800.55 ***-****** 98404 $2,474.84 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Flaggers $1,642.8 Medicare:$29.26, RG 0.00 8.00 8.00 4.00 8.00 5.00 4.00 37.00 $44.40 Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $2,018.34 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 3.50 3.50 $66.60 $233.10 / $0.00/hr $346.00 $125.13 $18.53 $1,499.42 ********* $2,018.34 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 6. Laborers Medicare:$29.26, RG 0.00 0.00 0.00 0.00 0.00 3.00 0.00 3.00 $47.48 $142.44 Traffic Control Laborer Jeana Hansen Paid Family (King) Ave CT E#B $2,018.34 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $346.00 $125.13 $18.53 $1,499.42 ***««« $2,018.34 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 7. Laborers-Underground $2,095.6 Medicare:$40.64, Sewer&Water RG 0.00 8.50 9.00 8.00 8.00 6.50 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $2,802.91 Medical Leave: g) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 2.50 6.50 9.00 $78.59 $707.31 / $0.00/hr $494.00 $173.78 $20.90 $2,073.59 98188 $2,802.91 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184.7 $0.00 8. Flaggers RG 0.00 0.00 0.00 0.00 0.00 0.00 7.50 7.50 $44.40 $333.00 Medicare:$4.83, Journey Level Diago Hunter Paid Family (King) 7620 S.Alaska $333.00/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $333.00 $0.00/hr $8.00 $20.64 $4.45 $295.08 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 9. Power Equipment $2,971.2 Medicare:$64.44, Operators-Underground RG 0.00 8.50 9.00 8.00 9.00 5.50 0.00 40.00 $74.28 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 4.00 8.50 12.50 $111.4 $1,392.7 $4,363.95 $36.95, Tractors Under 15 Metric Tons Gig Harbor,WA- 2 5 / $0.00/hr $936.00 $229.05 Garnishment: $2,726.10 (King) 98335 $4,443.95 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi.5 $0.00 10. Power Equipment RG 0.00 0.00 8.00 8.00 8.00 5.00 0.00 29.00 $72.28 $2,096.1 Medicare:$30.39, Operators-Underground 2 Paid Family c-ver&Water Edward Torres Medical Leave: $108.4 $2,096.12 vel,Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 / $0.00/hr $238.00 $129.96 $20.26 $1,677.51 .,:tors Under 15 Metric Tons Rd. (King) Talent,OR-97540 $2,096.12 * <« DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 fi $144.5 $0.00 11. Flaggers $1,398.6 Medicare:$20.28, RG 0.00 0.00 0.00 8.00 8.00 8.00 7.50 31.50 $44.40 Journey Level Joseph Tountas 0 Paid Family (King) 20407 30th Ave NE $1,398.60 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $169.00 $86.71 $13.41 $1,109.20 ...««.«.* 98155 $1,398.60 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Laborers Jesse Williams $1,635.0 Medicare:$24.14, Traffic Control Supervisor RG 0.00 8.00 8.00 8.00 8.50 0.00 0.00 32.50 $50.31 P 245 S 78th St 8 $1,635.08 Paid Family (King) Tacoma,WA- / $0.00/hr $227.00 $103.23 Medical Leave: $1,296.44 98408 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $1,665.08 $14.27 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 11/23/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: r?hvall Avenue NE 11/13/2022 11/19/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry naggers urney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side ***-**-**** $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 "ing) , I 6.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 8.Diago Hunter .aggers , .'urney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - ing) 12.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. " ,.Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ini • ng Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 11/28/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and Project Name County Project or Contract# �.... _::, Prime Contractor IZ Industries �.::: ::s. o:;�;� i:g;r Duvall Avenue NE King CAG-20-065 Prevailing Wage Program -.1:::,i,i4,, :.qt:. Subcontractor ❑ PO Box 44540 �'•;, _, w� Project Address Olympia WA 98504-4540 y` '"Fy Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone FOr the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 11/12/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date ' Deductions F o Thu Fri Sat Work Classification Name C7 Sun Mon Tue Wed Total cL o a> 11/1 11/1 11/1 Gross Amount and And E 11/6 11/7 11/8 11/9 0 1 2 Total Rate Earned/Gross Hourly Net Wages r Hours of Pay Payroll °Usual FICA Withholding Other Soc Sec#of Employee Address Benefits" Tax II O 5 Hours Worked Each Day 0 1. Flaggers RG 0.00 7.25 0.00 8.50 0.00 0.00 0.00 15.75 $44.40 $699.30 Medicare:$10.82, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $746.78/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $746.78 $0.00/hr $56.00 $46.30 $9.95 $623.71 * _ _ ** Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers RG 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Medicare:$10.82, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $746.78/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $746.78 $0.00/hr $56.00 $46.30 $9.95 $623.71 .4* _ ** Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 3. Laborers Medicare:$12.64, RG 0.00 0.00 10.00 2.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $871.96/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $871.96 $0.00/hr $91.00 $54.06 $11.38 $702.88 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Flaggers RG 0.00 0.00 8.00 8.00 0.00 0.00 0.00 16.00 $44.40 $710.40 Medicare:$12.64, JourneyLevel Paid Family Virginia Basher (King) 6936 E I st. OT 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $66.60 $66.60 $871.96/ Medical Leave: $0.00/hr $91.00 $54.06 $11.38 $702.88 Tacoma,WA- $871.96 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers RG 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 $47.48 $23.74 Medicare:$11.86, Traffic Control Laborer Jeana Hansen Paid Family (King) Ave CT E#B $817.39/ Medical Leave: * ** Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $817.39 $0.00/hr $84.00 $50.68 $7.77 $663.08 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 6. Flaggers RG 0.00 0.00 0.00 10.00 7.50 0.00 0.00 17.50 $44.40 $777.00 • Medicare:$11.86, Journey Level Jeana Hansen Paid Family (King) Ave CT E#B $817.39/ Medical Leave: * Tacoma,WA- OT 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.25 $66.60 $16.65 $817.39 $0.00/hr $84.00 $50.68 $7.77 $663.08 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 7. Laborers-Underground $1,912.2 Medicare:$28.87, Sewer&Water RG 0.00 9.50 8.50 10.00 8.50 0.00 0.00 36.50 $52.39 4 Paid Family Somnang Hean General Laborer&Topman *****Pacific Hwy S $1,990.83 Medical Leave: 1 (King) Des Moines,WA- OT 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $78.59 $78.59 / $0.00/hr $299.00 $123.43 $15.99 $1,523.54 98188 $1,990.83 ** $104 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 87. $0.00 8. Power Equipment RG 0.00 9.50 8.50 10.00 8.50 0.00 0.00 36.50 $74.28 $2,711.2 Medicare:$41.80, Operators-Underground 2 Paid Family Sewer&Water Nathan McAllister Medical Leave: $111.4 $2,822.64 Garnis, Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 2 $111.42 / Tractors Under 15 Metric Tons Gig Harbor,WA- $0.00/hr $494.00 $178.72 Garnishment: $1,689.22 (King) 98335 $2,882.64 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $16 5 $0.00 9. Power Equipment RG 0.00 9.00 8.00 5.50 8.50 0.00 0.00 31.00 $72.28 $2,240.6 Medicare:$32.49, Operators-Underground 8 Paid Family Sewer&Water Edward Torres Medical Leave: $108.4 $2,240.68 Shovel,Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 / $21.66 Tractors Under 15 Metric Tons Rd. $0.00/hr $269.00 $138.92 $1,778.61 (King) Talent,OR-97540 $2,240.68 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6S ' $0.00 10. Laborers Medicare:$20.94, RG 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 $47.48 $23.74 Traffic Control Laborer Joseph Tountas Paid Family (King) 20407 30th Ave NE $1,444.54 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $179.00 $89.56 $13.85 $1,141.19 * - ** 98155 $1,444.54 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 11. Flaggers $1,420.8 Medicare:$20.94, RG 0.00 8.00 8.00 8.50 7.50 0.00 0.00 32.00 $44.40 Journey Level Joseph Tountas 0 Paid Family (King) 20407 30th Ave NE $1,444.54 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $179.00 $89.56 $13.85 $1,141.19 - - ** 98155 $1,444.54 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $880 $0.00 12. Laborers Jesse Williams RG 0.00 8.75 8.00 10.00 8.00 0.00 0.00 34.75 $50. $1,748 J Medicare:$25.90, 1 Traffic Control Supervisor 245 S 78th St 7 $1,786.01 Paid Family (King) Tacoma,WA- / $0.00/hr $254.00 $110.73 Medical Leave: $1,380.36 98408 OT 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 $75.47 $37.74 $1,786.01 $15.02 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side ***-**-**** $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 11/18/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: . Duvall Avenue NE 11/6/2022 11/12/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Laborers • Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 i (King) ri 6.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 8.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 9.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 12.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and,complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed.above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person:either directly or indirectly from the full wages earned. ;5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist ' MB 11/21/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and E,-TATk, Project Name County Project or Contract# ?_>>_ '=t:°"' Prime Contractor Industries y •• Duvall Avenue NE King CAG-20-065 i=•i' Prevailing Wage Program 4;:=•:. �••�"'_ ,,:=.!E:• �•-;it•i Subcontractor ❑ PO Box 44540 �';__•�' 4 Project Address Olympia WA 98504-4540 f�` '"�y�� Final Week of (360) 902-5335 Payroll 0 Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 11/5/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name & F o Sun MonTue Wed Thu Fri Sat Total cc o ap 10/3 10/3 Gross Amount and And a E 11/1 11/2 11/3 11/4 11/5 Total Rate Hourly `m E 0 1 Hours of Pay Earned/Gross "Usual FICA Withholding Other Net Wages Soc Sec#of Employee Address f a Payroll Benefits" Tax IY O 8Hours Worked Each Day 0 1. Flaggers RG 0.00 8.00 0.00 8.50 8.00 0.00 0.00 24.50 $44.40 $1,087.8 Medicare:$23.72, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,635.55 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $221.00 $101.40 $21.28 $1,268.15 ... ** Puyallup,WA- $1,635.55 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers RG 0.00 0.00 9.00 0.00 0.00 0.00 0.00 9.00 $50.31 $452.79 Medicare:$23.72, Traffic Control Supervisor Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,635.55 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $221.00 $101.40 $21.28 $1,268.15 Puyallup,WA- $1,635.55 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 2 3. Laborers RG 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 $47.48 $94.96 Medicare:$23.72, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,635.55 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $221.00 $101.40 $21.28 $1,268.15 * _ _ ** Puyallup,WA- $1,635.55 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Laborers RG 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 $47.48 $47.48 Medicare:$19.09, Traffic Control Laborer Virginia Basher Paid Family (King) 6936 E I st. $691.28/ Medical Leave: * ** Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1 316.20 $0.00/hr $187.00 $81.61 $17.30 $1,011.20 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Flaggers RG 0.00 0.00 7.00 0.00 7.50 0.00 0.00 14.50 $44.40 $643.80 Medicare:$19.09, Journey Level Virginia Basher Paid Family (King) 6936 E I st. $691.28/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,316.20 $0.00/hr $187.00 $81.61 $17.30 $1,011.20 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 6. Laborers Medicare:$25.15, RG 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 $47.48 $47.48 Paid Family Control Laborer Jeana Hansen (King) Ave CT E#B $1,734.68 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $279.00 $107.55 $16.61 $1,306.37 98446 $1,734.68 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 7. Flaggers $1,687.2 Medicare:$25.15, RG 0.00 8.00 10.00 8.00 7.00 5.00 0.00 38.00 $44.40 Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $1,734.68 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $279.00 $107.55 $16.61 $1,306.37 98446 $1,734.68 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 8. Laborers-Underground $1,964.6 Medicare:$30.76, RG 0.00 8.50 10.00 10.00 9.00 0.00 0.00 37.50 $52.39 Sewer&Water 3 Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $2,121.81 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 1.00 1.00 0.00 0.00 0.00 2.00 $78.59 $157.18 / $0.00/hr $331.00 $131.56 $16.84 $1,611.65 98188 $2,121.81 "` DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184'7 $0.00 9. Flaggers RG 0.00 0.00 0.00 0.00 7.00 0.00 0.00 7.00 $44.40 $310.80 Medicare:$11.22, Journey Level Diago Hunter Paid Family (King) 7620 S.Alaska $310.80/ Medical Leave: �� Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $773.70 $0.00/hr $59.00 $47.94 $10.15 $645.39 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 10. Power Equipment RG 0.00 8.50 10.00 10.00 9.00 2.50 0.00 40.00 $74.28 $2,971.2 Medicare:$55.69, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: $111.4 $3,751.14 Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 1.00 1.00 0.50 4.50 0.00 7.00 $779.94 $35.17, Tractors Under 15 Metric Tons Gig Harbor,WA- 2 / $0.00/hr $743.00 $238.15 Garnishment: $2,317.72 (King) 98335 $3,841.14 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $148.5 $0.00 11. Power Equipment RG 0.00 8.00 10.00 10.00 9.00 0.00 0.00 37.00 $74.8 $2,674 3 Medicare:$39.56, Operators-Underground g� NI Paid Family Sewer&Water Edward Torres $108 - Medical Leave: Shovel,Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 2 $54.21 $2,728.57 $26.28 Tractors Under 15 Metric Tons Rd. $0.00/hr $377.00 $169.17 $2,116.56 (King) Talent,OR-97540 $2,728.57 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'5 $0.00 12. Laborers Medicare:$24.24, Joseph Tountas RG 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Traffic Control Laborer 20407 30th Ave NE $1,671.16 Paid Family (King) Shoreline,WA- / $0.00/hr $229.00 $103.61 Medical Leave: $1,298.34 98155 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1,671.16 $15.97 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 13. Flaggers $1,576.2 Medicare:$24.24, RG 0.00 8.00 8.00 6.50 8.00 5.00 0.00 35.50 $44.40 0 Paid Family Level Joseph Tountas (King) 20407 30th Ave NE $1,671.16 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $229.00 $103.61 $15.97 $1,298.34 ' «" 98155 $1,671.16 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 14. Laborers $1,697.9 Medicare:$25.19, RG 0.00 8.00 0.00 9.25 8.50 8.00 0.00 33.75 $50.31 6 Paid Family Traffic Control Supervisor Jesse Williams $1,697.96 Medical Leave: (King) 245 S 78th St OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $243.00 $107.72 $14.70 $1,346.69 Tacoma,WA- $1,737.30 ' 2'"" 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 11/18/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ,I Duvall Avenue NE 10/30/2022 11/5/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <i (King) 6.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King). 8.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 9.Diago Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 12.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 14.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • • . The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ,(5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this-report Title - Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 11/21/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and - Area Project Name County Project or Contract# 4•07`: . rime Contractor Industries ►�� o,cp::. a Prime Duvall Avenue NE King CAG-20-065 Prevailing Wage Program a l:::. ► Subcontractor ❑ PO Box 44540 :;. 04 Project Address Olympia WA 98504-4540 `1889 Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 10/29/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions a & Sun Mon Tue Wed Thu Fri Sat Work Classification Name Total EK o a) 10/2 10/2 10/2 10/2 10/2 10/2 10/2 Gross Amount Total Rate Hourl m E Earned/Gross y Net Wages and And E 3 4 5 6 7 8 9 Hours of Pay Payroll "Usual FICA Withholding Other g Soc Sec#of Employee Address , a) y Benefits" Tax cK O o Hours Worked Each Day 0 1. Flaggers RG 0.00 9.00 10.00 7.00 10.00 4.00 0.00 40.00 $44.40 $1,776.0 Medicare:$33.99, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $2,342.10 Medical Leave: E#30 OT 0.00 0.00 0.50 0.00 1.00 7.00 0.00 8.50 $66.60 $566.10 / $0.00/hr $384.00 $145.36 $29.47 $1,751.59 ***_****** Puyallup,WA- $2,344.41 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Flaggers RG 0.00 9.50 5.50 8.00 8.00 4.50 0.00 35.50 $44.40 $1,576.2 Medicare:$31.40, Journey Level Virginia Basher 0 Paid Family (King) 6936 E I st. $2,165.40 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 3.50 0.00 3.50 $66.60 $233.10 / $0.00/hr $381.00 $134.25 $27.53 $1,591.22 * ** 98404 $2,165.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 1 3. Laborers RG 0.00 0.50 0.00 2.00 2.00 0.00 0.00 4.50 $47.48 $213.66 Medicare:$31.40, Traffic Control Laborer Virginia Basher Paid FamilyLeave: (King) 6936 E I st. $2,165.40 Medical Tacoma,WA- OT 0.00 0.50 0.00 0.00 0.00 1.50 0.00 2.00 $71.22 $142.44 / $0.00/hr $381.00 $134.25 $27.53 $1,591.22 * ** 98404 $2,165.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Truck Drivers f v Medicare:$21.21, RG 0.00 1.50 0.00 1.50 6.00 0.00 0.00 9.00 $63.71 $573.39 Paid Family Dump Truck (King) Eric Ellis $573.39/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $1 472.14 $0.00/hr $183.00 $90.65 $17.02, Health: $1,150.26 Algona,WA-98001 $10.00 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 27 4 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Flaggers $1,642.8 Medicare:$28.67, RG 0.00 8.00 0.00 9.00 10.00 10.00 0.00 37.00 $44.40 Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $1,861.40 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 1.00 0.50 0.00 1.50 $66.60 $99.90 / $0.00/hr $336.00 $122.60 $20.64 $1,469.41 * ** 98446 $1,977.32 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 6. Laborers Medicare:$28.67, RG 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Traffic Control Laborer Jeana Hansen Paid Family (King) Ave CT E#B $1,861.40 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 $71.22 $71.22 / $0.00/hr $336.00 $122.60 $20.64 $1,469.41 * ** 98446 $1,977.32 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 7. Laborers-Underground $2,095.6 Medicare:$52.04, Sewer&Water RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman **Pacific Hwy S $1,493.2 $3,588.81 Medical Leave: g) Des Moines,WA- OT 0.00 2.00 2.00 0.00 3.00 12.00 0.00 19.00 $78.59 1 / $0.00/hr $689.00 $222.50 $25.16 $2,600.11 98188 $3,588.81 * *' DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4.7 $0.00 8. Flaggers Medicare:$11.43, RG 0.00 0.00 8.50 0.00 9.25 0.00 0.00 17.75 $44.40 $788.10 Journey Level Diago Hunter Paid Family (King) 7620 S.Alaska $788.10/ Medical Leave: * ** Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $788.10 $0.00/hr $61.00 $48.86 $10.52 $656.29 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 9. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971.2 Medicare:$77.07, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 2.00 2.00 1.50 3.00 12.00 0.00 20.50 $111.4 $2,284.1 $5,255.31 $1,240.0 $47.28, Tractors Under 15 Metric Tons Gig Harbor,WA- 2 1 / $0.00/hr 0 $329.55 Garnishment: $3,170.00 (King) 98335 $5,315.31 $451.41 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $148.5 1 $0.00 10. Laborers**Underground RG 0.00 0.00 10.00 10.00 10.00 0.00 0.00 30.00 $52 3g $1,571. Medicare:$51.36, Sewer&Water James Polwarth 0 1 Paid Sick Leave: eral Laborer&Topman 9886 Enterprise LN $2,986.32 $24.74 g) NW OT 0.00 0.00 2.00 1.50 3.00 11.50 0.00 18.00 $78.59 $1'414,6 / $0.00/hr $674.00 $219.64 $2,572.78 Silverdale,WA- 2 $3,542.52 98383 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $104.78 $0.00 11. Flaggers RG 0.00 0.00 8.50 8.50 8.00 9.00 0.00 34.00 $44.40 $1,509.6 Medicare:$21.89, Journey Level Talonika Summers 0 Paid Family (King) 2315 West Ridge $1,509.60 Medical Leave: Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $195.00 $93.59 $20.16 $1,178.96 * _ _ ** University Place, $1,509.60 WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Power Equipment $2,891.2 Medicare:$53.72, Operators- round RG 0.00 10.00 0.00 10.00 10.00 10.00 0.00 40.00 $72.28 p 9 0 Paid Family SewerEdward Torres &Water 513 Wagner Creek $108.4 $3,704.35 Medical Leave: Shovel, Excavator, Backhoe, Rd. OT 0.00 1.50 0.00 1.50 3.00 1.50 0.00 7.50 2 $813.15 / $0.00/hr $592.00 $229.67 $34.23 $2,794.73 Tractors Under 15 Metric Tons Talent,OR-97540 $3,704.35 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 6.5 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side ;� 13. Flaggers RG 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $44.40 $444.00 Medicare:$7.88, Journey Level Joseph Tountas Paid Family (King) 20407 30th Ave NE $543.90/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 1.50 0.00 1.50 $66.60 $99.90 $54 $0.00/hr $31.00 $33.73 $4'.90. $466.39 98155 - DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 14. Laborers RG 0.00 8.25 10.00 10.00 10.00 1.75 0.00 40.00 $50.31 $2,012.4 Medicare:$45.32, Traffic Control Supervisor Jesse Williams 0 Paid Family (King) 245 S 78th St $1,113.1 $3,125.58 - Medical Leave: Tacoma,WA- OT 0.00 0.00 0.25 0.75 3.00 10.75 0.00 14.75 $75.47 8 / $0.00/hr $572.00 $193.78 $23.33 $2,291.15 98408 $3,125.58 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120 6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 11/2/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Di wall Avenue NE 10/23/2022 10/29/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F • 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Virginia Basher Flaggers urney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Eric Ellis Truck Drivers Dump Truck $0.00 , $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Jeana Hansen - Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 _(King) ' Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 8.Diago Hunter F',aggers ;urney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) - 9.Nathan McAllister Power Equipment Operators-_ _ Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.James Polwarth Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 ling) 12.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 13.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Jesse Williams -'borers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll-report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed an the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. "',,1ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist - MB 1112/22 - F700-065-000 certified payroll report 05-09 / Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and �'`:_',",i�,� Prime Contractor ® Project Name County Project or Contract# Industries __ __•f. _: -�,;�:;� Duvall Avenue NE King CAG-20-065 PrevailingWage Program iiii: _'_= Subcontractor ❑9 9 W iifil• "lii.� PO Box 44540 °'„'_ oy°. Project Address Olympia WA 98504-4540 yi'=a Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 10/22/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name c� l o Sun Mon Tue Wed Thu Fri Sat Total o e 10/1 10/1 10/1 10/1 10/2 10/2 10/2 Gross Amount a, E Total Rate Hourly and And E 6 7 8 9 0 1 2 Hours of PayEarned/Gross Usual Withholding Net Wages rn 'E a) Payroll Benefits" FICA Tax Other Soc Sec#of Employee Address 0 > O o Hours Worked Each Day 0 1. Flaggers RG 0.00 8.00 0.00 8.00 3.00 10.00 0.00 29.00 $44.40 $1,287.6 Medicare:$18.67, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,287.60 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $144.00 $79.83 $17.20 $1,027.90 * _ _ - Puyallup,WA- _ $1,287.60 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers Medicare:$22.23, RG 0.00 0.00 0.00 1.00 0.50 0.00 0.00 1.50 $47.48 $71.22 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $1,070.22 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $235.00 $95.06 $20.24 $1,160.59 ****** $1,533.12 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 3. Flaggers RG 0.00 0.00 8.00 7.00 7.50 0.00 0.00 22.50 $44.40 $999.00 Medicare:$22.23, JourneyLevel Paid Family Virginia Basher(King) 6936 E I st. $1,070.22 Medical Leave: Tacoma,WA- 98404 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $235.00 $95.06 $20.24 $1,160.59 ********* - $1,533.12 - -- - - - - DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Truck Drivers RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $63.71 $0.00 Medicare:$52.14, Dump Truck Ryan Eubanks Paid Family (Pierce) 13633 Olympic De. $1,051.2 $1,051.27 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 11.00 0.00 11.00 $95.57 7 / $0.00/hr $531.00 $222.95 $36.15 $2,753.79 •****•*** $3,596.03 Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Flaggers $1,776.0 Medicare:$28.65, RG 0.00 8.00 8.00 8.00 8.50 7.50 0.00 40.00 $44.40 Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $1,975.80 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 3.00 0.00 3.00 $66.60 $199.80 / $0.00/hr $336.00 $122.50 $18.32 $1,470.33 * ** 98446 $1,975.80 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88..80 $0.00` 6. Laborers-Underground $2,095. / Medicare:$41.21, Sewer&Water RG 0.00 9.00 8.50 8.50 10.00 4.00 0.00 40.00 $52.39 0 V Paid Sick Leave: Somnang Hean ./ J $2,842.21 $21.11 General Laborer&Topman *****Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.50 9.00 0.00 9.50 $78.59 $746.61 / $0.00/hr $504.00 $176.22 $2,099.67 98188 $2,842.21 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184'7 $0.00 7. Flaggers Medicare:$6.95, RG 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $44.40 $444.00 Paid Family Level Diago Hunter (King) 7620 S.Alaska $479.61 / Medical Leave: * ** Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $479.61 $0.00/hr $24.00 $29.74 $6.27 $412.65 hlr98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 8. Laborers Medicare:$6.95, RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $47.48 $0.00 Traffic Control Laborer Paid Family Diago Hunter Medical Leave: (King) 7620 S.Alaska $479.61 / * ** Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.50 $71.22 $35.61 $479.61 $0.00/hr $24.00 $29.74 $6.27 $412.65 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 9. Power Equipment RG 0.00 9.50 8.50 9.00 10.00 1.00 0.00 38.00 $74.28 $2,822.6 Medicare:$62.79, Operators-Underground 4 Paid Family Sewer&Water Medical Leave: Nathan McAllister $111.4 $1,337.0 Shovel, Excavator,Backhoe, OT 0.00 0.00 0.00 0.00 1.00 11.00 0.00 12.00 $39.15, 2 4 $4,159.68 3201 36th St NW Tractors Under 15 Metric Tons / $0.00/hr $899.00 $268.44 Garnishment: $2 189 89 (King) Gig Harbor,WA- $419.00, 98335 $4,329.68 $148.5 Garnishment: * *. DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 $451.41 10. Power Equipment RG 0.00 9.00 8.00 8.50 10.00 4.50 0.00 40.00 $72.28 $2,891.2 Medicare:$45.06, ^ators-Underground 0 Paid Family er&Water Edward Torres Medical Leave: $108.4 $3,108.04 $29.62 Shovel, Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 2 $216.84 Tractors Under 15 Metric Tons Rd. / $0.00/hr $460.00 $192.70 $2,380.66 (King) Talent,OR-97540 $3,108.04 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65 . $0.00 11. Flaggers RG 0.00 8.00 7.00 0.00 0.00 0.00 0.00 15.00 $44.40 $666.00 Medicare:$9.66, JourneyLevel Paid Family Joseph Tountas (King) 20407 30th Ave NE $666.00/ Medical Leave: ***** **** Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $666.00 $0.00/hr $46.00 $41.29 $6.39 $562.66 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Laborers Jesse Williams $1,962.0 Medicare:$35.78, 245 S 78th St RG 0.00 8.00 8.00 8.00 9.50 5.50 0.00 39.00 $50.31 9 $2,414.91 $0.00/hr $414.00 $152.98 Paid Family $1,844.99 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Traffic Control Supervisor 'Tacoma,WA- / Medical Leave: (King) 98408 OT 0.00 0.00 0.00 0.00 0.00 6.00 0.00 6.00 $75.47 $452.82 $2,467.36 $19.61 • ***-****** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $12'6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 10/27/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 10/16/2022 10/22/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Virginia Basher Laborers ffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 5.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 rung) 6.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Diago Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Diago Hunter :borers affic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 ' Employee Benefits Distribution and Signature Certification on Reverse Side 10.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 rig) 12.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ling Council. ' Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 10/27/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and �`"r" Prime Contractor Project Name County Project or Contract# Industries ; ??'' _i!s, ? :�„ Duvall Avenue NE King CAG-20-065 "" Subcontractor ❑ Prevailing Wage Program 7iii;;, ;;;._ PO Box 44540 °•Lii: • �„Cr Project Address Olympia WA 98504-4540 y` '-""a Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 10/15/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions ~ Mon Tue Wed Thu Fri Sat Work Classification Name (7 --~ o Sun Total E a) 10/1 10/1 10/1 10/1 10/1 10/1 Gross Amount and And E E 10/9 0 1 2 3 4 5 Total Rate Earned/Gross Hourly Net Wages D . a Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address o (1) Benefits" Tax ( O o Hours Worked Each Day 1. Laborers Medicare:$20.86, Yolanda BarryRG 0.00 9.00 9.00 0.00 0.00 0.00 0.00 18.00 $50.31 $905.58 Paid Family Control Supervisor (King) 6906 52nd Street Ct $1,438.38 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $177.00 $89.18 $18.19 $1,133.15 Puyallup,WA- $1,438.38 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 2. Flaggers RG 0.00 0.00 0.00 0.00 8.00 4.00 0.00 12.00 $44.40 $532.80 Medicare:$20.86, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,438.38 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $177.00 $89.18 $18.19 $1,133.15 * ** Puyallup,WA- $1,438.38 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers Medicare:$10.32, RG 0.00 0.00 8.00 7.50 0.00 0.00 0.00 15.50 $44.40 $688.20 Paid Family Level Virginia Basher (King) 6936 E I st. $711.94/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $711.94 $0.00/hr $71.00 $44.14 $9.50 $576.98 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $888 80 $0V.p0 4. Laborers RG 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 $47.48 $23.74 Medicare:$10.32, JTraffic Control Laborer Virginia Basher Paid Family (King) 6936 E I st. $711.94/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $711.94 $0.00/hr $71.00 $44.14 $9.50 $576.98 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers RG 0.00 2.00 8.00 0.00 0.00 0.00 0.00 10.00 $50.31 $503.10 Medicare:$38.97, Traffic Control Supervisor Steve Cooper Paid Family (King) 7610 So Park Ave. $503.10! Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $2 824.06 $0.00/hr $349.00 $166.60 $31.73,Health: $2,100.64 * - - ** 98408 $137.12 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120'6 $0.00 6. Truck Drivers Medicare:$40.91, Dump Truck RG 0.00 1.00 0.00 0.00 6.50 0.00 0.00 7.50 $63.71 $477.83 Paid Family (King) Eric Ellis $477 83/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $2 834.16 $0.00/hr $499.00 $174.95 $23.60,Health: $2,083.32 ********* Algona,WA-98001 $12.38 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127'4 $0.,00 7. Truck Drivers RG 0.00 4.75 2.75 0.00 0.00 0.00 0.00 7.50 $64.55 $484.13 Medicare:$31.84, J Dump Truck&Trailer Ryan Eubanks Paid Family (King) 13633 Olympic De. $484.13/ Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $2195.72 $0.00/hr $223.00 $136.13 $27.54 $1,777.21 ********* Olalla,WA-98359 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $10 29'1 $0.00 8. Flaggers $1,598.4 Medicare:$23.18, RG 0.00 8.00 8.00 8.00 8.00 4.00 0.00 36.00 $44.40 Journey Level 0 Paid Family (King) Jeana Hansen $1,598.40 Medical Leave: Ave CT E#B OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $249.00 $99.10 $15.33 $1,211.79 ********* Tacoma,WA- 98446 $1,598.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 9. Laborers-Underground $2,095.6 Medicare:$32.67, Sewer&Water RG 0.00 8.50 9.00 9.00 9.50 4.00 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $2,252.78 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 $78.59 $157.18 / $0.00/hr $362.00 $139.67 $17.91 $1,700.53 98188 $2,252.78 * ****** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$'7 $0.00 10. Power Equipment Medicare:$8.39, Operators-Underground RG 0.00 0.00 8.00 0.00 0.00 0.00 0.00 8.00 $72.28 $578.24 Paid Family Sewer&Water Shay Howard $108.4 Medical Leave: Shovel,Excavator,Backhoe, 164 Senn Rd OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $578.24/ $5.59 tors Under 15 Metric Tons Chehalis,WA- $578.24 $0.00/hr $26.00 $35.85 $502.41 1) 98532 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ********* 11. Power Equipment RG 0.00 8.50 9.50 9.00 10.00 3.00 0.00 40.00 $74.28 $2,971.2 Medicare:$51.22, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: $1114 $3,472.59 Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.50 4.00 0.00 4.50 2 ' $501.39 / $0 , .00/hr $650.00 $219.02 $32.93 $2,128.31 Tractors Under 15 Metric Tons Gig Harbor,WA- $3,532.89 Garnishment: (King) 98335 $148.5 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ********* 12. Flaggers Talonika Summers Medicare:$5.15, JourneyLevel RG 0.00 8.00 0.00 0.00 0.00 0.00 0.00 8.00 $44.40 $355.20 Paid Family 2315 West Ridge $355.20/ (King) Ave $355.20 $0.00/hr $22.00 $22.03 Medical Leave: $301.28 University Place, OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $4.74 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side ** ****** WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 13. Power Equipment RG 0.00 8.00 9.00 8.50 9.00 5.50 0.00 40.00 $72.28 $2,891.2 Medicare:$41.93, Operators-Underground 0 Paid Family Sewer&Water Edward Torres $108.4 $2,891.20 Medical Leave: Shovel, Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 / $0.00/hr $412.00 $179.26 $27.96 $2,230.05 Tractors Under 15 Metric Tons Rd. $2 891 20 (King) Talent,OR-97540 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 I 14. Flaggers RG 0.00 8.00 8.00 8.00 8.00 4.00 0.00 36.00 $44.40 $1,598.4 Medicare:$23.18, Journey Level Joseph Tountas 0 Paid Family (King) 20407 30th Ave NE $1,598.40 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $213.00 $99.10 $15.33 $1,247.79 ** **"*** 98155 $1,598.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 Laborers $1,182.2 Medicare:$19.42, RG 0.00 0.00 0.00 8.25 8.00 7.25 0.00 23.50 $50.31 9 Paid Family I raffic Control Supervisor Jesse Williams (King) 245 S 78th St $1,182.29 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $156.00 $83.06 $11.29 $1,069.87 98408 $1,339.64 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 10/24/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 10/9/2022 10/15/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Flaggers arney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 • (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher • Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Steve Cooper Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 6.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Ryan Eubanks Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Jeana Hansen Flaggers ' uney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 it (King) 9.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 • (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Shay Howard Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 12.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons ng) 14.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Jesse Williams Laborers $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Traffic Control Supervisor F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and `!ning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 10/24/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and Project Name County Project or Contract# Prime Contractor Z IndustriesWage Program Duvall Avenue NE King CAG-20-065 Prevailing 9 g Subcontractor ❑ PO Box 44540 �► ,` Project Address Olympia WA 98504-4540 Final Week of (360)902-5335 Payroll D Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 10/8/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions H Work Classification Name c9 ~O o Sun Mon Tue Wed Thu Fri Sat Total a> Gross Amount and And aw E 10/2 10/3 10/4 10/5 10/6 10/7 10/8 Total Rate Earned/Gross Hourly Net Wages • E03 Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address • > Benefits" Tax ▪ O o Hours Worked Each Day 0 1. Laborers $1,886.6 Medicare:$30.09, Traffic Control Supervisor Yolanda Barry RG 0.00 10.00 0.00 9.00 9.50 9.00 0.00 37.50 $50.31 3 Paid Family (King) 6906 52nd Street Ct $2,075.30 Medical Leave: E#30 OT 0.00 2.50 0.00 0.00 0.00 0.00 0.00 2.50 $75.47 $188.68 / $0.00/hr $320.00 $128.67 $24.86 $1,571.68 Puyallup,WA- $2,075.30 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $16�0. $0.00 2. Laborers Medicare:$22.56, RG 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $47.48 $23.74 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $1,555.54 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $240.00 $96.44 $20.54 $1,176.00 98404 $1,555.54 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 3. Flaggers RG 0.00 10.00 7.50 7.50 0.00 8.00 0.00 33.00 $44.40 $1,465.2 Medicare:$22.56, Journey Level Virginia Basher 0 Paid Family (King) 6936 E I st. $1,555.54 Medical Leave: Tacoma,WA- OT 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 $66.60 $66.60 / $0.00/hr $240.00 $96.44 $20.54 $1,176.00 98404 $1,555.54 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Truck Drivers RG 0.00 0.00 0.00 0.00 5.00 0.00 0.00 5.00 $63 71 $31{55 Medicare:$36.73, Dump Truck 4 Paid Family (King) Eric Ellis $318.55/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $2 532 78 $0.00/hr $430.00 $157.04 $1.79 $1,907.22 _ _ •t Algona,WA-98001 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $12'4 $0.00 5. Truck Drivers Ryan Eubanks RG 0.00 7.50 0.00 0.00 7.50 0.00 0.00 15.00 $64.55 $968.25 Medicare:$43.73, 13633 Olympic De. $1,621.79 $0.00/hr $404.00 $186.98 Paid Family $2,348.36 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Dump Truck&Trailer SE OT 0.00 0.00 0.00 0.00 0.00 6.75 0.00 6.75 $96.82 $653.54 / Medical Leave: (King) Olalla,WA-98359 $3,015.74 $32.67 ***- -*** *** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1209.1 $0.00 6. Flaggers RG 0.00 10.00 8.00 8.00 9.00 0.00 0.00 35.00 $44.40 $1,554.0 Medicare:$26.14, Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $1,687.20 Medical Leave: Tacoma,WA- OT 0.00 2.00 0.00 0.00 0.00 0.00 0.00 2.00 $66.60 $133.20 / $0.00/hr $294.00 $111.79 $19.15 $1,352.04 it*ti*.tie 98446 $1,803.12 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 7. Laborers-Underground $2,095.6 Medicare:$44.63, Sewer&Water RG 0.00 9.50 10.00 10.00 10.00 0.50 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $3,077.98 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 1.00 1.00 10.50 0.00 12.50 $78.59 $982.38 / $0.00/hr $560.00 $190.84 $22.38 $2,260.13 98188 $3,077.98 `*`*�if4` DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 g4.7 $0.00 8. Power Equipment RG 0.00 9.00 9.00 10.00 8.00 0.00 0.00 36.00 $72.28 $2,602.0 Medicare:$38.52, Operators-Underground 8 Paid Family Sewer&Water Shay Howard Medical Leave: $108.4 $2,656.29 $25.57 Shovel,Excavator,Backhoe, 164 Senn Rd OT 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 2 $54.21 / $0.00/hr $439.00 $164.69 $1,988.51 Tractors Under 15 Metric Tons Chehalis,WA- (King) 98532 $2,656.29 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $16'5 $0.00 444 ti 4444 9. Power Equipment RG 0.00 9.50 10.00 10.00 10.00 0.50 0.00 40.00 $74.28 $2,971.2 Medicare:$66.63, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.50 1.00 1.50 10.50 0.00 13.50 $111.4 $1,504.1 $4,475.37 $41.00, Tractors Under 15 Metric Tons Gig Harbor,WA- 2 7 / $0.00/hr $988.00 $284.92 Garnishment: $2,763.41 (King) 98335 $4,595.37 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168.5 $0.00 4i4 44 4 44 10. Flaggers RG 0.00 0.00 0.00 0.00 8.00 8.00 0.00 16.00 $44.40 $710.40 Medicare:$10.30, Journey Level Talonika Summers Paid Family (King) 2315 West Ridge $710.40/ Medical Leave: Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $710.40 $0.00/hr $61.00 $44.04 $9.48 $585.58 * _ _ •• University Place, WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Power Equipment RG 0.00 9.00 9.00 10.00 10.00 2.00 0.00 40.00 $72.28 $2,891.2 Medicare:$55.28, Operators-Underground 0 Paid Family $108 Sewer&Water Edward Torres Medical Leave: 4 $3,812.77 Shovel,Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.50 0.50 7.50 0.00 8.50 2 ' $921.57 / $0.00/hr $618.00 $236.39 $35.06 $2,868.04 Tractors Under 15 Metric Tons Rd. (King) Talent,OR-97540 $3,812.77 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 $0.00 444 ti 4444 12. Flaggers Joseph Tountas RG 0.00 10.00 8.00 8.50 9.00 4.50 0.00 40.00 $44.40 $1,776.0 Medicare:$31.06, Journey Level 20407 30th Ave NE 0 $2,142.30 Paid Family (King) Shoreline,WA- / $0.00/hr $336.00 $132.82 Medical Leave: $1,623.04 98155 OT 0.00 2.00 0.00 0.00 0.00 3.50 0.00 5.50 $66.60 $366.30 $2,142.30 $19.38 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Y** DT 0.00 0.00 0.00 0.00 0.00 0.00, 0.00. 0.00 $88.80, $0:00 13. Laborers Medicare::$38.71, RG 0.00 0.00 8:75 0:00 0.00' 0.00 0.00: 815 $50.31 $440.21 Paid Famil Traffic.Control Supervisor Jesse Williams. Y y' (King) 245 S 78th'St '$44'0:21 1 Medical Leave: Tacoma,WA OT 0.00 0.00 0:00 0:00 D.00- .0.00 0.00 0:00 $75.47 $0.00 $2;669:37 '$0.00/hrl $462.00 $165.50 $20.25, $1,982.91 98408 DT 0.00 0.00 0:00 0.00 10.00; 0.00; 0.00 0:00 $12.6 $0:00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 10/13/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 10/2/2022 10/8/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D)Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Ryan Eubanks Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 6.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 8.Shay Howard Power Equipment Operators- Underground Sewer&Water " Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 9.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 12.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in:this Certified Payroll Report,.including:any:addenda, is correct and complete. (2)The wage rates for Workers,'laborersormechanics as reported above are:not less than the applicable-wage rates,contained in,any wage determination related to the contract; and the classifications as reported above for.each'worker, laborer or mechanic:conferm with the actual work performed bysuch worker„laborer or mechanic. (3)The payments of usual benefits,as,listed above have been or will,be made to appropriate approved plans, funds:or programs for the benefit-,of such employees. (4),All persons employed on the above-referenced project(s)have been paid the full weekly,wages earned, and no rebates;have been,or will be made either directly'or indirectly'to or on behalf ofthe-above-named contractor or°subcontractor from the weekly wages.earned by any person. No deductions,other than:those which are legally permissible, have.been made byany person,either directly,or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in:a bona fide apprenticeship'prog_ram`registered with the Washington-State Apprenticeship and Training Council. Falsification of any of the above statements;is a violation of RCW 39..12:050'subject-to prosecutio.n,'sanctions, and penalties: Printed Name of party signing this report Title 'Signature, Tiffani Barquist Contract Administrator Tiffani Barquist MI3 1 0/13/22' F700-065-000 certified payroll report 05-09 Employee Benefits.Distribution and.Signature Certification on Reverse Side Certified Payroll Report Department of Labor and aQ so Prime Contractor ❑x Project Name County Project or Contract# Industries '' `� ;.;; 7� Duvall Avenue NE King CAG-20-065 Prevailing Wage Program °' = Subcontractor ❑ PO Box 44540 "•1!' o4.3 Project Address Olympia WA 98504-4540 y` !88° Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: 'RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 10/1/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name C. ~O o Sun Mon Tue Wed Thu Fri Sat Total cC Gross Amount and And m E 9/25 9/26 9/27 9/28 9/29 9/30 10/1 Total Rate Hourly E is Hours of Pay Earned�oGlross °Usual FICA Withholding Other Net Wages Soc Sec#of Employee Address > - Benefits" Tax o O o Hours Worked Each Day a 1. Flaggers RG 0.00 9.00 0.00 5.00 10.00 1.00 0.00 25.00 $44.40 $1,110.0 Medicare:$34.83, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $2,401.89 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.50 7.00 0.00 7.50 $66.60 $499.50 / $0.00/hr $398.00 $148.91 $29.49 $1,790.66 * _ _ ** Puyallup,WA- $2,401.89 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers Medicare:$34.83, RG 0.00 0.00 10.00 5.00 0.00 0.00 0.00 15.00 $50.31 $754.65 Traffic Control Supervisor Yolanda Barry Paid Family (King) 6906 52nd Street Ct $2,401.89 Medical Leave: E#30 OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $75.47 $37.74 / $0.00/hr $398.00 $148.91 $29.49 $1,790.66 * _ _ ** Puyallup,WA- $2,401.89 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 s. Naggers 4 $1,42018 ` Medicare:$20.60, RG 0.00 9.00 10.00 5.00 8.00 0.00 0.00 32.00 $44.40 ON Paid\f Journey Level Virginia Basher 0 $1,420.80 Medical Leave: (King) 6936 E I st. OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $210.00 $88.09 $18.96 $1,083.15 Tacoma,WA- ** 98404 $1,420.80 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Truck Drivers RG 0.00 0.00 0.00 9.25 7.75 2.75 0.00 19.75 $63.71 $1,258.2 Medicare:$41.83, Dump Truck 7 Paid Family (King) Eric Ellis $1,736.12 Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 5.00 0.00 5.00 $95.57 $477.85 / $0.00/hr $514.00 $178.88 $20.26, $2,002.25 * `* "*** Algona,WA-98001 $2,885.22 Garnishment: $127.4 $128.00 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $74.28 $0.00 Medicare:$73.28, Operators-Underground Paid Family Chance Erdmann Sewer&Water Medical Leave: 2331 Greenfield ST $111 4 Shovel,Excavator,Backhoe, SE OT 0.00 0.00 0.00 0.00 0.00 5.00 0.00 5.00 2 ' $557.10 $557.10/ $0.00/hr $916.00 $0.00 $24.06 $4,040.64 Tractors Under 15 Metric Tons Olympia,WA- $5,053.98 (King) 98501 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168'S $0.00 6. Truck Drivers RG 0.00 7.75 0.00 8.25 9.00 0.00 0.00 25.00 $64.55 $1,613.7 Medicare:$53.09, Dump Truck&Trailer Ryan Eubanks 5 Paid Family (King) 13633 Olympic De. $1,113.4 $2'774.96 Medical Leave: SE OT 0.00 0.00 0.00 0.75 1.75 9.00 0.00 11.50 $96.82 3 / $0.00/hr $546.00 $227.02 $39.27 $2,796.22 * '""-**** Olalla,WA-98359 $3,661.60 $191 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 p ' $0.00 7. Truck Drivers Medicare:$53.09, DumpTruck RG 0.00 0.00 0.00 0.75 0.00 0.00 0.00 0.75 $63.71 $47.78 Paid Family Ryan Eubanks $2,774.96 Medical Leave: rce) 13633 Olympic De. OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $546.00 $227.02 $39.27 $2,796.22 ********* SE Olalla,WA-98359 $3,661.60 $1274 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ' $0.00 8. Flaggers RG 0.00 0.00 10.00 10.00 10.00 8.00 0.00 38.00 $44.40 $1,687.2 Medicare:$25.95, Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $1,787.10 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 1.50 0.00 0.00 1.50 $66.60 $99.90 / $0.00/hr $291.00 $110.94 $16.83 $1,344.38 ********* $1,789.10 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 9. Laborers-Underground $2,095.6 Medicare:$60.58, Sewer&Water RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $52.39 0 Paid Family Somnang Hean $4,178.24 Medical Leave: General Laborer&Topman ****Pacific Hwy S $2,082.6 (King) Des Moines,WA- OT 0.00 1.00 1.00 2.00 2.00 12.50 8.00 26.50 $78.59 4 / $0.00/hr $877.00 $259.05 $28.37 $2,953.24 98188 $4,178.24 * *` $184 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 '7 $0.00 10. Power Equipment RG 0.00 10.00 10.00 0.00 0.00 0.00 0.00 20.00 $72.28 $1,445.6 Medicare:$22.53, Operators-Underground 0 Paid Family c-wer&Water Shay Howard Medical Leave: Ivel,Excavator,Backhoe, 164 Senn Rd OT 0.00 0.50 0.50 0.00 0.00 0.00 0.00 1.00 $108.4 $1,554.02 2 $108.42 / $0.00/hr $185.00 $96.35 $14.82 $1,235.32 a'actors Under 15 Metric Tons Chehalis,WA- (King) 98532 $1,554.02 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65 " $0.00 *.** .. 11. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971.2 Medicare:$86.70, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 1.00 1.00 2.50 2.00 12.50 8.00 27.00 $111.4 $3,008.3 $5,979.54 $1,472.0 $51.14, Tractors Under 15 Metric Tons Gig Harbor,WA- 2 4 / $0.00/hr .73 Garnishment: $3,547.56 (King) 98335 $5,979.54 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168'S $0.00 *le**** ** 12. Power Equipment Edward Torres $2,891.2 Medicare:$57.65, Operators-Underground 513 Wagner Creek RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 0 $3,975.40 $0.00/hr $657.00 $246.47 Paid Family $2,977.96 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Sewer&Water Rd. $108.4 $1,084.2 / Medical Leave: Shovel, Excavator,Backhoe, Talent,OR-97540 OT 0.00 0.50 0.50 2.50 1.50 5.00 0.00 10.00 2 0 $3,975.40 $36.32 Tractors Under 15 Metric Tons (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'5 $0.00 13. Laborers Medicare:$26.10, Traffic Control Laborer RG 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 $47.48 $23.74 Paid Family Joseph Tountas $1,799.74 Medical Leave: (King) 20407 30th Ave NE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $257.00 $111.59 $17.04 $1,388.01 Shoreline,WA- ***.**** 98155 $1,799.74 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 14. Flaggers RG 0.00 9.00 10.00 9.50 10.00 0.00 0.00 38.50 $44.40 $1,709.4 Medicare:$26.10, Journey Level Joseph Tountas 0 Paid Family (King) 20407 30th Ave NE $1,799.74 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.50 0.00 0.50 0.00 0.00 1.00 $66.60 $66.60 / $0.00/hr $257.00 $111.59 $17.04 $1,388.01 ,, $1,799.74 98155 • DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $881 80 $0.00 15. Laborers V $1,308' 4 Medicare:$39.74, Traffic Control Supervisor RG 0.00 9.00 0.00 5.00 10.00 2.00 0.00 26.00 $5031 6 Paid Family P Jesse Williams $2,006.16 Medical Leave: (King) 245 S 78th St Tacoma,WA- OT 0.00 0.00 0.00 0.00 1.75 7.50 0.00 9.25 $75.47 $698.10 / $0.00/hr $479.00 $196.91 $20.99 $2,003.82 $2,740.46 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 2'6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 10/6/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ^'wall Avenue NE 9/25/2022 10/1/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry ('borers affic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and i,.5TATA Project Name County Project or Contract# _i;:',,• Prime Contractor X Industries a3 __ >>;' -':» , Duvall Avenue NE King GAG-20-065 Prevailing Wage Program stiii£, ,lF,.. Subcontractor ❑ PO Box 44540 °'k__ '2 Project Address Olympia WA 98504-4540 y` '""�ac Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 9/24/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions F= Work Classification Name E9- ~O fa Sun Mon Tue Wed Thu Fri Sat Total rY a) Gross Amount and And E 9/18 9/19 9/20 9/21 9/22 9/23 9/24 Total Rate Earned/Gross Hourly Net Wages f Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address o o Hours Worked Each Day Benefits" Tax 0 1. Laborers-Underground RG 0.00 10.00 10.00 10.00 0.00 0.00 0.00 30.00 $52.39 $1,571.7 Medicare:$24.50, Sewer&Water Heather Alldredge 0 Paid Family General Laborer&Topman 6818 124th St E $1,689.59 Medical Leave: (King) Puyallup,WA- OT 0.00 0.50 0.50 0.50 0.00 0.00 0.00 1.50 $78.59 $117.89 / $0.00/hr $269.00 $104.75 $19.79 $1,271.55 98373 $1,689.59 7 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$ $0.00 2. Flaggers RG 0.00 10.00 10.00 9.00 0.00 0.00 0.00 29.00 $44.40 $1,287.6 Medicare:$20.15, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,387.50 Medical Leave: E#30 OT 0.00 1.00 0.50 0.00 0.00 0.00 0.00 1.50 $66.60 $99.90 / $0.00/hr $167.00 $86.17 $18.22 $1,095.96 Puyallup,WA- .. _$1,387.50 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 s. rlaggers Medicare:$19.44, RG 0.00 0.00 0.00 0.00 10.00 8.75 0.00 18.75 $44.40 $832.50 Paid Family Level Virginia Basher (King) 6936 E I st. $899.10/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 $66.60 $66.60 $1,341.17 $0.00/hr $192.00 $83.15 $17.51 $1,029.07 - 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88. 0 $0.00 4. Truck Drivers $1,576. / Medicare:$46.44, RG 0.00 0.00 8.75 8.25 7.75 0.00 0.00 24.75 $6 71 V Dump Truck 2 Paid Family (King) Eric Ellis V $2,389.17 Medical Leave: 705 Celery Ave OT 0.00 0.00 0.75 0.00 0.00 7.75 0.00 8.50 $95.57 $812.35 / $0.00/hr $590.00 $198.58 $21.33 $2,346.51 t _ _ •• Algona,WA-98001 $3,202.86 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 2'4 $0.00 5. Truck Drivers Ryan Eubanks RG 0.00 8.00 0.00 4.75 6.50 0.00 0.00 19.25 $64.55 $1,242.5 Medicare:$58.10, 13633 Olympic De. 9 $2,234.99 $0.00/hr $625.00 $248.41 Paid Family $3,032.52 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Dump Truck&Trailer SE / Medical Leave: (King) Olalla,WA-98359 OT 0.00 0.00 0.00 0.00 2.25 8.00 0.00 10.25 $96.82 $992.41 $4,006.61 $42.58 **x***** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 O9'1 $0.00 6. Flaggers $2,042.4 Medicare:$38.58, RG 0.00 10.00 10.00 9.00 10.00 7.00 0.00 46.00 $44.40 0 Paid Family Journey Level Jeana Hansen (King) Ave CT E#B $2,658.45 Medical Leave: Tacoma,WA- OT 0.00 0.00 1.00 0.00 0.50 7.75 0.00 9.25 $66.60 $616.05 / $0.00/hr $500.00 $164.97 $23.54 $1,933.67 **.**.*** 98446 $2,660.76 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 7. Laborers-Underground RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $52.39 $2,095.6 Medicare:$43.49, Sewer&Water 0 Paid Family Somnang Hean $2,999.39 Medical Leave: General Laborer&Topman *****Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.50 0.50 0.50 0.00 10.00 0.00 11.50 $78.59 $903.79 / $0.00/hr $542.00 $185.96 $21.97 $2,205.97 98188 $2,999.39 `"*`*�" DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4.7 $0.00 o. r'ower Equipment RG 0.00 10.00 10.00 10.00 0.00 5.00 0.00 35.00 $72.28 $2,529.8 Medicare:$39.82, Operators-Underground 0 Paid Family Sewer&Water Shay Howard $108Medical Leave: Shovel,Excavator,Backhoe, 164 Senn Rd OT 0.00 0.50 0.50 1.00 0.00 0.00 0.00 2.00 2 ' $216.84 $2,746.64 $26.13 Tractors Under 15 Metric Tons Chehalis,WA / $0.00/hr $461.00 $170.29 $2,049.40 98532 $2,746.64 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'5 $0.00 9. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971.2 Medicare:$66.57, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 1.00 1.00 1.00 0.50 10.50 0.00 14.00 $111.4 $1,559.8 $4,531.08 2 8 / $0.00/hr $986.00 $284.65 $40.78, $2,761.67 Tractors Under 15 Metric Tons Gig Harbor,WA Garnishment: (King) 98335 $148.5 $4,591.08 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 10. Power Equipment RG 0.00 10.00 10.00 10.00 9.00 1.00 0.00 40.00 $72.28 $2,891.2 Medicare:$58.42, Operators-Underground 0 Paid Family Sewer&Water Edward Torres $108.4 $1,138.4 $4,029.61 Medical Leave: vel,Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.50 0.50 0.50 0.50 8.50 0.00 10.50 2 1 / $0.00/hr $670.00 $249.84 $36.73 $3,014.62 :tors Under 15 Metric Tons Rd. (King) Talent,OR-97540 $144.5 $4,029.61 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 11. Flaggers $1,776.0 Medicare:$36.95, RG 0.00 10.00 10.00 9.00 10.00 1.00 0.00 40.00 $44.40 0 Paid Family Journey Level Joseph Tountas (King) 20407 30th Ave NE $2,541.90 Medical Leave: Shoreline,WA- OT 0.00 1.00 1.00 0.00 1.00 8.50 0.00 11.50 $66.60 $765.90 / $0.00/hr $433.00 $158.02 $21.95 $1,898.91 ********* Shore $2,548.83 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Laborers $2,465.1 Medicare:$37.93, Jesse Williams RG 0.00 10.00 10.00 9.00 10.00 10.00 0.00 49.00 $50.31 Traffic Control Supervisor 245 S 78th St 9 $2,616.13 Paid Family (King) Tacoma,WA- / $0.00/hr $450.00 $162.20 Medical Leave: $1,944.27 98408 OT 0.00 0.00 0.50 0.00 1.00 0.50 0.00 2.00 $75.47 $150.94 $2,616.13 $21.73 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side r 4.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Chance Erdmann Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (nmg) 6.Ryan Eubanks Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) Jeana Hansen A_iggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (_King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature-Certification on Reverse Side 10.Shay Howard Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 12.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 13.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 king) 14.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All informatiO contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (''Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and :fining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist 'MB 1.0%6122% • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 9/28/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: wall Avenue NE 9/18/2022 9/24/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) p Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Heather Alldredge Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) Yolanda Barry iggers '' Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 • $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Ryan Eubanks Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) o.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Shay Howard "'-,»wer Equipment Operators- )derground Sewer&Water 5novel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 9.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 'ng) 12.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. —` '1ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 9/28/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • Certified Payroll Report Department of Labor and f,s�ert; Project Name County Project or Contract# J:I Prime Contractor NI Industries o .7Duvall Avenue NE King CAG-20-065 Prevailin Wa e Pro ram a= ' .i 6g g g L Subcontractor ❑ PO Box 44540 i .� Project Address Olympia WA 98504-4540 y` 18d8�� Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 9/17/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions IL- Work Classification Name c7 ~O o Sun Mon Tue Wed Thu Fri Sat Total a> Gross Amount and And E 9/11 9/12 9/13 9/14 9/15 9/16 9/17 Total Rate Earned/Gross Hourly Net Wages `m E i= Hours of Pay "Usual FICA Withholding Other = a Payroll Benefits" Tax Soc Sec#of Employee Address O o Hours Worked Each Day a 1. Laborers-Underground $2,043.2 Medicare:$30.76, Sewer&Water RG 0.00 10.00 10.00 0.00 9.50 9.50 0.00 39.00 $52.39 1 Paid Family Heather Alldredge $2,121.80 Medical Leave: General Laborer&Topman 6818 124th St E (King) Puyallup,WA- OT 0.00 0.50 0.50 0.00 0.00 0.00 0.00 1.00 $78.59 $78.59 / $0.00/hr $371.00 $131.55 $25.03 $1,563.46 98373 $2,121.80 ` """* DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$7 $0.00 2. Laborers RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $47.48 $0.00 Medicare:$17.09, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,190.01 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 $71.22 $35.61 / $0.00/hr $120.00 $73.05 $15.71 $952.29 _ _ *• Puyallup,WA- $1,178.14 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 s. Flaggers RG 0.00 10.00 0.00 0.00 9.00 7.00 0.00 26.00 $44.40 $1,154.4 Medicare:$17.09, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,190.01 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $120.00 $73.05 $15.71 $952.29 _ _ x Puyallup,WA- $1,178.14 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Flaggers RG 0.00 10.00 10.00 9.25 0.00 0.00 0.00 29.25 $44.40 $1,298.7 Medicare:$19.35, Journey Level Virginia Basher 0 Paid Family (King) 6936 E I st. $1,334.31 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $191.00 $82.73 $17.70 $1,023.53 *. 98404 $1,334.31 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 5. Laborers Virginia Basher RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $47.48 $0.00 Medicare:$19.35, 6936 E 1st. $1,334.31 $0.00/hr $191.00 $82.73 Paid Family $1,023.53 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Traffic Control Laborer Tacoma,WA- / Medical Leave: (King) 98404 OT 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 $71.22 $35.61 $1,334.31 $17.70 «**««**** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 6. Laborers Medicare:$41.47, Traffic Control Supervisor RG 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.00 $50.31 $201.24 Health:$142.66, p Steve Cooper (King) 7610 So Park Ave. $201.24/ Paid Family Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $3,002.82 $0.00/hr $387.00 $177.33 Medical Leave: $2,221.09 98408 $33.27 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120'6 $0.00 7. Truck Drivers RG 0.00 9.00 8.25 7.00 7.00 0.00 0.00 31.25 $63.71 $1,990.9 Medicare:$47.17, Dump Truck 4 Paid Family (King) Eric Ellis $2,874.96 Medical Leave: 705 Celery Ave OT 0.00 0.50 1.25 0.00 0.00 7.50 0.00 9.25 $95.57 $884.02 / $0.00/hr $602.00 $201.65 $22.51 $2,379.13 * _ _ ** Algona,WA-98001 $3,252.46 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127'4 $0.00 Truck Drivers RG 0.00 0.00 0.00 0.00 0.00 3.50 0.00 3.50 $63.71 $222.99 Medicare:$31.29, Dump Truck Ryan Eubanks Paid Family (Pierce) 13633 Olympic De. $1,554.02 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.25 0.00 0.25 $95.57 $23.89 / $0.00/hr $215.00 $133.78 $25.27 $1,752.43 Olalla,WA-98359 $2,157.77 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127'4 $0.00 9. Truck Drivers RG 0.00 8.25 0.00 0.00 6.50 5.50 0.00 20.25 $64.55 $1,307.1 Medicare:$31.29, Dump Truck&Trailer Ryan Eubanks 4 Paid Family (King) 13633 Olympic De. $1,554.02 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 / $0.00/hr $215.00 $133.78 $25.27 $1,752.43 ********* Olalla,WA-98359 $129.1 $2,157.77 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 $0.00 10. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971 2 Medicare:$59.24, Operators-Underground 0�/ Paid Family Sewer&Water Travis Haney Medical Leave: Shovel,Excavator,Backhoe, ****169th Ave E OT 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $111 4 $1,114/2 $4,085.40 $21.36 Tractors Under 15 Metric Tons Lake Tapps,WA- 2 J 0 V / $0.00/hr $768.00 $253.30 $2,983.50 (King) 98391 $4,085.40 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65. $0.00 11. Flaggers $1,776.0 Medicare:$34.20, RG 0.00 10.00 10.00 9.25 9.50 1.25 0.00 40.00 $44.40 Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $2,358.75 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 8.75 0.00 8.75 $66.60 $582.75 / $0.00/hr $427.00 $146.24 $20.77 $1,730.54 *«******* 98446 $2,358.75 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Laborers-Underground $2,095.6 Medicare:$41.79, Sewer&Water RG 0.00 10.00 10.00 10.00 9.50 0.50 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman *****Pacific Hwy S $2,881.50 Medical Leave: (King) Des Moines,WA- OT 0.00 0.50 0.00 0.50 0.00 9.00 0.00 10.00 $78.59 $785.90 / $0.00/hr $513.00 $178.65 $21.32 $2,126.74 98188 $2,881.50 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184'7 $0.00 13. Power Equipment Shay Howard $2,891.2 Medicare:$51.36, Operators-Underground 164 Senn Rd RG 0.00 10.00 10.00 8.00 8.50 3.50 0.00 40.00 $72.28 0 $3,541.72 $0.00/hr $652.00 $219.58 Paid Family $2,585.81 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • Sewer&Water Chehalis,WA- $108.4 / Medical Leave: Shovel, Excavator,Backhoe, 98532, OT 0.00 0.50 0.50 0.00 0.00 5.00 0.00 6.00 2 $650.52 $3,541.72 $32.97 Tractors Under 15 Metric Tons (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 $0.00 ......... 14. Power Equipment $2,971.2 Medicare:$64.96, Operators-Underground RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 0- Paid Family Sewer&Water Nathan McAllister $111.4 $1,448.4 $4,419.66 Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 1.00 1.00 1.00 0.00 10.00 0.00 13.00 $39.93, Tractors Under 15 Metric Tons Gig Harbor,WA- 2 6 / $0.00/hr $947.00 $277.73 Garnishment: $2,698.63 (King) 98335 $148.5 $4,479.66 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 15. Laborers RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $54.01 $2,160.4 Medicare:$43.07, Pipe Layer Lead Shaun McNally 0 Paid Family ""r1 9) 15010 113th Ave E $2,970.60 Medical Leave: Puyallup,WA- OT 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $81.02 $810.20 / $0.00/hr $624.00 $184.18 $21.21 $2,098.14 .* .*-`*" 98374 $2,970.60 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 Z'0 $0.00 16. Power Equipment $2,891.2 Medicare:$57.64, Operators-Underground RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 0 Paid Family Sewer&Water Shawn Olson Medical Leave: 12208 200th Ave Ct OT 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $108.4 $1,084.2 $3,975.40 $36.33 Shovel, Excavator,Backhoe, E 2 0 / $0.00/hr $839.00 $246.47 $2,795.96 Tractors Under 15 Metric Tons Bonney Lake,WA- $3,975.40 (King), 98391 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'5 $0.00 .... .... 17. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 $2,891.2 Medicare:$58.43, ' Operators-Underground 0 Paid Family Sewer&Water Edward Torres Medical Leave: Shovel, Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.50 0.50 0.00 0.00 9.50 0.00 10.50 $108.4 $1,138.4 $4,029.61 $36.73 Tractors Under 15 Metric Tons Rd. 2 1 / $0.00/hr $670.00 $249.84 $3,014.61 $4,029.61 (King) Talent,OR-97540 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 1R Flaggers RG 0.00 0.00 10.00 9.25 9.50 10.00 0.00 38.75 $44.40 $1,720.5 Medicare:$24.95, lrney Level Joseph Tountas 0 Paid Family "<.:7.1g) 20407 30th Ave NE $1,720.50 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $239.00 $106.67 $16.50 $1,333.38 *"''*.. 98155 $1,720.50 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 19. Laborers $2,012.4 Medicare:$41.22, RG 0.00 10.00 10.00 10.00 9.50 0.50 0.00 40.00 $50.31 0 Paid Family Control Supervisor Jesse Williams (King) 245 S 78th St $2,842.57 Medical Leave: Tacoma,WA- OT 0.00 0.50 1.00 0.00 0.00 9.50 0.00 11.00 $75.47 $830.17 / $0.00/hr $504.00 $176.24 $21.74 $2,099.37 "-""` 98408 $2,842.57 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120'6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 10/4/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 9/11/2022 9/17/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Heather Alldredge Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 2.Yolanda Barry •tborers ,,-affic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side r 4.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) ii.Steve Cooper Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Ryan Eubanks Truck Drivers ';imp Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 9.Ryan Eubanks Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ing) 12.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 13.Shay Howard Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons - 14.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 15.Shaun McNally Laborers $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer Lead F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side v ❑+ (King) 16.Shawn Olson Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Edward Torres ewer Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) • 18.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 19.Jesse Williams ,7borers .affic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda,'is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (51 Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ( fining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Amended Reason Missed hours for one employee MB 10/4/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ,,�rF; Project Name County Project or Contract# ��`'"�''••••t� °� Prime Contractor LRJ t ,::: 4 r Industries , Duvall Avenue NE King GAG-20-065 Prevailing Wage Program =,ii{ 4{j' $ ��{`..'•. '' 11 Subcontractor ❑ PO Box 44540 °;� - y Project Address Olympia WA 98504-4540 y` e�°�� Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 9/10/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions IL- Work Classification Name c9 ~O o Sun Mon Tue Wed Thu Fri Sat Total cc m Gross Amount and And E 9/4 9/5 9/6 9/7 9/8 9/9 9/10 Total Rate Earned/Gross Hourly Net Wages r a Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address a0 > la Benefits" O o Hours Worked Each Day 0 1. Laborers-Underground RG 0.00 0.00 10.00 0.00 10.00 9.50 0.00 29.50 $52.39 $1,545.5 Medicare:$23.55, Sewer&Water ily Heather Alldredge 1 $1,624.10 MedicalPaid Leave: General Laborer&Topman 6818 124th St E (King) Puyallup,WA- OT 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 $78.59 $78.59 / $0.00/hr $255.00 $100.70 $19.11 $1,225.74 98373 $1,624.10 `} DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$7 $0.00 2. Flaggers RG 0.00 0.00 10.00 10.00 10.00 0.00 0.00 30.00 $44.40 $1,332.0 Medicare:$19.31, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,332.00 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $154.00 $82.58 $17.79 $1,058.32 _ _ *• Puyallup,WA- $1,332.00 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 Laborers RG 0.00 0.00 1.00 0.25 1.00 0.00 0.00 2.25 $47.48 $106.83 Medicare:$19.55, Traffic Control Laborer Virginia Basher `� Paid Family (King) 6936 E I st. J $1,347.95 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.75 0.00 0.00 0.00 0.75 $71.22 $53.42 / $0.00/hr $194.00 $83.57 $17.74 $1,033.09 98404 $1,347.95 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Flaggers $1,187.7 Medicare:$19.55, RG 0.00 0.00 9.00 9.75 8.00 0.00 0.00 26.75 $44.40 0 Paid Family Journey Level Virginia Basher (King) 6936 E 1st. $1,347.95 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $194.00 $83.57 $17.74 $1,033.09 98404 $1,347.95 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 5. Truck Drivers Eric Ellis RG 0.00 0.00 0.00 7.75 7.75 7.00 0.00 22.50 $63.71 $1,433.4 Medicare:$28.79, 705 Celery Ave 8 $1,433.48 $0.00/hr $298.00 $123.12 Paid Family $1,519.71 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Dump Truck Algona,WA-98001 I / I Medical Leave: (King) OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $1,985.81 $16.19 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 27'4 $0.00 6. Truck Drivers RG 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.50 $64.55 $290.48 Medicare:$29.37, Dump Truck&Trailer Paid Family (King) Chris Grove $1,255.66 Medical Leave: ***Berger Ln OT 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.25 $96.82 $121.03 / $0.00/hr $308.00 $125.60 $16.41, $1,374.98 Port Orchard,WA- $2,025.75 Garnishment: 98366 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $129.10 $171.39 $0.00 7. Truck Drivers RG 0.00 0.00 0.00 0.00 5.75 7.50 0.00 13.25 $63.71 $844.16 Medicare:$29.37, Dump Truck Paid Family (King) Chris Grove $1,255.66 Medical Leave: '**Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $308.00 $125.60 $16.41, $1.374.98 Port Orchard,WA- Garnishment: 98366 $2,025.75 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 27'4 $0.00 $171.39 8. Laborers Medicare:$18.71, RG 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Paid Family Control Laborer Jeana Hansen (King) Ave CT E#B $1,290.68 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $181.00 $80.03 $12.35 $998.59 ********* ; $1,290.68 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 9. Flaggers $1,243.2 Medicare:$18.71, RG 0.00 0.00 9.00 10.00 0.00 9.00 0.00 28.00 $44.40 Journey Level Ave E#B 0 Paid Family Hansen $1,290.68 Medical Leave: (K(King) A CT Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $181.00 $80.03 $12.35 $998.59 98446 $1,290.68 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 10. Laborers-Underground 4 $2,069 4 Medicare:$31.14, Sewer&Water RG 0.00 10.00 10.00 10.00 9.50 0.00 0.00 39.50 $52.39 1 4 J Paid Family Somnang Hean General Laborer&Topman *****Pacific Hwy S 4 $2,148.00 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $78.59 $78.594 / $0.00/hr $337.00 $133.18 $17.26 $1,629.42 98188 $2,148.00 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184'7 $0.00 11. Power Equipment RG 0.00 0.00 10.00 8.00 0.00 9.00 0.00 27.00 $72.28 $1,951.5 Medicare:$28.30, Operators-Underground 6 Paid Family Sewer&Water Shay Howard Medical Leave: $108.4 $1,951.56 Shovel,Excavator,Backhoe, 164 Senn Rd OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $18.87 Tractors Under 15 Metric Tons Chehalis,WA 2 / $0.00/hr $272.00 $121.00 $1,511.39 (King) 98532 $1,951.56 $1645 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ' $0.00 12. Power Equipment RG 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00 $74.28 $2,971.2 Medicare:$45.86, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister $111.4 $3,082.62 Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 $111.42 $30.25, Tractors Under 15 Metric Tons Gig Harbor,WA- 2 / $0.00/hr $561.00 $196.09 Garnishment: $1,878.01 (King) 98335 $148.5 $3,162.62 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 'nor -- 13. Flaggers RG 0.00 0.00 0.00 10.00 9.00 9.00 0.00 28.00 $44.40 $1,243.2 Medicare:$18.02, Journey Level Deinse Stamolis 0 Paid Family (King) 3909 48th Ave NE $1,243.20 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $153.00 $77.08 $16.60 $978.50 98422 $1,243.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 14. Flaggers Medicare:$6.44, RG 0.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00 $44.40 $444.00 Journey Level Talonika Summers Paid Family (King) 2315 West Ridge $444.00/ Medical Leave: Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $444.00 $0.00/hr $31.00 $27.53 $5.93 $373.10 ***_*+**** University Place, WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 15. Power Equipment RG 0.00 0.00 10.00 10.00 10.00 9.00 0.00 39.00 $72.28 $2,818.9 Medicare:$42.45, ,` 'xators-Underground 2 Paid Family r er&Water Edward Torres $108 A Medical Leave: Shovel,Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 2 $108.42 $2,927.34 $28.09 Tractors Under 15 Metric Tons Rd. / $0.00/hr $420.00 $181.49 $2,255.31 $2,927.34 (King) Talent,OR-97540 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 **** *** 16. Laborers $1,962.0 Medicare:$28.45, RG 0.00 0.00 10.00 10.00 10.00 9.00 0.00 39.00 $50.31 9 Paid Family Traffic Control Supervisor Jesse Williams (King) 245 S 78th St $1,962.09 Medical Leave: . Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $293.00 $121.64 $16.62 $1,502.38 $1,962.09 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $12.6 $0.00 L • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 9/15/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: F�,.vall Avenue NE 9/4/2022 9/10/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Heather Alldredge Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 2-Yolanda Barry iggers .:,;urney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) ,Ihris Grove Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Chris Grove Truck Drivers • Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Jeana Hansen Laborers affic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 11.Shay Howard Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 12.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 13.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ng) 14.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Edward Torres Power Equipment Operators- Underground Sewer&Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Shovel,Excavator,Backhoe, Tractors Under 15 Metric Tons F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) 16.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. `Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 9/16/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and 5"'" Prime Contractor Project Name County Project or Contract# 0 Industries .�,_;. _ =f _,;.: ''`':. Duvall Avenue NE King CAG-20-065 J 61S' Stii Prevailing Wage Program <,:(i, .:,ll,r Subcontractor ❑ PO Box 44540 61i` yam. ,�/ Project Address Olympia WA 98504-4540 y` '�`��� Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 9/3/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name c9 ~o o Sun Mon Tue Wed Thu Fri Sat Total a) Gross Amount and And E 8/28 8/29 8/30 8/31 9/1 9/2 9/3 Total Rate Earned(Gross Hourly Net Wages E Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address f12 o Hours Worked Each Day y Benefits" Tax a 1. Laborers-Underground $2,095.6 Medicare:$43.50, RG 0.00 10.0010.00 9.00 9.00 2.00 0.00 40.00 $52.39 Sewer&Water 0 Paid Family Heather Alldredge General Laborer&Topman 6818 124th St E $2,999.39 Medical Leave: (King) Puyallup,WA- OT 0.00 3.50 2.00 0.00 0.00 6.00 0.00 11.50 $78.59 $903.79 / $0.00/hr $581.00 $185.96 $33.25 $2,155.68 98373 $2,999.39 **` " ""' $104 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $7 . $0.00 2. Laborers RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $47.48 $0.00 Medicare:$15.52, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,070.22 Medical Leave: E#30 OT 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $71.22 $71.22 / $0.00/hr $96.00 $66.36 $13.93 $878.41 Puyallup,WA- $1,070.22 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 s. rlaggers RG 0.00 0.00 10.00 8.50 0.00 3.25 0.00 21.75 $44.40 $965.70 Medicare:$15.52, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,070.22 Medical Leave: E#30 OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $66.60 $33.30 / $0.00/hr $96.00 $66.36 $13.93 $878.41 Puyallup,WA- $1,070.22 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.�80 $0.00 4. Flaggers RG 0.00 8.00 8.25 6.50 7.75 0.00 0.00 30.50 $44 40 $1,354t2 Medicare:$31.45, Journey Level Virginia Basher ( 0 J `� Paid Family (King) 6936 E I st. V $2,168.93 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 3.50 0.00 3.50 $66.60 $233.10 / $0.00/hr $382.00 $134.48 $27.12 $1,593.88 * ****** $2,168.93 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 5. Laborers Virginia Basher RG 0.00 2.00 1.75 1.00 1.00 1.25 0.00 7.00 $47.48 $332.36 Medicare:$31.45, 6936 E 1st. $2,168.93 $0.00/hr $382.00 $134.48 Paid Family $1,593.88 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Traffic Control Laborer Tacoma,WA- / Medical Leave: (King) 98404 OT 0.00 2.50 0.25 0.00 0.00 0.75 0.00 3.50 $71.22 $249.27 $2,168.93 $27.12 ***** *** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 6. Truck Drivers RG 0.00 0.00 9.00 0.00 0.00 0.00 0.00 9.00 $63.71 $573.39 Medicare:$36.44, Dump Truck Paid Family (King) Eric Ellis $573.39/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $2 513.04 $0.00/hr $425.00 $155.81 $22.28 $1,873.51 ** Algona,WA-98001 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127.4 $0.00 7. Truck Drivers RG 0.00 0.00 8.75 0.00 0.00 0.00 0.00 8.75 $63.71 $557.46 Medicare:$34.10, Dump Truck Ryan Eubanks Paid Family (Pierce) 13633 Olympic De. $772.50/ Medical Leave: SE OT 0.00 0.00 2.25 0.00 0.00 0.00 0.00 2.25 $95.57 $215.03 $2 351.87 $0.00/hr $257.00 $145.82 $30.78 $1,884.17 * ** Olalla,WA-98359 $127 4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 ... .ruck Drivers $1,162.7 Medicare:$49.83, RG 0.00 9.25 9.00 0.00 0.00 0.00 0.00 18.25 $63.71 Dump Truck 1 Paid Family (King) Chris Grove $2491.19 Medical Leave: ***Berger Ln OT 0.00 0.25 2.00 0.00 0.00 0.00 0.00 2.25 $95.57 $215.03 / $0.00/hr $646.00 $213.05 $23.31, $2,332.73 * _ _ ** Port Orchard,WA- $3,436.31 Garnishment: 98366 $127.4 $171.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 .1 $00..00 9. Truck Drivers RG 0.00 0.00 0.00 0.00 6.00 0.75 0.00 6.75 $64 55 $435.71 Medicare:$49.83, Dump Truck&Trailer Paid Family Kin Chris Grove J Medical Leave: ( 9) ****Berger Ln OT 0.00 0.00 0.00 0.00 0.75 6.25 0.00 7.00 $96.82 $677.74 $2,491.19 $23.31, Port Orchard,WA- / $0.00/hr $646.00 $213.05 Garnishment: $2,332.73 $3,436.31 98366 $129.1 $171.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 $0.00 10. Flaggers $1,587.3 Medicare:$28.12, RG 0.00 8.75 9.00 7.50 7.75 2.75 0.00 35.75 $44.40 0 Paid Family Journey Level Jeana Hansen(King) Ave CT E#B $1,938.94 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 2.25 0.00 2.25 $66.60 $149.85 / $0.00/hr $327.00 $120.21 $18.00 $1,445.61 ** * **** 98446 $1,938.94 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Laborers Medicare:$28.12, RG 0.00 0.00 0.00 1.25 2.00 1.00 0.00 4.25 $47.48 $201.79 Paid Family Traffic Control Laborer Jeana Hansen(King) Ave CT E#B $1,938.94 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $327.00 $120.21 $18.00 $1,445.61 Irk. ** 98446 $1,938.94 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 12. Laborers-Underground RG 0.00 10.00 10.00 9.00 9.00 2.00 0.00 40.00 $52.39 $2,095.6 Medicare:$43.49, Sewer&Water 0 Paid Family Somnang Hean $2,999.39 Medical Leave: General Laborer&Topman *****Pacific Hwy S (King) Des Moines,WA- OT 0.00 3.50 2.00 0.00 0.00 6.00 0.00 11.50 $78.59 $903.79 / $0.00/hr $542.00 $185.96 $21.96 $2,205.98 98188 $2,999.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$.7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 13. Power Equipment RG 0.00 10.00 10.00 10.00 9.50 0.50 0.00 40.00 $74.28 $2,971.2 Medicare:$66.94, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: $111.4 $1,615.5 $4,586.79 Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 3.50 2.50 0.00 0.00 8.50 0.00 14.50 2 9 I $0.00/hr $995.00 $286.24 , $2,776.32 Garnis Tractors Under 15 Metric Tons Gig Harbor,WA- $4,616.79 Garnishment: (King) 98335 $148.5 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 • 14. Flaggers RG 0.00 9.00 0.00 9.50 9.50 6.00 0.00 34.00 $44.40 $1,509.6 Medicare:$23.57, Journey Level Deinse Stamolis 0 Paid Family (King) 3909 48th Ave NE $1,509.60 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $237.00 $100.78 $20.60 $1,243.57 ********* 98422 $1,625.52 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 15. Laborers Medicare:$13.74, RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $47.48 $0.00 �Tr-tic Control Laborer Talonika Summers Paid Family t) 2315 West Ridge $948 12/ Medical Leave: !, . Ave OT 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $71.22 $71.22 $94812 $0.00/hr $90.00 $58.78 $12.30 $773.30 **** **** University Place, WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 16. Flaggers RG 0.00 9.00 10.00 0.00 0.00 0.00 0.00 19.00 $44.40 $843.60 Medicare:$13.74, Journey Level Talonika Summers Paid Family (King) 2315 West Ridge $948.12! Medical Leave: Ave OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $66.60 $33.30 $94812 $0.00/hr $90.00 $58.78 $12.30 $773.30 ********* University Place, WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 17. Power Equipment Medicare:$55.97, RG 0.00 0.00 0.00 0.00 9.00 1.00 0.00 10.00 $72.28 $722.80 Operators-Underground Paid Family Sewer&Water Edward Torres $108.4 Medical Leave: Shovel, Excavator,Backhoe, 513 Wagner Creek OT 0.00 0.00 0.00 0.00 0.00 7.00 0.00 7.00 2 $758.94 $1,481.74 $35.03 Tractors Under 15 Metric Tons Rd $0.00/hr $629.00 $239.32 $2,900.67 (King) Talent,OR-97540 $144.5 $3,859.99 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 18. Flaggers RG 0.00 0.00 0.00 0.00 9.50 0.00 0.00 9.50 $44.40 $421.80 Medicare:$6.12, ney Level Joseph Tountas Paid Family 20407 30th Ave NE $421.80/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $421.80 $17.00 $26.16 $4.05 $368.47 ****.**** 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 19. Laborers $2,012.4 Medicare:$40.12, RG 0.00 10.00 10.00 9.50 9.50 1.00 0.00 40.00 $50.31 0 Paid Family Traffic Control Supervisor Jesse Williams $2,767.10 Medical Leave: (King) 245 S 78th St OT 0.00 3.00 2.00 0.00 0.00 5.00 0.00 10.00 $75.47 $754.70 / $0.00/hr $486.00 $171.57 $21.31 $2,048.10 *** ***** Tacoma,WA- 98408 $2,767.10 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 9/8/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ^..vall Avenue NE 8/28/2022 9/3/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Heather Alldredge Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) ',Yolanda Barry lorers iaffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side „y1 4.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (t)ng) 1 6.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 8.Chris Grove Truck Drivers -imp Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Chris Grove Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F7OO-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 13.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Deinse Stamolis Agars Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Talonika Summers Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 16.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 17.Edward Torres Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons Png) 18.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 19.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 9/9/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and r.ar,. Project Name County Project or Contract# Industries I!.''''i ", Prime Contractor `MI:. • in,. Duvall Avenue NE King CAG-20-065 Prevailing Wage Program 'AV 4I111, Subcontractor ❑ PO Box 44540 y _ Project Address Olympia WA 98504-4540 J�� '""" Final Week of (360) 902-5335 Payroll Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 8/27/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions P Work Classification Name c7 8o Sun Mon Tue Wed Thu Fri Sat Total d Gross Amount and And a) E 8/21 8/22 8/23 8/24 8/25 8/26 8/27 Total Rate Earned/Gross Hourly Net Wages E i= Hours of Pay "Usual FICA Withholding Other C CD Payroll Soc Sec#of Employee Address o Benefits" Tax CD o Hours Worked Each Day a 1. Laborers-Underground RG 0.00 8.50 8.50 9.00 10.00 4.00 0.00 40.00 $52.39 $2,095.6 Medicare:$38.93, Sewer&Water Heather Alldredge 0 Paid Family General Laborer&Topman 6818 124th St E $2,685.03 Medical Leave: (King) Puyallup,WA- OT 0.00 0.00 0.00 0.00 2.00 5.50 0.00 7.50 $78.59 $589.43 / $0.00/hr $506.00 S166 47 $30.35 $1,943.28 98373 $2,685.03 **` "" DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 S'7 $0.00 2. Laborers $1,588.7 Medicare:$26.56, Yolanda BarryRG 0.00 9.58 6.00 8.00 8.00 0.00 0.00 31.58 $50.31 9 Paid Family Control Supervisor (King) 6906 52nd Street Ct $1,588.79 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $264.00 $113.59 $23.94 $1,404.06 *****_**** Puyallup,WA- $1,832.15 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 3. Laborers Medicare:$25.97, RG 0.00 0.00 1.00 0.00 4.00 0.00 0.00 5.00 $47.48 $237.40 Paid Family Traffic Control Laborer Virginia Basher (King) 6936 E I st. $1,791.40 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $291.00 $111.06 $23.25 $1,340.12 **-* **** 98404 $1,791.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Flaggers RG 0.00 7.00 7.75 5.50 6.00 5.00 0.00 31.25 $44.40 $1,387.5 Medicare:$25.97, Journey Level Virginia Basher 0 Paid Family (King) 6936 E I st. $1,791.40 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 2.50 0.00 0.00 2.50 $66.60 $166.50 / $0.00/hr $291.00 $111.06 $23.25 $1,340.12 ********* $1,791.40 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 5. Laborers-Underground Trevor Dietrich $1,519.3 Medicare:$22.03, Sewer&Water 20014 53rd Ave E RG 0.00 8.50 8.50 9.00 3.00 0.00 0.00 29.00 $52.39 1 $1,519.31 $0.00/hr $232.00 $94.20 Paid Family $1,153.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side General Laborer&Topman Spanaway,WA- / Medical Leave: (King) 98387 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $1,519.31 $18.08 ***«*-* ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $104.7 solo 6. Truck Drivers J Medicare:$27.21, Dump Truck&Trailer RG 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 $64.55 $64.55 / Paid Family (King) Chris Grove V Medical Leave: ****Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $64.55/ $19.16, ***«***** Port Orchard,WA- $1,876.49 $0.00/hr $274.00 $116.49 Garnishment: $1,268.24 98366 $129.1 $171.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 $0.00 7. Laborers Medicare:$25.66, RG 0.00 0.00 0.00 0.00 0.00 2.25 0.00 2.25 $47.48 $106.83 Paid Family Control Laborer Jeana Hansen (King) Ave CT E#B $1,769.97 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 2.00 0.00 0.00 2.00 $71.22 $142.44 / $0.00/hr $287.00 $109.74 $16.29 $1,331.28 ***«*_**** 98446 $1,769.97 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 8. Flaggers RG 0.00 1.00 8.50 8.00 10.00 6.00 0.00 33.50 $44.40 $1,487.4 Medicare:$25.66, Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $1,769.97 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 $66.60 $33.30 / $0.00/hr $287.00 $109.74 $16.29 $1,331.28 ***2,-,,_**** 98446 $1,769.97 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 9. Laborers-Underground J $2 095 6 Medicare:$38.94, RG 0.00 8.50 8.50 9.00 10.00 4.00 0.00 40.00 $52.39 5 J Paid Family Sewer&Water 0 Somnang Hean General Laborer&Topman Pacific Hwy S J $2,685.03 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 2.00 5.50 0.00 7.50 $78.59 $589.43 / $0.00/hr $466.00 $166.47 $20.25 $1,993.37 98188 $2,685.03 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $104.7 $0.00 10. Power Equipment RG 0.00 9.00 9.00 10.00 10.00 2.00 0.00 40.00 $74.28 $2,971.2 Medicare:$61.35, Operators-Underground 0 Garnishment: Sewer&Water Nathan McAllister $451.41,Paid $111.4 $1,169.9 $4,141.11 Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.50 2.00 8.00 0.00 10.50 2 1 / $0.00/hr $868.00 $262.33 Family Medical $2,549.89 Tractors Under 15 Metric Tons Gig Harbor,WA- $4,231.11 Leave:$38.13 g) 98335 $148.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 **** *** 11. Flaggers $1,309.8 Medicare:$21.92, RG 0.00 1.00 8.50 8.00 8.00 4.00 0.00 29.50 $44.40 Journey Level Deinse Stamolis 0 Paid Family (King) 3909 48th Ave NE $1,511.59 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $212.00 $93.72 $20.06 $1,163.89 *••«*«*•• 98422 $1,511.59 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Laborers Medicare:$21.92, Traffic Control LaborerRG 0.00 0.00 0.00 0.00 0.00 4.25 0.00 4.25 $47.48 $201.79 Paid Family Deinse Stamolis $1,511.59 Medical Leave: (King) 3909 48thtAve NE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $212.00 $93.72 $20.06 $1,163.89 Tacoma,WA- • _ _ ** 98422 $1,511.59 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 13. Flaggers Medicare:$12.36, RG 0.00 0.00 0.00 0.00 10.00 7.00 0.00 17.00 $44.40 $754.80 Journey Level Talonika Summers Paid Family (King) 2315 West Ridge $852.23/ Medical Leave: Ave OT 0.00 0.00 0.00 0.00 0.75 0.00 0.00 0.75 $66.60 $49.95 $852.23 $0.00/hr $79.00 $52.84 $11.19 $696.84 **** **** University Place, WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 • - 14. Laborers Medicare:$12.36, RG 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 $47.48 $47.48 Traffic Control Laborer Talonika Summers Paid Family (King) 2315 West Ridge $852.23/ Medical Leave: - Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $852.23 $0.00/hr $79.00 $52.84 $11.19 $696.84 ********* University Place, WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 15. Flaggers $1,132.2 Medicare:$16.41, RG 0.00 9.00 8.50 8.00 0.00 0.00 0.00 25.50 $44.40 0 Paid Family Journey Level Joseph Tountas (King) 20407 30th Ave NE $1,132.20 Medical Leave: !' v" OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $110.00 $70.19 $10.86 $924.74 ********* Shoreline,WA 98155 $1,132.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88:80 $0.00 16. Laborers $1,936.9 Medicare:$28.09, RG 0.00 2.00 8.75 8.75 10.00 9.00 0.00 38.50 $50.31 4 Paid Family Traffic Control Supervisor Jesse Williams $1,936.94 Medical Leave: (King) 245 S 78th St OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $287.00 $120.09 $16.40 $1,485.36 Tacoma,WA- * *'**** 98408 $1,936.94 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 1 - • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program - PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 9/2/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 8/21/2022 8/27/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Heather Alldredge Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 2.Yolanda Barry )orers iffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Trevor Dietrich Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman 6.Chris Grove Truck Drivers Dump Truck&Trailer, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Jeana Hansen ",ggers ,L'irney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 12.Deinse Stamolis Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Talonika Summers ;)orers affic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Joseph Tountas Flaggers • Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 16.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as-listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (S)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and fining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist • MB 9/6/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side r Certified Payroll Report Department of Labor and �s,�:,fi;"r;0, Prime Contractor XIProject Name County Project or Contract# Industries a.t! 4 o.::: y Duvall Avenue NE King CAG-20-065 Prevailing Wage Program 1iix Subcontractor ❑ "h Project Address PO Box 44540 ; ".` 1 Olympia WA 98504-4540 y` '��"av Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 8/20/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c7 r o Sun Mon Tue Wed Thu Fri Sat Total cC a) Gross Amount and And a E 8/14 8/15 8/16 8/17 8/18 8/19 8/20 Total Rate Earned/Gross Hourly Net Wages `m E i Hours of Pay "Usual FICA Withholding Other Soc Sec#of Employee Address a > Payroll Benefits" Tax O o Hours Worked Each Day a 1. Laborers-Underground V $2,017 0 Medicare:$32.09, RG 0.00 10.00 10.00 10.00 8.50 0.00 0.00 38.50 $52.39 Sewer&Water 2 Paid Family Heather Alldredge General Laborer&Topman 6818 124th St E $2,213.49 Medical Leave: (King) Puyallup,WA- OT 0.00 1.00 1.00 0.50 0.00 0.00 0.00 2.50 $78.59 $196.48 / $0.00/hr $393.00 $137.24 $25.80 $1,625.36 98373 $2,213.49 "` `* DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$7 $0.00 2. Flaggers RG 0.00 10.00 10.00 10.00 5.50 0.00 0.00 35.50 $44.40 $1,576.2 Medicare:$28.30, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,942.50 Medical Leave: E#30 OT 0.00 4.00 0.50 1.00 0.00 0.00 0.00 5.50 $66.60 $366.30 / $0.00/hr $290.00 $121.01 $24.80 $1,478.39 _ _ •• Puyallup,WA- $1,942.50 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Laborers Medicare:$25.71, RG 0.00 2.00 0.50 2.00 4.50 0.00 0.00 9.00 $47.48 $427.32 Traffic Control Laborer Virginia Basher Paid Family (King) 6936 E I st. $1,772.73 Medical Leave: Tacoma,WA OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $71.22 $35.61 / $0.00/hr $287.00 $109.91 $22.85 $1,327.26 ** 98404 $1,772.73 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Flaggers $1,176.6 Medicare:$25.71, RG 0.00 8.00 9.50 8.00 1.00 0.00 0.00 26.50 $44.40 0 Paid Family Journey Level Virginia Basher (King) 6936 E I st. $1,772.73 Medical Leave: Tacoma,WA OT 0.00 1.00 0.00 1.00 0.00 0.00 0.00 2.00 $66.60 $133.20 / $0.00/hr $287.00 $109.91 $22.85 $1,327.26 ***-**It*** 98404 $1,772.73 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 5. Power Equipment Steven Coon RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $72.28 $722.80 Medicare:$48.22, Operators-Underground 18024 113th St E $777.01 / $0.00/hr $620.00 $206.16 Paid Family $2,432.61 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Sewer&Water Bonney Lake,WA- Shovel,Excavator,Backhoe, 98391 OT 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 $12'4 $54.21 $3,325.14 $18.151 Leave: Tractors Under 15 Metric Tons (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'S $0.00 6. Laborers-Underground RG 0.00 10.00 10.00 10.00 8.50 0.00 0.00 38.50 $52.39 $2,017.0 Medicare:$32.10, Sewer&Water Trevor Dietrich 2 Paid Family General Laborer&Topman 20014 53rd Ave E $2,213.49 Medical Leave: (King) Spanaway,WA- OT 0.00 1.00 1.00 0.50 0.00 0.00 0.00 2.50 $78.59 $196.48 / $0.00/hr $393.00 $137.24 $25.80 $1,625.36 98387 $2,213.50 *** ***** $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $4'7 $0.00 7. Power Equipment Medicare:$67.61, Operators-Underground RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $74.28 $742.80 Paid Family Sewer&Water Chance Erdmann Medical Leave: 2331 Greenfield ST $111.4 Shovel, Excavator,Backhoe, SE OT 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 2 $111.42 $854.22/ $22.91 :tors Under 15 Metric Tons $4,662.35',tors $822.00 $289.06 $3,460.77 �) Olympia,WA- * 98501 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $16.5 $0.00 8. Truck Drivers*** Medicare:$38.25, RG 0.00 8.50 0.00 0.00 0.00 0.00 0.00 8.50 $64.55 $548.68 Dump Truck&Trailer Ryan Eubanks Ni Paid Family (King) 13633 Olympic De. $742.32/ Medical Leave: SE OT 0.00 2.00 0.00 0.00 0.00 0.00 0.00 2.00 $96.82 $193.64 $2 638.13 $0.00/hr $320.00 $163.57 $31.97 $2,084.34 *** **** Olalla,WA-98359 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 a9'1 $0.00 9. Truck Drivers RG 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 $63.71 $63.71 Medicare:$46.29, Dump Truck Paid Family Chris Grove (King) Medical Leave: ****Berger Ln OT 0.00 1.25 0.00 0.00 0.00 0.00 0.00 1.25 $95.57 $119.46 $183.17/ * .* Port Orchard,WA- $0.00/hr $588.00 $197.97 $22.0 , $2,167.26 $3,192.98 Garnishment: 98366 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127 4 $0.00 $171.39 10. Laborers RG 0.00 0.00 0.00 0.00 6.50 0.00 0.00 6.50 $47.48 $308.62 Medicare:$26.13, Traffic Control Laborer Jeana Hansen Paid Family ,,,, g) Ave CT E#B $1,801.57 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $294.00 $111.70 $16.72 $1,353.02 * ** 98446 $1,801.57 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 11. Flaggers $1,376.4 Medicare:$26.13, Journey Level RG 0.00 10.00 10.00 9.00 2.00 0.00 0.00 31.00 $44.40 0 Paid Family Hansen (King) Ave CT E#B $1,801.57 Medical Leave: Tacoma,WA- ********* OT 0.00 1.25 0.50 0.00 0.00 0.00 0.00 1.75 $66.60 $116.55 / $0.00/hr $294.00 $111.70 $16.72 $1,353.02 98446 $1,801.57 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Laborers-Underground $1,466.9 Medicare:$24.12, Sewer&Water RG 0.00 0.00 10.00 10.00 8.00 0.00 0.00 28.00 $52.39 2 Paid Family Somnang Hean General Laborer&Topman ****Pacific Hwy S $1,663.40 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.50 2.00 0.00 0.00 0.00 2.50 $78.59 $196.48 / $0.00/hr $227.00 $103.13 $13.01 $1,296.14 98188 $1,663.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184'7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 13. Laborers-Underground Medicare:$40.42, ' Sewer&Water Adrian Juarez- RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $52.39 $523.90 Paid Family General Laborer&Topman Flores $602.49/ Medical Leave: (King) 15502 79th Ave E OT 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 $78.59 $78.59 $2 787 38 $0.00/hr $530.00 $172.82 $28.83 $2,015.31 Puyallup,WA- ***•*_**** 98375 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 8'7 $0.00 14. Power Equipment RG 0.00 10.00 10.00 10.00 8.50 0.00 0.00 38.50 $74.28 $2,859.7 Medicare:$57.75, Operators-Underground 8 Paid Family Sewer&Water Nathan McAllister $111.4 $1,002.7 $3,862.56 Medical Leave: Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 3.00 3.00 3.00 0.00 0.00 0.00 9.00 2 8 / $0.00/hr $788.00 $246.92 $36.14, $2,402.34 Tractors Under 15 Metric Tons Gig Harbor,WA Garnishment: (King) 98335 $148.5 $3,982.56 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ********* 15. Laborers-Underground Medicare:$47.61, RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $53.35 $533.50 Sewer&Water James Polwarth Paid Family Layer 9886 Enterprise LN $613.53/ Medical Leave: ) NW OT 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 $80.03 $80.03 $3 283 29 $0.00/hr $610.00 $203.56 $22.61 $2,399.51 Silverdale,WA- ****__**** 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 0'7 $0.00 16. Flaggers $1,332.0 Medicare:$24.21, RG 0.00 10.00 10.00 9.00 1.00 0.00 0.00 30.00 $44.40 0 Paid Family Journey Level Deinse Stamolis (King) 3909 48th Ave NE $1,669.30 Medical Leave: Tacoma,WA- OT 0.00 1.00 0.50 0.00 0.00 0.00 0.00 1.50 $66.60 $99.90 / $0.00/hr $246.00 $103.49 $21.83 $1,273.77 ********* $1,669.30 98422 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 17. Laborers Medicare:$24.21, RG 0.00 0.00 0.00 0.00 0.00 5.00 0.00 5.00 $47.48 $237.40 Paid Family Control Laborer Deinse Stamolis (King) 3909 48th Ave NE $1,669.30 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $246.00 $103.49 $21.83 $1,273.77 ****.**** 98422 $1,669.30 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 18. Flaggers $1,287.6 Medicare:$20.12, Talonika Summers RG 0.00 10.00 10.00 9.00 0.00 0.00 0.00 29.00 $44.40 0 Paid Family Level 13) 2315 West Ridge $1,387.50 Medical Leave: Ave OT 0.00 1.00 0.50 0.00 0.00 0.00 0.00 1.50 $66.60 $99.90 / $0.00/hr $168.00 $86.03 $18.21 $1,095.14 ****.**** University Place, $1,387.50 WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 19. Laborers Medicare:$29.04, RG 0.00 0.00 0.00 0.00 4.50 0.00 0.00 4.50 $47.48 $213.66 Paid Family Control Laborer Joseph Tountas (King) 20407 30th Ave NE $2,002.59 Medical Leave: Shoreline,WA- OT 0.00 1.00 1.00 2.00- 0.00 0.00 0.00 4.00 $71.22 $284.88 / $0.00/hr $302.00 $124.16 $17.79 $1,529.60 *****'**** 98155 $2,002.59 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 20. Flaggers $1,420.8 Medicare:$29.04, RG 0.00 10.00 10.00 10.00 2.00 0.00 0.00 32.00 $44.40 0 Paid Family Level Joseph Tountas (King) 20407 30th Ave NE $2,002.59 Medical Leave: Shoreline,WA- OT 0.00 0.50 0.75 0.00 0.00 0.00 0.00 1.25 $66.60 $83.25 / $0.00/hr $302.00 $124.16 $17.79 $1,529.60 ********* $2,002.59 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 21. Laborers RG 0.00 10.00 10.00 10.00 7.25 0.00 0.00 37.25 $50.31 $1,874.0 Medicare:$37.02, Traffic Control Supervisor Jesse Williams 5 Paid Family (King) 245 S 78th St $2,553.28 Medical Leave: Tacoma,WA- OT 0.00 4.25 2.25 2.50 0.00 0.00 0.00 9.00 $75.47 $679.23 / $0.00/hr $434.00 $158.30 $19.72 $1,904.24 * x 98408 $2,553.28 $106 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 . $0.00 F700-065-000 certified payroll report-05-09 Employee Benefits Distribution and Signature Certification on Reverse Side w i- Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 • Olympia WA 98504-4540 Today's Printed name of party signing-this report Title Date Tiffani Barquist Contract Administrator 8/26/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ^'wall Avenue NE 8/14/2022 8/20/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Heather Alldredge Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Yolanda Barry ggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Steven Coon Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons ng) 6.Trevor Dietrich Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 7 $0.00 $0.00 $0.00 General Laborer&Topman (King) 7.Chance Erdmann Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons -Ing) 8.Ryan Eubanks Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700 065 000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) N Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Adrian Juarez-Flores Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) ', Nathan McAllister ver Equipment Operators- ^;.derground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons -(King) 15.James Polwarth Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse-Side 16.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 17.Deinse Stamolis _ Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 19.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 20.Joseph Tountas Flaggers '7Jrney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 21.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below-AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ;,-`,Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and 'ning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 9/6/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and a1:,44.. Project Name County Project or Contract# Industries y Prime Contractor Duvall Avenue NE King CAG-20-065 Prevailing Wage Program 'g Subcontractor ❑ PO Box 44540 , . >. Project Address Olympia WA 98504-4540 y� ,sb aQ Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 8/13/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name C7 ~O o Sun Mon Tue Wed Thu Fri Sat Total a> Gross Amount and And a> E 8/7 8/8 8/9 8/10 8/11 8/12 8/13 Total Rate Eamed/Gross Hourly Net Wages E Hours of Pay "Usual FICA Withholding Other a, Payroll Benefits" Tax Soc Sec#of Employee Address CD Ce o o Hours Worked Each Day 0 1. Laborers-Underground $1,571.7 Medicare:$32.48, RG 0.00 0.00 ' 0.00 10.00 10.00 10.00 0.00 30.00 $52.39 Sewer&Water 0 Paid Family Heather Alldredge $2,239.72 Medical Leave: General Laborer&Topman 6818 124th St E (King) Puyallup,WA- OT 0.00 0.00 0.00 2.00 2.50 4.00 0.00 8.50 $78.59 $668.02 / $0.00/hr $399.00 $138.86 $24.84 $1,644.54 98373 $2,239.72 ""«"' DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$'7 $0.00 2. Laborers Medicare:$7.30, Yolanda BarryRG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $50.31 $503.10 Paid Family Control Supervisor (King) 6906 52nd Street Ct $503.10/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $503.10 $0.00/hr $27.00 $31.19 $6.15 $431.46 _ _ _* Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120 6 $0.00 3. Flaggers RG 0.00 0.00 0.00 4.50 7.50 0.50 0.00 12.50 $44.40 $555.00 Medicare:$29.09, Journey Level Virginia Basher Paid Family (King) 6936 E 1st. $1,196.30 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 2.50 0.00 2.50 $66.60 $166.50 / $0.00/hr $343.00 $124.40 $25.65 $1,484.25 ...«*«*** 98404 $2,006.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers J J Medicare:$29.09, RG 0.00 0.00 0.00 6.00 2.00 2.00 0.00 10.00 $47.48 $474.80 J Paid Family Control Laborer Virginia Basher (King) 6936 E 1st. $1,196.30 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $343.00 $124.40 $25.65 $1,484.25 "`*«t«••• 98404 $2,006.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 5. Laborers-Underground Trevor Dietrich RG 0.00 10.00`0.00 0.00 0.00 0.00 0.00 10.00 $52.39 $523.90 Medicare:$45.03, Sewer&Water 20014 53rd Ave E j $1,466.98 $0.00/hr $607.00 $192.54 Paid Family $2,227.15 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side General Laborer&Topman Spanaway,WA- / Medical Leave: (King) 98387 OT 0.00 1.00 0.00 0.00 0.00 11.00 0.00 12.00 $78.59 $943.08 $3,105.58 $33.86 * - **** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4'7 $0.00 6. Truck Drivers Medicare:$27.71, RG 0.00 0.00 0.00 0.00 5.50 0.00 0.00 5.50 $64.55 $355.03 Paid Family Truck&Trailer Ryan Eubanks (King) 13633 Olympic De. $355.03/ Medical Leave: * ** SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $1,910.51 $0.00/hr $172.00 $118.45 $22.66 $1,569.69 Olalla,WA-98359 $129.1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 $0.00 7. Truck Drivers RG 0.00 0.00 9.00 0.00 0.00 0.00 0.00 9.00 $63.71 $573.39 Medicare:$52.46, Dump Truck Paid Family (King) Chris Grove Medical Leave: *** Berger Ln OT 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $95.57 $95.57 $733.51 / $0.00/hr $698.00 $224.28 $23.15, $2,448.11 * _ _ ** Port Orchard,WA- $3,617.39 Garnishment: 98366 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $12'4 $171.39 $0.00 8. Truck Drivers RG 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $64.55 $64.55 Medicare:$52.46, Dump Truck&Trailer Paid Family Chris Grove (King) Medical Leave: **Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $733.51 / $23.15, * _ _ ** Port Orchard,WA- $3,617.39 $0.00/hr $698.00 $224.28 Garnishment: $2,448.11 98366 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120 $171.39 9.1 $0.00 9. Flaggers $1,776.0 Medicare:$36.85, RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $44.40 Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $2,541.90 Medical Leave: Tacoma,WA- OT 0.00 0.50 0.00 1.00 0.00 10.00 0.00 11.50 $66.60 $765.90 / $0.00/hr $471.00 $157.59 $21.95 $1,854.51 *** ****** $2,541.90 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 10. Laborers-Underground $2,095.6 Medicare:$50.89, Sewer&Water RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman **Pacific Hwy S $1,414.6 $3,510.22 Medical Leave: (King) Des Moines,WA- OT 0.00 1.00 1.00 2.00 2.00 12.00 0.00 18.00 $78.59 2 / $0.00/hr $664.00 $217.64 $24.73 $2,552.96 98188 $3,510.22 *`**`"** $147 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ . $0.00 11. Flaggers Medicare:$9.02, RG 0.00 4.00 0.00 0.00 0.00 10.00 0.00 14.00 $44.40 $621.60 Journey Level Diago Hunter Paid Family (King) 7620 S.Alaska $621.60/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $621.60 $0.00/hr $41.00 $38.54 $8.31 $524.73 * * * *** 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971.2 Medicare:$80.12, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 1.00 1.00 2.00 2.50 14.00 0.00 20.50 $111.4 $2,284.1 $5,255.31 $1,313.0 $48.56, Tractors Under 15 Metric Tons Gig Harbor,WA- 2 1 / $0.00/hr 0 $342.56 Garnishment: $3,289.66 (King) 98335 $5,525.31 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168'5 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 13. Power Equipment $2,891.2 Medicare:$67.86, Operators-Underground RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 0 Paid Family Sewer&Water Jason Metzner Medical Leave: Shovel, Excavator,Backhoe, 9117 24th Ave E OT 0.00 1.00 1.00 2.00 2.00 10.50 0.00 16.50 $108.4 $1,788.9 $4,680.13 $1,075.0 $41.75 2 3 / $0.00/hr $290.16 $3,205.36 Tractors Under 15 Metric Tons Tacoma,WA- $4,680.13 0 (King) 98445 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 $0.00 x****xxxx 14. Power Equipment J `► Medicare:$52.23, RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $72.28 '$722.80 Operators-Underground ! Paid Family Sewer&Water Jason Sniezak $108 V Medical Leave: Shovel, Excavator,Backhoe, 16448 Cougar OT 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 2 $108.42 $831.22/ $0.00/hr $514.00 $223.35 $36.51,Health: $2,776.38 Tractors Under 15 Metric Tons Village Ln SE $4,028.47 $426.00 (King) Yelm,WA-98597 $144.5 - DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 *xx**_xxxx ',,1 -1Flaggers $1,332.0 Medicare:$20.28, I ne Level RG 0.00 10.00 10.00 10.00 0.00 0.00 0.00 30.00 $44.40 0 Paid Family Y 3909 e4 th Ave $1,398.60 Medical Leave: hi��9) 3909 48th Ave NE Tacoma,WA- OT 0.00 0.50 0.00 0.50 0.00 0.00 0.00 1.00 $66.60 $66.60 / $0.00/hr $187.00 $86.72 $18.46 $1,086.14 x ..xxxx 98422 $1,398.60 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 16. Flaggers $1,576.2 Medicare:$23.82, RG 0.00 6.50 9.00 0.00 10.00 10.00 0.00 35.50 $44.40 Journey Level Talonika Summers 0 Paid Family (King) 2315 West Ridge $1,642.80 Medical Leave: Ave OT 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 $66.60 $66.60 / $0.00/hr $224.00 $101.85 $21.73 $1,271.40 University Place, $1,642.80 WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 17. Flaggers RG 0.00 10.00 10.00 6.25 10.00 0.00 0.00 36.25 $44.40 $1,609.5 Medicare:$39.11, Journey Level Joseph Tountas 0 Paid Family (King) 20407 30th Ave NE $2,697.05 Medical Leave: Shoreline,WA- OT 0.00 0.50 0.25 0.00 0.00 10.50 0.00 11.25 $66.60 $749.25 / $0.00/hr $469.00 $167.22 $22.79 $1,998.93 ***** x** 98155 $2,697.05 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 18. Laborers Medicare:$39.11, RG 0.00 0.00 0.00 3.75 0.00 0.00 0.00 3.75 $47.48 $178.05 Paid Family Control Laborer Joseph Tountas I',_.,-0) 20407 30th Ave NE $2,697.05 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.25 $71.22 $160.25 / $0.00/hr $469.00 $167.22 $22.79 $1,998.93 ****x**x* 98155 $2,697.05 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 19. Laborers $1,886.6 Medicare:$37.19, RG 0.00 0.00 7.50 10.00 10.00 10.00 0.00 37.50 $50.31 3 Paid Family Traffic Control Supervisor Jesse Williams $2,433.78 Medical Leave: (King) 245 S 78th St OT 0.00 0.00 0.75 2.75 1.50 2.25 0.00 7.25 $75.47 $547.16 / $0.00/hr $437.00 $159.02 $20.14 $1,911.57 Tacoma,WA- * *x 98408 $2,564.92 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $12'6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 8/25/2022 . The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 8/7/2022 8/13/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Heather Alldredge Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 2.Yolanda Barry borers ...ffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Trevor Dietrich Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ,not) 6.Ryan Eubanks Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) • 8.Chris Grove lck Drivers np Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 '(King) F7OO-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 11.Diago Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1. ng) 12.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 13.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons :ng) 14.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 15.Deinse Stamolis Flaggers $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Journey Level F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) 16.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 • (King) 17.Joseph Tountas F'tiggers ,urney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 18.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 19.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 i9) F7OO-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. «?Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and 'ping Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist • MB 9/6/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and `. ?�r,G Project Name County Project or Contract# Industries ^0:�' 't,;;4 Prime Contractor L] Duvall Avenue NE King CAG-20-065 Prevailing Wage Program < �. , ;i = ; �i. itC Subcontractor ❑ PO Box 44540 ':,;y',� ��-4 Project Address Olympia WA 98504-4540 "Na Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 8/6/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name C7 ~O o Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And E 7/31 8/1 8/2 8/3 8/4 8/5 8/6 Total Rate Earned/Gross Wages Hourly Net E F= Hours of Pay "Usual FICA Withholding Other Soc Sec#of Employee Address cll o o Hours Worked Each Day gyro Benefits" Tax 0 1. Flaggers RG 0.00 10.00 10.00 9.00 0.00 0.00 0.00 29.00 $44 40 $1,287. Medicare:$39.53, Journey Level Yolanda Barry p \ Paid Family (King) 6906 52nd Street Ct J $2,671.23 Medical Leave: E#30 OT 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $66.60 $66.60 / $0.00/hr $476.00 $169.04 $32.43 $2,009.45 * _ _ •* Puyallup,WA- $2,726.45 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers Medicare:$39.53, Yolanda BarryRG 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $50.31 $50.31 Paid Family Control Supervisor (King) 6906 52nd Street Ct $2,671.23 Medical Leave: E#30 OT 0.00 0.00 1.00 1.00 0.00 0.00 0.00 2.00 $75.47 $150.94 / $0.00/hr $476.00 $169.04 $32.43 $2,009.45 x _ _ Puyallup,WA- $2,726.45 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�0.6 $0.00 3. Laborers RG 0.00 0.00 0.00 0.00 10.00 0.00 0.00 10.00 $47.48 $474.80 Medicare:$39.53, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $2,671.23 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 9.00 0.00 9.00 $71.22 $640.98 / $0.00/hr $476.00 $169.04 $32.43 $2,009.45 Puyallup,WA- $2,726.45 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Laborers Medicare:$25.18, RG 0.00 1.00 1.50 2.00 0.00 0.00 0.00 4.50 $47.48 $213.66 Paid Family Traffic Control Laborer Virginia Basher - (King) 6936 E I st. $1,226.07 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $71.22 $35.61 / $0.00/hr $279.00 $107.67 $22.72 $1,302.10 98404 '$1,736.67 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 5. Flaggers Virginia Basher RG 0.00 9.00 8.50 4.50 0.00 0.00 0.00 22.00 $44.40 $976.80 Medicare:$25.18, 6936 E 1st. $1,226.07 $0.00/hr $279.00 $107.67 Paid Family $1,302.10 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Journey Level Tacoma,WA- / Medical Leave: (King) 98404 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,736.67 $22.72 ***-**-**** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 6. Truck Drivers RG 0.00 0.00 5.75 6.25 0.00 0.00 0.00 12.00 $63.71 $764.52 Medicare:$43.51, Dump Truck Paid Family (King) Eric Ellis $764.52/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $3,000.52 $0.00/hr $542.00 $186.03 $20.79 $2,208.19 +* *+*+** Algona,WA-98001 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $12'4 $0.00 7. Truck Drivers RG 0.00 7.25 0.00 0.00 6.00 0.50 0.00 13.75 $64.55 $887.56 Medicare:$33.49, Dump Truck&Trailer Paid Family Chris Grove (King) Medical Leave: ***Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $887.56/ $0.00/hr $376.00 $143.21 $17.38, $1,568.40 ****.**** Port Orchard,WA- i $2,309.87 Garnishment: 98366 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $10 29'1 $171.39 $0.00 8. Flaggers RG 0.00 10.00 10.00 10.00 9.50 0.50 0.00 40.00 $44.40 $1,776.0 Medicare:$34.45, Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $2,375.40 Medical Leave: Tacoma,WA- ********* OT 0.00 0.00 0.50 0.00 0.00 8.50 0.00 9.00 $66.60 $599.40 / $0.00/hr $431.00 $147.28 $20.88 $1,741.79 98446 $2,375.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 9. Laborers-Underground $2,095.6 Medicare:$43.49, Sewer&Water RG 0.00 10.00 10.00 10.00 9.50 0.50 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman *****Pacific Hwy S $2,999.39 Medical Leave: (King) Des Moines,WA- OT 0.00 0.50 1.50 1.00 0.00 8.50 0.00 11.50 $78.59 $903.79 / $0.00/hr $542.00 $185.96 $21.96 $2,205.98 98188 $2,999.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$.7 $0.00 10. Flaggers Medicare:$11.91, RG 0.00 0.00 0.00 0.00 9.50 9.00 0.00 18.50 $44.40 $821.40 Journey Level Diago Hunter Paid Family (King) 7620 S.Alaska $821.40/ Medical Leave: ********* Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $821.40 $0.00/hr $65.00 $50.93 $10.97 $682.59 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 .. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971.2 Medicare:$68.37, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 0.50 1.50 1.00 1.00 9.50 0.00 13.50 $111.4 $1,504.1 $4,475.37 $1,030.0 $42.31, Gig 2 7 $0.00/hr 0 $292.36 Garnishment: $2,830.92 Tractors Under 15 Metric Tons Harbor,WA- (King) 98335 $4,715.37 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168'5 $0.00 12. Laborers Medicare:$47.64, Pipe Layer Lead RG 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 $54.01 $540.10 Paid Family Shaun McNally (King) 15010 113th Ave E $621.12/ Medical Leave: ********* Puyallup,WA- OT 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $81.02 $81.02 $3,286.09 $0.00/hr $700.00 $203.74 $22.06 $2,312.65 98374 $108.0 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 13. Power Equipment RG 0.00 10.00 8.00 10.00 9.50 2.50 0.00 40.00 $72.28 $2,891{2 Medicare:$54.50, Operators-Underground O,V 1 Paid Family Sewer&Water Jason Sniezak $108 J V Medical Leave: Shovel,Excavator,Backhoe, 16448 Cougar OT 0.00 0.50 0.00 1.00 0.00 6.50 0.00 8.00 $867.36 $3,758.56 $34.64 Tractors Under 15 Metric Tons Village Ln SE 2 / $0.00/hr $549.00 $233.03 $2,887.39 $3,758.56 (King) Yelm,WA-98597 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 xx r +r:rx 14. Flaggers RG 0.00 10.00 10.00 10.00 9.50 0.50 0.00 40.00 $44.40 $1,776.0 Medicare:$34.44, Journey Level Deinse Stamolis 0 Paid Family (King) 3909 48th Ave NE $2,375.40 Medical Leave: Toma,WA- OT 0.00 0.00 0.50 0.00 0.00 8.50 0.00 9.00 $66.60 $599.40 / $0.00/hr $412.00 $147.27 $29.81 $1,751.88 ac Taco2 $2,375.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 15. Laborers Medicare:$36.35, RG 0.00 1.00 0.25 1.00 0.00 0.00 0.00 2.25 $47.48 $106.83 ,F--"ic Control Laborer Paid Family Joseph Tountas 1 ~'i) 20407 30th Ave NE $2,506.97 Medical Leave: WA- OT 0.00 0.00 0.75 1.00 0.00 0.00 0.00 1.75 $71.22 $124.64 / $0.00/hr $423.00 $155.43 $21.62 $1,870.57 Shoreline, S8155 $2,506.97 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 16. Flaggers RG 0.00 9.00 9.75 9.00 10.00 0.00 0.00 37.75 $44.40 $1,676.1 Medicare:$36.35, Journey Level Joseph Tountas 0 Paid Family (King) 20407 30th Ave NE $2,506.97 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 9.00 0.00 9.00 $66.60 $599.40 / $0.00/hr $423.00 $155.43 $21.62 $1,870.57 Shore . .. Shore $2,506.97 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 17. Laborers $1,509.3 Medicare:$27.90, RG 0.00 10.00 10.00 10.00 0.00 0.00 0.00 30.00 $50.31 0 Paid Family Traffic Control Supervisor Jesse Williams (King) 245 S 78th St $1,924.39 Medical Leave: WA- OT 0.00 0.00 3.00 2.50 0.00 0.00 0.00 5.50 $75.47 $415.09 / $0.00/hr $284.00 $119.32 $15.13 $1,478.04 Tacoma, 98408 $1,924.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 00.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 8/12/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 7/31/2022 8/6/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry Laborers iffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side .rp • 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 tkanco s.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Chris Grove Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Jeana Hansen Flaggers Q,irney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 i (King) 9.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Diago Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons 'rig) 12.Shaun McNally Laborers Pipe Layer Lead $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 16.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 17.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 _ (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and fling Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 8/15/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ,��re. Project Name County Project or Contract# �':`" Prime Contractor XI Industries Duvall Avenue NE King CAG-20-065 Prevailing Wage Program -lilt' =:""= Subcontractor ❑ i' tll'` Project Address PO Box 44540 "'',t isi .' j Olympia WA 98504-4540 H� '"""a Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 7/30/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name C7 ~O o Sun Mon Tue Wed Thu Fri Sat Total a) Gross Amount and And m E 7/24 7/25 7/26 7/27 7/28 7/29 7/30 Total Rate Earned/Gross Hourly Net Wages .E a Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address O o Hours Worked Each Day Benefits" Tax a 1. Flaggers $1,221.0 Medicare:$19.19, RG 0.00 10.00 7.50 10.00 0.00 0.00 0.00 27.50 $44.40 0 Paid Family Level Virginia Basher (King) 6936 E 1st. $1,323.21 Medical Leave: Tacoma,WA- OT 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 $66.60 $66.60 / $0.00/hr $188.00 $82.04 $17.33 $1,016.65 * ** 98404 $1,323.21 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers Medicare:$19.19, RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $47.48 $0.00 Paid Family Control Laborer Virginia Basher (King) 6936 E 1st. $1,323.21 Medical Leave: Tacoma,WA- OT 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 $71.22 $35.61 / $0.00/hr $188.00 $82.04 $17.33 $1,016.65 * '* 98404 $1,323.21 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 3. Truck Drivers RG 0.00 7.00 0.00 6.50 4.00 0.00 0.00 17.50 $63.71 $1,114.9 Medicare:$28.53, Dump Truck Ryan Eubanks 3 Paid Family (Pierce) 13633 Olympic De. $1,114.93 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $178.00 $122.02 $24.77 $1,614.74 * ** Olalla,WA-98359 $1,968.06 $12 7.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24. $0.00 24. Truck Drivers RG 0.00 0.00 2.75 0.00 0.00 0.00 0.00 2.75 $63.71 $175.20 Medicare:$36.58, Dump Truck Chris Grove Granishment: (King) ****Berger Ln $1,466.20 $73.58 Port Orchard,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $427.00 $156.41 $1,829.23 * ** 98366 $2,522.80 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 2'4 $0.00 5. Truck Drivers Chris Grove $1,291.0 Medicare:$36.58, ****Berger Ln RG 0.00 4.50 0.00 7.25 8.25 0.00 0.00 20.00 $64.55 0 $1,466.20 $0.00/hr $427.00 $156.41 Granishment: $1,829.23 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Dump Truck&Trailer Port Orchard,WA- / $73.58 (King) 98366 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $2,522.80 kit ir- - «« DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1209'1 $0.00 6. Flaggers $1,753.8 Medicare:$31.60, RG 0.00 10.00 8.00 10.00 8.00 3.50 0.00 39.50 $44.40 Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $2,179.45 Medical Leave: Tacoma,WA- OT 0.00 1.00 0.00 0.00 0.00 4.50 0.00 5.50 $66.60 $366.30 / $0.00/hr $384.00 $135.12 $19.59 $1,609.14 ««''..... 98446 $2,179.45 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 7. Laborers Medicare:$31.60, RG 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $47.48 $23.74 Traffic Control Laborer Jeana Hansen Paid Family (King) Ave CT E#B $2,179.45 Medical Leave: Tacoma,WA- OT 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 $71.22 $35.61 / $0.00/hr $384.00 $135.12 $19.59 $1,609.14 «««.«+««« 98446 $2,179.45 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 _aborers-Underground J $2 095 Medicare:$35.52, Sewer&Water RG 0.00 10.00 10.00 9.50 8.50 2.00 0.00 40.00 $52.39 '0 16 J Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $2,449.26 Medical Leave: (King) Des Moines,WA- OT 0.00 0.50 0.00 0.00 0.00 4.00 0.00 4.50 $78.59 $353.66 / $0.00/hr $410.00 $151.85 $18.98 $1,832.91 98188 $2,449.26 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4'7 $0.00 9. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971.2 Medicare:$60.29, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: $1114 $3,918.27 Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.50 0.00 0.00 0.00 8.00 0.00 8.50 2 ' $947.07 / $0 $38.07, Tractors Under 15 Metric Tons Gig Harbor,WA- .00/hr $844.00 $257.81 Garnishment: $2,506.96 (King) 98335 $4,158.27 $451.14 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168.5 $0.00 10. Power Equipment RG 0.00 10.00 10.00 8.00 8.50 3.50 0.00 40.00 $72.28 $2,891.2 Medicare:$46.64, Operators-Underground 0 Paid Family Sewer&Water Jason Metzner Medical Leave: $108.4 $3,216.46 Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.50 0.00 0.00 0.00 2.50 0.00 3.00 2 ' $325.26 $30.46 Tractors Under 15 Metric Tons Tacoma,WA- / $0.00/hr $613.00 $199.42 $2,326.94 g) 98445 $3,216.46 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 $0.00 11. Power Equipment RG 0.00 10.00 10.00 8.00 8.50 3.50 0.00 40.00 $72.28 $2,891.2 Medicare:$41.33, Operators-Underground 0 Paid Family Sewer&Water Jason Sniezak Medical Leave: $108 4 $3,216.46 Shovel,Excavator,Backhoe, 16448 Cougar OT 0.00 0.50 0.00 0.00 0.00 2.50 0.00 3.00 2 ' $325.26 / $0.00/hr $349.00 $176.71 $30.47,Health: Tractors Under 15 Metric Tons Village Ln SE $366.36 $2,252.59 (King) Yelm,WA-98597 $3,216.46 $145 « «« DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 ' $0.00 12. Laborers Medicare:$29.96, Deinse Stamolis RG 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $47.48 $23.74 Paid Family Control Laborer 3909 48th Ave NE $2,066.14 (King) Tacoma,WA- / $0.00/hr $337.00 $128.10 Medical Leave: $1,544.34 98422 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $2,066.14 $26.74 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 13. Flaggers $1,776.0 Medicare:$29.96, RG 0.00 10.00 8.00 10.00 8.00 4.00 0.00 40.00 $44.40 Paid Family Level Deinse Stamolis 0 (King) 3909 48th Ave NE $2,066.14 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 4.00 0.00 4.00 $66.60 $266.40 / $0.00/hr $337.00 $128.10 $26.74 $1,544.34 ********* $2,066.14 98422 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 14. Flaggers RG 0.00 10.00 0.00 0.00 8.00 8.00 0.00 26.00 $44.40 $1,154.4 Medicare:$16.74, Journey Level Talonika Summers 0 Paid Family (King) 2315 West Ridge $1,154.40 Medical Leave: Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $117.00 $71.57 $15.41 $933.68 ***_****** University Place, _ _ $1,154.40 WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 „tF Flaggers $1,509.6 Medicare:$21.89, ne LevelRG 0.00 0.00 8.00 10.00 8.00 8.00 0.00 34.00 $44.40 0 Paid Family Y Joseph47 Aves $1,509.60 Medical Leave: t-" �3) 20407 30th Ae NE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $193.00 $93.60 $14.48 $1,186.63 **** Shoreline,WA- 98155 $1,509.60 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 16. Laborers RG 0.00 10.00 8.50 10.00 9.00 2.50 0.00 40.00 $50.31 $2 012.4 Medicare:$38.21, 0 Traffic Control Supervisor Jesse Williams Paid Family (King) 245 S 78th St J $2,635.03 Medical Leave: Tacoma,WA- OT 0.00 1.75 0.00 0.00 0.00 6.50 0.00 8.25 $75.47 $622.63 / $0.00/hr $454.00 $163.37 $20.57 $1,958.88 ********* $2,635.03 98408 $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 8/5/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 7/24/2022 7/30/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F ) 1.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Virginia Basher Laborers affic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • 4.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Chris Grove Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -r1(ng) ) 6.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Somnang Hean Laborers-Underground Sewer& ater neral Laborer&To man $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 p (King) 9.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 12.Deinse Stamolis Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 16.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. !c' Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and `ning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 8/10/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and �,�r'.�!'"!:o� Prime Contractor x❑ Project Name County Project or Contract# Industries is 1''Mr Duvall Avenue NE King CAG-20-065 Prevailing Wage Program Vila + 4 Subcontractor ❑ PO Box 44540 ",k;�' aay" Project Address Olympia WA 98504-4540 � '"�� ' Final Week of (360) 902-5335 Payroll ❑ • Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 7/23/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions ip Work Classification Name 6' ~O 2- Sun Mon Tue Wed Thu Fri Sat Total rze and And Gross Amount 7/17 7/18 7/19 7/20 7/21 7/22 7/23 Total Rate Hourly Earned/Gross Net Wages = Hours of Pay Payroll "Usual FICA Withholdingf a) Other Soc Sec#of Employee Address o o Hours Worked Each Day Benefits" Tax a 1. Flaggers `I J Medicare:$38.30, Yolanda BarryRG 0.00 7.25 10.00 0.00 0.00 0.00 0.00 17.25 $44.40 $765.90 Paid Family Level J (King) 6906 52nd Street Ct J J $799.20/ Medical Leave: E#30 OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $66.60 $33.30 $2 641.55 $0.00/hr $456.00 $163.77 $30.71 $1,952.77 ********* Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Laborers Medicare:$10.67, RG 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 $47.48 $47.48 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $735.68/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $735.68 $0.00/hr $74.00 $45.61 $9.79 $595.61 ***_.r*** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 3. Flaggers Medicare:$10.67, RG 0.00 3.00 0.00 5.00 0.00 7.50 0.00 15.50 $44.40 $688.20 Paid Family Level Virginia Basher (King) 6936 E I st. $735.68/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $735.68 $0.00/hr $74.00 $45.61 $9.79 $595.61 ***--*'**** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Truck Drivers RG 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 $64.55 $516.40 Medicare:$47.41, Dump Truck&Trailer Paid Family Kin Chris Grove Medical Leave: ( g) * $1,511.90 ***Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 / $0.00/hr $606.00 $202.72 $24.86, $2,302.66 ********* Port Orchard,WA- - - $3,269.63 Garnishment: 98366 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 p'1 $0.00 $85.98 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers Medicare:$47.41, RG 0.00 0.00 7.00 0.00 0.00 0.00 0.00 7.00 $63.71 $445.97 Dump Truck Paid Family $1,511.90(King) Chris Grove Medical Leave: ****Berger Ln OT 0.00 0.00 0.75 0.00 0.00 5.00 0.00 5.75 $95.57 $549.53 / $0.00/hr $606.00 $202.72 $24.86, $2,302.66 * ****** Port Orchard,WA- $3,269.63 Garnishment: 98366 $127.4 $85.98 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 6. Laborers Medicare:$35.00, RG 0.00 0.00 0.00 0.50 0.50 0.00 0.00 1.00 $47.48 $47.48 Traffic Control Laborer Jeana Hansen Paid Family (King) Ave CT E#B $2,414.09 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.50 $71.22 $35.61 / $0.00/hr $441.00 $149.68 $21.09 $1,767.32 ***-**-**** 98446 $2,414.09 . DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 7. Flaggers $1,731.6 Medicare:$35.00, JourneyLevel RG 0.00 10.00 10.00 9.50 9.50 0.00 0.00 39.00 $44.40 0 Paid Family Jeana CT Hansen $2,414.09 Medical Leave: 9) Ave E#B OT 0.00 0.50 0.50 0.00 0.00 8.00 0.00 9.00 $66.60 $599.40 / $0.00/hr $441.00 $149.68 $21.09 $1,767.32 Tacoma,WA- ***2,....,.,* 98446 $2,414.09 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 8. Laborers-Underground $2,095.6 Medicare:$41.78, RG 0.00 10.00 10.00 10.00 8.50 1.50 0.00 40.00 $52.39 Sewer&Water 0 Paid Family Somnang Hean $2,881.50 Medical Leave: General Laborer&Topman *****Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.50 1.00 1.00 0.00 7.50 0.00 10.00 $78.59 $785.90 / $0.00/hr $513.00 $178.66 $21.32 $2,126.74 98188 $2,881.50 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4'7 $0.00 9. Flaggers RG 0.00 0.00 10.00 8.50 0.00 0.00 0.00 18.50 $44.40 $821.40 Medicare:$19.47, Journey Level Diago Hunter Paid Family (King) 7620 S.Alaska $845.14/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,342.76 $0.00/hr $156.00 $83.25 $17.61 $1,066.43 ********* 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 10. Laborers Medicare:$19.47, RG 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 $47.48 $23.74 Paid Family Traffic Control Laborer Diago Hunter Medical Leave: (King) 7620 S.Alaska $845.14/ Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1,342.76 $0.00/hr $156.00 $83.25 $17.61 $1,066.43 *** **** 98409 - DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 _ 11. Power Equipment RG 0.00 10.00 10.00 10.00 9.50 0.50 0.00 40.00 $74.28 $2,971.2 Medicare:$65.83, Operators-Underground 0 Garnishment: Sewer&Water Nathan McAllister $451.41,Paid $111.4 $1,448.4 $4,419.66 Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 1.00 1.00 1.50 0.00 9.50 0.00 13.00 2 6 / $0.00/hr $968.00 $281.46 Family Medical $2,732.38 Tractors Under 15 Metric Tons Gig Harbor,WA- Leave:$40.58 (King) 98335 $4,539.66 $1685 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 . $0.00 • 12. Power Equipment Jason Metzner $2,891.2 Medicare:$56.86 RG 0.00 10.00 10.00 10.00 8.00 2.00 0.00 40.00 $72.28 Operators-Underground 0 9117 24th Ave E $3,921.19 Sewer&Water Tacoma,WA $108.4 $1,029.9 / $0.00/hr $821.00 $243.12 $2,800.21 Shovel, Excavator,Backhoe, 98445 OT 0.00 0.50 1.00 1.00 0.00 7.00 0.00 9.50 2 g $3,921.19 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Tractors Under 15 Metric Tons (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 $0.00 ********* 13. Power Equipment $2,891.2 Medicare:$50.74, Operators-Underground RG 0.00 10.00 10.00 10.00 8.00 2.00 0.00 40.00 $72.28 0 Paid Family Sewer&Water Jason Sniezak Medical Leave: Shovel,Excavator,Backhoe, 16448 Cougar OT 0.00 0.50 1.00 1.00 0.00 7.00 0.00 9.50 $108.4 $1,029.9 $3 921.19 $35.90,Health: Tractors Under 15 Metric Tons Village Ln SE 2 9 / $0.00/hr $492.00 $216.97 $2,703.84 $421.74 $3,921.19 (King) Yelm,WA-98597 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ********* 14. Flaggers RG 0.00 10.00 10.00 9.50 8.50 1.00 0.00 39.00 $44.40 $1,731.6 Medicare:$34.04 Journey Level Deinse Stamolis 0 $2,347.49 (King) 3909 48th Ave NE ' Tacoma,WA- OT 0.00 0.50 0.50 0.00 0.00 7.00 0.00 8.00 $66.60 $532.80 / $0.00/hr $405.00 $145.55 $1,762.90 ********* $2,347.49 98422 - DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 15. Laborers Medicare:$34.04 RG 0.00 0.00 0.00 0.50 0.50 0.00 0.00 1.00 $47.48 $47.48 Traffic Control Laborer Deinse Stamolis (King) 3909 48th Ave NE $2,347.49 Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.50 $71.22 $35.61 / $0.00/hr $405.00 $145.55 $1,762.90 ********* 98422 $2,347.49 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 16. Flaggers RG 0.00 0.00 0.00 10.00 0.00 8.50 0.00 18.50 $44.40 $821.40 Medicare:$11.91, Journey Level Talonika Summers Paid Family (King) 2315 West Ridge $821.40/ Medical Leave: Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $821.40 $0.00/hr $75.00 $50.93 $10.97 $672.59 * _ ***** University Place, WA-98466 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 17. Flaggers RG 0.00 10.00 10.00 10.00 8.50 0.00 0.00 38.50 $44.40 $1,709.4 Medicare:$25.51, Journey Level Joseph Tountas 0 Paid Family (King) 20407 30th Ave NE $1,759.35 Medical Leave: Shoreline,WA- OT 0.00 0.50 0.25 0.00 0.00 0.00 0.00 0.75 $66.60 $49.95 / $0.00/hr $248.00 $109.08 $16.72 $1,360.04 ********* $1,759.35 98155 , DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 To'Laborers RG 0.00 10.00 10.00 10.00 9.00 1.00 0.00 40.00 $50.31 $2,012 4 Medicare:$39.58, Traffic Control Supervisor Jesse Williams J 0`� `� Paid Family (King) 245 S 78th St $2,729.37 Medical Leave: Tacoma,WA- OT 0.00 1.00 0.50 0.00 0.00 8.00 0.00 9.50 $75.47 $716.97 / $0.00/hr $477.00 $169.22 $21.11 $2,022.46 ****.**** 98408 - $2,729.37 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 • Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 7/29/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 7/17/2022 7/23/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other _ "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Virginia Basher Laborers affic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • 4.Chris Grove • Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 „ 0 ing) i 6.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Somnang Hean Laborers-Underground Sewer& ater ;neral Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Diago Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F7OO-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Diago Hunter Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons ing) 12.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 13.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons 'ing) 14.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Deinse Stamolis Laborers $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Traffic Control Laborer F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) 16.Talonika Summers Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 17.Joseph Tountas 5aggers gurney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 18.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)AU information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (F. Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 8/2/22 • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ��I,is1'A�t,°� Prime Contractor ❑x Project Name County Project or Contract# Industries a"••' "`� Duvall Avenue NE 0. 1; •ii; King CAG-20-065 Prevailing Wage Program <ss.. •%"' I=`x Subcontractor ❑ w`'•{' ''s Project Address PO Box 44540 k t ao' 1 Olympia WA 98504-4540 Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 7/16/2022 1055 S GRADY WAY RENTON,WA-98055 " 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions F= Work Classification Name c9 010' o Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And a) E 7/10 7/11 7/12 7/13 7/14 7/15 7/16 Total Rate Earned/Gross Hourly Net Wages j E R. Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address m CD - y Benefits" Tax o o Hours Worked Each Day 0 1. Laborers Medicare:$27.77, . Yolanda BarryRG 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Paid Family Traffic Control Laborer (King) 6906 52nd Street Ct $1,914.59 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 $71.22 $35.61 / $0.00/hr $282.00 $118.71 $25.09 $1,461.02 **** **** Puyallup,WA- $1,914.59 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 2. Flaggers RG 0.00 10.00 10.00 9.00 10.00 0.00 0.00 39.00 $44.40 $1,731.6 Medicare:$27.77, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,914.59 Medical Leave: E#30 OT 0.00 0.00 1.50 0.00 0.00 0.00 0.00 1.50 $66.60 $99.90 / $0.00/hr $282.00 $118.71 $25.09 $1,461.02 ********* Puyallup,WA- $1,914.59 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers RG 0.00 8.50 9.00 10.00 3.00 0.00 0.00 30.50 $44.40 $1,354.2 Medicare:$24.07, Journey Level Virginia Basher 0 Paid Family (King) 6936 E I st. $1,532.25 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $263.00 $102.94 $20.52 $1,249.82 ** *.**** 98404 $1,660.35 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$24.07, RG 0.00 0.50 1.00 0.00 0.00 0.00 0.00 1.50 $47.48 $71.22 Traffic Control Laborer Virginia Basher Paid Family (King) 6936 E I st. $1,532.25 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.50 $71.22 $106.83 / $0.00/hr $263.00 $102.94 $20.52 $1,249.82 **.*,**** 98404 $1,660.35 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 5. Power Equipment Steven Coon Medicare:$65.39, RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $72.28 $722.80 Operators-Underground 18024 113th St E $885.43/ $0.00/hr $986.00 $279.58 Paid Family $3,155.59 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • Sewer&Water Bonney Lake,WA- $108.4 $4,509.43 Medical Leave: Shovel,Excavator,Backhoe, 98391 OT 0.00 1.50 0.00 0.00 0.00 0.00 0.00 1.50 2 $162.63 $22.87 Tractors Under 15 Metric Tons (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 $0.00 ********* 6. Laborers-Underground Medicare:$47.32, RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $52.39 $523.90 Paid Family &Water Trevor Dietrich Medical Leave: General Laborer&Topman 20014 53rd Ave E $641.79/ (King) Spanaway,WA- OT 0.00 1.50 0.00 0.00 0.00 0.00 0.00 1.50 $78.59 $117.89 $3,263.55 $0.00/hr $645.00 $202.34 $35.09 $2,333.80 98387 $104.7 * `" **" DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 $0.00 7. Truck Drivers Medicare:$57.01, RG 0.00 0.00 0.75 0.00 0.00 0.00 0.00 0.75 $64.55 $48.41 Dump Truck&Trailer Paid Family (King) Eric Ellis $48.41/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $3,931.73 $0.00/hr $798.00 $243.77 $25.59 $2,807.36 ********* Algona,WA-98001 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $129.1 $0.00 8. Power Equipment Medicare:$68.41, Operators-Underground RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $74.28 $742.80 Paid Family Sewer&Water Chance Erdmann Medical Leave: 2331 Greenfield ST OT 0.00 1.50 0.00 0.00 0.00 0.00 0.00 1.50 $111.4 $$167.13 909,93/ $23.13 Shovel, Excavator,Backhoe, SE 2 $0.00/hr $835.00 $292.52 $3,499.00 Tractors Under 15 Metric Tons Olympia,WA- $4,718.06 (King) 98501 $148.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 * ******* 9. Truck Drivers - Medicare:$29.09, RG 0.00 0.00 7.25 0.00 0.00 0.00 0.00 7.25 $63.71 $461.90 Paid Family Dump Truck Ryan Eubanks (Pierce) 13633 Olympic De. $461.90/ Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $2 005.80 ********* $0.00/hr $183.00 $124.36 $21.19 $1,648.16 Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 10. Truck Drivers Medicare:$54.72, RG 0.00 4.50 1.00 0.00 0.00 0.00 0.00 5.50 $64.55 $355.03 Paid Family Dump Truck&Trailer (King) Chris Grove Medical Leave: "*""Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $355.03/ $0.00/hr $748.00 $233.98 $27.08, $2,538.81 ***_**_**** Port Orchard,WA- $3,773.98 Garnishment: 98366 $129.1 $171.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 $0.00 11. Power Equipment Medicare:$65.49, Operators-Underground RG 0.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00 $72.28 $722.80 Paid Family Sewer&Water Travis Haney Medical Leave: Shovel, Excavator,Backhoe, ****169th Ave E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 2.4 $0.00 $722.80/ $22.86 Tractors Under 15 Metric Tons Lake Tapps,WA- $4,516.68 $0.00/hr $906.00 $280.03 $3,242.30 (King) 98391 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $144.56 $0.00 * *** 12. Flaggers $1,731.6 Medicare:$38.94, Jeana Hansen RG 0.00 10.00 9.00 10.00 10.00 0.00 0.00 39.00 $44.40 Journey Level Ave CT E#B 0 $2,685.11 Paid Family (King) Tacoma,WA- / $0.00/hr $506.00 $166.47 Medical Leave: $1,950.91 98446 OT 0.00 1.50 0.00 0.50 0.00 10.00 0.00 12.00 $66.60 $799.20 $2,685.11 $22.79 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 13. Laborers Medicare:$38.94, RG 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Paid Family Traffic Control Laborer Jeana Hansen (King) Ave CT E#B $2,685.11 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 1.00 0.00 0.50 0.00 1.50 $71.22 $106.83 / $0.00/hr $506.00 $166.47 $22.79 $1,950.91 ***'**_**** 98446 $2,685.11 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 14. Laborers-Underground $2,095.6 Medicare:$46.91, RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $52.39 Sewer&Water 0 Paid Family Somnang Hean $3,235.16 Medical Leave: General Laborer&Topman *****Pacific Hwy S $1,139.5 (King) Des Moines,WA- OT 0.00 1.50 1.00 1.50 0.50 10.00 0.00 14.50 $78.59 6 / $0.00/hr $598.00 $200.58 $23.24 $2,366.43 98188 $3,235.16 `* **"** $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $7 ' $0.00 15. Power Equipment $2,971.2 Medicare:$68.62, :rators-Underground RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 0 Paid Family ^wer&Water Nathan McAllister - Medical Leave: Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 1.50 1.00 1.50 0.50 10.50 0.00 15.00 $111.4 $1,671.3 $4,642.50 $1,036.0 $41.95, Tractors Under 15 Metric Tons Gig Harbor,WA- 2 0 / $0.00/hr 0 Garnishment: $293.41 . $2,841.11 (King) 98335 $4,732.50 $45141 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $148 5 $.0 ********* 16. Laborers RG 0.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00 $54.01 $540.10 Medicare:$48.34, Pipe Layer Lead Shaun McNally J Paid Family (King) 15010 113th Ave E $540.10/ Medical Leave: Puyallup,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $81.02 $0.00 $3,334.03 $0.00/hr $712.00 $206.71 $22.27 $2,344.71 ** * **** 98374 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $12 08'0 $0.00 17. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 $2,891.2 Medicare:$48.21, Operators-Underground 0 Paid Family Sewer&Water Jason Metzner Medical Leave: $108.4 $3,324.88 $31.30 Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 1.50 1.00 1.50 0.00 0.00 0.00 4.00 2 $433.68 / $0.00/hr $640.00 $206.14, 206.14 $2,399.23 Tractors Under 15 Metric Tons Tacoma,WA- (King) 98445 $3,324.88 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 **** **** Power Equipment RG 0.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00 $72.28 $722.80 Medicare:$64.67, Operators-Underground Paid Family Shawn Olson Sewer&Water Medical Leave: 12208 200th Ave Ct $108.4 Shovel, Excavator,Backhoe, E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $722,g0/ $39.43 Tractors Under 15 Metric Tons $4,460.05 $0.00/hr $998.00 $276.52 $3,081.43 Bonney Lake,WA- (King) 98391 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'5 $0.00 * **** ** 19. Laborers-Underground RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $53.35 $533.50 Medicare:$48.19, Sewer&Water James Polwarth Paid Family Pipe Layer 9886 Enterprise LN Medical Leave: NW OT 0.00 1.50 0.00 0.00 0.00 0.00 0.00 1.50 $80.03 $120.05 $ 3 / $0.00/hr $619.00 $206.04 $22.82 $2,427.26 (King) $3,323.31 Silverdale,WA- "*•****** 98383 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 0'7 $0.00 20. Power Equipment Jason Sniezak RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 $2,891.2 Medicare:$57.26, Operators-Underground 16448 Cougar 0 $4,409.08 $0.00/hr $591.00 $244.83 Paid Family _ $3,016.25 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Sewer&Water Village Ln SE $108.4 $1,517.8 / Medical Leave: Shovel, Excavator,Backhoe, Yelm,WA-98597 OT 0.00 1.50 1.00 1.50 0.00 10.00 0.00 14.00 2 8 $4,409.08 $39.66,Health: Tractors Under 15 Metric Tons $460.08 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 $0.00 ......... 21. Flaggers $1,731.6 Medicare:$37.45, JourneyLevel RG 0.00 9.00 10.00 10.00 10.00 0.00 0.00 39.00 $44.40 0 Paid Family 0eh Ave $2,582.90 Medical Leave: (King) 20407 30th Ae NE Shoreline,WA- OT 0.00 0.00 0.00 0.50 0.00 10.50 0.00 11.00 $66.60 $732.60 / $0.00/hr $442.00 $160.14 $22.16 $1,921.15 ......... 98155 $2,582.90 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 22. Laborers Medicare:$37.45, RG 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Paid Family Control Laborer Joseph Tountas (King) 20407 30th Ave NE $2,582.90 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 $71.22 $71.22 / $0.00/hr $442.00 $160.14 $22.16 $1,921.15 _**** 98155 $2,582.90 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 23. Laborers J $2,012 Medicare:$43.13, RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $50. 1 Traffic Control Supervisor Jesse Williams 0 Paid Family (King) 245 S 78th St $2,974.64 Medical Leave: Tacoma,WA- OT 0.00 1.50 0.50 1.50 0.25 9.00 0.00 12.75 $75.47 $962.24 / $0.00/hr $536.00 $184.43 $22.49 $2,188.59 ......... 98408 $100.6 $2,974.64 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 7/22/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ^;wall Avenue NE 7/10/2022 7/16/2022 i ) "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Yolanda Barry 9 ggers urney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Steven Coon Power Equipment Operators- -Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons .:,ing) 6.Trevor Dietrich Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Eric Ellis Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Chance Erdmann -ewer Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 9.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • 10.Chris Grove Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - Tractors Under 15 Metric Tons ing) 12.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) "..Somnang Hean )borers-Underground Sewer& ivater $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 15.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • 16.Shaun McNally Laborers Pipe Layer Lead $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 17.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons -_ping) 18.Shawn Olson Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 19.James Polwarth Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer `'1ng) 20.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 21.Joseph Tountas Flaggers $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Journey Level F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) 22.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 23.Jesse Williams ',borers affic Control Supervisor $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either.directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ,Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ,lining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 7/22/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and $'?"?'k Prime Contractor ❑x Project Name County Project or Contract# .�?.3i< <<.,*.�. Industries v Iii. �n y Duvall Avenue NE King CAG-20-065 Prevailing Wage Program ,4iili. -:tiiiis vA;it, iii Subcontractor ❑ Project Address PO Box 44540 �,ti,•Ab:w� 1 Olympia WA 98504-4540 Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 7/9/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name c9 ~O 9- Sun Mon Tue Wed Thu Fri Sat Total rY a) Gross Amount and And m E 7/3 7/4 7/5 7/6 7/7 7/8 7/9 Total Rate Earned/Gross Hourly Net Wages co E i= Hours of Pay "Usual FICA Withholding Other a', f a, Payroll Benefits" Tax Soc Sec#of Employee Address o o Hours Worked Each Day 0 1. Power Equipment Medicare:$14.01, RG 0.00 0.00 10.00 3.00 0.00 0.00 0.00 13.00 $74.28 $965.64 Operators-Underground Paid Family Sewer&Water Jordan Ausbun $111.4 Medical Leave: Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $965.64/ $5.55, Tractors Under 15 Metric Tons Puyallup,WA- $965.64 $0.00/hr $82.00 $59.87 Garnishment: $448.14 (King) 98373 $148.5 $356.07 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 2. Laborers RG 0.00 0.00 0.00 0.00 0.00 10.00 8.00 18.00 $50.31 $905.58 Medicare:$13.13, Traffic Control Supervisor Yolanda Barry Paid Sick Leave: (King) 6906 52nd Street Ct $905.58/ $11.09 E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $905.58 $0.00/hr $75.00 $56.15 $750.21 _ _ ** Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 20 6 $0.00 3. Laborers Medicare:$31.16, RG 0.00 0.00 1.00 0.00 1.00 0.00 0.00 2.00 $47.48 $94.96 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $2,148.46 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $377.00 $133.21 $27.47 $1,579.62 98404 $2,148.46 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 4. Flaggers RG 0.00 0.00 9.00 8.00 8.50 10.00 2.50 38.00 $44.40 $1,687.2 Medicare:$31.16, Journey Level Virginia Basher 0 Paid Family (King) 6936 E I st. $2,148.46 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 5.50 5.50 $66.60 $366.30 / $0.00/hr $377.00 $133.21 $27.47 $1,579.62 98404 $2,148.46 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment RG 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $72.28 $722.80 Medicare:$54.43, Operators-Underground Paid Family Sewer&Water Steven Coon $108 4 $1,319.11 Medical Leave: Shovel, Excavator,Backhoe, 18024 113th St E OT 0.00 0.00 0.00 0.00 0.00 0.50 5.00 5.50 2 ' $596.31 / $0.00/hr $741.00 $232.75 $20.08 $2,705.73 Tractors Under 15 Metric Tons Bonney Lake,WA- (King) 98391 $144.5 $3,753.99 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ********* 6. Laborers-Underground J J Medicare:$41.66, Sewer&Water RG 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $52.39 $523.90 ..I Paid Family Trevor Dietrich J J $1,152.62 Medical Leave: General Laborer&Topman 20014 53rd Ave E (King) Spanaway,WA- OT 0.00 ;0.00 0.00 0.00 0.00 0.00 8.00 8.00 $78.59 $628.72 / $0.00/hr $551.00 $178.14 $31.71 $2,070.64 98387 $2,873.15 **`-*`-**** $147 DT 0.00 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ ' $0.00 7. Power Equipment RG 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $74.28 $742.80 Medicare:$63.23, Operators-Underground Paid Family Chance Erdmann ver&Water 2331 Greenfield ST $111.4 $1,058.4 $1,801.29 Medical Leave: -:vel, Backhoe, OT 0.00 0.00 0.00 0.00 0.00 0.50 9.00 9.50 $21.89 Tractors Under Excavator,5 Metric Tons SE 2 9 / $0.00/hr $749.00 $270.36 $3,256.19 Olympia,WA- $4,360.67 (King) 98501 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 68'5 $0.00 8. Truck Drivers RG 0.00 0.00 7.75 8.25 8.75 8.75 0.00 33.50 $63.71 $2,134.2 Medicare:$48.19, Dump Truck Ryan Eubanks 9 Paid Family (Pierce) 13633 Olympic De. $2,803.28 Medical Leave: SE OT 0.00 '0.00 0.00 0.00 0.00 0.00 7.00 7.00 $95.57 $668.99 / $0.00/hr $471.00 $206.08 $19.33 $2,579.31 **.. **** Olalla,WA 98359 $3,323.91 $1274 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ' $0.00 9. Truck Drivers $2,022.7 Medicare:$34.15, Dum Truck RG 0.00 0.00 7.25 8.00 8.25 8.25 0.00 31.75 $63.71 9 Paid Family p(King) Chris Grove $2,022.79 Medical Leave: ****Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $387.00 $146.03 $18.54, $1,598.18 * _ _ ** Port Orchard,WA- $2 355 29 Garnishment: 98366 $127.4 $171.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 Power Equipment RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $72.28 $0.00 Medicare:$65.53, orators-Underground Paid Family sewer&Water Travis Haney Medical Leave: Shovel, Excavator,Backhoe, ****169th Ave E OT 0.00 0.00 0.00 0.00 0.00 0.00 9.00 9.00 $12"4 $975.78 $975.78/ $0.00/hr $907.00 $280.20 $22.65 $3,243.91 Tractors Under 15 Metric Tons Lake Tapps,WA- { $4,519.29 (King) 98391 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ..**** ** 11. Laborers Medicare:$35.31, RG 0.00 0.00 1.00 0.75 1.00 0.00 0.00 2.75 $47.48 $130.57 Paid Family Traffic Control Laborer Jeana Hansen (King) Ave CT E#B $2,434.98 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.25 $71.22 $17.81 / $0.00/hr $446.00 $150.97 $21.20 $1,781.50 **.*****. 98446 $2,434.98 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 12. Flaggers Jeana Hansen RG 0.00 0.00 9.00 9.25 9.00 10.00 0.00 37.25 $44.40 $1,653.9 Medicare:$35.31, Ave CT E#B 0 $2,434.98 $0.00/hr $446.00 $150.97 Paid Family $1,781.50 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Journey Level Tacoma,WA- / Medical Leave: (King) 98446 OT 0.00 0.00 0.00 0.00 0.00 0.50 9.00 9.50 $66.60 $632.70 $2,434.98 $21.20 ***-****** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 13. Laborers-Underground $2,095.6 Medicare:$43.49, RG 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00 $52.39 Sewer&Water 0 Paid Family Somnang Hean $2,999.39 Medical Leave: General Laborer&Topman *****Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.00 0.00 0.50 0.50 0.50 10.00 11.50 $78.59 $903.79 / $0.00/hr $542.00 $185.96 $21.96 $2,205.98 98188 $2,999.39 *le -***"' $104 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 87 ' $0.00 14. Flaggers Medicare:$4.83, RG 0.00 0.00 0.00 0.00 0.00 0.00 7.50 7.50 $44.40 $333.00 Paid Family Level Diago Hunter (King) 7620 S.Alaska $333.00/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $333.00 $0.00/hr $8.00 $20.64 $4.44 $295.09 * x*''`*** 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00- $88.80 $0.00 i . Power Equipment $1,857.0 Medicare:$68.24, Operators-Underground RG 0.00 0.00 0.00 5.00 10.00 10.00 0.00 25.00 $74.28 0 Paid Family Sewer&Water Nathan McAllister Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 1.00 0.50 1.00 10.50 13.00 $111.4 $1,448.4 $3,305.46 2 6 / $0.00/hr $1,026.0 $291.78 $41.86, $2,826.80 Tractors Under 15 Metric Tons Gig Harbor,WA- 0 Garnishment: (King) 98335 $148.5 $4,706.09 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ********* 16. Power Equipment RG 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00 $72.28 $2,891 2 Medicare:$44.28, Operators-Underground 0� J Paid Family Sewer&Water Jason Metzner $108 yl J Medical Leave: Shovel, Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.50 0.50 0.50 0.00 1.50 2 J $162.63 $3,053.83 $29 20 $0.00/hr $574.00 $189.34 $2,217.01 Tractors Under 15 Metric Tons Tacoma,WA- Kin 98445 $3,053.83 (King) $144 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 fi5 . $0.00 **** *** 17. Laborers-Underground RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $52.39 $0.00 Medicare:$38.83, Sewer&Water James Polwarth Paid Family General Laborer&Topman 9886 Enterprise LN Medical Leave: NW OT 0.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 $78.59 $392.95 $926.45/ $0.00/hr $465.00 $166.07 $19.61 $1,988.97 9) $2,678.48 Silverdale,WA- * _It*_ ** 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4'7 $0.00 18. Laborers-Underground RG 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $53.35 $533.50 Medicare:$38.83, Sewer&Water James Polwarth Paid Family Pipe Layer 9886 Enterprise LN $926.45/ Medical Leave: (King) NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $80.03 $0.00 $2,678.48 $0.00/hr $465.00 $166.07 $19.61 $1,988.97 Silverdale,WA- ********* 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1006'7 $0.00 19. Power Equipment $2,891.2 Medicare:$39.15, Operators-Underground RG 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00 $72.28 0 Paid Family Sewer&Water Jason Sniezak - 16448 Cougar $108.4 $3,053.83 Medical Leave: OT 0.00 0.00 0.00 0.50 0.50 0.50 0.00 1.50 2 $162.63 / $0.00/hr $316.00 $167.42 $29.21,Health: $2,148.47 Shovel,Excavator,Backhoe, Village Ln SE Tractors Under 15 Metric Tons Yelm,WA-98597 $3,053.83 $353.58 (King)g DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 44.5 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 20. Flaggers RG 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00 $44.40 $1,776.0 Medicare:$25.99, Journey Level Deinse Stamolis 0 Paid Family (King) 3909 48th Ave NE $1,792.65 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.25 $66.60 $16.65 / $0.00/hr $274.00 $111.14 $23.88 $1,357.64 "` .4."" 98422 $1,792.65 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 21. Flaggers RG 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00 $44.40 $1,776.0 Medicare:$33.72, Journey Level Joseph Tountas 0 Paid Family (King) 20407 30th Ave NE $2,325.45 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.25 0.00 0.00 8.00 8.25 $66.60 $549.45 / $0.00/hr $380.00 $144.17 $20.55 $1,747.01 Shore .,'...... Shore $2,325.45 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 22. Laborers $1,509.3 Medicare:$24.62, RG 0.00 0.00 10.00 10.00 10.00 0.00 0.00 30.00 $50.31 0 Paid Family Ific Control Supervisor Jesse Williams ,g) 245 S 78th St $1,697.98 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 1.25 1.25 0.00 0.00 2.50 $75.47 $188.68 / $0.00/hr $234.00 $105.27 $13.85 $1,320.24 " * .... 98408 $1,697.98 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 7/14/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: "hJyall Avenue NE 7/3/2022 7/9/2022 j "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F r ) 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Yolanda Barry Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 1 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Steven Coon Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons .,`'ng) 6.Trevor Dietrich Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 7.Chance Erdmann Power Equipment Operators- Underground Sewer&Water . Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons sing) 8.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 9.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ing) 12.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) Diago Hunter --,`Daggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 16.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 17.James Polwarth Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 18.James Polwarth Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer (King) 19.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons _ding) 20.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 21.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) 22.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and 'fining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 7/21/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side . Certified Payroll Report Department of Labor and ws,er} Project Name County Project or Contract# , ... i::.., Prime Contractor X Industries �:::: x. �.... Duvall Avenue NE King CAG 20 065 Prevailing Wage Program ' X Subcontractor ❑ PO Box 44540 °:p:4,�goy" Project Address Olympia WA 98504-4540 86 Final Week of (360) 902-5335 Payroll E Awarding Agency Name Phone Company Name Phone For the week ending: RENTON, CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 7/2/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions H Work Classification Name & ~O fa Sun Mon Tue Wed Thu Fri Sat Total cC m Gross Amount and And a) E 6/26 6/27 6/28 6/29 6/30 7/1 7/2 Total Rate Earned/Gross Hourly Net Wages 03 E .a Hours of Pay' Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address o O -a Tax o Hours Worked Each Day Benefits" 0 1. Power Equipment RG 0.00 9.00 10.00 10.00 10.00 0.00 0.00 39.00 $74.28 $2,896.9 Medicare:$52.44, Operators-Underground 2 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 $1,114.2 $4,011.12 $21.36, Shovel,Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.50 0.50 9.00 0.00 10.00 2 0 Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $698.00 $224.26 Garnishment: $2,264.99 (King) 98373 $4,086.12 $356.07, Health: DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi **** **** 'S $0.00 $469.00 2. Flaggers RG 0.00 0.00 8.00 0.00 9.50 8.50 0.00 26.00 $44.40 $1,154.4 Medicare:$16.74, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,154.40 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $115.00 $71.57 $15.41 $935.68 * ** Puyallup,WA- - $1,154.40 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers RG 0.00 0.00 8.50 8.25 9.00 9.00 0.00 34.75 $44.40 $1,542.9 Medicare:$25.21, Journey Level Virginia Basher 0 Paid Family (King) 6936 E I st. $1,738.76 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $280.00 $107.80 $23.04 $1,302.71 *.... **** 98404 $1,738.76 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$25.21, RG 0.00 0.00 1.00 1.75 1.00 0.00 0.00 3.75 $47.48 $178.05 Paid Family Traffic Control Laborer Virginia Basher (King) 6936 E 1st. $1,738.76 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.25 $71.22 $17.81 / $0.00/hr $280.00 $107.80 $23.04 $1,302.71 ,,....**2,*** 98404 $1,738.76 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers RG 0.00 3.75 0.00 0.00 0.00 0.00 0.00 3.75 $64.55 $242.06 Medicare:$8.80, Dump Truck&Trailer Paid Family (King) Tyrone Bufanda $242.06/ Medical Leave: 5808 Queens Way OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $606.41 $0.00/hr $0.00 $37.60 $9.51 $550.50 ********* Milton,WA-98354 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 / $0:10 6. Truck Drivers RG 0.00 7.00 5.25 0.00 0.00 0.00 0.00 12.25 $63.71 $780.45 Medicare:$37.25, Dump Truck Paid Family (King) Eric Ellis Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $780.45/ $0.00/hr $438.00 $159.29 $20.25, $1,788.32 Algona,WA-98001 $2,569.11 Garnishment: DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127'4 $0.00 $126.00 7. Truck Drivers Paid Family RG 0.00 7.25 7.75 0.00 0.00 0.00 0.00 15.00 $63.71 $955.65 Dump Truck Ryan Eubanks Medical Leave: ce) 13633 Olympic De. $1,600.75 $32.56,Medicare: SE OT 0.00 0.00 0.00 0.00 0.00 6.75 0.00 6.75 $95.57 $645.10 / $0.00/hr $397.00 $185.24 $43.33 $2,329.57 * ** Olalla,WA-98359 $2,987.70 $1274 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ' $0.00 8. Truck Drivers RG 0.00 8.25 8.00 0.00 0.00 0.00 0.00 16.25 $63.71 $1,035.2 Medicare:$45.37, Dump Truck 9 Paid Family (King) Chris Grove $1,429.72 Medical Leave: ****Berger Ln OT 0.00 0.00 0.75 0.00 0.00 0.00 0.00 0.75 $95.57 $71.68 / $0.00/hr $572.00 $193.96 $23.03, $2,122.67 • ** Port Orchard,WA- Garnishment: 98366 $3,128.42 $127.4 $171.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 9. Truck Drivers RG 0.00 0.00 0.00 0.00 5.00 0.00 0.00 5.00 $64.55 $322.75 Medicare:$45.37, Dump Truck&Trailer Paid Family (King) Chris Grove $1 429 72 Medical Leave: ***Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 / $0.00/hr $572.00 $193.96 $23.03. $2,122.67 ********* Port Orchard,WA- Garnishment: 98366 $3,128.42 $171.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 29'1 $0.00 10. Flaggers $1,665.0 Paid Family RG 0.00 9.00 9.00 10.00 9.50 0.00 0.00 37.50 $44.40 ney Level Jeana Hansen 0 $1,765.90 $16.71,Medicare: 3) Ave CT E#B OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $286.00 $109.42 $25.58 $1,328.19 Tacoma,WA- * " ** 98446 $1,765.90 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Laborers Paid Family Traffic Control Laborer Jeana Hansen RG 0.00 0.00 0.50 0.00 0.50 0.00 0.00 1.00 $47.48 $47.48 Medical Leave: (King) Ave CT E#B $1,765.90 $16.71,Medicare: Tacoma,WA- OT 0.00 0.00 0.00 0.25 0.50 0.00 0.00 0.75 $71.22 $53.42 / $0.00/hr $286.00 $109.42 $25.58 $1,328.19 * ****** $1,765.90 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 12. Laborers-Underground Somnang Hean RG 0.00 9.00 9.50 10.00 10.00 1.00 0.00 39.50 $52.39 $2,069.4 Medicare:$39.69, Sewer&Water *****Pacific Hwy S 1 $2,737.42 Paid Family General Laborer&Topman Des Moines,WA- / $0.00/hr $479.00 $169.72 Medical Leave: $1,950.76 (King) 98188 OT 0.00 0.00 0.00 0.50 0.00 8.00 0.00 8.50 $78.59 $668.02 $2,737.42 $98.25 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 8'7 $0.00 13. Power Equipment $1,225.6 Medicare:$58.25, Operators-Underground RG 0.00 6.50 10.00 0.00 0.00 0.00 0.00 16.50 $74.28 2 Paid Family Sewer&Water Nathan McAllister Medical Leave: $111.4 $1,281.33 Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 2 $55.71 / $0.00/hr $799.00 $249.09 $36.27, $2,423.56 Tractors Under 15 Metric Tons Gig Harbor,WA- Garnishment: (King) 98335 $148.5 $4,017.58 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ********* 14. Laborers-Underground Medicare:$40.92, RG 0.00 9.00 9.50 0.00 0.00 0.00 0.00 18.50 $53.35 $986.98 Sewer&Water Paid Family Shaun McNally Medical Leave: (King) Puyallup,WA- Pipe Layer 15010 113th Ave E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $80.04 $0.00 $986'98/ $2,822.44 $0.00/hr $589.00 $174.99 $20.15 $1,997.38 98374 $106.7 ***.'-"*`* DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 $0.00 Power Equipment $2,855.0 Medicare:$55.55, i _..`rators-Underground RG 0.00 9.00 10.00 10.00 10.00 0.50 0.00 39.50 $72.28 6 Paid Family $108 Sewer&Water Jason Metzner Medical Leave: 4 $3,830.84 Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.50 0.00 8.50 0.00 9.00 2 ' $975.78 / $0.00/hr $792.00 $237.51 $126.97 $2,618.81 Tractors Under 15 Metric Tons Tacoma,WA- Kin 98445 $3,830.84 (King) $14 4.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ********* 16. Power Equipment RG 0.00 0.00 0.00 0.00 10.00 0.00 0.00 10.00 $72.28 $722.80 Medicare:$32.76, Operators-Underground Health:$251.34, Sewer&Water Jason Sniezak Paid Family Shovel,Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 9.00 0.00 9.00 2 $975.78 /$1,698.58 $0.00/hr $219.00 $140.05 Medical Leave: $1,845.02 $108.4 Tractors Under 15 Metric Tons Village Ln SE $22.04 (King) Yelm,WA-98597 $2,510.21 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65 . $0.00 **** ** 17. Laborers Medicare:$24.09, RG 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $47.48 $23.74 Paid Family Traffic Control Laborer Deinse Stamolis -- -- (King) 3909 48th Ave NE $1,660.99 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $245.00 $102.98 $22.11 $1,266.81 **x****** 98422 $1,660.99 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.9f6 $0.00 18. Flaggers V $1,620/t Medicare:$24.09, RG 0.00 9.00 9.00 10.00 0.00 8.50 0.00 36.50 $44.40 0 J Paid Family Journey Level Deinse Stamolis (King) 3909 48th Ave NE I J J $1,660.99 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.25 $66.60 $16.65 / $0.00/hr $245.00 $102.98 $22.11 $1,266.81 **x****** 98422 $1,660.99 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 19. Flaggers RG 0.00 8.00 0.00 10.00 10.00 8.50 0.00 36.50 $44.40 $1,620.6 Medicare:$24.43, Journey Level Joseph Tountas _ 0 Paid Family (King) 20407 30th Ave NE $1,684.73 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.25 $66.60 $16.65 / $0.00/hr $232.00 $104.46 $16.08 $1,307.76 ********* $1,684.73 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 20. Laborers Joseph Tountas RG 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Medicare:$24.43, 20407 30th Ave NE $1,684.73 $0.00/hr $232.00 $104.46 Paid Family $1,307.76 I F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Traffic Control Laborer Shoreline,WA- / Medical Leave: (King) 98155 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 $1,684.73 $16.08 ********* DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 21. Flaggers RG 0.00 9.00 0.00 0.00 0.00 0.00 0.00 9.00 $44.40 $399.60 Medicare:$5.79, Journey Level Paid Family (King) Lorinda Urbaetis $399.60/ Medical Leave: 1107 A St.NE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $399.60 $0.00/hr $34.00 $24.78 $5.34 $329.69 **:****** Auburn,WA-98002 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 22. Laborers $2,012.4 Medicare:$38.48, Traffic Control SupervisorRG 0.00 9.00 9.50 10.00 10.00 1.50 0.00 40.00 $50.31 0 Paid Family Jessetams (King) 245S 78th $2,653.90 Medical Leave: St OT 0.00 0.00 0.00 0.50 0.50 7.50 0.00 8.50 $75.47 $641.50 / $0.00/hr $459.00 $164.54 $20.67 $1,971.21 Tacoma,WA- ** ****** 98408 $2,653.90 $106 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 . $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side l Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 7/8/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: +,,;rail Avenue NE 6/26/2022 7/2/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) I� folanda Barry ,.ggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Tyrone Bufanda Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) v.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 8.Chris Grove Truck Drivers mp Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Chris Grove Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Jeana Hansen • Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) iz.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Shaun McNally .aoorers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer (King) 15.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) 16.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Deinse Stamolis __Jaorers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 18.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 19.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 20.Joseph Tountas Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 21.Lorinda Urbaetis Flaggers $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Journey Level F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) 22.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F7OO-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. rs\Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ping Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Amended Reason Missed one employees hours MB 7/11/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side. Certified Payroll Report Department of Labor and �S�.rE. Project Name County Project or Contract# , _r•.°� Prime Contractor Industries §, y Duvall Avenue NE King CAG-20-065 Prevailing Wage Program <i'ii:=�:s:"`= Subcontractor ❑ `` �. 3` Project Address PO Box 44540 ''� j Olympia WA 98504-4540 y� ' " Final Week of (360) 902-5335 Payroll Awarding Agency Name Phone Company Name Phone For the week ending: RENTON. CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 6/25/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name C7 ~O o Sun Mon Tue Wed Thu Fri Sat Total Gross Amount 7 E 6/19 6/20 6/21 6/22 6/23 6/24 6/25 Total Rate Hourly and And Earned I Gross Net Wages r o Hours of Pay Payroll °Usual FICA Withholding Other Soc Sec#of Employee Address a a a Benefits" O o Hours Worked Each Day 0 1. Power Equipment RG 0.00 10.00 10.00 10.00 9.00 0.00 0.00 39.00 $74.28 $2,896.9 Medicare:$53.57, Operators-Underground 2 Paid Family Sewer&Water - Medical Leave: Jordan Ausbun $111.4 $1,225.6 $21 79 Shovel,Excavator,Backhoe, OT 0.00 0.00 0.00 0.00 0.50 10.00 0.50 11.00 $4,122.54 9501 124th St E 2 2 / $0.00/hr $722.00 $229.04 Garnishment: $2,311.69 Tractors Under 15 Metric Tons Puyallup,WA- $4,172.54 $356.07,Health: (King) 98373 $148.5 $478.38 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 2. Flaggers RG 0.00 10.00 10.00 0.00 10.00 9.50 0.00 39.50 $44.40 $1,753.8 Medicare:$25.43, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,753.80 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $247.00 $108.73 $23.42 $1,349.22 Or.*_**..**.* Puyallup,WA- $1,753.80 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers RG 0.00 0.00 9.00 9.00 9.00 0.00 0.00 27.00 $44.40 $1,198.8 Medicare:$19.45, JourneyLevel 0 Paid Family Virginia Basher (King) 6936 E I st. $1,341.24 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $192.00 $83.16 $17.83 $1,028.80 * « *** 98404 _ $1,341.24 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.$0 $0400 4. Laborers J Medicare:$19.45, RG 0.00 0.00 1.00 1.00 1.00 0.00 0.00 3.00 $47.48 $142.44 Paid Family Traffic Control Laborer Virginia Basher (King) 6936 E I st. $1,341.24 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $192.00 $83.16 $17.83 $1,028.80 ********* $1,341.24 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers Medicare:$36.01, RG 0.00 0.00 0.00 6.75 7.75 0.00 0.00 14.50 $64.55 $935.98 Dump Truck&Trailer Paid Family (King) Tyrone Bufanda $935.98/ Medical Leave: 5808 Queens Way OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $2 483 77 $0.00/hr $72.00 $153.99 $27.04 $2,194.73 Milton,WA-98354 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 0'1 $0.00 6. Truck Drivers Medicare:$45.45, RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $63.71 $0.00 Dump Truck Paid Family (King) Eric Ellis $812.35/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 8.50 0.00 8.50 $95.57 $812.35 $3,134.31 $0.00/hr $574.00 $194.33 $21.44 $2,299.09 *««_*«_**** Algona,WA-98001 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�7'4 $0.00 7. Truck Drivers Medicare:$48.21, RG 0.00 6.50 0.00 0.00 0.00 0.75 0.00 7.25 $63.71 $461.90 Dump Truck Ryan Eubanks Paid Family (Pierce) 13633 Olympic De. $1,107.00 Medical Leave: OT 0.00 0.00 0.00 0.00 0.00 6.75 0.00 6.75 $95.57 $645.10 I $0.00/hr $472.00 $206.16 $34.38 $2,564.45 SE $3,325.20 Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 8. Flaggers RG 0.00 10.00 0.00 9.00 9.00 9.00 0.00 37.00 $44.40 $1,642.8 Medicare:$25.55, Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $1,761.50 Medical Leave: OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $285.00 $109.21 $16.83,Misc: $1,087.51 Tacoma,WA- 98446 $1,761.50 $237.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 9. Laborers Medicare:$25.55, RG 0.00 0.00 0.00 1.00 1.00 0.50 0.00 2.50 $47.48 $118.70 Traffic Control Laborer Jeana Hansen Paid Family (King) Ave CT E#B $1,761.50 Medical Leave: Tacoma,WA OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $285.00 $109.21 $16.83,Misc: $1,087.51 98446 $1,761.50 $237.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 10. Laborers-Underground RG 0.00 10.00 10.00 10.00 9.00 0.00 0.00 39.00 $52.39 $2,043.2 Medicare:$41.98, Sewer&Water 1 Paid Family Somnang Hean $2,868.41 Medical Leave: General Laborer&Topman ***Pacific Hwy S ng) Des Moines,WA- OT 0.00 0.00 0.00 0.00 1.00 9.50 0.00 10.50 $78.59 $825.20 / $0.00/hr $516.00 $179.46 $21.11 $2,109.86 98188 $2,868.41 ********* DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4'7 $0.00 11. Flaggers Medicare:$6.11, RG 0.00 0.00 0.00 0.00 0.00 9.50 0.00 9.50 $44.40 $421.80 Paid Family Journey Level Diago Hunter (King) 7620 S.Alaska $421.80/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $421.80 $0.00/hr $17.00 $26.16 $5.64 $366.89 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Power Equipment RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $74.28 $0.00 Medicare:$63.32, Operators-Underground Paid Family Sewer&Water Nathan McAllister $111.4 $1,058.4 $1,058.49 Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 9.50 0.00 9.50 2 9 / $0.00/hr $911.00 $270.73 $38.86, $2,631.30 Tractors Under 15 Metric Tons Gig Harbor,WA- $4,366.62 Garnishment: 98335 $451.41 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi.5 $0.00 « «*** F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Sid( • 13. Power Equipment RG 0.00 0.00 10.00 10.00 9.00 9.50 0.00 38.50 $72.28 $2,782.7 Medicare:$42.44, Operators-Underground 8 Paid Family Sewer&Water Jason Metzner $108.4 Medical Leave: Shovel, Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 2 $108.42 $2,891.20 $27.89 Tractors Under 15 Metric Tons Tacoma,WA- / $0.00/hr $544.00 $181.49 $2,095.38 (King) 98445 $2,891.20 ( $1645 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ' $0.00 **** **** 14. Flaggers $1,753.8 Medicare:$25.43, JourneyLevel RG 0.00 10.00 10.00 10.00 0.00 9.50 0.00 39.50 $44.40 0 Paid Family 3909 4 th Ave $1,753.80 Medical Leave: (King) 3909 48th Ave NE Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 '$66.60 $0.00 / $0.00/hr $265.00 $108.74 $23.43 $1,331.20 *****_**** 98422 $1,753.80 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 15. Flaggers RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $44.40 $1,776.0 Medicare:$25.75, ' rney Level Joseph Tountas 0 Paid Family N1g) 20407 30th Ave NE $1,776.00 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $252.00 $110.11 $17.04 $1,371.10 ****** 98155 $1,776.00 - DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 16. Laborers RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $50.31 $2 012r4 Medicare:$39.31, Traffic Control Supervisor 0 V J Paid Family P Jesse Williams $2,710.50 Medical Leave: (King) 245 S 78th St OT 0.00 0.00 0.00 0.25 0.00 9.00 0.00 9.25 '$75.47 $698.10 / $0.00/hr $472.00 $168.05 $21.00 $2,010.14 Tacoma,WA- $2,710.50 ** * **** 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 00.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 7/1/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ^nwall Avenue NE 6/19/2022 6/25/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) .Yolanda Barry laggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Tyrone Bufanda Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) o.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 8.Jeana Hansen Flaggers iurney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 11.Diago Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ;inq) 12.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 13.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons Xing) 14.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Sid( r Yt 16.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. • (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full,wages earned. Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 7/5/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ��4,^S#;j''� Prime Contractor ® Project Name County Project or Contract# Industries ,..g :<_. ¢ o,it- -t,,....y Duvall Avenue NE King CAG-20-065 Prevailing Wage Program <8il ti x ,�., jl:l Subcontractor ❑ PO Box 44540 i i� Project Address Olympia WA 98504-4540 y` 7$89ac+ Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 6/18/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name (0 HO 9- Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And a) E 6/12 6/13 6/14 6/15 6/16 6/17 6/18 Total Rate Earned/Gross Hourly Net Wages m E i= Hours of Pay "Usual FICA Withholding Other Soc Sec#of Employee Address CD o o Hours Worked Each Day PayrollBenefits" Tax rX 0 1. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 8.00 0.00 48.00 $74.28 $3,565.4 Medicare:$45.97, Operators-Underground 4 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 Shovel,Excavator,Backhoe, OT 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 $55.71 $3,621.15 $20.71, 9501 124th St E 2 / $0.00/hr $583.00 $196.58 Garnishment: $1,968.25 Tractors Under 15 Metric Tons puyallup,WA- $3,621.15 $356.07,Health: (King) 98373 $148.5 $450.57 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 2. Flaggers RG 0.00 10.00 0.00 10.00 9.00 8.00 0.00 37.00 $44.40 $1,642.8 Medicare:$24.16, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,666.54 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $228.00 $103.33 $22.25 $1,288.80 ********* Puyallup,WA- S1,666.54 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Laborers RG 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 $47.48 $23.74 Medicare:$24.16, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,666.54 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $228.00 $103.33 $22.25 $1,288.80 ********* Puyallup,WA- $1,666.54 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94496 $O.Op 4. Laborers J Medicare:$13.16, RG 0.00 0.00 1.00 0.00 •0.00 0.00 0.00 1.00 $47.48 $47.48 Paid Family Control Laborer Virginia Basher (King) 6936 E I st. $907.73/ Medical Leave: ...*.. Tacoma,WA- OT 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 $71.22 $0.00 $907.73 $0.00/hr $97.00 $56.28 $12.04 $729.25 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Flaggers RG 0.00 10.00 9.00 0.00 0.00 0.00 0.00 19.00 $4440 $843. 0 Medicare:$13.16, Journey Level Virginia Basher J Paid Family (King) 6936 E I st. �J $907.73/ Medical Leave: Tacoma,WA- OT 0.00 0.25 0.00 0.00 0.00 0.00 0.00 0.25 $66.60 $16.65 $907.73 $0.00/hr $97.00 $56.28 $12.04 $729.25 •**''*•*•* 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 6. Truck Drivers $1,497.1 Medicare:$44.54, DumpTruck RG 0.00 8.25 8.00 7.25 0.00 0.00 0.00 23.50 $63.71 9 Paid Family (King) Eric Ellis $1,544.97 Medical Leave: 705 Celery Ave OT 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 $95.57 $47.79 / $0.00/hr $559.00 $190.44 $20.38, $2,118.26 it It.'***** Algona,WA-98001 $3,071.62 Garnishment: $127.4 $139.00 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 7. Truck Drivers RG 0.00 0.00 7.50 8.00 8.00 8.00 0.00 31.50 $63.71 $2,006.8 Medicare:$37.79, Dump Truck Ryan Eubanks 7 Paid Family erce) 13633 Olympic De. $2,006.87 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $313.00 $161.59 $30.37 $2,063.50 * ** Olalla,WA-98359 $2,606.25 $174 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 � ' $0.00 8. Power Equipment RG 0.00 10.00 10.00 10.00 8.50 1.50 0.00 40.00 $72.28 $2,891.2 Medicare:$52.93, Operators-Underground 0 Paid Family Sewer&Water Travis Haney $108 4 Medical Leave: Shovel,Excavator,Backhoe, ****169th Ave E OT 0.00 0.50 0.00 0.00 0.00 6.50 0.00 7.00 2 ' $758.94 $3,650.14 $20.08 Tractors Under 15 Metric Tons Lake Tapps,WA- / $0.00/hr $638.00 $226.31 $2,712.82 (King) 98391 $144.5 $3,650.14 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 9. Laborers Medicare:$37.22, RG 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 $47.48 $23.74 Paid Family Traffic Control Laborer Jeana Hansen(King) Ave CT E#B $2,567.44 Medical Leave: Tacoma,WA- OT 0.00 0.50 0.00 0.00 9.50 0.00 0.00 10.00 $71.22 $712.20 / $0.00/hr $478.00 $159.18 $20.46 $1,872.58 $2,567.44 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 10. Flaggers RG 0.00 10.00 10.00 9.50 0.00 0.50 0.00 30.00 $44.40 $1,332.0 Medicare:$37.22, urney'- Levela 0 Paid Family Ave CT Hansen $2,567.44 Medical Leave: ng) Ave E#B OT 0.00 0.00 0.00 0.00 0.00 7.50 0.00 7.50 $66.60 $499.50 / $0.00/hr $478.00 $159.18 $20.46 $1,872.58 ********* Tacoma,WA- $2,567.44 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Laborers-Underground RG 0.00 10.00 9.50 10.00 10.00 0.50 0.00 40.00 $52.39 $2,095.6 Medicare:$39.50, Sewer&Water 0 Paid Family Somnang Hean $2,724.32 Medical Leave: General Laborer&Topman *****Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.50 0.00 0.00 0.00 7.50 0.00 8.00 $78.59 $628.72 / $0.00/hr $476.00 $168.91 $20.46 $2,019.45 98188 $2,724.32 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184'7 $0.00 12. Laborers-Underground $2,134.0 Medicare:$40.22, Shaun McNally RG 0.00 10.00 9.50 10.00 10.00 0.50 0.00 40.00 $53.35 Sewer&Water 15010 113th Ave E 0 $2,774.32 Paid Family Pipe Layer Puyallup,WA- / $0.00/hr $577.00 $172.00 Medical Leave: $1,964.66 (King) 98374 OT 0.00 0.50 0.00 0.00 0.00 7.50 0.00 8.00 $80.04 $640.32 $2 774 24 $20.36 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1006.7 $0.00 I 13. Power Equipment $2,891.2 Medicare:$55.29, Operators-Underground RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 0 Paid Family Sewer&Water Jason Metzner Medical Leave: $108.4 $3,812.77 Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.50 0.00 0.00 0.00 8.00 0.00 8.50 2 $921.57 / $0.00/hr $787.00 $236.40' $35.05 $2,699.03 Tractors Under 15 Metric Tons Tacoma,WA- (King) 98445 $3,812.77 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 14. Laborers Medicare:$33.36, RG 0.00 0.00 0.00 0.50 0.50 0.00 0.00 1.00 $47.48 $47.48 Paid Family Control Laborer Deinse Stamolis (King) 3909 48th Ave NE $2,300.78 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $394.00 $142.65 $29.00 $1,701.77 ********k $2,300.78 98422 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 Flaggers $1,720.5 Medicare:$33.36, ,vurne Level RG 0.00 10.00 10.00 9.50 9.00 0.25 0.00 38.75 $44.40 0 Paid Family Y 3909 e Ave $2,300.78 Medical Leave: (King) 3909 48th Ave NE Tacoma,WA- OT 0.00 0.25 0.00 0.00 0.00 7.75 0.00 8.00 $66.60 $532.80 / $0.00/hr $394.00 $142.65 $29.00 $1,701.77 *#k*k**** $2,300.78 98422 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.$0 $0.00 16. Flaggers J $1 665. Medicare:$24.14, RG 0.00 0.00 10.00 10.00 9.50 8.00 0.00 37.50 $44.40 Paid Family Journey Level Joseph Tountas 0 Medical Leave: (King) 20407 30th Ave NE $1,665.00 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $227.00 $103.23 $15.97 $1,294.66 *****#*** Shoreline,WA- 98155 $1,665.00 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 17. Laborers RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $50.31 $2,012.4 Medicare:$38.48, Traffic Control Supervisor Jesse Williams - -- 0 Paid Family $2,653.90 Medical Leave: (King) 245 S 78th St Tacoma,WA- OT 0.00 0.50 0.00 0.00 0.00 8.00 0.00 8.50 $75.47 $641.50 / $0.00/hr $459.00 $164.55 $20.67 $1,971.20 # *#***# $2,653.90 98408 $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 6/23/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: ¶'•jvall Avenue NE 6/12/2022 6/18/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) ' .Yolanda Barry ,-laggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side ` - M kr 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (.King) b.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 8.Travis Haney Power Equipment Operators- nderground Sewer&Water .hovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 9.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 'King) 12.Shaun McNally Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer (King) 13.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) �4.Deinse Stamolis Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 16.Joseph Tountas _ Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 17.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ' 'Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and :'lining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 7/5/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and aT�tf.o Project Name County Project or Contract# .?:..= Prime Contractor IZ Industries �.::: it o.... Duvall Avenue NE King CAG-20-065 Prevailing Wage Program : x '`' - Subcontractor ❑ PO Box 44540 d;�,..�� ,y2 Project Address Olympia WA 98504-4540 H� �e°`'� Final Week of (360) 902-5335 Payroll D Awarding Agency Name Phone Company Name Phone For the week ending: RENTON, CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 6/11/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions H Work Classification Name c 8 -- Sun Mon Tue Wed Thu Fri Sat Total m Gross Amount and And a) E 6/5 6/6 6/7 6/8 6/9 6/10 6/11 Total Rate Eamed/Gross Hourly Net Wages E i= Hours of Pay "Usual FICA Withholding Other a) 0 Payroll Benefits" Tax Soc Sec#of Employee Address Et o Hours Worked Each Day 0 1. Power Equipment $2,822.6 Medicare:$35.81, Operators-Underground RG 0.00 10.00 10.00 10.00 8.00 0.00 0.00 38.00 $74.28 4 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 Shovel,Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $2,822.64 $16.22, Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $414.00 $153.11 Garnishment: $1,494.41 (King) 98373 $2,822.64 $356.07,Health: DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $16 ********* 8.5 $0.00 $353.02 2. Flaggers RG 0.00 8.50 9.00 0.00 8.00 0.00 0.00 25.50 $44.40 $1,132.2 Medicare:$24.40, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $1,682.78 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $231.00 $104.33 $21.87 $1,301.18 ********* Puyallup,WA- $1,682.78 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Laborers `i Ni Medicare:$24.40, Yolanda BarryRG 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 $50.31 $503.10 J Paid Family Control Supervisor (King) 6906 52nd Street Ct $1,682.78 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $231.00 $104.33 $21.87 $1,301.18 ********* Puyallup,WA- $1,682.78 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120.6 $0.00 4. Laborers RG 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $47.48 $47.48 Medicare:$24.40, Traffic Control Laborer Yolanda Barry Paid Family (King) 6906 52nd Street Ct $1,682.78 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $231.00 $104.33 $21.87 $1,301.18 * ****** Puyallup,WA- $1,682.78 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers Medicare:$18.57, RG 0.00 1.00 1.00 0.00 0.00 0.00 0.00 2.00 $47.48 $94.96 Traffic Control Laborer Virginia Basher Paid Family (King) 6936 E I st. $1,049.56 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $179.00 $79.40 $16.95 $987.09 ***"'**** 98404 $1,281.01 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 6. Flaggers Medicare:$18.57, RG 0.00 9.00 9.00 0.00 3.50 0.00 0.00 21.50 $44.40 $954.60 JourneyLevel Paid Family Virginia Basher $1,049.56 Medical Leave: (King) 6936 E I st. OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $179.00 $79.40 $16.95 $987.09 Tacoma,WA- ********* $1,281.01 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 7. Truck Drivers RG 0.00 0.00 0.00 0.00 7.00 0.00 0.00 7.00 $63.71 $445.97 Medicare:$40.96, Dump Truck Paid Family (King) Eric Ellis Medical Leave: 705 CeleryAve OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $445.97/ $18.67, $2,825.34 $0.00/hr $500.00 $175.17 $1,999.54 *****.*** Algona,WA-98001 Garnishment: DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 27'4 $0.00 $91.00 8. Truck Drivers RG 0.00 0.00 7.25 0.00 2.00 0.00 0.00 9.25 $63.71 $589.32 Medicare:$39.05, Dump Truck Paid Family (Pierce) Ryan Eubanks Medical Leave: 13633 Olympic De. OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $589.32/ $0.00/hr $333.00 $166.97 $31.02, $2,032.02 * _ _ ** SE $2,693.06 Garnishment: Olalla,WA-98359 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 27.4 $0.00 $91.00 9. Power Equipment RG 0.00 10.00 10.00 10.00 8.00 0.00 0.00 38.00 $72.28 $2,746.6 Medicare:$40.61, Operators-Underground 4 Paid Family Sewer&Water Travis Haney Medical Leave: $108.4 Shovel,Excavator,Backhoe, ****169th Ave E OT 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 2 $54.21 $2,800.85 $16.43 Tractors Under 15 Metric Tons Lake Tapps,WA / $0.00/hr $434.00 $173.65 $2,136.16 (King) 98391 $2,800.85 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 fi5 . $0.00 10. Laborers-Underground $1,990.8 Medicare:$29.44, er&Water RG 0.00 10.00 10.00 10.00 8.00 0.00 0.00 38.00 $52.39 2 Paid Family Somnang Hean eral Laborer&Topman Pacific Hwy S $2,030.12 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 $78.59 $39.30 / $0.00/hr $309.00 $125.87 $16.41 $1,549.40 98188 $2,030.12 * **** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4.7 $0.00 11. Flaggers RG 0.00 10.00 10.00 4.00 0.00 0.00 0.00 24.00 $44.40 $1,065.6 Medicare:$15.45, Journey Level Diago Hunter 0 Paid Family (King) 7620 S.Alaska $1,065.60 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $95.00 $66.06 $14.22 $874.87 * - - ** 98409 $1,065.60 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 12. Power Equipment Nathan McAllister Ni $1,299. J Medicare:$65.20, OOperators-Under round RG 0.00 10.00 7.50 0.00 0.00 0.00 0.00 17.50 $74.28 p g 3201 36th St NW 0 $1,299.90 Paid Family Sewer&Water Gig Harbor,WA- $111 4 / $0.00/hr $953.00 $278.80 Medical Leave: $2,720.47 Shovel, Excavator,Backhoe, 98335 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $4,496.78 $27.90, F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side a-. Tractors Under 15 Metric Tons Garnishment: (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168.5 $0.00 $451.41 13. Laborers-Underground $2,027.3 Medicare:$29.40, Sewer&Water RG 0.00 10.00 10.00 10.00 8.00 0.00 0.00 38.00 $53.35 0 Paid Family Shaun McNally $2,027.30 Medical Leave: Pipe Layer 15010 113th Ave E (King) Puyallup,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $80.04 $0.00 / $0.00/hr $398.00 $125.69 $16.12 $1,458.09 98374 $2,027.30 "`"""` DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 '7 $0.00 14. Power Equipment RG 0.00 10.00 10.00 10.00 8.00 0.00 0.00 38.00 $72.28 $2,746.6 Medicare:$39.82, Operators-Underground 4 Paid Family Sewer&Water Jason Metzner $108.4 Medical Leave: Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $2,746.64 / $0.00/hr $501.00 $170.29 $26.56 $2,008.97 Tractors Under 15 Metric Tons Tacoma,WA- $2,746.64 (King) 98445 $144.5 r '5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 15. Laborers-Underground RG 0.00 10.00 7.50 0.00 0.00 0.00 0.00 17.50 $52.39 $916.83 Medicare:$42.40, Sewer&Water Paid Family James Polwarth General Laborer&Topman 9886 Enterprise LN Medical Leave: (King) NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $916.83/ $0.00/hr $523.00 $181.29 $21.11, $1,979.60 Silverdale,WA- $2,924.12 Garnishment: '"" " """ 98383- $104.7 $176.72 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 $0.00 16. Flaggers RG 0.00 10.00 10.00 10.00 8.00 0.00 0.00 38.00 $44.40 $1,687.2 Medicare:$24.46, Journey Level Deinse Stamolis 0 Paid Family (King) 3909 48th Ave NE $1,687.20 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $250.00 $104.60 $22.53 $1,285.61 98422 $1,687.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 17. Flaggers $1,687.2 Medicare:$24.47, RG 0.00 10.00 10.00 10.00 8.00 0.00 0.00 38.00 $44.40 0 Paid Family Journey Level Joseph Tountas (King) 20407 30th Ave NE $1,687.20 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $232.00 $104.61 $16.18 $1,309.94 "" 98155 $1,687.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 18. Laborers $1,408.6 Medicare:$29.74, RG 0.00 10.00 10.00 0.00 8.00 0.00 0.00 28.00 $50.31 8 Paid Family Traffic Control Supervisor Jesse Williams (King) 245 S 78th St $1,408.68 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $314.00 $127.17 $16.84 $1,563.45 "'*_**_**** 98408 $2,051.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 6/17/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 6/5/2022 6/11/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) (olanda Barry .Iggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Yolanda Barry Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Kticl) 6.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Eric Ellis • Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Ryan Eubanks Truck Drivers np Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 9.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 11.Diago Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 rig) 12.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 13.Shaun McNally Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer (King) Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 15.James Polwarth Laborers-Underground Sewer& $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Water General Laborer&Topman F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side .;r (King) 16.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 17.Joseph Tountas F!Eggers ' 'irney Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 18.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ling Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 6/17/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and y.,,f Project Name County Project or Contract# °=r}t l_`- Prime Contractor El Industries , .bn,,4ils y. Duvall Avenue NE King CAG-20-065 Prevailing Wage Program 41 PO Box 44540 t4.!,y``, ih-' Subcontractor El_ Project Address Olympia WA 98504-4540 ' "'" Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 6/4/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name C7 ~O 9- Sun Mon Tue Wed Thu Fri Sat Total cc (1) Gross Amount and And , E 5/29 5/30 5/31 6/1 6/2 6/3 6/4 Total Rate Earned/Gross Hourly Net Wages .E a Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address act - Benefits" Tax f O o Hours Worked Each Day 0 1. Power Equipment RG 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00 $74.28 $2,971.2 Medicare:$38.44, Operators-Underground 0 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 Shovel, Excavator, Backhoe, OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $55.71 $3,026.91 $17.30, 9501 124th St E 2 Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $458.00 $164.34 Garnishment: $1,616.51 (King) 98373 $3,026.91 $356.07, Health: DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168'S $0.00* ** $376.25 2. Flaggers Medicare:$11.91, RG 0.00 0.00 7.50 0.00 10.00 1.00 0.00 18.50 $44.40 $821.40 Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $821.40/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $821.40 $0.00/hr $65.00 $50.93 $10.98 $682.58 Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers RG 0.00 0.00 9.50 7.50 10.00 4.00 0.00 31.00 $44.40 $1,376.4 Medicare:$21.34, Journey Level Virginia Basher 0 Paid Family (King) 6936 E I st. $1,471.36 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $221.00 $91.22 $19.60 $1,118.20 * ** 98404 ---- - _$1,471.36 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Laborers Medicare:$21.34, RG 0.00 0.00 0.00 1.00 0.00 1.00 0.00 2.00 $47.48 $94.96 Paid Family Control Laborer Virginia Basher (King) 6936 E 1st. $1,471.36 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $221.00 $91.22 $19.60 $1,118.20 98404 $1,471.36 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers RG 0.00 0.00 0.00 0.00 0.00 8.00 0.00 8.00 $63.71 $509.68 Medicare:$19.01, Dump Truck J Paid Family (King) Eric Ellis $509.68/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $1,310.98 $0.00/hr $149.00 $81.28 $11.66 $1,050.03 **** **** Algona,WA-98001 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127'4 $0.00 6. Truck Drivers RG 0.00 0.00 7.50 8.50 7.25 5.75 0.00 29.00 $63.71 $1,847.5 Medicare:$34.34, Dump Truck Ryan Eubanks 9 Paid Family (Pierce) 13633 Olympic De. $1,847.59 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $261.00 $146.83 $26.92 $1,899.13 ********* $2,368.22 Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 7. Truck Drivers RG 0.00 0.00 4.50 0.00 0.00 0.00 0.00 4.50 $63.71 $286.70 Medicare:$35.42 Dump Truck Chris Grove (King) ****Berger Ln $1,174.26 Port Orchard,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $434.55 $151.46 $1,821.48 98366 $2,442.91 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 2'4 $0.00 8. Truck Drivers RG 0.00 0.00 0.00 8.00 5.75 0.00 0.00 13.75 $64.55 $887.56 Medicare:$35.42 Dump Truck&Trailer Chris Grove (King) ****Berger Ln $1,174.26 Port Orchard,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 / $0.00/hr $434.55 $151.46 $1,821.48 * ** 98366 $2,442.91 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 p9'1 $0.00 9. Power Equipment RG 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00 $72.28 $2,891.2 Medicare:$43.50, Operators-Underground 0 Paid Family Sewer&Water Travis Haney Medical Leave: **** $108 4 $2,999.62 $17.51 Shovel,Excavator,Backhoe, 169th Ave E OT 0.00 0.00 0.50 0.00 0.50 0.00 0.00 1.00 2 ' $108.42 Tractors Under 15 Metric Tons Lake Tapps,WA- / $0.00/hr $482.00 $185.98 $2,270.63 (King) 98391 $2,999.62 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'5 $0.00 lt.jr* 10. Flaggers RG 0.00 0.00 9.50 8.50 10.00 9.00 0.00 37.00 $44.40 $1,642.8 Medicare:$24.51, Journey Level Jeana Hansen 0 Paid Family 3) Ave CT E#B $1,690.28 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $269.00 $104.79 $16.18 $1,275.80 98446 $1,690.28 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Laborers RG 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 $47.48 $47.48 Medicare:$24.51, Traffic Control Laborer Jeana Hansen Paid Family (King) Ave CT E#B $1,690.28 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $269.00 $104.79 $16.18 $1,275.80 98446 $1,690.28 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 12. Laborers-Underground RG 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00 $52.39 $2,095.6 Medicare:$30.95, Sewer&Water Somnang Hean 0 Paid Family General Laborer&Topman *****Pacific Hwy S $2,134.90 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 $78.59 $39.30 / $0.00/hr $334.00 $132.36 $17.26 $1,620.33 98188 $2,134.90 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184'7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 13. Flaggers $1,509.6 Medicare:$22.38, RG 0.00 5.50 10.00 10.00 8.50 0.00 0.00 34.00 $44.40 Journey Level Diago Hunter 0 $1,542.90Paid Family Medical Leave: (King) 7620 S.Alaska OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $66.60 $33.30 / $0.00/hr $200.00 $95.66 $20.50 $1,204.36 ******* $1,542.90 Tacoma,WA- ** 98409 - DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 14. Power Equipment RG 0.00 0.00 8.50 7.00 9.50 10.00 0.00 35.00 $74.28 $2,599.8 Medicare:$38.86, Operators-Underground 0 Paid Family Sewer&Water Nathan McAllister $111.4 Medical Leave: Shovel,Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $2'599.80 $25.89, Tractors Under 15 Metric Tons Gig Harbor,WA / $0.00/hr $445.00 $166.15 Garnishment: $1,552.49 (King) 98335 $2,679.80 $451.41 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168'5 $0.00 ********* 15. Laborers-Underground J $2 134 0 Medicare:$30.94, RG 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00 $53.35 Sewer&Water 0 J Paid Family Shaun McNally J Layer 15010 113th Ave E $2,134.00 Medical Leave: 9) Puyallup,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $80.04 $0.00 / $0.00/hr $424.00 $132.31 $16.97 $1,529.78 98374 $2,134.00 *****-**** $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 07 ' $0.00 16. Power Equipment $2,746.6 Medicare:$39.83, Operators-Underground RG 0.00 0.00 8.00 10.00 10.00 10.00 0.00 38.00 $72.28 p g 4 Paid Family Sewer&Water Jason Metzner Medical Leave: Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $108.4 2 $2,746.64$0.00 / $0.00/hr $501.00 $170.29 $26.56 $2,008.96 Tractors Under 15 Metric Tons Tacoma,WA- (King) 98445 $2,746.64 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'S $0.00 17. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 $2,891.2 Medicare:$45.06, Operators-Underground 0 Paid Family Shawn Olson Sewer&Water Medical Leave: 12208 200th Ave Ct $108 4 $3,108.04 Shovel,Excavator,Backhoe, E OT 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 2 ' $216.84 $29.63 Tractors Under 15 Metric Tons / $0.00/hr $587.00 $192.70 $2,253.65 Bonney Lake,WA- $3,108.04 (King) 98391 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 $0.00 ********* `Laborers-Underground $1,912.2 Medicare:$27.73, er&Water James Polwarth RG 0.00 0.00 9.50 7.00 10.00 10.00 0.00 36.50 $52.39 4 Paid Family General Laborer&Topman 9886 Enterprise LN $1,912.24 Medical Leave: (King) NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $282.00 $118.56 $15.56 $1,468.39 Silverdale,WA- $1,912.24 ***-'*-*'*' 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4'7 $0.00 19. Flaggers RG 0.00 0.00 9.50 8.50 10.00 10.00 0.00 38.00 $44.40 $1,687.2 Medicare:$24.47, Journey Level Deinse Stamolis 0 Paid Family (King) 3909 48th Ave NE $1,687.20 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $250.00 $104.61 $22.53 $1,285.59 **.*.**** 98422 $1,687.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 20. Flaggers Joseph Tountas RG 0.00 0.00 9.50 8.50 10.00 10.00 0.00 38.00 $44.40 $1,687.2 Medicare:$24.46, 20407 30th Ave NE 0 $1,687.20 $0.00/hr $232.00 $104.60 Paid Family $1,309.95 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Journey Level Shoreline,WA- / Medical Leave: (King) 98155 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,687.20 $16.19 ***-**-**** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 21. Laborers RG 0.00 0.00 10.00 10.00 9.75 2.00 0.00 31.75 $50.31 $1,597.3 Medicare:$29.79, Traffic Control Supervisor Jesse Williams 4 Paid Family (King) 245 S 78th St $1,635.08 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $75.47 $37.74 / $0.00/hr $315.00 $127.39 $17.14 $1,565.36 ********* 98408 . $2,054.68 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 00.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side f: tS Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 6/7/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: wall Avenue NE 5/29/2022 6/4/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) ,Yolanda Barry daggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) u.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 7.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Chris Grove Truck Drivers imp Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Jeana Hansen Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Diago Hunter Flaggers Journey Level - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 14.Nathan McAllister Equipment Operators- ierground Sewer&Water Snovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 15.Shaun McNally Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 16.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 17.Shawn Olson Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 18.James Polwarth Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 19.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ';ing) 20.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 21.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for.the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. 51.Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ping Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist Amended Reason Wrong week entered MB 6/7/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side r , Certified Payroll Report Department of Labor and q,'TAr$. Prime Contractor ❑x Project Name County Project or Contract# Industries '4"•_a "�f Duvall Avenue NE King CAG 20 065 Prevailing Wage Program ,jii ;;j ,�t;j;t; �il f Subcontractor ❑ PO Box 44540 °';,'� . Project Address Olympia WA 98504-4540 y� '°"" Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 1 5/28/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name c7 ~O o Sun Mon Tue Wed Thu Fri Sat Total a) Gross Amount and And m E 5/22 5/23 5/24 5/25 5/26 5/27 5/28 Total Rate Earned/Gross Hourly Net Wages .E a Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address acr' m -0Benefits" Tax O o Hours Worked Each Day a 1. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971.2 Medicare:$53.24, Operators-Underground 0 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 $1,169.9 Shovel, Excavator,Backhoe, OT 0.00 0.00 1.00 0.50 0.00 9.00 0.00 10.50 $4,141.11 $21.16, 9501 124th St E 2 1 Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $715.00 $227.66 Garnishment: $2,298.41 $4,141.11 $356.07, Health: (King) 98373 $148.5 $469.57 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 2. Flaggers RG 0.00 0.00 9.75 10.00 6.25 0.00 0.00 26.00 $44.40 $1,154.4 Medicare:$33.13, Journey Level Yolanda Barry 0 Paid Family (King) 6906 52nd Street Ct $2,284.55 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $370.00 $141.64 $27.98 $1,711.81 x _ _ ** Puyallup,WA- $2,284.56 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Laborers Medicare:$33.13, Yolanda BarryRG 0.00 10.00 0.00 0.00 0.00 3.00 0.00 13.00 $50.31 $654.03 Paid Family Control Supervisor (King) 6906 52nd Street Ct $2,284.55 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 4.50 0.00 4.50 $75.47 $339.62 / $0.00/hr $370.00 $141.64 $27.98 $1,711.81 _ _ •• Puyallup,WA- $2,284.56 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6/ $0.001 4. Laborers RG 0.00 0.00 0.25 0.00 0.00 0.00 0.00 0.25 $4 48 $1 87 r Medicare:$33.13, Traffic Control Laborer Yolanda Barry I v Paid Family (King) 6906 52nd Street Ct 4/ 4 $2,284.55 Medical Leave: E#30 OT 0.00 0.00 1.75 0.00 0.00 0.00 0.00 1.75 $71.22 $124.64 / $0.00/hr $370.00 $141.64 $27.98 $1,711.81 Puyallup,WA- $2,284.56 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Flaggers RG 0.00 7.00 8.00 7.50 7.00 5.50 0.00 35.00 $44.40 $1,554.0 Medicare:$28.87, Journey Level Virginia Basher 0 Paid Family (King) 6936 E 1st. $1,991.20 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 3.00 0.00 3.00 $66.60 $199.80 / $0.00/hr $339.00 $123.46 $25.80 $1,474.07 98404 $1,991.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 6. Laborers Medicare:$28.87, RG 0.00 1.00 0.00 1.00 3.00 0.00 0.00 5.00 $47.48 $237.40 Traffic Control Laborer Virginia Basher Paid Family (King) 6936 E I st. $1,991.20 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $71.22 $0.00 / $0.00/hr $339.00 $123.46 $25.80 $1,474.07 ***_****** 98404 $1,991.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 7. Truck Drivers RG 0.00 7.25 0.00 0.00 0.00 5.25 0.00 12.50 $63.71 $796.38 Medicare:$31.16, Dump Truck Paid Family (King) Eric Ellis $796 38/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $2 148 97 $0.00/hr $337.00 $133.23 $15.68 $1,631.90 ********* Algona,WA-98001 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $12'4 $0.00 8. Truck Drivers RG 0.00 0.00 7.50 8.50 7.25 5.75 0.00 29.00 $63.71 $1,847.5 Medicare:$34.34, Dump Truck Ryan Eubanks 9 Paid Family (Pierce) 13633 Olympic De. $1,847.59 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $261.00 $146.83 $26.92 $1,899.13 ***••**** Olalla,WA-98359 $127.4 $2,368.22 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 9. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 $2,891.2 Medicare:$62.36, Operators-Underground 0 Paid Family Sewer&Water Travis Haney Medical Leave: Shovel,Excavator,Backhoe, ****169th Ave E OT 0.00 0.00 1.00 0.50 1.50 10.00 0.00 13.00 $108.4 $1,409.4 $4,300.66 2 6 / $0.00/hr $837.00 $266.65 $22.64 Tractors Under 15 Metric Tons Lake Tapps,WA- . $3,112.01 (King) 98391 $4,300.66 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'5 $0.00 10. Flaggers RG 0.00 10.00 0.00 0.00 10.00 3.00 0.00 23.00 $44.40 $1,021.2 Medicare:$31.52, Journey Level Jeana Hansen I 0 Paid Family /W'"9) Ave CT E#B $1,387.50 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 5.50 0.00 5.50 $66.60 $366.30 I $0.00/hr $383.00 $134.82 $19.38 $1,605.71 98446 $2,174.43 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Laborers-Underground $2,095.6 Medicare:$40.64, Sewer&Water RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $2,802.91 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.50 0.00 8.50 0.00 9.00 $78.59 $707.31 / $0.00/hr $494.00 $173.78 $20.89 $2,073.60 98188 $2,802.91 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4'7 $0.00 12. Flaggers RG 0.00 5.50 10.00 10.00 8.50 0.00 0.00 34.00 $44.40 $1,509.6 Medicare:$22.38, Journey Level Diago Hunter 0 Paid Sick Leave: (King) 7620 S.Alaska $1,542.90 $20.50 Tacoma,WA- ********* OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $66.60 $33.30 / $0.00/hr $200.00 $95.66 $1,204.36 98409 $1,542.90 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side I. r ,,,., 13. Laborers-Underground I $2,134.0 Medicare:$40.81, Sewer&Water 'RG 0.00 10.00 10.00 10.00 10.00 0.00 ' 0.00 40.00 $53.35 0 Paid Family Shaun McNally $2,814.34 Medical Leave: Pipe Layer 15010 113th Ave E (King) Puyallup,WA- OT 0.00 0.00 0.00 0.00 0.00 8.50 0.00 8.50 $80.04 $680.34 / $0.00/hr $587.00 $174.48 $20.57 $1,991.48 98374 $2,814.34 * `***** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 0'7 $0.00 14. Power Equipment $2,891.2 Medicare:$52.14, Operators-Underground RG 0.00 10.00 8.00 10.00 10.00 2.00 0.00 40.00 $72.28 0 Paid Family Sewer&Water Jason Metzner Medical Leave: $108.4 $3,595.93 Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 6.50 0.00 6.50 2 $704.73 / $0.00/hr $717.00 $222.95 $33.39 $2,570.45 Tractors Under 15 Metric Tons Tacoma,WA- (King) 98445 $144.5 $3,595.93 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ********* 15. Power Equipment $2,891.2 Medicare:$45.06, RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 `/ operators-Underground 0 / Paid Family Shawn Olson V ''rer&Water Medical Leave: 12208 200th Ave Ct $108.�} $3,108.04 „�vel, Excavator,Backhoe, E OT 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 2 J $216.84 / $0.00/hr $587.00 $192.70 $29.63 $2,253.65 Tractors Under 15 Metric Tons Bonney Lake,WA- $3,108.04 (King) 98391 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'5 $0.00 16. Flaggers $1,776.0 Medicare:$34.75, RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $44.40 0 Paid Family Level Deinse Stamolis (King) 3909 48th Ave NE $2,396.67 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 8.25 0.00 8.25 $66.60 $549.45 / $0.00/hr $417.00 $148.59 $30.00 $1,766.63 ********* 98422 $2,396.97 • DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 17. Laborers Medicare:$34.75, Traffic Control Laborer RG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $47.48 $0.00 Paid Family Deinse Stamolis(King) 3909 48th Ave NE $2,396.67 Medical Leave: Tacoma,WA- OT 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 $71.22 $71.22 / $0.00/hr $417.00 $148.59 $30.00 $1,766.63 ********* $2,396.97 98422 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $94.96 $0.00 118. Flaggers $1,776.0 Medicare:$34.45, ne Level RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $44.40• 0 Paid Family Y Joseph Tountas $2,375.40 Medical Leave: g) 20407 30th Ave NE OT 0.00 0.00 0.50 0.00 0.00 8.50 0.00 9.00 $66.60 $599.40 / $0.00/hr $392.00 $147.28 $20.88 $1,780.79 * ***** Shoreline,WA- $2,375.40 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 19. Laborers RG 0.00 0.00 10.00 10.00 10.00 9.00 0.00 39.00 $50.31 $1,962.0 Medicare:$29.82, Traffic Control Supervisor Jesse Williams 9 Paid Family (King) 245 S 78th St I $2,056.43 Medical Leave: *It* **** Tacoma,WA- OT 0.00 0.00 0.00 0.50 0.75 0.00 0.00 1.25 $75.47 $94.34 / $0.00/hr $315.00 $127.50 $17.15 $1,566.96 98408 $2,056.43 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 6/6/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 5/22/2022 5/28/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Yolanda Barry tggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) • 3.Yolanda Barry Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Yolanda Barry Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) b.Virginia Basher Laborers Traffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Ryan Eubanks Truck Drivers ,mp Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 9.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ing) 12.Diego Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 13.Shaun McNally Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer (King) 14.Jason Metzner ewer Equipment Operators- ,iderground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 15.Shawn Olson Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) 16.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 17.Deinse Stamolis Laborers iffic Control Laborer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 18.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 19.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ng) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. 'g>,Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and lining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 6/6/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and rnre�. Project Name County Project or Contract# �_+_ _i::F Prime Contractor Industries :Ili II:, 1.:411;Y Duvall Avenue NE King CAG-20-065 Prevailing Wage Program i1jl,;' ,}�gli'�x Subcontractor ❑ PO Box 44540 ° y:� �,y Project Address Olympia WA 98504-4540 '-"� Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON, CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 5/21/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions FL- Work Classification Name c9 ~O o Sun Mon Tue Wed Thu Fri Sat Total a� Gross Amount and And a) E 5/15 5/16 5/17 5/18 5/19 5/20 5/21 Total Rate Earned/Gross Hourly Net Wages E Hours of Pay "Usual FICA Withholding Other Soc Sec#of Employee Address > Payroll Benefits" Tax o O 8 Hours Worked Each Day 0 1. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971.2 Medicare:$54.72, Operators-Underground 0 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 $1,281.3 $4,252.53 $22.01, Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.50 0.00 11.00 0.00 11.50 2 3, Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $748.00 $234.00 Garnishment: $2,359.29 (King) 98373 $4,252.53 $356.07, Health: * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168.5 $0.00 $478.44 2. Flaggers RG 0.00 10.00 10.00 10.00 9.00 0.00 0.00 39.00 $44.40 $1,731.f� / Medicare:$35.49, Journey Level Yolanda Barry 0 N/ v Paid Family (King) 6906 52nd Street Ct $2,536.61 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $409.00 $151.77 $30.50 $1,821.15 Puyallup,WA- $2,447.91 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Laborers Medicare:$35.49, Yolanda BarryRG 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 $50.31 $50.31 Paid Family Control Supervisor (King) 6906 52nd Street Ct $2,536.61 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $75.47 $754.70 / $0.00/hr $409.00 $151.77 $30.50 $1,821.15 _ _ •* Puyallup,WA- $2,447.91 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 2 00'6 $0.00 4. Flaggers $1,776.0 Medicare:$34.44, RG 0.00 9.00 10.00 10.00 10.00 1.00 0.00 40.00 $44.40 0 Paid Family Journey Level Virginia Basher (King) 6936 E I st. $2,375.40 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 9.00 0.00 9.00 $66.60 $599.40 / $0.00/hr $431.00 $147.27 $29.82 $1,732.87 98404 $2,375.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers RG 0.00 2.25 0.00 0.00 0.00 0.00 0.00 2.25 $64.55 $145.24 Medicare:$41.18, Dump Truck&Trailer Paid Family (King) Eric Ellis $1,515.00 Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 / $0.00/hr $503.00 $176.09 $21.10 $2,098.77 ********* Algona,WA-98001 $2,840.14 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $129'1 $0.00 6. Truck Drivers RG 0.00 0.00 7.00 6.75 7.75 0.00 0.00 21.50 $63.71 $1,369.7 Medicare:$41.18, Dump Truck 7 Paid Family (King) Eric Ellis - $1,515.00 Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $503.00 $176.09 $21.10 $2,098.77 ********* Algona,WA-98001 $2,840.14 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127'4 $0.00 7. Truck Drivers RG 0.00 0.00 0.00 0.00 7.50 0.25 0.00 7.75 $63.71 $493.75 Medicare:$58.04, Dump Truck Ryan Eubanks Paid Family (Pierce) 13633 Olympic De. $1,282.21 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 8.25 0.00 8.25 $95.57 $788.45 / $0.00/hr $624.00 $248.16 $40.03 $3,032.48 ********* $4,002.71 Olalla,WA-98359 $127 4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 8. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 $2,891.2 Medicare:$63.93, Operators-Underground 0 Paid Family Sewer&Water Travis Haney Medical Leave: Shovel,Excavator,Backhoe, ****169th Ave E OT 0.00 2.50 0.00 0.50 0.00 11.00 0.00 14.00 $108.4 $1,517.8 $4,409.08 $23.08 Tractors Under 15 Metric Tons Lake Tapps,WA- 2 8 / $0.00/hr $872.00 $273.36 $3,176.71 (King) 98391 $4,409.08 $1* ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 fi5 ' $0.00 9. Laborers -Underground $1,571.7 Medicare:$42.68, Sewer&Water RG 0.00 10.00 10.00 10.00 0.00 0.00 0.00 30.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman *****Pacific Hwy S $2,396.90 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.50 0.00 10.00 0.00 10.50 $78.59 $825.20 / $0.00/hr $528.00 $182.48 $21.54 $2,168.40 98188 $2,943.10 «««.« ««« $147 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ ' $0.00 10. Flaggers $1,332.0 Medicare:$19.79, JourneyLevel RG 0.00 0.00 0.00 10.00 10.00 10.00 0.00 30.00 $44.40 0 Paid Family Diago Hunter g) 7620 S.Alaska $1,365.30 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 $66.60 $33.30 / $0.00/hr $161.00 $84.65 $18.12 $1,081.74 ********* $1,365.30 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Laborers-Underground $2,134.0 Medicare:$43.13, Sewer&Water RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $53.35 0 Paid Family Shaun McNally Pipe Layer 15010 113th Ave E $2,974.42 Medical Leave: (King) Puyallup,WA- OT 0.00 0.00 0.00 0.50 0.00 10.00 0.00 10.50 $80.04 $840.42 / $0.00/hr $625.00 $184.41 $21.42 $2,100.36 98374 $2,974.32 *****«««« DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1006'7 $0.00 12. Power Equipment $2,891.2 Medicare:$56.86, O erators-Under round RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $72.28 P g Jason Metzner 0 Paid Family Sewer&Water $3,921.19 Medical Leave: 9117 24th Ave E $108.4 $1029.9 Shovel, Excavator,Backhoe, Tacoma,WA- OT 0.00 0.00 0.00 0.50 0.00 9.00 0.00 9.50 29, / $0.00/hr $821.00 $243.11 $35.90 $2,764.32 Tractors Under 15 Metric Tons 98445 $3,921.19 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164'5 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side ......... 13. Power Equipment RG 0.00 10.00 10.00 10.00 0.00 10.00 0.00 40.00 $72.28 $2,891.2 Medicare:$43.50, Operators-Underground 0 Paid Family Shawn Olson Sewer&Water Medical Leave: 12208 200th Ave Ct $108 4 $2,999.62 Shovel, Excavator,Backhoe, E OT 0.00 0.50 0.00 0.50 0.00 0.00 0.00 1.00 2 ' $108.42 / $0.00lhr $561.00 $185.98 $28.79 $2,180.35 Tractors Under 15 Metric Tons Bonney Lake,WA- $2,999.62 (King) 98391 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 ......... 14. Flaggers $1,753.8 Medicare:$34.12, RG 0.00 8.00 10.00 10.00 10.00 1.50 0.00 39.50 $44.40 0 Paid Family Journey Level Deinse Stamolis (King) 3909 48th Ave NE $2,353.20 Medical Leave: acoma,WA- OT 0.00 0.00 0.00 0.50 0.00 8.50 0.00 9.00 $66.60 $599.40 / $0.00/hr $406.00 $145.90 $29.51 $1,737.67 T "�`...... aco2 $2,353.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 'Flaggers $1,776.0 Medicare:$31.54, �hr a Level RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $44.40 0 Paid Family n Y Joseph Tountas $2,175.60 Medical Leave: (King) 20407 30th Ave NE Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 6.00 0.00 6.00 $66.60 $399.60 / $0.00/hr $344.00 $134.88 $19.59 $1,645.59 ......... $2,175.60 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 16. Laborers $2,012.4 Medicare:$44.23, RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $50.31 0 Paid Family Traffic Control Supervisor Jesse Williams (King) 245 S 78th St $1,037.7 $3,050.11 Medical Leave: Tacoma,WA- OT 0.00 0.25 1.00 0.50 0.00 12.00 0.00 13.75 $75.47 1 / $0.00/hr $554.00 $189.11 $22.92 $2,239.85 ••"••'••• 98408 - $3,050.11 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120•6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 • Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 5/27/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: „ 1l"wall Avenue NE 5/15/2022 5/21/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Yolanda Barry ,,-aggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Yolanda Barry Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Eric Ellis Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) u.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 8.Travis Haney Power Equipment Operators- '%rderground Sewer&Water ;ovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 i ractors Under 15 Metric Tons (King) 9.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Diego Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Shaun McNally Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer ng) 12.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 13.Shawn Olson Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons ing) 14.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 15.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 16.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ping Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 5/27/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and c STATE• Project Name County Project or Contract# .?;. _:•• F Prime Contractor NI Industries f =•:: r Duvall Avenue NE King CAG-20-065 PrevailingWage Program .., 9 g s •.,• �•;=;•K Subcontractor ❑ PO Box 44540 °,:: 1° Project Address Olympia WA 98504-4540 y` 'ed"a�> Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 5/14/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name C7 ' 9-a) Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And E 5/8 5/9 5/10 5/11 5/12 5/13 5/14 Total Rate Hourly E F= Hours of PayEarned/Gross "Usual Withholding Net Wages = r w Payroll Benefits" FICA Tax Other Soc Sec#of Employee Address Cll O o Hours Worked Each Day 0 1. Power Equipment RG 0.00 9.50 9.00 10.00 7.50 4.00 0.00 40.00 $74.28 $2,971.2 Medicare:$43.62, Operators-Underground 0 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 Shovel,Excavator,Backhoe, OT 0.00 0.00 0.00 0.00 0.00 4.00 0.00 4.00 $445.68 $3,416.88 $18.79, 9501 124th St E 2 / $0.00/hr $544.00 $186.50 Garnishment: $1,859.14 Tractors Under 15 Metric Tons Puyallup,WA- (King) 98373 $3,416.88 $356.07,Health: * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi'S $0.00 $408.76 2. Flaggers RG 0.00 9.50 9.00 9.00 7.00 5.50 0.00 40.00 $44.40 $1,776.0 Medicare:$28.17, Journey Level Virginia Basher 0 Paid Family (King) 6936 E 1st. $1,942.50 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 2.50 0.00 2.50 $66.60 $166.50 / $0.00/hr $328.00 $120.44 $25.41 $1,440.48 * ** 98404 $1,942.50 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $8810 $0.QJ0 3. Truck Drivers Medicare:$41.95, RG 0.00 0.00 5.75 0.00 0.00 0.00 0.00 5.75 $64.55 $371.16 Paid Family Truck&Trailer J (King) Eric Ellis $371.16/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $2 893 17 $0.00/hr $516.00 $179.38 $19.20 $2,136.64 ********* Algona,WA-98001 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�9'1 $0.00 4. Truck Drivers RG 0.00 0.00 4.75 0.00 0.00 0.00 0.00 4.75 $63.71 $302.62 Medicare:$26.10, DumpTruck Garnishment: Chris Grove $148.66 (Pierce) ""Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $302.62/ $0.00/hr $257.00 $111.62 $1,257.06 Port Orchard,WA- $1,800.44 * ** 98366 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Flaggers RG 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 $44.40 $444.00 Medicare:$20.87, JourneyLevel Paid Family Jeana Hansen (King) Ave CT E#B $444.00/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,439.24 $0.00/hr $214.00 $89.23 $13.20 $1,101.94 ' * 98446 -- -- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 6. Laborers-Underground RG 0.00 9.50 9.00 10.00 7.50 4.00 0.00 40.00 $52.39 $2,095.6 Medicare:$34.94, Sewer&Water 0 Paid Family Somnang Hean $2,409.96 Medical Leave: General Laborer&Topman *****Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 4.00 0.00 4.00 $78.59 $314.36 / $0.00/hr $400.00 $149.41 $18.75 $1,806.86 98188 $2,409.96 ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $104.7 $0.00 7. Flaggers $1,465.2 Medicare:$21.25, RG 0.00 9.50 9.00 7.00 7.50 0.00 0.00 33.00 $44.40 Journey Level Diago Hunter _ 0 Paid Family (King) 7620 S.Alaska - $1,465.20 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $183.00 $90.84 $19.58 $1,150.53 * ** 98409 .$1,465.20 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 8. Power Equipment RG 0.00 8.00 8.00 10.00 7.50 5.00 0.00 38.50 $72.28 $2,782.7 Medicare:$45.83, Operators-Underground 8 Paid Family Sewer&Water Jason Metzner Medical Leave: $108.4 $3,108.04 $30.25 Shovel, Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 3.00 0.00 3.00 2 $325.26 / $0.00/hr $600.00 $195.95, 195.95 $2 288 51 Tractors Under 15 Metric Tons Tacoma,WA- (King) 98445 $3,160.54 $14 4.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 9. Flaggers $1,420.8 Medicare:$27.90, JourneyLevel RG 0.00 9.50 9.00 0.00 7.50 6.00 0.00 32.00 $44.40 0 Paid Family Deinse Stamolis (King) 3909 48th Ave NE $1,554.00 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 $66.60 $133.20 / $0.00/hr $303.00 $119.31 $25.13 $1,448.98 * ** 98422 $1,924.32 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 10. Flaggers $1,776.0 Medicare:$29.62, RG 0.00 9.50 9.00 10.00 7.50 4.00 0.00 40.00 $44.40 Journey Level Joseph Tountas 0 Paid Family g) 20407 30th Ave NE $2,042.40 Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 4.00 0.00 4.00 $66.60 $266.40 / $0.00/hr $312.00 $126.63 $18.74 $1,555.41 * ** 98155 $2,042.40 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Laborers RG 0.00 9.50 9.00 10.00 9.00 2.50 0.00 40.00 $50.31 $2,012.4 Medicare:$36.29, Traffic Control Supervisor Jesse Williams 0 Paid Family (King) 245 S 78th St $2,502.96 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 6.50 0.00 6.50 $75.47 $490.56 / $0.00/hr $422.00 $155.18 $19.82 $1,869.67 ********* 98408 $2,502.96 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 5/20/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: I„ „fall Avenue NE 5/8/2022 5/14/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Virginia Basher naggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Eric Ellis Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 5.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Diago Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.Jason Metzner Power Equipment Operators- iderground Sewer&Water s,ovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 9.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side •r 10.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F7OO-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (RI Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 5/20/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side . . r Certified Payroll Report Department of Labor and t,sT�r, Project Name County Project or Contract# ?.3> °� Prime Contractor XI Industries = i': Alit: Duvall Avenue NE King CAG-20-065 Prevailing Wage Program `; IU = Subcontractor ❑ PO Box 44540 44/"" ., any` Project Address Olympia WA 98504-4540 "�" ' Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 5/7/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name C7 ~o o Sun Mon Tue Wed Thu Fri Sat Total a) Gross Amount and And a� E 5/1 5/2 5/3 5/4 5/5 5/6 5/7 Total Rate Earned/Gross Hourly Net Wages r Hours of Pay Payroll "Usual FICA Wit Tax o_ ding Other Soc Sec#of Employee Address > Benefits" O o Hours Worked Each Day a 1. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971.2 Medicare:$56.95, Operators-Underground 0 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 $1,448.4 $4,419.66 $22.65, Shovel,Excavator,Backhoe, 9501 124th St E OT 0.00 1.50 1.00 1.50 2.00 7.00 0.00 13.00 2 6, Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $797.00 $243.49 Garnishment: $2,451.13 (King) 98373 $4,419.66 $356.07, Health: DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi.5 $0.00* ** $492.37 2. Flaggers RG 0.00 10.00 9.00 0.00 10.00 5.00 0.00 34.00 $44.40 $1,509.6 Medicare:$23.34, Journey Level Virginia Basher 0 Paid Family (King) 6936 E I st. $1,609.50 Medical Leave: Tacoma,WA- OT 0.00 0.50 0.00 0.00 1.00 0.00 0.00 1.50 $66.60 $99.90 / $0.00/hr $251.00 $99.79 $21.17 $1,214.20 ***2,,,_**** 98404 $1,609.50 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Laborers-Underground $1,781.2 Medicare:$37.99, RG 0.00 10.00 4.00 10.00 10.00 0.00 0.00 34.00 $52.39 Sewer&Water 6 Paid Family Somnang Hean $2,292.10 Medical Leave: General Laborer&Topman *****Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.50 6.00 0.00 6.50 $78.59 $510.84 / $0.00/hr $450.00 $162.43 $19.83 $1,949.57 98188 $2,619.82 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4'7 $0.00 4. Flaggers $1,110.0 Medicare:$17.78, RG 0.00 10.00 0.00 0.00 10.00 5.00 0.00 25.00 $44.40 0 Paid Family Level Diago Hunter (King) 7620 S.Alaska $1,226.55 Medical Leave: Tacoma,WA- OT 0.00 0.25 0.00 0.00 1.50 0.00 0.00 1.75 $66.60 $116.55 / $0.00/hr $131.00 $76.05 $16.00 $985.72 * ** 98409 $1,226.55 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers-Underground Medicare:$24.50, Sewer&Water RG 0.00 8.00 0.00 0.00 0.00 0.00 0.00 8.00 $52.39 $419.12 Paid Family John Kammerer Medical Leave: General Laborer&Topman 219 Donna Ave $419.12/ (King) Bozeman,MT- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $1,689.04 $0.00/hr $233.00 $104.72 $10.03 $1,316.79 59718 $104.7 ' DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 $0.00 6. Power Equipment RG 0.00 8.00 3.00 10.00 10.00 0.00 0.00 31.00 $72.28 $2,240.6 Medicare:$33.27, Operators-Underground 8 Paid Family Sewer&Water Jason Metzner $108.4 Medical Leave: Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 2 $54.21 $2,294.89 $22.08 Tractors Under 15 Metric Tons Tacoma,WA / $0.00/hr $392.00 $142.29 $1,705.25 (King) 98445 $2,294.89 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 fi5. $0.00 ... .. .... 7. Power Equipment RG 0.00 8.00 0.00 0.00 0.00 0.00 0.00 8.00 $72.28 $578.24 Medicare:$49.09, 'Operators-Underground Health:$514.56, ier&Water Jason Sniezak Paid Family vel, Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $108.4 $0.00 $578.24/ Medical Leave: Tractors Under 15 Metric Tons Village Ln SE $3,900.24 $0.00/hr $467.00 $209.91 $35.18 $2,624.50 (King) Yelm,WA-98597 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 8. Flaggers $1,554.0 Medicare:$24.71, JourneyLevel RG 0.00 10.00 10.00 0.00 10.00 5.00 0.00 35.00 $44.40 0 Paid Family Deinse Stamolis(King) 3909 48th Ave NE $1,703.85 Medical Leave: Tacoma,WA- OT 0.00 0.25 0.50 0.00 1.50 0.00 0.00 2.25 $66.60 $149.85 / $0.00/hr $254.00 $105.64 $22.27 $1,297.23 .. *;** 98422 $1,703.85 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 9. Laborers RG 0.00 10.00 10.00 10.00 10.00 6.00 0.00 46.00 $50.31 $2,314.Z Medicare:$40.12, Traffic Control Supervisor 6 �/ Paid Family p Jesse Williams (King) 245 S 78th St .� $2,767.08 Medical Leave: Tacoma,WA- OT 0.00 1.50 2.00 1.00 1.50 0.00 0.00 6.00 $75.47 $452.82 / $0.00/hr $486.00 $171.56 $22.17 $2,042.23 k - #* 98408 $2,762.08 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation _ Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 5/16/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: rzs..Lvall Avenue NE 5/1/2022 5/7/2022 • "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Virginia Basher ,{aggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Diago Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.John Kammerer Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman ing) 6.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 7.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons ' :ing) 8.Deinse Stamolis Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. !F'Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist _ Contract Administrator Tiffani Barquist MB 5/17/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and . :,ti,, r ; Project Name County Project or Contract# <"iT' ' Prime Contractor Industries Duvall Avenue NE King CAG-20-065 Prevailing Wage Program �- , Subcontractor ! PO Box 44540 "., , `„` Project Address Olympia WA 98504-4540 ",�„ Final Week of (360) 902-5335 Payroll ! Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 4/30/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions H _ Work Classification Name C9 ~O o. Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And d E 4/24 4/25 4/26 4/27 4/28 4/29 4/30 Total Rate Hourly " Earned/Gross Net Wages E Hours of Pay Usual Withholding a) Payroll FICA Other Soc Sec#of Employee Address O> g Hours Worked Each Day Benefits" Tax 1. Power Equipment RG 0.00 9.00 10.00 10.00 9.50 1.50 0.00 40.00 $74.28 $2,971.2 Medicare:$47.32, Operators-Underground 0 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111 4 Shovel,Excavator,Backhoe, OT 0.00 0.00 0.00 0.00 0.00 6.50 0.00 6.50 $724.23 $3,695.43 $19.87, 9501 124th St E 2 / $0.00/hr $605.00 $202.34 Garnishment: $2,032.84 Tractors Under 15 Metric Tons puyallup,WA- $3,695.43 (King) 98373 $148.5 $356.07,Health: * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 $431.99 2. Flaggers ✓ Medicare:$4.50, JourneyLevel RG 0.00 0.00 7.00 0.00 0.00 0.00 0.00 7.00 $44.40 $310.80 Paid Family Virginia Basher (King) 6936 E I st. $310.80/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $310.80 $0.00/hr $23.00 $19.27 $4.16 $259.87 * ** 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Truck Drivers RG 0.00 0.00 3.75 0.00 0.00 0.00 0.00 3.75 $63.7 1$238.91 Medicare:$9.01, Dump Truck Paid Family (King) Eric Ellis $238.91 / Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $621 57 $0.00/hr $41.00 $38.54 $5.43 $527.59 * _ _ ** Algona,WA-98001 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127.4 $0.00 4. Truck Drivers �$1,162.7 Medicare:$22.88 RG 0.00 0.00 5.75 8.00 4.50 0.00 0.00 18.25 $63.71 Dump Truck Ryan Eubanks 1 $1,258.28 (Pierce) 13633 Olympic De. OT 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 $95.57 $95.57 / $0.00/hr $321.00 $163.73 $2,133.21 SE * ** Olalla,WA-98359 $2,640.82 $1274 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 . $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers-Underground RG 0.00 9.00 10.00 10.00 9.50 1.50 0.00 40.00 $52.39 $2,095.6 Medicare:$37.79, Sewer&Water 0 Paid Family General Laborer&Topman Somnang Hean $2,606.44 Medical Leave: Pacific Hwy S(King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 6.50 0.00 6.50 $78.59 $510.84 / $0.00/hr $447.00 $161.60 $19.83 $1,940.22 $2,606.44 98188�' $104.7 '�'� DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 $0.00 6. Laborers-Underground RG 0.00 0.00 0.00 0.00 0.00 5.50 0.00 5.50 $52.39$288.15 Medicare:$34.30, Sewer&Water John Kammerer Paid Family General Laborer&Topman 219 Donna Ave $484.62/ Medical Leave: (King) Bozeman,MT- OT 0.00 0.00 0.00 0.00 0.00 2.50 0.00 2.50 $78.59 $196.48 $2 365 68 $0.00/hr $389.00 $146.67 $18.12 $1,777.59 59718 $104.7 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 $0.00 7. Power Equipment RG 0.00 9.00 7.00 10.00 9.00 2.00 0.00 37.00 $72.28 $2,674.3 Medicare:$49.74, Operators-Underground 6 Paid Family Sewer&Water Jason Metzner $108.4 Medical Leave: Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 6.00 0.00 6.00 $650.52 $3,324.88 $32.55 Tractors Under 15 Metric Tons Tacoma,WA- 2 / $0.00/hr $665.00 $212.65 $2,469.94 98445 $3,429.88 (King) $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65 . $0.00 8. Power Equipment RG 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.50 $72.28 $36.14 Medicare:$43.93, Operators-Underground Paid Family Sewer&Water Jason Sniezak $108.4 Medical Leave: Shovel,Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 7.50 0.00 7.50 2 $813.15 $849.29/ $33.83, Health: Tractors Under 15 Metric Tons Village Ln SE - $3 543 92 $0.00/hr $388.00 $187.82 $514.56 $2,375.78 (King) Yelm,WA-98597 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 **t **9. Flaggers RG 0.00 0.00 7.00 0.00 9.50 0.00 0.00 16.50 $44.40 $732.60 Medicare:$10.62, Journey Level Deinse Stamolis Paid Family Medical Leave: (King) 3909 48th Ave NE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $732.60! $0.00/hr $64.00 $45.42 $9.79 $602.77 t ** Tacoma,WA- $732.60 98422 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 10. Flaggers Medicare:$10.78, JourneyLevel RG 0.00 9.00 7.75 0.00 0.00 0.00 0.00 16.75 $44.4 $743.70 Paid Family Joseph Tountas (King) 20407 30th Ave NE $743.70/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $743.70 $0.00/hr $55.00 $46.11 $7.14 $624.67 ** 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 11. Laborers RG 0.00 10.00 10.00 10.00 9.50 0.50 0.00 40.00 $50.3�$2,012.4 Medicare:$39.58, Traffic Control Supervisor 0 Paid Family P Jesse Williams (King) 245 S 78th St $2,729.37 Medical Leave: Tacoma,WA- OT 0.00 1.00 0.00 1.00 0.00 7.50 0.00 9.50 $75.47 $716.97 / $0.00/hr $477.00 $169.22 $21.10 $2,022.47 98408 $2,729.37 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0 00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 5/4/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 4/24/2022 4/30/2022 "USUAL BENEFITS" DISTRIBUTION(Please report in"per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 2.Virginia Basher • •1 Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) • 3.Eric Ellis Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 5.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 6.John Kammerer Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 7.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 8.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 9.Deinse Stamolis Flaggers $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Journey Level F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) 10.Joseph Tountas Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 11.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side .. , Certified Payroll Report Department of Labor and ,rarf Project Name County Project or Contract# • �;,."F Prime Contractor Industries `"'' _ �:''. i.n Duvall Avenue NE King CAG-20-065 Prevailing Wage Program ,'.: •... `K Subcontractor ❑ PO Box 44540 °, ;'�` 4, Project Address Olympia WA 98504-4540 ` `8Ra a� Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 4/23/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c7 - 9- Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And E 4/17 4/18 4/19 4/20 4/21 4/22 4/23 Total Rate Hourly E i= Hours of Pay Earned/Gross "Usual Withholding Net Wages Soc Sec#of Employee Address O o Hours Worked Each Day Benefits" FICA Other Tax 0 1. Power Equipment RG 0.00 9.50 0.00 10.00 9.00 2.50 0.00 31.00 $74.28 $2,302.6 Medicare:$31.43, Operators-Underground 8 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 Shovel,Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.50 2 $167.13 $2,469.81 $13.88, Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $342.00 $134.40 Garnishment: $1,290.10 (King) 98373 $2,469.81 $356.07, Health: * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $148.5 $0.00 $301.93 2. Flaggers RG 0.00 0.00 9.50 0.00 0.00 0.00 0.00 9.50 $44.40 $421.80 Medicare:$25.58, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $421.80/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,764.21 $0.00/hr $249.00 $109.38 $23.03 $1,357.22 * _ _ ** Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Flaggers Medicare:$6.12, RG 0.00 0.00 0.00 9.50 0.00 0.00 0.00 9.50 $44.40 $421.80 Paid Family Level Virginia Basher (King) 6936 E I st. $421.80/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $421.80 $0.00/hr $37.00 $26.15 $5.63 $346.90 ********* 98404 I DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 4. Truck Drivers $1,783.8 I Medicare:$43.46, RG 0.00 8.00 0.00 8.75 3.50 7.75 0.00 28.00 $63.71 Dump Truck Ryan Eubanks 8 Paid Family (Pierce) 13633 Olympic De. $1,783.88 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $399.00 $185.83 $32.18 $2,336.84 * ** Olalla,WA-98359 $2,997.31 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2'4 $0.00 2 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers RG 0.00 0.00 0.00 5.00 3.75 0.00 0.00 8.75 $63.71 $557.46 Medicare:$24.63, Dump Truck Paid Family (Pierce) Chris Grove Medical Leave: ***Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $557.46/ $0.00/hr $235.00 $105.32 $14.07, $1,148.29 * ** Port Orchard,WA- $1,698.70 Garnishment: 98366 $127.4 $171.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 6. Laborers-Underground RG 0.00 9.50 8.00 10.00 9.00 3.50 0.00 40.00 $52.39 $2,095.6 Medicare:$38.37, Sewer&Water 0 Paid Family Somnang Hean $2,645.73 Medical Leave: General Laborer&Topman ***Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.00 0.00 0.50 0.00 6.50 0.00 7.00 $78.59 $550.13 / $0.00/hr $457.00 $164.04 $20.04 $1,966.28 98188 $2,645.73 '*****'** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4'.7 $0.00 7. Power Equipment RG 0.00 9.50 8.00 10.00 9.00 3.50 0.00 40.00 $72.28 $2,891F2 Medicare:$52.92, Operators-Underground 0��1 I Paid Family rer&Water Jason Metzner �l Medical Leave: vel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.50 0.00 6.50 0.00 7.00 $108 4 $758.94 $3,650.14 $33.81 r ractors Under 15 Metric Tons Tacoma,WA 2 J / $0.00/hr $735.00 $226.31 $2,602.10 Km 98445 $3,650.14 (King) $144 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 fi5. $0.00 8. Flaggers RG 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $44.40 $444.00 Medicare:$13.15, Journey Level Joseph Tountas Paid Family (King) 20407 30th Ave NE $444.00/ Medical Leave: Shoreline,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $906.90 $0.00/hr $75.00 $56.23 $8.51 $754.01 98155 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 9. Laborers RG 0.00 10.00 0.00 10.00 10.00 10.00 0.00 40.00 $50.31 $2,012.4 Medicare:$44.18, Traffic Control Supervisore 0 Paid Family P 245 S 78tha t $2,502.96 Medical Leave: (King) 245 S 78th St Tacoma,WA- OT 0.00 1.00 0.00 2.50 1.00 2.00 0.00 6.50 $75.47 $490.56 / $0.00/hr $553.00 $188.92 $24.19 $2,236.84 * ****** $3,047.13 98408 $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 4/28/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: "'veil Avenue NE 4/17/2022 4/23/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly •(D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 'Yolanda Barry r aggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 5.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) ...Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 7.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Joseph Tountas .-.Uggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. fr' .1riy apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barguist Contract Administrator Tiffani Barquist MB 5/2/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • Certified Payroll Report Department of Labor and Project Name County Project or Contract# '•�c-{ Prime Contractor IZI Industries l .:> -_:I,r-:rl r, Duvall Avenue NE King CAG-20-065 Prevailing Wage Program : ;i - ail;,. Subcontractor ❑ PO Box 44540 Project Address Olympia WA 98504-4540 Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 4/16/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions H Work Classification Name (0 ~O o Sun Mon Tue Wed Thu Fri Sat Total a> Gross Amount and And a� E 4/10 4/11 4/12 4/13 4/14 4/15 4/16 Total Rate Eamed/Gross Hourly Net Wages ` f a Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address o o Hours Worked Each Day Benefits" Tax 0 1. Power Equipment RG 0.00 6.00 10.00 10.00 10.00 4.00 0.00 40.00 $74.28 $2,971.2 Medicare:$45.10, Operators-Underground 0 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 Shovel,Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.50 4.50 0.00 5.00 2 $557.10 $3,528.30 $19.22 Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $568.00 $192.84 Garnishment: $1,929.02 (King) 95373 $3,528.30 $356.07,Health: * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $148.5 $0.00 $418.05 2. Flaggers Medicare:$5.15, RG 0.00 0.00 0.00 0.00 8.00 0.00 0.00 8.00 $44.40 $355.20 Paid Family Level Virginia Basher (King) 6936 E I st. $355.20/ Medical Leave: * ** Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $355.20 $0.00/hr $29.00 $22.02 $4.74 $294.29 98404 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Truck Drivers RG 0.00 7.25 9.25 6.00 6.00 0.00 0.00 28.50 $63.71 $1,815.7 Medicare:$42.41, Dump Truck Ryan Eubanks 4 Paid Family (Pierce) 13633 Olympic De. $2,198.02 Medical Leave: SE OT 0.00 0.00 0.50 0.00 0.00 3.50 0.00 4.00 $95.57 $382.28 / $0.00/hr $383.00 $181.33 $32.52 $2,285.39 Olalla,WA-98359 $2,924.65 $1274 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ' $0.00 4. Laborers-Underground $2,095.6 Medicare:$35.51, RG 0.00 8.00 10.00 9.00 8.00 5.00 0.00 40.00 $52.39 Sewer&Water 0 Paid Family Somnang Hean General Laborer&Topman ****Pacific Hwy S $2,449.26 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 4.50 0.00 4.50 $78.59 $353.66 / $0.00/hr $410.00 $151.85 $18.97 $1,832.93 98188 $2,449.26 **``***** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $104.7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Flaggers RG 0.00 0.00 0.00 0.00 7.50 0.00 0.00 7.50 $44.40 $333.00 Medicare:$4.83, Journey Level Diago Hunter Paid Family (King) 7620 S.Alaska $333.00/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $333.00 $0.00/hr $8.00 $20.65 $4.45 $295.07 98409 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 6. Power Equipment RG 0.00 8.00 10.00 9.00 8.00 5.00 0.00 40.00 $72.28 $2,891.2 Medicare:$47.43, Operators-Underground 0 Paid Family Sewer&Water Jason Metzner Medical Leave: Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 3.50 0.00 3.50 2$108.4 $379.47 $3,270.67 $30.87 Tractors Under 15 Metric Tons Tacoma,WA- / $0.00/hr $626.00 $202.78 $2,363.59 (King) 98445 $3,270.67 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1\644.5 $0.00 7. Laborers****f $1,974.6 Medicare:$44.14, RG 0.00 10.00 10.00 9.25 10.00 0.00 0.00 39.25 $50.31 V Traffic Control Supervisor Jesse Williams J7 Paid Family (King) 245 S 78th St OT 0.00 0.00 2.00 0.00 2.00 0.00 0.00 4.00 $75.47 $301.88 $2,2/6.55 $0.00/hr $552.00 $188.71 $22 Medical Leave: $2,236.13 Tacoma,WA- 98408 $3,043.68 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $120.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 4/22/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting:' For the week ending: Duvall Avenue NE 4/10/2022 4/16/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B)Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F • 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 2.Virginia Basher Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Diego Hunter Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 6.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 7.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions,other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ,(5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 4/22/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and 1,Srpr,, Project Name County Project or Contract# ?... °F Prime Contractor Industries '•1' f. Duvall Avenue NE King CAG-20-065 Prevailing Wage Program 4_;:: Subcontractor ❑ PO Box 44540 �'�..;� "y° Project Address Olympia WA 98504-4540 y� '���ac Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 4/9/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date I Deductions F= Work Classification Name 6 ~o o Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And E 4/3 4/4 4/5 4/6 4/7 4/8 4/9 Total Rate Earned/Gross Hourly Net Wages E i= Hours of Pay "Usual Withholding a) Payroll FICA Other Soc Sec#of Employee Address O o Hours Worked Each Day Benefits" Tax 0 1. Power Equipment RG 0.00 9.50 10.00 0.00 9.50 9.50 0.00 38.50 $74.28 $2'859.j Medicare:$36.28, Operators-Underground 8 Paid Family Sewer&Water V Medical Leave: Jordan Ausbun OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $111.4 $0.00 $2,859.78 Shovel, Excavator,Backhoe, 9501 124th St E 2 $16.44, Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $422.00 $155.13 Garnishment: $1,516.19 (King) 98373 $2,859.78 $356.07, Health: DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168'S $0.00* ** $357.67 2. Truck Drivers Medicare:$28.90, DumpTruck RG 0.00 5.50 8.00 0.00 0.00 0.00 0.00 13.50 $63.71 $860.09 Paid Family Ryan Eubanks (Pierce) 13633 Olympic De. $860.09/ Medical Leave: x SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $1 993.48 $0.00/hr $181.00 $123.60 $25.66 $1,634.32 Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 3. Laborers-Underground $2,095.6 Medicare:$37.79, Sewer&Water RG 0.00 9.50 10.00 8.00 9.50 3.00 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $2,606.44 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 6.50 0.00 6.50 $78.59 $510.84 / $0.00/hr $447.00 $161.60 $19.83 $1,940.22 98188 $2,606.44 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 8'7 $0.00 4. Power Equipment $2,891.2 Medicare:$52.14, Operators-Underground RG 0.00 9.50 10.00 8.00 9.50 3.00 0.00 40.00 $72.28 p g 0 Paid Family SewerJason Metzner &Water 9117 24th Ave E $108.4 $3,595.93 Medical Leave: Shovel,Excavator,Backhoe, Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 6.50 0.00 6.50 2 $704.73 / $0.00/hr $717.00 $222.95 $33.40 $2,570.44 Tractors Under 15 Metric Tons 98445 $3,595.93 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi'S $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment RG 0.00 0.00 0.00 6.00 0.00 0.00 0.00 6.00 $72.28 $433.68 Medicare:$41.84, Operators-Underground Paid Family Sewer&Water Jason Sniezak $108.4 Medical Leave: Shovel, Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $433.68! $31.65,Health: Tractors Under 15 Metric Tons Village Ln SE $3,362.58 $0.00/hr $357.00 $178.91 $477.04 $2,276.14 (King) Yelm,WA-98597 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 4/18/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: r1.7rall Avenue NE 4/3/2022 4/9/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly j (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Cyan Eubanks ck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 3.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 5.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side - - - The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no.rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the.weekly wages.earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned.. ,'-`-'\ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and .ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050.subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist • MB.4/19/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and , ,,r, 4 Prime Contractor ® Project Name County Project or Contract# Industries Prevailing Wage Program _ is,.=�';;u°' Duvall Avenue NE King CAG-20-065 �k m: Subcontractor ❑ PO Box 44540 y Project Address Olympia WA 98504-4540 t� " ` Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 4/2/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c- ~O Sun Mon Tue Wed Thu Fri Sat Total Gross Amount a) E 3/27 3/28 3/29 3/30 3/31 4/1 4/2 Total Rate Hourly and And Earned/Gross WithholdingNet Wages m E i Hours of Pay Net FICA Other Soc Sec#of Employee Address CD o Ce o Hours Worked Each Day Payroll Benefits" Tax a 1. Power Equipment RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $74.28 $2,971.2 Medicare:$54.73, Operators-Underground 0 Paid Family Sewer&Water Jordan Ausbun Medical Leave: OT 0.00 0.00 0.50 1.50 0.00 9.50 0.00 11.50 $111.4 $1,281.3 $4,252.53 $22.01, Shovel, Excavator,Backhoe, 9501 124th St E2 3 Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $748.00 $233.99 Garnishment: $2,359.29 $4,252.53 $356.07,Health: (King) 98373 $148.5 $478.44 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 * `* 6 2. Flaggers RG 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 $44.40 $444.00 Medicare:$26.24, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $444.00/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1 809.56 $0.00/hr $259.00 $112.20 $23.64 $1,388.48 * _ _ ** Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Truck Drivers RG 0.00 0.00 0.00 0.00 8.00 0.00 0.00 8.00 $63.71 $509.68 Medicare:$22.90, Dump Truck Ryan Eubanks Paid Family (Pierce) 13633 Olympic De. $509.68/ Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $1579.08 $0.00/hr $132.00 $97.90 $17.25 $1,309.03 Olalla,WA-98359 $127 4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 4. Laborers-Underground RG 0.00 10.00 10.00 10.00 10.00 0.00 0.00 40.00 $52.39 $2,095.6 Medicare:$43.50, Sewer&Water Somnang Hean 0 Paid Family General Laborer&Topman ****Pacific Hwy S $2,999.39 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.50 1.50 0.00 9.50 0.00 11.50 $78.59 $903.79 / $0.00/hr $542.00 $185.96 $21.96 $2,205.97 98188 $2,999.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 84.7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers-Underground $1,067.0 Medicare:$43.57, Sewer 8 Water RG 0.00 10.00 10.00 0.00 0.00 0.00 0.00 20.00 $53.35 0 Paid Family Shaun McNally Pipe Layer 15010 113th Ave E $1,107.02 Medical Leave: (King) Puyallup,WA- OT 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.50 $80.04 $40.02 / $0.00/hr $632.00 $186.27 $21.21 $2,121.30 98374 $3,004.35 ` DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $10 7 $0.00 6. Power Equipment RG 0.00 10.00 10.00 4.50 10.00 5.50 0.00 40.00 $72.28 $2,891.2 Medicare:$48.99, Operators-Underground 0 Paid Family Sewer&Water Jason Metzner Medical Leave: Shovel, Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.50 0.00 0.00 4.00 0.00 4.50 2 379.09 $31.71 $487.89 $3, / $0.00/hr $653.00 $209.50 $2,435.89 Tractors Under 15 Metric Tons Tacoma,WA- • $1084' (King) 98445 $3,379.09 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $164.5 i;f .0$0.00 7. Truck Drivers RG 0.00 3.50 0.00 0.00 0.00 0.00 0.00 3.50 $63.71 $222.99 Medicare:$10.69, niimp Truck Paid Family I) Thomas Shanahan $222 99/ Medical Leave: 852 Davis Lake Rd. OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $737.71 $0.00/hr $41.00 $45.74 $8.43 $631.85 ••�••*••* Morton,WA-98356 . DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127.4 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side L _Y Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 4/8/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: - ,tll Avenue NE 3/27/2022 4/2/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Jolanda Barry .J 9ers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 5.Shaun McNally Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pipe Layer ig) 6.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 7.Thomas Shanahan Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly,or indirectly from the full wages earned. '(iy apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ding Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist NIB 4/8/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ��. Tyr �� Project Name County Project or Contract# Industries 4•• „ f Prime Contractor Duvall Avenue NE King CAG-20-065 -1.7: Prevailing Wage Program <,,:.,, ii is� PO Box 44540 a ;,: �r< Subcontractor ❑ Project Address Olympia WA 98504-4540 y� 'A d ae Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 3/26/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c7 ~O o Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And a E 3/20 3/21 3/22 3/23 3/24 3/25 3/26 Total Rate Earned/Gross Hourly al E i , Hours of Pay "Usual Withholding Net Wages Soc Sec#of Employee Address cm al o o Hours Worked Each Day Payroll Benefits" FICA Tax Other a 1. Power Equipment RG 0.00 10.00 4.50 10.00 10.00 0.50 0.00 35.00 $74.28 $2,599 8 Medicare:$52.66, Operators-Underground 0 Paid Family Sewer&Water Jordan Ausbun $111.4 $1,281.3 Medical Leave: Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.50 11.00 0.00 11.50 2 / 3 / $3,881.13 $21.79, Tractors Under 15 Metric Tons Puyallup,WA- N/ V / • $0.00/hr $702.00 $225.21 Garnishment: $2,274.61 $4,106.13 $356.07,Health: (King) 98373 $148.5 $473.79 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 *** *** ** 6 2. Power Equipment RG 0.00 0.00 0.00 0.00 0.00 7.50 0.00 7.50 $72.28 $542.10 Medicare:$48.58, Operators-Underground Paid Family Sewer&Water Steven Coon Medical Leave: el, Excavator,Backhoe, 18024 113th St E OT 0.00 0.00 0.00 0.00 0.00 4.00 0.00 4.00 $108.4 2 $433.68 $976.76/ $18.79 ors Under 15 Metric Tons Bonney Lake,WA- . . $3,349.19 $0.00/hr $626.00 $207.69 $2,448.13 (King) 98391 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 3. Truck Drivers RG 0.00 0.00 0.00 0.00 5.00 4.50 0.00 9.50 $63.71 $605.25 Medicare:$34.85, Dump Truck Ryan Eubanks Paid Family (Pierce) 13633 Olympic De. $605.25/ Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $2 403.68 $0.00/hr $269.00 $149.03 $25.04 $1,925.76 Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 4. Truck Drivers Medicare:$25.03, Chris Grove RG 0.00 2.00 0.00 0.00 0.00 0.00 0.00 2.00 $63.71 $127.42 Dump Truck ****Berger Ln _ $127.42/ Paid Family (Pierce) Port Orchard,WA $1,726.62 $0.00/hr $241.00 $107.05 Medical Leave: $1,170.21 98366 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 i 0.00 $95.57 $0.00 $11.94, F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side *lek - - ** Garnishment: DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�7'4 $0.00 $171.39 5. Laborers-Underground RG 0.00 10.00 9.00 10.00 10.00 1.00 0.00 40.00 $52.39 $2,095.6 Medicare:$42.92, Sewer&Water 0 Paid Family Somnang Hean $2,960.09 Medical Leave: General Laborer&Topman *****Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.50 10.50 0.00 11.00 $78.59 $864.49 / $0.00/hr $532.00 $183.53 $21.75 $2,179.89 98188 $2,960.09 * DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184'7 $0.00 6. Power Equipment RG 0.00 0.00 0.00 0.00 0.00 5.50 0.00 5.50 $74.28 $408.54 Medicare:$51.39, Operators-Underground Paid Family Sewer&Water Nathan McAllister Medical Leave: $111.4 Shovel, Excavator,Backhoe, 3201 36th St NW OT 0.00 0.00 0.00 0.00 0.00 6.00 0.00 6.00 2 $668.52 $1,077.06 $32.97 Tractors Under 15 Metric Tons Gig Harbor,WA- $0.00/hr $652.00 $219.71 $2,587.54 (King) 98335 $148.5 $3,543.61 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 mower Equipment RG 0.00 10.00 9.00 10.00 10.00 1.00 0.00 40.00 $72.28 $2,891.2 Medicare:$57.65, Operators-Underground 0 Paid Family Sewer&Water Jason Metzner Medical Leave: Shovel, Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 10.00 0.00 10.00 $108.4 $1,084.2 $3,975.40 $36.32 Tractors Under 15 Metric Tons Tacoma,WA- 2 0 / $0.00/hr $839.00 $246.48 $2,795.95 (King) 98445 $3,975.40 $1645 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ' $0.00 8. Laborers-Underground Medicare:$35.43, Sewer&Water James Polwarth RG 0.00 0.00 0.00 0.00 0.00 7.50 0.00 7.50 $52.39 $392.93 Paid Family General Laborer&Topman 9886 Enterprise LN $667 99/ Medical Leave: (King) NW OT 0.00 0.00 0.00 0.00 0.00 3.50 0.00 3.50 $78.59 $275.07 $2 443.15 $0.00/hr $408.00 $151.47 $18.54 $1,829.71 Silverdale,WA- 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4'7 $0.00 9. Truck Drivers RG 0.00 0.00 0.00 6.50 0.00 0.00 0.00 6.50 $63.71 $414.12 Medicare:$7.10, Dump Truck Paid Family (King) Thomas Shanahan $414.12/ Medical Leave: 852 Davis Lake Rd. OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $489.12 $0.00/hr $16.00 $30.33 $5.89 $429.80 * _ _ ** Morton,WA-98356 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127.4 $0.00 10. Power Equipment RG 0.00 10.00 9.00 10.00 10.00 1.00 0.00 40.00 $72.28 $2,891.2 Medicare:$58.42, Operators-Underground 0 Paid Family Sewer&Water Jason Sniezak Medical Leave: $108.4 $1,138.4 $4,029.61 Shovel, Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 10.50 0.00 10.50 2 1 / $0.00/hr $610.00 $249.84 $36.73 $3,074.62 Tractors Under 15 Metric Tons Village Ln SE (King) Yelm,WA-98597 $4,029.61 $1645 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ' $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 4/4/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: r",fall Avenue NE 3/20/2022 3/26/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual - Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) teven Coon .1,-wer Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 3.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 5.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ,ig) 6.Nathan McAllister Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 7.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons ing) 8.James Polwarth Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Thomas Shanahan Truck Drivers $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Dump Truck F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) 10.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) . F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. is\.Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ping Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 4/5/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side T 'Y Certified Payroll Report Department of Labor and �ef;,s."T"�� Prime Contractor ® Project Name County Project or Contract# Industries ; =ii f. ___, Duvall Avenue NE King CAG-20-065 Prevailing Wage Program z1.,ol, .'=•#1I` Subcontractor ❑ PO Box 44540 ': ii.If a�,„2 Project Address 4'1Olympia WA 98504-4540 ""a ' Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 3/19/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name E7 ~O o Sun Mon Tue Wed Thu Fri Sat Total m Gross Amount and And • a� E 3/13 3/14 3/15 3/16 3/17 3/18 3/19 Total Rate Earned/Gross Hourly Net Wages • r Hours of Pay Payroll Net FICA Withholding Other Soc Sec#of Employee Address m > Benefits" cc O o Hours Worked Each Day 0 1. Power Equipment RG 0.00 0.00 8.00 8.50 8.00 10.00 0.00 34.50 $74.28 $2,562.6 Medicare:$32.52, Operators-Underground 6 Paid Family Sewer&Water Medical Leave: Jordan Ausbun $111.4 Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $2,562.66 $14.73, Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $360.00 $139.01 Garnishment: $1,339.82 (King) 98373 $2,562.66 $356.07, Health: * *� DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi'S $0.00 $320.51 2. Flaggers Medicare:$5.15, RG 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 $44.40 $355.20 Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $355.20/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $355.20 $0.00/hr $11.00 $22.02 $4.74 $312.29 Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0�0 3. Laborers v Medicare:$10.99, RG 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 $50.31 $402.48 / Paid Family Traffic Control Supervisor Steve Cooper v (Pierce) 7610 So Park Ave. $402.48/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $757.68 $0.00/hr $43.00 $46.98 $9.66 $647.05 "`**•*... 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�0.6 $0.00 4. Truck Drivers RG 0.00 0.00 0.00 8.00 8.00 0.00 0.00 16.00 $63.71 $1,019.3 Medicare:$18.34, Dump Truck Ryan Eubanks 6 Paid Family (Pierce) 13633 Olympic De. $1,019.36 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $94.00 $78.39 $14.14 $1,059.49 Olalla,WA-98359 $1,264.36 $12 7.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 2 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers-Underground $1,807.4 Medicare:$26.21, RG 0.00 0.00 8.00 8.50 8.00 10.00 0.00 34.50 $52.39 Sewer&Water 6 Paid Family Somnang Hean General Laborer&Topman *****Pacific Hwy S $1,807.46 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $259.00 $112.06 $14.69 $1,395.50 98188 $1,807.46 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18 7 $0.00 6. Power Equipment RG 0.00 8.00 8.00 8.00 10.00 0.00 0.00 34.00 $72.28 $2,457.5 Medicare:$35.63, Operators-Underground 2 Paid Family Sewer&Water Jason Metzner Medical Leave: Shovel, Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�8.4 $0.00 $2,457.52 $23.76 Tractors Under 15 Metric Tons Tacoma,WA / $0.00/hr $431.00 $152.36 $1,814.77 (King) 98445 $2,457.52 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 fi5. $0.00 * * **** F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 3/25/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: r--t rail Avenue NE 3/13/2022 3/19/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) ;r'olanda Barry r-,aggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Steve Cooper Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 5.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman 41g) 6.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or.will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s).have been paid the full weekly wages earned; and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages_earned by.any.person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. .1ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and fining Council. Falsification of any of the above statements is a violation_of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist • • • 'M B 4/4/22 • • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and <;;r,; ->, Prime Contractor Project Name County Project or Contract# Industries '`` ;;1 Duvall Avenue NE King CAG-20-065 Prevailing Wage Program I-' 'ai�i= Subcontractor ! PO Box 44540 '' �"., ' , Project Address Olympia WA 98504-4540 "'"" Final Week of (360) 902-5335 Payroll ! Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 3/12/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name 6 ~O o Sun Mon Tue Wed Thu Fri Sat Total ar and And E 3/6 3/7 3/8 3/9 3/10 3/11 3/12 Total Rate Gross Amount Earned/Gross Hourly Net Wages `m E i= y Hours of Pa "Usual Withholding m d Payroll FICA Tax Other Soc Sec#of Employee Address g a) 8 Hours Worked Each Day Benefits" O 1. Flaggers RG 0.00 8.00 0.00 0.00 0.00 0.00 0.00 8.00 $44.40 $355.20 Medicare:$5.15, Journey Level Yolanda Barry Paid Family (King) 6906 52nd Street Ct $355 20/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $355.20 $0.00/hr $11.00 $22.02 $4.74 $312.29 _ _ •* Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 2. Flaggers Medicare:$19.31, RG 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00 $44.40 $444.00 Journey Level Steve Cooper Paid Family (King) 7610 So Park Ave. $444.00/ Medical Leave: * ** Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1 332 $0.00/hr $112.00 $82.58 $17.80 $1,100.31 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Truck Drivers $1,051.2 Medicare:$32.44, Dump TruckRG 0.00 7.25 6.50 2.75 0.00 0.00 0.00 16.50 $63.71 2 Paid Family Ryan Eubanks $1,051.22 Medical Leave: (Pierce) 13633 Olympic De. SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $232.00 $138.72 $24.73 $1,809.63 * ** Olalla,WA-98359 $2,237.52 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127.4 $0.00 4. Truck Drivers RG 0.00 3.25 0.00 2.00 0.00 0.00 0.00 5.25 $63.71 $334.48 Medicare:$30.42, Dump Truck Paid Family (Pierce) Chris Grove Medical Leave: ***Berger Ln OT 0.00 1.75 0.00 0.00 0.00 0.00 0.00 1.75 $95.57 $167.25 $501.73/ $0.00/hr $325.00 $130.11 $16.94, $1,424.69 ** Port Orchard,WA- $2,098.55 Garnishment: 98366 $127.4 $171.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment RG 0.00 10.00 8.00 5.50 0.00 0.00 0.00 23.50 $72.28 $1,698.5 Medicare:$61.23, Operators-Underground 8 Paid Family Sewer&Water Travis Haney $108.4 Medical Leave: Shovel,Excavator,Backhoe, ...'169th Ave E OT 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 2 $54.21 $1,752.79 $23.07 Tractors Under 15 Metric Tons Lake Tapps,WA- / $0.00/hr $812.00 $261.82 $3,064.70 (King) 98391 $4,222.82 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $16/.5 $0.00 6. Laborers**Underground v $1 253 7 Medicare:$39.50, Sewer&Water RG 0.00 10.00 8.00 5.50 0.00 0.00 0.00 23.50 $53.35 Somnang Hean 3J 4 Paid Family Pipe Layer Pacific Hwy S $1,293.74 Medical Leave: (King) Des Moines,WA- OT 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 $80.03 $40.02 / $0.00/hr $476.00 ' $168.91 $20.05 $2,019.81 98188 $2,724.27 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $106 7 $0.00 7. Power Equipment RG 0.00 10.00 8.00 5.50 0.00 0.00 0.00 23.50 $72.28 $1,698.5 Medicare:$25.42, Operators-Underground 8 Paid Family Sewer&Water Jason Metzner $108 4' Medical Leave: Shovel,Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.50 2 $54.21 $1,752.79 $16.84 Tractors Under 15 Metric Tons Tacoma,WA- ! $0.00/hr $265.00 $108.68 $1,336.85 (King) 98445 $1,752.79 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65 $0.00 8. Laborers Medicare:$32.09, Traffic Control Supervisor RG 0.00 2.50 8.00 5.50 0.00 0.00 0.00 16.00 $50.31 $804.96 Paid Family P Jesse Williams (King) 245 S 78th St $804.96/ Medical Leave: ** Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $2 213.25 $0.00/hr $353.00 $137.23 $18.00 $1,672.93 98408 $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 3/21/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 3/6/2022 3/12/2022 "USUAL BENEFITS" DISTRIBUTION(Please report in"per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Yolanda Barry Flaggers Joumey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 2.Steve Cooper Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 5.Travis Haney Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons '1 (King) 6.Somnang Hean Laborers-Underground Sewer& Water Pipe Layer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons - (King) 8.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions,other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ,/(5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 3/22/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and a ""a Prime Contractor Project Name County Project or Contract# sfi ,< Industries `,fIt/.r ;'A Duvall Avenue NE King CAG-20-065 Prevailing Wage Program i - eI:,= Subcontractor ! PO Box 44540 ' ?" Project Address Olympia WA 98504-4540 Final Week of (360) 902-5335 Payroll ! Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 3/5/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions F Work Classification Name 6 ~O o Sun Mon Tue Wed Thu Fri Sat Total a> Gross Amount and And a� E 2/27 2/28 3/1 3/2 3/3 3/4 3/5 Total Rate Earned/Gross Hourly Net Wages 3 - w - Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address O 8 Hours Worked Each Day Benefits" Tax 1. Power Equipment RG 0.00 0.00 10.00 8.00 7.50 10.00 0.00 35.50 $7 28 $2 636 Medicare:$36.41, Operators-Underground 4 Paid Family Sewer&Water J Medical Leave: $111.4 Shovel,Excavator,Backhoe, Jordan Ausbun OT 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 2 $222.84 $2 859 78 $16.02, 9501 124th St E Garnishment: Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $424.00 $155.71 $356.07,Health $1,523.19 (King) 98373 $2,859.78 Insurance: DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $16 5 $0.00 $348.38 2. Truck Drivers $1,640.5 Medicare:$27.47, RG 0.00 0.00 3.00 6.75 7.50 8.50 0.00 25.75 $63.71 Dump Truck Ryan Eubanks 3 Paid Family (Pierce) 13633 Olympic De. $1,640.53 Medical Leave: _ SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $170.00 $117.45 $21.09 $1,558.27 * * Olalla,WA-98359 $1,894.28 $174 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 z . $0.00 3. Laborers-Underground RG 0.00 0.00 10.00 8.00 7.50 10.00 0.00 35.50 $52.39 $1,859.8 Medicare:$28.67, Sewer&Water 5 Paid Family Somnang Hean $1,977.73 Medical Leave: General Laborer&Topman ** Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 1.50 0.00 1.50 $78.59 $117.89 / $0.00/hr $296.00 $122.62 $15.77 $1,514.68 98188 $1,977.74 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$.7 $0.00 4. Power Equipment RG 0.00 0.00 10.00 8.00 7.50 10.00 0.00 35.50 $72.28 $2'S65.9 Medicare:$39.56, Operators-Underground Jason Metzner 4 Paid Family Sewer&Water 9117 24th Ave E $108 4 Tacoma,WA- $2,728.57 Medical Leave: Shovel,Excavator,Backhoe, OT 0.00 0.00 0.00 0.00 0.00 1.50 0.00 1.50 2 $162.63 / $0.00/hr $496.00 $169.17 $26.07 $1,997.77 Tractors Under 15 Metric Tons 98445 -- - - --- -$2,728.57 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $16'5 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment RG 0.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00 $72.28 $722.80 Medicare:$27.25, Operators-Underground Paid Family Sewer&Water Jason Sniezak Medical Leave: Shovel,Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $108.4 $0.00 Tractors Under 15 Metric Tons Village Ln SE $722.80/ $0.00/hr $158.00 $116.50 $22.62 $1,554.59 $1,878.96 (King) Yelm,WA-98597 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 6. Laborers RG 0.00 0.00 0.00 10.00 10.00 10.00 0.00 30.00 $50.31 $1,509.3 Medicare:$24.07, Traffic Control Supervisor Jesse Williams 0 $1,660.24 Paid Family Medical Leave: (King) 245 S 78th St OT 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 $75.47 $150.94 / $0.00/hr $226.00 $102.93 $13.63 $1,293.61 Tacoma,WA- 98408 $1,660.24 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0 00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 3/11/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 2/27/2022 3/5/2022 "USUAL BENEFITS" DISTRIBUTION(Please report in"per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) ' 2.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 3.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 5.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 6.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers,laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic: (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist M B 3/14/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • Certified Payroll Report Department of Labor and �,}�+T�. Project Name County Projector Contract# Industries • ,,•0.; "i;'•`. Prime Contractor Z Prevailing Wage Program ;, „<:i i= Duvall Avenue NE King CAG-20-065 w l;;l;, ;i.� Subcontractor ❑ PO Box 44540 ':�y��'` Project Address Olympia WA 98504-4540 Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 2/26/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name w ~O o Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And `" a E 2/20 2/21 2/22 2/23 2/24 2/25 2/26 Total Rate Hourly `m▪ E i= Hours of PayEarned/Gross 'Usual Withholding Net Wages a, Payroll FICA Other Soc Sec#of Employee Address • O o Hours Worked Each Day Benefits" Tax a 1. Power Equipment RG 0.00 0.00 8.50 9.00 8.50 4.00 0.00 30.00 $74.28 $2,228.4 Medicare:$48.81, Operators-Underground 0 Paid Family Sewer&Water Jordan Ausbun $111.4 Medical Leave: Shovel,Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 6.00 0.00 6.00 2 $668.52 $2,896.92 $20.50,Health: Tractors Under 15 Metric Tons Puyallup,WA- / $0.00/hr $630.00 $208.71 $467.56, $2,102.19 (King) 98373 $3,833.84 Garnishment: * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168'5 $0.00 $356.07 2. Truck Drivers RG 0.00 0.00 8.50 8.75 8.50 8.00 0.00 33.75 $63.71 Dump Truck Ryan Eubanks 1 $2,150.2 / Medicare:$35.68, 1 q ./ Paid Family (Pierce) 13633 Olympic De. Medical Leave: OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $2,150.21 $0.00/hr $281.00 $152.57 $27.05 $1,964.54 SE Olalla,WA-98359 $2,460.84 $174 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 � . $0.00 3. Truck Drivers RG 0.00 0.00 0.00 8.50 5.25 0.00 0.00 13.75 $63.71 $876.01 Medicare:$33.39, Dump Truck Chris Grove Paid Family Pierce Medical Leave: (Pierce) '*"Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $876.01 / $0.00/hr $374.00 $142.79 $47.39 $1,705.46 {t Port Orchard,WA- $2,303.03 98366 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 4. Laborers-Underground $1,571.7 Medicare:$39.51, Sewer&Water RG 0.00 0.00 8.50 9.00 8.50 4.00 0.00 30.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $2,043.24 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 6.00 0.00 6.00 $78.59 $471.54 / $0.00/hr $476.00 $168.90 $20.47 $2,019.44 98188 $2,724.32 ..,,,,2,,,_**** $104.7 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment RG 0.00 0.00 8.50 9.00 8.00 4.50 0.00 30.00 $72.28 $2,168.4 Medicare:$53.30, Operators-Underground 0 Paid Family Sewer&Water Jason Metzner Medical Leave: Shovel, Excavator, Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 5.50 0.00 5.50 $1 28'4 $596.31 $2,764.71 $34.11 Tractors Under 15 Metric Tons Tacoma,WA- $0.00/hr $743.00 $227.89 $2,617.33 Kin ) 98445 $3,675.63 ( 9 $1645 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 6. Power Equipment RG 0.00 0.00 8.50 9.00 8.50 10.00 0.00 36.00 $72.28 $2,602.0 Medicare:$37.73, Operators-Underground 8 Paid Family Sewer&Water Jason Sniezak Medical Leave: Shovel, Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $108.4 $0.00 $2,602.08 $25.16 Tractors Under 15 Metric Tons Village Ln SE 2 / $0.00/hr $294.00 $161.33 $2,083.86 (King) Yelm,WA-98597 $2,602.08 $145 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side . Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 3/4/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: "Jaall Avenue NE 2/20/2022 2/26/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Cyan Eubanks truck.Drivers _ Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 3.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 5.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 6.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and lining Council. Falsification of any of the above statements is a violation.of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 3/5/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and s F G Project Name County Project or Contract# Industries ;K ,f Prime Contractor CZ Duvall Avenue NE King CAG-20-065 Prevailing Wage Program y. . ,:;=f) Subcontractor ❑ PO Box 44540 . 411/ Project Address Olympia WA 98504-4540 '"�" ' y Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 2/19/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name C7 ~O o Sun Mon Tue Wed Thu Fri Sat Total m Gross Amount and And a� E 2/13 2/14 2/15 2/16 2/17 2/18 2/19 Total Rate Earned/Gross Hourly Net Wages r Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address 0) Benefits" Tax W O o Hours Worked Each Day a 1. Power Equipment RG 0.00 9.00 10.00 8.00 8.00 5.00 0.00 40.00 $74.28 $2,971.2 Medicare:$46.32, Operators-Underground 0 Paid Family Sewer&Water Jordan Ausbun $111.4 Medical Leave: Shovel,Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 2 $222.84 , / , Tractors Under 15 Metric Tons Puyallup,WA- $0.00/hr $588.00 $198.03 Garnishment: $1,987.68 Garnishment: (King) 98373 $148.5 $3,194.04 $356.07 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 , / $0.00 2. Truck Drivers RG 0.00 7.75 7.00 0.00 0.00 1.75 0.00 16.50 $63.71 $1,05`1.� / Medicare:$40.25, Dump Truck Ryan Eubanks 2 V v Paid Family (Pierce) 13633 Olympic De. $1,051.22 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $351.00 $172.10 $29.64 $2,182.84 * ** Olalla,WA-98359 $2,775.83 $12 7.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 2 3. Truck Drivers RG 0.00 0.00 0.00 0.00 5.25 0.00 0.00 5.25 $63.71 $334.48 Medicare:$34.38, Dump Truck Paid Family (Pierce) Chris Grove Medical Leave: ****Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $334.48/ $0.00/hr $391.00 $146.99 $18.54, $1,608.66 Port Orchard,WA- $2,370.96 Garnishment: 98366 $127.4 $171.39 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 4. Laborers-Underground RG 0.00 9.00 9.50 8.00 8.00 5.50 0.00 40.00 $52.39 $2,095.6 Medicare:$32.09, Sewer&Water 0 Paid Family Somnang Hean General Laborer&Topman Pacific Hwy S $2,213.49 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 1.50 0.00 1.50 $78.59 $117.89 / $0.00/hr $353.00 $137.24 $17.68 $1,673.48 98188 $2,213.49 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment RG 0.00 9.00 9.50 8.00 7.00 0.00 0.00 33.50 $72.28 $2,421.3 Medicare:$35.11, Operators-Underground 8 Paid Family Sewer&Water Jason Metzner Medical Leave: Shovel, Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 2.4 $0.00 $2,421.38 $23.42 Tractors Under 15 Metric Tons Tacoma,WA- / $0.00/hr $423.00 $150.12 $1,789.73 (King) 98445 $144.5 $2,421.38 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 6. Truck Drivers RG 0.00 8.50 6.25 0.00 0.00 0.00 0.00 14.75 $63.71 $939.72 Medicare:$19.85, Dump Truck Paid Family (King) Thomas Shanahan $939.72/ Medical Leave: 852 Davis Lake Rd. OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $1,369.56 $0.00/hr $117.00 $84.91 $16.12 $1,131.68 * _ _ ** Morton,WA-98356 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�7.4 $0.00 7. Power Equipment RG 0.00 9.00 10.00 8.00 0.00 7.00 0.00 34.00 $72.28 $2,457.5 Medicare:$35.63, Operators-Underground 2 Paid Family ,er&Water Jason Sniezak $108.4 Medical Leave: vel, Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $2,457.52 $23.75 Tractors Under 15 Metric Tons Village Ln SE / $0.00/hr $263.00 $152.36 $1,982.78 (King) Yelm,WA-98597 $2,457.52 $14645 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 . $0.00 8. Laborers Medicare:$28.94, RG 0.00 0.00 0.00 0.00 0.00 5.00 0.00 5.00 $50.31 $251.55 Paid Family Control Supervisor Jesse Williams (King) 245 S 78th St $251.55/ Medical Leave: * *# Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $1,995.52 $0.00/hr $301.00 $123.72 $16.30 $1,525.56 98408 $100.6 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side f Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 2/25/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: h ^•.,call Avenue NE • 2/13/2022 2/19/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) �,yan Eubanks ;k Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) • - 3.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 5.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 6.Thomas Shanahan Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 7.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons ing) 8.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: • (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. `.,Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and lining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 3/1/22 • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and s ArF r.. Project Name County Project or Contract# Industries 4eli F Prime Contractor f Duvall Avenue NE King CAG-20-065 Prevailing Wage Program 11::: _ :::,4., Subcontractor ❑ PO Box 44540 °';.,�r .,y Project Address Olympia WA 98504-4540 H` '"aa a� Final Week of (360) 902-5335 Payroll E • Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 2/12/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions P Work Classification Name C9 ~O raw Sun Mon Tue Wed Thu Fri Sat Total Gross Amount and And a� E 2/6 2/7 2/8 2/9 2/10 2/11 2/12 Total Rate Earned/Gross Hourly Net Wages E a Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address 12 O o Hours Worked Each Day Benefits" Tax 0 1. Power Equipment RG 0.00 9.00 9.50 9.50 9.50 2.50 0.00 40.00 $74.28 $2,971.2 Medicare:$54.39, Operators-Underground _ _ 0 Paid Family Sewer&Water Jordan Ausbun Medical Leave: $1114 $3,751.14 Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 7.00 0.00 7.00 2 ' $779.94 / $0.00/hr $741.00 $232.57 $41.84, Tractors Under 15 Metric Tons Puyallup,WA- Garnishment: $2,325.27 (King) 98373 $148.5 $3,751.14 $356.07 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 2. Flaggers RG 0.00 8.00 9.50 0.00 0.00 0.00 0.00 17.50 $44.40 $777.00 Medicare:$22.21, Journey Level Steve Cooper Paid Family(King) 7610 So Park Ave. $777.00/ Medical Leave: �� Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1,531.80 $0.00/hr $136.00 $94.97 $20.45 $1,258.17 IFIt 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Truck Drivers RG 0.00 5.75 5.50 8.25 8.50 0.00 0.00 28.00 $63.71 $1,783.8 Medicare:$41.28, DumpTruckyan 8 Paid Family 13633 Olympics $2,309.52 Medical Leave: (Pierce) De. SE OT 0.00 0.00 0.00 0.00 0.00 5.50 0.00 5.50 $95.57 $525.64 / $0.00/hr $366.00 $176.54 $30.76 $2,232.72 Olalla,WA-98359 $2,847.30 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 27 4 $0.00 4. Flaggers RG 0.00 0.00 9.50 0.00 0.00 0.00 0.00 9.50 $44.40 $421.80 Medicare:$6.12, Journey Level Jeana Hansen _ Paid Family (King) Ave CT E#B $421.80/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $421.80 $0.00/hr $37.00 $26.15 $6.50 $346.03 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers-Underground $2,095.6 Medicare:$36.66, Sewer&Water RG 0.00 9.00 9.50 8.00 9.50 4.00 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman *****Pacific Hwy S $2,527.85 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 5.50 0.00 5.50 $78.59 $432.25 / $0.00/hr $428.00 $156.73 $34.06 $1,872.39 98188 $2,527.84 * '* DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18 7 $0.00 6. Power Equipment RG 0.00 9.00 9.50 8.00 9.50 4.00 0.00 40.00 $72.28 $2,891.2 Medicare:$50.57, Operators-Underground 0 Paid Family Sewer&Water Jason Metzner Medical Leave: $108.4 $3,487.51 Shovel, Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 5.50 0.00 5.50 2 $596.31 / $0.00/hr $683.00 $216.23 $32.55 $2,505.16 Tractors Under 15 Metric Tons Tacoma,WA- (King) 98445 $3,487.51 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $144.5 $0.00 7. Laborers-Underground Medicare:$43.47, RG 0.00 7.00 0.00 0.00 9.50 0.00 0.00 16.50 $52.39 $864.44 Sewer&Water James Polwarth Paid Family feral Laborer&Topman 9886 Enterprise LN $864.44/ Medical Leave: 9) NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $2 997 87 $0.00/hr $541.00 $185.87 $22.60 $2,204.93 Silverdale,WA- 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$'7 _ $0.00 8. Truck Drivers RG 0.00 6.00 6.75 8.75 7.00 0.00 0.00 28.50 $63.71 $1,815.7 Medicare:$39.90, Dump Truck 4 Paid Family (King) Thomas Shanahan $2,389.16 Medical Leave: 852 Davis Lake Rd. OT 0.00 0.00 0.00 0.00 0.00 6.00 0.00 6.00 $95.57 $573.42 / $0.00/hr $364.00 $170.60 $30.72 $2,146.44 * _ _ ** Morton,WA-98356 $2,751.66 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�7'4 $0.00 9. Power Equipment RG 0.00 10.00 9.50 9.50 9.50 1.50 0.00 40.00 $72.28 $2,891.2 Medicare:$58.43, Operators-Underground 0 Paid Family Sewer&Water Jason Sniezak Medical Leave: Shovel,Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 10.50 0.00 10.50 $108.4 $1,138.4 $4,029.61 2 1 / $0.00/hr $610.00 $249.84 $36.74 Tractors Under 15 Metric Tons Village Ln SE $3,074.60 (King) Yelm,WA-98597 $4,029.61 $1* ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 fi5. $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 2/18/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: wall Avenue NE 2/6/2022 2/12/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) -Steve Cooper .: ggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 • $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Somnang Hean Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ,ng) 6.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 7.James Polwarth Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) Thomas Shanahan Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Jason Sniezak Power Equipment Operators- Underground Sewer&Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Shovel,Excavator,Backhoe, Tractors Under 15 Metric Tons F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ;(s)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and fining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 3/1/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side , Certified Payroll Report Department of Labor and , ; Prime Contractor ® Project Name County Project or Contract# Industries is,r4 e..; Duvall Avenue NE King CAG-20-065 Prevailing Wage Program ;;E'' � 4111 Subcontractor El PO Box 44540 ;.y Project Address Olympia WA 98504-4540 Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 2/5/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions I Work Classification Name (-3 ~o o Sun Mon Tue Wed Thu Fri Sat Total a) Gross Amount and And a E 1/30 1/31 2/1 2/2 2/3 2/4 2/5 Total Rate Earned/Gross Hourly Net Wages `m r Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address CD O o Hours Worked Each Day Benefits" Tax 0 1. Power Equipment RG 0.00 7.50 10.00 9.50 4.50 0.00 0.00 31.50 $74.28 $2,339.8 Medicare:$41.44, Operators-Underground 2 Garnishment: Sewer&Water Jordan Ausbun $356.07,Paid Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $111.4 $0.00 $2,339.82/ Family Medical Tractors Under 15 Metric Tons Puyallup,WA- $0.00/hr $508.00 $177.22 Leave:$33.23 $1,742.32 (King) 98373 $148.5 $2,858.28 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 2. Truck Drivers RG 0.00 4.50 6.50 7.75 1.25 0.00 0.00 20.00 $63.71 $1,274.2 Medicare:$39.91, Dump Truck Ryan Eubanks 0 Paid Family(Pierce) 13633 Olympic De. $1,274.20 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $346.00 $170.64 $29.66 $2,166.07 * ****** $2,752.28 Olalla,WA-98359 $127 4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24 $010 3. Power Equipment RG 0.00 0.00 4.50 0.00 0.00 0.00 0.00 4.50 $72.28 $325.26 Medicare:$4.72, Operators-Underground Paid Family Sewer&Water Michael Goodwin J Medical Leave: Shovel, Excavator,Backhoe, 2101 N Meridian OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $325.26! $108.4 $3.14 Tractors Under 15 Metric Tons Puyallup,WA- $325.26 $0.00/hr $25.00 $20.17 $272.23 (King) 98371 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 4. Flaggers RG 0.00 8.00 8.00 8.00 1.00 0.00 0.00 25.00 $44.40 $1,110.0 Medicare:$16.09, Journey Level Jeana Hansen 0 Paid Family (King) Ave CT E#B $1,110.00 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $142.00 $68.82 $17.09 $866.00 * ** 98446 ff $1,110.00 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Laborers-Underground $1,414.5 Medicare:$25.44, RG 0.00 7.00 10.00 9.00 1.00 0.00 0.00 27.00 $52.39 Sewer&Water 3 Paid Family Somnang Hean $1,414.53 Medical Leave: General Laborer&Topman *****Pacific Hwy S (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $247.00 $108.81 $24.45 $1,349.37 98188 $1,755.07 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.7 $0.00 6. Power Equipment RG 0.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 $72.28 $650.52 Medicare:$9.43, Operators-Underground Paid Family Sewer&Water Jason Metzner $108.4 Medical Leave: Shovel, Excavator,Backhoe, 9117 24th Ave E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $650.52/ $6.29 Tractors Under 15 Metric Tons Tacoma,WA- $650.52 $0.00/hr $54.00 $40.33 $540.47 (King) 98445 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 *** ** **** 7. Truck Drivers RG 0.00 6.25 8.00 6.50 1.00 7.75 0.00 29.50 $63.71 $1,879.4 Medicare:$30.88, Dump Truck 5 Paid Family 3) Thomas Shanahan $1,879.45 Medical Leave: 852 Davis Lake Rd. OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $227.00 $132.03 $24.85 $1,714.69 ********* Morton,WA-98356 $2,129.45 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1�7'4 $0.00 8. Power Equipment RG 0.00 7.50 10.00 8.00 2.50 0.00 0.00 28.00 $72.28 $2,023.8 Medicare:$29.35, Operators-Underground 4 Paid Family Sewer&Water Jason Sniezak Medical Leave: $108.4 $2,023.84 $19.57 Shovel, Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 / $0.00/hr $175.00 $125.48 $1,674.44 Tractors Under 15 Metric Tons Village Ln SE (King) Yelm,WA-98597 $2,023.84 $145 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 . $0.00 **** ** F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 2/10/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: wall Avenue NE 1/30/2022 2/5/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) yan Eubanks t ruck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 3.Michael Goodwin Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman $0.00 6.Jason Metzner Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 7.Thomas Shanahan Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) ason Sniezak ,;,uer Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side -7 The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either,directly or indirectly to or on'behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which h are legally permissible, have been made by any person either directly or indirectly from the full wages earned. Nny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and Ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title . Signature Tiffani Barquist Contract Administrator Tiffani Barquist • • MB 2/11/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and , 1:i Project Name County Project or Contract# Industries "'?t"'''.'`, Prime Contractor PrevailingWage Program -` I. Duvall Avenue NE King CAG-20-065 9 9 Subcontractor PO Box 44540 Project Address Olympia WA 98504-4540 y` '"''''�\ Final Week of (360) 902-5335 Payroll ! Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 1/29/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name pnl- 9- Sun Mon Tue Wed Thu Fri Sat Total CC Gross Amount and And a� E 1/23 1/24 1/25 1/26 1/27 1/28 1/29 Total Rate Earned/Gross Hourly Net Wages E H Hours of Pay "Usual Withholding r a) Payroll FICA Other Soc Sec#of Employee Address ix O> S Hours Worked Each Day Benefits" Tax 1. Power Equipment $2,934.0 Medicare:$50.18, Operators-Underground RG 0.00 9.00 8.50 8.50 8.50 5.00 0.00 39.50 $74.28 6 Paid Family Sewer&Water Jordan Ausbun Medical Leave: $111.4 $2,934.06 Shovel,Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $39.08, Tractors Under 15 Metric Tons Puyallup,WA- 2 / $0.00/hr $652.00 $214.54 Garnishment: $2,148.58 (King) 98373 $3,460.45 $356.07 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $16.5 $0.00 2. Flaggers $1,065.6 Medicare:$15.45, Yolanda BarryRG 0.00 0.00 8.00 0.00 8.00 8.00 0.00 24.00 $44.40 Journey Level 0 Paid Family (King) 6906 52nd Street Ct $1,065.60 Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 / $0.00/hr $95.00 $66.07 $20.41 $868.07 •* Puyallup,WA- $1,065.00 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $810 $0.7 3. Power Equipment RG 0.00 0.00 0.00 0.00 8.00 0.00 0.00 8.00 $72.28 $578.24 Medicare:$8.39, Operators-Underground Paid Family Sewer&Water Steven Coon - $108 4 ✓ Medical Leave: Shovel,Excavator,Backhoe, 18024 113th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $578.24/ $6.77 Tractors Under 15 Metric Tons Bonney Lake,WA- - - $578.24 $0.00/hr $36.00 $35.85 $491.23 (King) 98391 $144.5 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 4. Truck Drivers RG 0.00 0.00 0.00 0.00 7.50 0.00 0.00 7.50 $64.55 $484.13 Medicare:$23.64, Dump Truck&Trailer Paid Family (King) Eric Ellis $484.13/ Medical Leave: 705 Celery Ave OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $1 630 $0.00/hr $220.00 $101.10 $21.72 $1,264.20 Algona,WA-98001 . DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $10 1 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers $1,783.8 Medicare:$44.20, RG 0.00 5.00 8.50 8.00 6.50 0.00 0.00 28.00 $63.71 Dump Truck Ryan Eubanks 8 Paid Family (Pierce) 13633 Olympic De. 7 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $1 / 88 $0.00/hr $411.00 $188.99 $32 Medical Leave: 00 $2,371.13 SE * ** Olalla,WA-98359 $3,048.22 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127.4 $0.00 6. Truck Drivers RG 0.00 0.00 0.00 0.00 6.25 0.00 0.00 6.25 $63.71 $398.19 Medicare:$36.90, Dump Truck Paid Family Chris Grove $2 119 25 * Medical Leave: (Pierce) ***Berger Ln OT 0.00 0.00 0.00 0.00 0.00 4.50 0.00 4.50 $95.57 $430.07 / $0.00/hr $432.00 $157.80 $33.74, $1,701.76 ties ** Port Orchard,WA- Garnishment: 98366 $2,545.13 $182.93 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $127 4 $0.00 7. Truck Drivers RG 0.00 6.75 6.00 7.25 0.00 0.00 0.00 20.00 $64.55 $1,291.0 Medicare:$36.90, Dump Truck&Trailer 0 Paid Family (Pierce) Chris Grove $2,119.25 Medical Leave: **Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 / $0.00/hr $432.00 $157.803.74, $1,701.76 * .. Port Orchard,WA- Garnishment: 98366 $2,545.13 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $129.1 $0.00 $182.93 8. Laborers-Underground $2,095.6 Medicare:$33.81, Sewer&Water RG 0.00 9.00 8.00 8.00 8.50 6.50 0.00 40.00 $52.39 0 Paid Family Somnang Hean General Laborer&Topman *Pacific Hwy S $2,331.37 Medical Leave: (King) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 3.00 0.00 3.00 $78.59 $235.77 / $0.00/hr $381.00 $144.55 $31.86 $1,740.15 98188 $2,331.37 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9. Laborers*Underground $10�/4/.7 RG 0.00 0.00 0.00 8.00 0.00 8.00 0.00 16.00 $52.39 $838.24 Medicare:$23.93, Sewer&Water James PolwarthPaid Family General Laborer&Topman 9886 Enterprise LN $838.24/ Medical Leave: (King) NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $1 650 29 $0.00/hr $224.00 $102.32 $13.42 $1,286.62 Silverdale,WA- _ ** 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18 04'7 $0.00 10. Power Equipment RG 0.00 9.00 8.50 8.50 8.50 5.00 0.00 39.50 $72.28 $2,855.0 Medicare:$49.26, Operators-Underground 6 Paid Family Sewer&Water Jason Sniezak Medical Leave: Shovel,Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.50 4.50 0.00 5.00 $108.4 $542.10 $3,397.16 $31.79 Tractors Under 15 Metric Tons Village Ln SE / $0.00/hr $469.00 $210.62 $2,636.49 (King) Yelm,WA-98597 $3,397.16 * ** DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $16'5 $0.00 11. Laborers RG 0.00 5.50 0.00 8.50 0.00 0.00 0.00 14.00 $50.31 $704.34 Medicare:$32.19, Traffic Control Supervisor Jesse Williams Paid Family (King) 245 S 78th St $704.34/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 $2 219 94 $0.00/hr $354.00 $137.64 $31.09 $1,665.02 98408 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 2/4/2022 The party signing this report pays.or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 1/23/2022 1/29/2022 "USUAL BENEFITS" DISTRIBUTION(Please report in"per hour"terms) Work Classification Total Hourly (A)Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F • 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 2.Yolanda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Steven Coon Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Eric Ellis Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 6.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 7.Chris Grove Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 8.Somnang Hean Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 , General Laborer&Topman (King) 9.James Polwarth Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) 11.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract;and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions,other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ,(5)Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and 'Training Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 2/4/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ��ti:�;?"r;;.� Prime Contractor ® Project Name County Project or Contract# Industries =t=y Duvall Avenue NE King CAG-20-065 Prevailing Wage Program 49!!:. :: Subcontractor ❑ PO Box 44540 ';� ,' �y° Project Address Olympia WA 98504-4540 y� ' 3e a� Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 1/22/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c9 ~O o Sun Mon Tue Wed Thu Fri Sat Total GrosscC Amount and And E 1/16 1/17 1/18 1/19 1/20 1/21 1/22 Total RateHourly m` E Hours of Pay Earned/Gross "Usual Withholding Net Wages Soc Sec#of Employee Address m > Payroll Benefits" FICA Tax Other o_ O o Hours Worked Each Day a 1. Power Equipment RG 0.00 8.00 8.50 8.50 9.50 4.50 0.00 39.00 $74.28 $2,896.9 Medicare:$49.19, Operators-Underground 2 Paid Family Sewer&Water Jordan Ausbun Medical Leave: Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $111.4 2 $2,896.92 /$0.00 $38.46, Tractors Under 15 Metric Tons Puyallup,WA- $0.00/hr $636.00 $210.35 Garnishment: $2,102.53 (King) 98373 $3,392.60 $356.07 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 fi'S $0.00 * ** **2. Flaggers RG 0.00 0.00 0.00 0.00 7.00 8.00 0.00 15.00 $44.40 $666.00 Medicare:$9.66, Journey Level Yolonda Barry / Paid Family (King) 6906 52nd Street Ct $666.00/ Medical Leave: E#30 OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $666.00 $0.00/hr $46.00 $41.29 $12.75 $556.30 * _ _ ** Puyallup,WA- 98371 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 3. Truck Drivers Medicare:$25.56, RG 0.00 8.00 6.00 0.00 0.00 0.00 0.00 14.00 $63.71 $891.94 Dump Truck Ryan Eubanks Paid Family (Pierce) 13633 Olympic De. $1,150.14 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $154.00 $109.28 $21.76 $1,452.04 * ** Olalla,WA-98359 $1,762.64 $1274 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ' $0.00 4. Truck Drivers Medicare:$25.56, RG 0.00 0.00 0.00 0.00 0.00 4.00 0.00 4.00 $64.55 $258.20 Dump Truck&Trailer Ryan Eubanks Paid Family (King) 13633 Olympic De. $1,150.14 Medical Leave: SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 / $0.00/hr $154.00 $109.28 $21.76 $1,452.04 * ** Olalla,WA-98359 $1,762.64 $1 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 01 ' $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Truck Drivers RG 0.00 0.00 0.00 6.00 7.50 0.00 0.00 13.50 $63.71 $860.09 Medicare:$31.01, Dump Truck Paid Family Pierce Chris Grove Medical Leave: ( ) $2,051.03 * ***Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 / $0.00/hr $335.00 $132.59 $27.52, $1,429.49 * _ _ ** Port Orchard,WA- $2,138.54 Garnishment: 98366 $127.4 $182.93 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 6. Truck Drivers RG 0.00 8.50 9.20 0.75 0.00 0.00 0.00 18.45 $64.55 $1,190.9 Medicare:$31.01, Dump Truck&Trailer 5 Paid Family Chris Grove Medical Leave: (Pierce) ****Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $2,051.03 $27 52 / $0.00/hr $335.00 $132.59 $1,429.49 * _ _ ** Port Orchard,WA- $2,138.54 Garnishment: 98366 $129.1 $182.93 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 $0.00 7. Flaggers Medicare:$19.31, RG 0.00 0.00 0.00 8.50 0.00 0.00 0.00 8.50 $44.40 $377.40 Paid Family Level Jeana Hansen 1g) Ave CT E#B $377.40/ Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $66.60 $0.00 $1 332.00 $0.00/hr $190.00 $82.58 $20.08 $1,020.03 * ** 98446 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $88.80 $0.00 8. Laborers-Underground RG 0.00 8.00 8.50 8.50 9.50 5.50 0.00 40.00 $52.39 $2,095.6 Medicare:$33.23, Sewer&Water James Polwarth 0 Paid Family General Laborer&Topman 9886 Enterprise LN $2,292.08 Medical Leave: (King) NW OT 0.00 0.00 0.00 0.00 0.00 2.50 0.00 2.50 $78.59 $196.48 / $0.00/hr $372.00 $142.11 $18.12 $1,726.62 Silverdale,WA- $2,292.08 .,,,,2,._*,,,,,, 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4.7 $0.00 9. Power Equipment RG 0.00 8.00 8.50 8.50 9.50 5.50 0.00 40.00 $72.28 $2,891.2 Medicare:$45.85, Operators-Underground 0 Paid Family Sewer&Water Jason Sniezak Medical Leave: $108.4 $3,162.25 $30.04 Shovel, Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 2.50 0.00 2.50 2 $271.05 / $0.00/hr $418.00 $196.06, 196.06 $2,472.30 Tractors Under 15 Metric Tons Village Ln SE (King) Yelm,WA-98597 $144.5 $3,162.25 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 10. Laborers RG 0.00 0.00 9.50 8.50 9.50 8.50 0.00 36.00 $50.31 $1,811.11 Medicare:$26.26, - ffic Control Supervisor 6 V 11 Paid Family p Jesse Williams -1g) 245 S 78th St $1,811.16 Medical Leave: Tacoma,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.47 $0.00 / $0.00/hr $259.00 $112.29 $25.84 $1,387.77 ********* 98408 $1,811.16 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $100.6 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 1/28/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: • ;Nall Avenue NE 1/16/2022 1/22/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F)Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) Yolonda Barry Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.Ryan Eubanks Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 4.Ryan Eubanks Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 5.Chris Grove Truck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) Chris Grove Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 7.Jeana Hansen Flaggers Journey Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 8.James Polwarth Laborers-Underground Sewer& Water eneral Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 9.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 10.Jesse Williams Laborers Traffic Control Supervisor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. (.51 Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and `ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 2/1/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and . Project Name County Project or Contract# Industries 1 Prime Contractor =: .r Duvall Avenue NE King CAG-20-065 Prevailing Wage Program =. ;,y Subcontractor El PO Box 44540 Project Address Olympia WA 98504-4540 , °' Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 1/15/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name C7 H GI Sun Mon Tue Wed Thu Fri Sat Total cc O a Gross Amount and And E 1/9 1/10 1/11 1/12 1/13 1/14 1/15 Total Rate Earned/Gross Hourly Net Wages E Hours of Pay "Usual FICA Withholding Other Soc Sec#of Employee Address O o Hours Worked Each Day Payroll Benefits" Tax a 1. Power Equipment RG 0.00 5.50 7.50 8.00 4.00 8.50 0.00 33.50 $74.28 $2,488.3 Medicare:$37.53, Operators-Underground 8 Paid Family Sewer&Water Jordan Ausbun Medical Leave: 4 $2 38 ,488. Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $111. $0.00 $30.18, Tractors Under 15 Metric Tons Puyallup,WA- 2 / $0.00/hr $443.00 $160.47 Garnishment: $1,561.13 (King) 98373 $148.5 $2,588.38 $356.07 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00J $0.00 2. Truck Drivers RG 0.00 0.00 0.00 5.50 0.00 6.50 0.00 12.00 $63.71 $764.52 Medicare:$20.48, Dump Truck Ryan Eubanks Paid Family Medical Leave: (Pierce) 13633 Olympic De. $764.52/ SE OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $95.57 $0.00 $1,412.02 $0.00/hr $24.00 $87.54 $18.30 $1,261.70 ** Olalla,WA-98359 $127.4 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 j $01 3. Truck Drivers RG 0.00 0.00 0.00 6.25 0.00 7.25 0.00 13.50 $64.55 $871.43 Medicare:$22.06, Dump Truck&Trailer / Paid Family (Pierce) Chris Grove �/ Medical Leave: ***"Berger Ln OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $96.82 $0.00 $871.43/ $0.00/hr $196.00 $94.32 $23.20, $1,002.84 Port Orchard,WA- $1,521.35 Garnishment: 98366 $129.1 $182.93 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 $0.00 4. Laborers-Underground RG 0.00 5.50 7.50 8.00 0.00 8.00 0.00 29.00 $52.39 $1,519.3 Medicare:$22.39, Sewer&Water James Polwarth 1 Paid Family General Laborer&Topman 9886 Enterprise LN $1,519.31 Medical Leave: (King) NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 / $0.00/hr $201.00 $95.75 $12.79 $1,212.38 Silverdale,WA- $1,544.31 _ _ •• 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1$4.7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side 5. Power Equipment RG 0.00 0.00 6.00 8.00 0.00 8.00 0.00 22.00 $70.07 $1,541.5 Medicare:$24.07, Operators-Underground 4 Paid Family Sewer&Water Jason Sniezak Medical Leave: $105.1 Shovel, Excavator,Backhoe, 16448 Cougar OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54 0 $0.00 $1,541. $16.49 Tractors Under 15 Metric Tons Village Ln SE • / $0.00/hr $132.00 $102.93 $1,384.67 (Pierce) Yelm,WA-98597 $1,660.16 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1401 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side • Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 1/24/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: rvall Avenue NE 1/9/2022 1/15/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour"terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator, Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) !Ryan Eubanks '{,uck Drivers Dump Truck $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) 3.Chris Grove Truck Drivers Dump Truck&Trailer $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Pierce) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Sid( 4.James Polwarth Laborers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) 5.Jason Sniezak Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons I (Pierce) • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Sid( The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s)have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. ' Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and 'lining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 1/25/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and ��i,5TATi F4 Project Name County Project or Contract# Industries Prime Contractor IZ _' Duvall Avenue NE King CAG-20-065 Prevailing Wage Program t...,. •";::_ _ y.,�,,:. +!i' Subcontractor ❑ PO Box 44540 4,:::: ,y Project Address Olympia WA 98504-4540 y� '""°a� Final Week of (360)902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 1/8/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions p Work Classification Name c7 0 o Sun Mon Tue Wed Thu Fri Sat Total a� Gross Amount and And E 1/2 1/3 1/4 1/5 1/6 1/7 1/8 Total Rate Hourly Earned/Gross Net Wages r m Hours of Pay Payroll "Usual FICA Withholding Other Soc Sec#of Employee Address cc O o Hours Worked Each Day Benefits" Tax (n �// J 1. Power Equipment RG 0.00 5.50 0.00 3.00 0.00 0.00 0.00 8.50 $74.28 $631.38 Medicare:$21.14, Operators-Underground Paid Family $111.4 / Sewer&Water Jordan Ausbun \. Medical Leave: Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $631.38/ $0.00/hr $182.00 $90.40 $17.63, $790.70 Tractors Under 15 Metric Tons Puyallup,WA- • $1,457.94 Garnishment: (King) 98373 $148.5 $356.07 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 $0.00 2. Laborers-Underground RG 0.00 5.50 0.00 4.50 0.00 0.00 0.00 10.00 $52.39 $523.90 Medicare:$13.64, Sewer&Water James Polwarth Paid Family General Laborer&Topman 9886 Enterprise LN $523.90/ Medical Leave: (King) NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $940.63 $0.00/hr $79.00 $58.31 $8.09 $781.59 Silverdale,WA- ..*2,_***. 98383 DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $184'7 $0.00 I F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 1/14/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: lTh vall Avenue NE 1/2/2022 1/8/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) ames Polwarth ___orers-Underground Sewer& Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 General Laborer&Topman (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly.wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned: ' ny apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and lning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution,sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 1/1.9/22 • F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and I+r, Project Name County Project or Contract# ,\I ftlt Prime Contractor CZ Industries t' z.r� PrevailingWage Program br'� ,{", Duvall Avenue NE King CAG-20-065 9 g '. " 1- Subcontractor ❑ PO Box 44540 '' Project Address Olympia WA 98504-4540 Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 1/1/2022 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions Work Classification Name o Sun Mon Tue Wed Thu Fri Sat Total cC 2- a.) 12/2 12/2 12/2 12/2 12/3 12/3 Gross Amount and And °' E 6 7 8 9 0 1 1/1 Total Rate Earned/Gross Hourly Net Wages a r a Hours of Pay Payroll "Usual FICA Wit h lding Other Soc Sec#of Employee Address 0 a) a Benefits" w O 'o Hours Worked Each Day a 1. Power Equipment Medicare:$8.62, RG 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 $74.28 $594.24 Operators-Underground Garnishment: Sewer&Water Jordan Ausbun $111.4 $254.15, Paid Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 $0.00 $594.24/ $0.00/hr $37.00 $36.84Family Medical Tractors Under 15 Metric Tons Puyallup,WA- $594.24 Leave:$6.30 $251.33 Kin 98373 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168/5 $0.00 2. Laborers-Underground RG 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 $52.39 $419.12 Paid Family Sewer&Water J Medical Leave: Somnang Hean r^�eral Laborer&Topman ***Pacific Hwy S $419.12/ $5.28, Medicare: 9) Des Moines,WA- OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $419.12 $0.00/hr $17.00 $25.99 $6.08 $364.77 98188 $104.7 * '* DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 $0.00 3. Laborers-Underground Medicare:$6.08, RG 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 $52.39 $419.12 Sewer&Water James Polwarth Paid Family General Laborer&Topman 9886 Enterprise LN $419.12/ Medical Leave: (King) NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $419.12 $0.00/hr $17.00 $25.99 $2.85 $367.20 Silverdale,WA- 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $104.7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 1/4/2022 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: van Avenue NE 12/26/2021 1/1/2022 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E) Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F • 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel, Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) • Somnang Hean borers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) 3.James Polwarth Laborers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans,funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. !�> Any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ning Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 1/19/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Certified Payroll Report Department of Labor and �,� ss�rf Project Name County Project or Contract# ,_ i}°�'•'s.i 4 Prime Contractor IX Industries r Duvall Avenue NE King CAG 20 065 a :: Prevailing Wage Program <,i3;t, ,y':ii Subcontractor ❑ PO Box 44540 t-:::_ way Project Address Olympia WA 98504-4540 y` '""" Final Week of (360) 902-5335 Payroll ❑ Awarding Agency Name Phone Company Name Phone For the week ending: RENTON,CITY OF (425)430-7303 REED TRUCKING&EXCAVATING INC (253)841-4837 Month Day Year Awarding Agency Address Address City State Zip+4 12/25/2021 1055 S GRADY WAY RENTON,WA-98055 2207 Inter Ave. PUYALLUP WA 98372 Day and Date Deductions o Sun Mon Tue Wed Thu Fri Sat Work Classification Name c7 Total cc 2 N 12/1 12/2 12/2 12/2 12/2 12/2 12/2 Gross Amount E Total Rate Hourly and And E 9 0 1 2 3 4 5 Hours of Pay Earned/Gross Usual FICA Withholding Other Net Wages Soc Sec#of Employee Address a) a a Payroll Benefits" Tax O a Hours Worked Each Day 1. Power Equipment RG 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 $74.28 $594.24 Medicare:$28.58, Operators-Underground Garnishment: Sewer&Water Jordan Ausbun ✓ $356.07, Paid Shovel, Excavator,Backhoe, 9501 124th St E OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1 21.4 $0.00 $594.24/ $0.00/hr $300.00 $122.19 Family Medical $1,152.54 Tractors Under 15 Metric Tons Puyallup,WA- $1,970.80 Leave:$11.42 Kin 98373 (King) DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $168/5 $0.00 2. Laborers*-Underground RG 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 $52.39 $419.12 Medicare:$14.87, Sewer&Water James Polwarth / Paid Family ^^eral Laborer&Topman 9886 Enterprise LN $419.12/ Medical Leave: g) NW OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.59 $0.00 $1,025.74 $0.00/hr $91.00 $63.60 $8.35 $847.92 Silverdale,WA- _ _ `• 98383- DT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18 04'7 $0.00 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side Affirmation Department of Labor and Industries Prevailing Wage Program PO Box 44540 Olympia WA 98504-4540 Today's Printed name of party signing this report Title Date Tiffani Barquist Contract Administrator 12/31/2021 The party signing this report pays or (Name of contractor or subcontractor) supervises the payment of the persons REED TRUCKING&EXCAVATING INC employed by: Project Name: For the week starting: For the week ending: Duvall Avenue NE 12/19/2021 12/25/2021 "USUAL BENEFITS" DISTRIBUTION (Please report in "per hour" terms) Work Classification Total Hourly (A) Hourly (B) Hourly (C) Hourly (D) Hourly (E)Approved (F) Other "Usual Pension Medical Vacation Holiday Apprentice Benefits Benefits" Program (A+B+C+D+E+F 1.Jordan Ausbun Power Equipment Operators- Underground Sewer&Water Shovel,Excavator,Backhoe, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tractors Under 15 Metric Tons (King) James Polwarth borers-Underground Sewer& Water General Laborer&Topman $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (King) F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side The party signing below AFFIRMS the following: (1)All information contained in this Certified Payroll Report, including any addenda, is correct and complete. (2)The wage rates for workers, laborers or mechanics as reported above are not less than the applicable wage rates contained in any wage determination related to the contract; and the classifications as reported above for each worker, laborer or mechanic conform with the actual work performed by such worker, laborer or mechanic. (3)The payments of usual benefits as listed above have been or will be made to appropriate approved plans, funds or programs for the benefit of such employees. (4)All persons employed on the above-referenced project(s) have been paid the full weekly wages earned, and no rebates have been or will be made either directly or indirectly to or on behalf of the above-named contractor or subcontractor from the weekly wages earned by any person. No deductions, other than those which are legally permissible, have been made by any person either directly or indirectly from the full wages earned. >�any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with the Washington State Apprenticeship and ining Council. Falsification of any of the above statements is a violation of RCW 39.12.050 subject to prosecution, sanctions, and penalties. Printed name of party signing this report Title Signature Tiffani Barquist Contract Administrator Tiffani Barquist MB 1/19/22 F700-065-000 certified payroll report 05-09 Employee Benefits Distribution and Signature Certification on Reverse Side